GEO-NRG Project. Adrovicz Áron Soós S zabolcs Vető Benjamin. The blocks of flats. It was built in 1973 It was a normal blockhouse 256 flat 1000 people It was heated by normal central heating but it had very great loss of heat 25.320 GJ/year. The first steps. 2007-7446 GJ/year - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: GEO-NRG Project

GEO-NRGGEO-NRGProjectProject

Adrovicz ÁronAdrovicz ÁronSoós SzabolcsSoós SzabolcsVető BenjaminVető Benjamin

Page 2: GEO-NRG Project

The blocks of flatsThe blocks of flats• It was built in 1973• It was a normal

blockhouse• 256 flat• 1000 people• It was heated by

normal central heating but it had very great loss of heat

• 25.320 GJ/year

Page 3: GEO-NRG Project

The first stepsThe first steps• 1998-block of flats has

own cenral heating• 25.320 GJ/year -

25%=18.996 GJ• 45 Celsius• In 2000 they started 8

project • 2007-7446 GJ/year• 120 million Ft invested • They couldn’t save

money becouse the prices have grown by time

• „Főtáv” conferancia

Page 4: GEO-NRG Project

GEO-NRGGEO-NRG• They begin to plan in 2008• 2009.06.01 heating is started to work• First time just warm water• 2009. october heating• No airconditionar • 60-70 Celsius• -15% heat loss• 2010-6097 GJ/year• It cost’s160 million Ft• They begin to put Fenkor radiators into the flats

Page 5: GEO-NRG Project

How does it work?How does it work?

Page 6: GEO-NRG Project
Page 7: GEO-NRG Project

Chateau d’Yquem

Disneyland in Tokyo La Defense

El Corte Ingles

Page 8: GEO-NRG Project

Kreml

Telenor

Vatican

Page 9: GEO-NRG Project