GEO-NRG Project. Adrovicz Áron Soós S zabolcs Vető Benjamin. The blocks of flats. It was built in 1973 It was a normal blockhouse 256 flat 1000 people It was heated by normal central heating but it had very great loss of heat 25.320 GJ/year. The first steps. 2007-7446 GJ/year - PowerPoint PPT PresentationTRANSCRIPT
GEO-NRGGEO-NRGProjectProject
Adrovicz ÁronAdrovicz ÁronSoós SzabolcsSoós SzabolcsVető BenjaminVető Benjamin
The blocks of flatsThe blocks of flats• It was built in 1973• It was a normal
blockhouse• 256 flat• 1000 people• It was heated by
normal central heating but it had very great loss of heat
• 25.320 GJ/year
The first stepsThe first steps• 1998-block of flats has
own cenral heating• 25.320 GJ/year -
25%=18.996 GJ• 45 Celsius• In 2000 they started 8
project • 2007-7446 GJ/year• 120 million Ft invested • They couldn’t save
money becouse the prices have grown by time
• „Főtáv” conferancia
GEO-NRGGEO-NRG• They begin to plan in 2008• 2009.06.01 heating is started to work• First time just warm water• 2009. october heating• No airconditionar • 60-70 Celsius• -15% heat loss• 2010-6097 GJ/year• It cost’s160 million Ft• They begin to put Fenkor radiators into the flats
How does it work?How does it work?
Chateau d’Yquem
Disneyland in Tokyo La Defense
El Corte Ingles
Kreml
Telenor
Vatican