EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 1
Ghidulde stabilire si aplicare a BAT
in procedura de autorizare
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 2
Structurare
• Introducere• Terminologie• Obligaţii ale procedurii de autorizare• Stabilirea BAT cu BREF / Utilizarea unui BREF• Utilizarea BAT în procedura de autorizare /
decizia de autorizare conform IPPCExemple de masuri conform anexei IV din Directiva IPPCExemple de procese de evaluare cuprinzand toate mediileExemple: legatura dintre Directiva IPPC şi directivele LCP, VOC şi Seveso-II
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 3
Introducere
Directiva IPPC 96/61/ECScopul:Prevenirea si reducerea integrata a poluarii mediului la anumite activitati industriale si agricole pentru a atinge un nivel ridicat de protectie pentru mediu in ansambluAutorizatiile pentru aceste activitati sunt necesare cu cerinte si valori limita de emisie
BAT-Reference Documents (BREF)Schimb de informatii despre cele mai bune tehnici disponibile, ce trebuie luate in considerare la stabilirea valorilor limita de emisieArmonizarea standardelor in Comunitate
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 4
Directive UE importante pentru protectia mediului• 76/464/EEC
„Evacuarea anumitor substanţe periculoase în apele de suprafata a Comunitatii“
• 80/68/EEC „Protejarea apei freatice de poluarea datorata anumitor substanţe periculoase“
• 82/501/EEC„Pericole în cazul accidentelor grave la anumite instalaţii industriale (Seveso-I)“
• 96/61/EC“Directiva referitoare la prevenirea si reducerea integrata a poluarii mediului (directiva-IPPC)”
• 96/82/EC “Limitarea pericolelor în cazul accidentelor grave cu substanţe periculoase (Seveso-II)”
• 1999/13/EC “Limitarea emiterii compusilor organici volatili la utilizarea solventilor organici în anumite instalaţii (directiva-VOC)”
• 2001/80/EC „Limitarea emiterii anumitor substanţe rezultate din instalatiile mari de ardere (directiva-LCP)“
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 5
Terminologie
„Cele mai bune tehnici disponibile“ (Directiva IPPC, Articolul 2, alin. 11)Stadiul de dezvoltare eficient si evoluat al activitatilor si metodelor de functionare,
a caror adecvare este dovedita in practica
„Tehnici“
„disponibile“
„cele mai bune“
„integrate“
„abordare integrata“ (Directiva IPPC, Articolul 7)Procedura de autorizare complet coordonata, pentru care se determina cel mai
bun proces pentru un amplasament concret pentru o anumita activitate
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 6
Sarcinile in procedura de autorizare - Solicitantul -
Prezentarea documentelor de solicitare, in care se recunosc si se evalueaza
• tehnicile de proces utilizate si
• fluxurile masice rezultate din acestea
Felul si complexitatea acestor documente sunt reglementate de obicei de catre legislatorul national, stand la baza cerintele articolului 6 din Directiva IPPC.
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 7
Sarcinile in procedura de autorizare - autoritatile -
Asigurarea, ca nu se exploateaza nici o instalatie IPPC, fara autorizatie integrata
ca vor fi utilizat doar procedee si metode de exploatare conform stadiului tehnicii (cele mai bune tehnici disponibile BAT)
Scopul:
Mediul per ansamblu sa fie poluat pe cat de putin posibil
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 8
Metoda de stabilire a BAT
Informatiile despre procedeele si metodele de exploatare care se regasesc intr-o bransa, trebuie sa fie cunoscute
Comparatii sub aspectul minimizarii influentei asupra mediului
Anexa IV a Directivei IPPC numeste criteriile relevante
Abordare pentru evaluare si apreciere :- calitativ (de obicei prea superficial)- semi- cantitativ (la o baza de date suficienta duce la un rezultat realist)- cantitati (iluzoriu, efortul este putin probabil pentru o strangere completa a
datelor)
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 9
Schema de verificarein primul rand: verificare specifica bransei
• Determinarea debitelor de Input / Output (cantitate absoluta) • Compararea debitelor de Input / Output din diferitele procedee si metode de exploatare • Evaluarea consumului de resurse inclusiv de energie (Input) al diferitelor procedee si
metode de exploatare • Evaluarea emisiilor (aer evacuat, apa reziduala, deseuri, caldura cedata, zgomot) in
influentele lor daunatoare in cadrul diferitelor procedee si metode de utilizare pe baza anumitor criterii ponderate ( de ex. Protectia muncii, serviciul sanitar, diminuarea bioxidului de carbon, potentialul de distrugere al stratului de ozon, acumularile biologice, acidifierea apei si a pamantului, protectia apei si a apei freatice, relevanta apei potabile, ….)
• Prezentarea rezultatului specific bransei
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 10
Schema de verificareapoi: verificarea aspectelor locale
• Determinarea situatiei, in principal: - utilizarea zonei (industrie, zona rezidentiala, agricultură, ...) - calitatea teritoriului (apă, pământ, aer, natură, ...) - particularitatile teritoriului (protecţia naturii/zona de protecţie a apei, zona de recreere...)
• Siguranţa şi asigurarea impotriva accidentelor, asistenţă în caz de avarii • Alegerea amplasamentului, alternative în privinţa amplasamentului • Criterii economice:
- pentru operator (preţurile tehnologiei instalatiei) - pentru regiune (locuri de muncă, exploatarea infrastructurii existente, personal calificat, ...) • Evaluarea posibilelor efecte ecologice:
complexitatea si gravitatea, probabilitatea, durata, frecvenţa, reversibilitatea, ... • Evaluarea posibilelor efecte economice • Prezentarea rezultatului verificarii locale
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 11
Schemă de verificareapoi: evaluare sintetizata
- Verificarea - Evaluarea - Aprecierea
Rezultatele verificarii specifice bransei si locale
ofera
Rezultatul final
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 12
Verificari pentru completare
Pentru evaluarea finala trebuie ca intreg rezultatul sa fie verificat in final pentru a se obser va daca rezulta efecte asupra conventieiinternationale, de ex.:
Protectia Marii Nordului si a Marii Baltice (OSPAR-COM, HEL-COM)
Protectia Rinului (IKSR)
Protectia Elbei (IKSE)
...
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 13
Structura unui BREF (1)
Inaintea capitolelor individuale se afla „Rezumatul“, „Prefata“ si „Domeniul de aplicare“
Capitolul 1 „Informatii generale“ si Capitolul 2 „Procese si tehnici aplicate“informatii generale pentru branse si procedeele industriale aplicate in bransa.
Capitolul 3 „Valori uzuale ale emisiei si consumului“Valorile de consum si emisie in instalatiile existente
Capitolul 4 „Tehnicile ce trebuie luate in considerare la determinarea BAT“Descrierea proceselor de reducere a emisiilor si a altor metode, considerate a fi cele mai
importante pentru determinarea BAT in general si la stabilirea conditiilor din autorizatie bazate pe BAT; suplimentar: valorile consumului si ale emisiilor
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 14
Structura unui BREF (2)Inaintea capitolelor individuale se afla „Rezumatul“, „Prefata“ si „Domeniul de
Procesele cu valorile respective pentru emisie si consum, care corespund in general cerintelor catre cele mai bune tehnici disponibile si servesc ca valori de referinta
Capitolul 6 „Tehnicile aflate in dezvoltare “tehnicile noi, aflate inca in dezvoltare, care pot fi in viitor probabil BAT
Capitolul 7 „Concluziile si recomandarile “Sinteza celor mai importante concluzii si recomandari, numirea domeniilor in care lipsesc
informatii si in care sunt necesare alte cercetari
La final se gaseste Glosarul cu explicatiile prescurtarilor utilizate si alte Anexe.
aplicare“Capitoltul 5 „Cele mai bune tehnici disponibile (BAT)“
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 15
Utilizarea unui BREF
Diagrama desfasurariicontine prezentarea fluxului de substanta si tehnica concreta aprocedeului si productiei
Ansamlul fluxurilor masicePrezentarea partii referitoare la substantele de intrare cu materiile prime si secundare inclusiv utilizarea energiei
partii referitoare la produs cu emisiile aferente
Comparatia cu informatiile corespunzatoaer din BREFs
Vorbehandlung• Bleichen mit Wasserstoffperoxid • Mercerisieren im Natronlaugebad • Waschen
Färberei• Reaktivfarbstoff semikontinuierlich
aufbringen • Auswaschen
Druckerei• Drucken • durch Dämpfen fixieren • Auswaschen
Ausrüstung• Weichmacher aufbringen • Trocknen
Produkt
1. Textilveredlungsbetrieb mit bestimmten, definierten
Verfahrensschritten
2.2 Energie
2.3 Wasser
2.4 Chemikalien/Hilfsmittel
Mengen [t/a]: - Farbstoffe und Pigmente:........ ... - organische
- Jährl. Verbrauch [m3/a]:……………….- eigene Brunnen/Versorgung [%]:……...
- Öl [t/a]:…………………………… - Kohle [t/a]:………..... ............ .........
Gas
3.5 Abwasser
3.4 Abfall
3.3 Abgas
Quellen und Mengen [t/a] von SO2, NOx, org.C, andere: - ..... ...... ............ ............. ...... ............ ......... - ..... ...... ............ ............. ...... ............ .........
Art und Mengen [t/a]: - .. ............. ...... ............ ... - .. ............. ...... ............ ... - .. ............. ...... ............ ...
2.1 Textilsubstrate 3.1 Produkte
- Bezugsjahr: - Alter des Standorts [a]: - Anzahl Beschäftigte: - Jahresumsatz [€/a]: - Arbeitstage [d/a]: - kürzeste Entfernung zur
N hb h f [ ]
Arten und Mengen [t/a]: - Co:…… - PES:……... - Co/PES:… - PA:………. - Wo....….. - CV.... ......... - PUR........ - PAN........ ... - ..... ............ ...... ...... ... - ..... ............ ...... ...... ...
Art und Menge [t/a]: - ...... ...... ............ ...- ...... ...... ............ ...-
Allg. Informationen
3.2 Abwärme
in [kWh/a]: - Abgas:…………- Abwasser:……..- weitere:………..
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 16
Schema desfasurarii procedurii de autorizare
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 17
Decizia de autorizare conform IPPC (1)
BazaEvaluarea finala sintetizata in baza verificarii specifice bransei si considerarea aspectelor locale si a aprecierii reciproce
DocumentareaProcesul de apreciere trebuie sa fie verificabil, pentru a putea verifica ce date si aprecieri au condus la evaluarea finala
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 18
Decizia de autorizare conform IPPC (2)
CoordonareaEvaluarea si aprecierea aspectelor, induse de alte autoritati, cetatenti, institutii (chiar si in cadrul implicarii publicului)
Emiterea autorizatieiDecizia de autorizare contine limitari ale emisiilor si alte conditii si clauze, in special planuri etapizate de reabilitare cu termene pentru realizarea BAT
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 19
Continutul deciziei de autorizare
Partea I : Felul şi volumul autorizaţiei Enumerarea principalelor componente de instalatie cu informaţii privind capacitatea maximă admisibilă de producţie şi alte date despre instalaţie/părţi de instalaţie inclusiv limitarile in timp Partea a-II-a: Valori limită de emisii, Cerinţe-BAT Stabilirea emisiilor permise pentru substantele ce polueaza aerul Stabilirea emisiilor permise într-o apă sau în canalizarea publică Reglementări privind deşeurile Stabilirea tipului şi a cantităţii deşeurilor cu caile de Îndepărtare controlata şi obligaţiile de argumentare, -diminuare şi prevenire Stabilirea limitei admisibile de poluare fonică Reglementări privind depozitarea şi manevrarea substanţelor periculoase/sau care pot periclita apa Stabilirea măsurilor de protecţie tehnice şi organizatorice (d. ex. dispozitive de captare, pastrarea apei pentru stingerea incendiilor, protectia în caz de inundaţii, protectia impotriva incendiului)
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 20
Partea a-3-a: Monitorizarea • Stabilirea felului şi a frecventei monitorizarii de catre autoritate pentru toate emisiile relevante • Monitorizare proprie:
Stabilirea felului si a frecventei masurilor de control si monitorizare interna pentru documentarea conform autorizatiei si pentru detectarea si recunoasterea din timp a defectiunilor
• Anuntarea si obligatia informarii in cazul defectiunilor Partea a-4-a: Obligatiile intreprinderii
• Informarea autoritatilor in privinta emisiilor la perioade definite de timp si evaluarea rezultatelor propriei monitorizari (rapoarte despre mediu)
Partea a-5-a:Reglementari privind inbunatatiri ulterioare ale situatiei mediului inconjurator
• Planurile cronologice si de reabilitare pentru atingerea BAT • Alte masuri, de exemplu introducerea sistemelor de management pentru protectia mediului formarea reprezentantilor intreprinderii
Partea a-6-a: Argumentare
• Prezentatrea bazei legislative • Prezentarea bazei de specialitate (considerarea , evaluarea si cantarirea tuturor aspectelor relevante)
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 21
Exemplureferitor la masurile desfasurate conform Anexei IV din Directiva IPPC
Producerea de placi conductoare (1): Situatia initiala Productia existenta a placilor conductoare trebuie sa se dubleze prin capacitate prin intermediul unei
constructii noi (7.100 m2/saptamana)
Alocarea ariei: zona lucrativa, constructii de locuinte invecinate direct (problematica de zgomot
deosebita)
Constructie noua in aria de protectie a apelor (cerinte deosebite pentru manipularea si depozitarea
substantelor ce pericliteaza apa)
Procesele relevante pentru mediu: taiere, ingaurire, presarea straturilor multiple, metalizarea
peretelului ingaurit, frezare chimica, imprimare, stratul de lipitura, stratul de nichel/aur, cositorie cu
aer fierbinte, cositorie chimica, acoperirea cu un strat de protectie organic, prelucrarea mecanica
finala
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 22
Exemplureferitor la masurile desfasurate conform Anexei IV din Directiva IPPC
Productia de placi conductoare (2): Efectele asupra mediuluiAerul
• Pulberi (fibre de sticla, rasini epoxidice), • Solventi, NOx, CO din incinerarea aerului uzat, • NH3 si NOx din aerul uzat acidifiat si alcalin
Deseurile
• Deseuri metalice • Deseuri din plastic/ mixtura metal/plastic • Masa de filtrare • Namoluri precipitate cu continut de metale grele • Namoluri din materiale rezistente (cu continut de plastic)
Apa uzata
• Cantitatea de apa uzata = 260 m3/d poluata cu TOC, AOX, Cr, Ni, Cu, Sn, Zn d) Zgomotul
• Ventilatoare si suflante in instalatiile de productie si epurare a aerului uzat • Livrarea pe /trimiterea de pe amplasament (trafic, in spec. vehicule de tonaj) • Parcarea (in special noaptea, la rotirea schimbului)
Apa subterana/Solul
• Instalatiile de depozitare pentru substantele periculoase/ ce pericliteaza apa, conductele... • Prin emisiile din aer • Instalatiile pentru apa uzata
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 23
Exemplureferitor la masurile desfasurate conform Anexei IV din Directiva IPPC
Industria de finisare textila
La intreprinderea descrisa in exemplu se fabrica mai intai tesut din viscoza si in final se vopseste si se
finiseaza, Procesul de productie se imparte in trei etape esentiale:
a) Pretratatea
Reducerea cantitatii de substante organice in apa uzata, re-utilizarea agentilor de incleiere (vezi
cap. 6 criteriile 3, 9 si 10)
b) Vopsirea
Reducerea poluarii apei uzate prin substante greu degradabile, manipularea economica cu
chimicale (vezi capitolul 6, criteriile 5 si 9)
c) Finisarea
Determinarea prin calcul a emisiilor de aer, prevenirea in mod orientat a emisiilor provenite din
substantele introduse (vezi capitolul 6, criteriile 2, 6 si 9)
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 24
Exemplureferitor la masurile desfasurate conform Anexei IV din Directiva IPPC
Industria chimica (1): Situatia initiala
Amplasament cu diferite cladiri pentru productieproduse diferite
fiecare cladire are cate un depozit cu rezervoare pentru materiile prime fluidealimentarea cu energie, abur, apa are loc central
Problemain caz de incendii sau avarii trebuie sa se impiedice ca substantele
periculoase / ce pericliteaza apa sa ajunga necontrolat in apele de suprafata, panza freatica, sol sau instalatiile de tratare a apei uzate
datorita cantitatilor mari de apa uzata si din racirea directa, si bazinele mari se umplu intr-un timp scurt
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 25
Exemplureferitor la masurile desfasurate conform Anexei IV din Directiva IPPC
Industria chimica (2): imbunatatiri realizate (Anexa IV cifra 11)
Impartirea amplasamentului in sectoare aproape de aceeasi marime
Amenajarea mai multor bazine, ce pot fi umplute separat din diferitele sectoare
Montajul siberelor de blocare corespunzatoare
Rezervoarele sunt protejate prin cuve de captare, care pot captacontinutul celui mai mare recipient si 10% din intreg volumul
Elaborarea planului de aparare impotriva pericolelor si exercitii periodice cu personalul si echipa de interventie
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 26
Exemplupentru procese de apreciere
Industria hartiei (1)Ce masuri de reducere a emisiilor sunt cele mai avantajoase pentru ape?
Starea de faptUn rau mic cu un debit mediu de curgere de 2 m³/sec
Deversarea apei uzate poluate organic: 57 litri/sec
Deversarea apei de racire poluata termic: 400 litri/sec
Pestii mor in zilele foarte calduroase ca urmare a lipsei de oxigen
AlternativeReducerea cantitatii de caldura cedata in apa de racire
Reducerea cantitatii deversate de substante organice ce distrug oxigenul
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 27
Imbunatatirile desfasurateInstalarea unei instalatii de absorptie cu racire pentru reducerea cantitatii de caldura cu avantajul imbunatatirii productiei (temperatura constanta a masei de aplicare)
Utilizarae apei reci de izvor in bazinul de retentie a apei de stingere a incendiilor pentru racirea apei inconjuratoare in cazul de pasirii temperaturii limita
Imbunatatirea in apa inconjuratoare: modificarea digurilor, indepartarea pragurilor, umbrirea prin plante si tufisuri
Optimizarea instalatiei de epurare a apei uzate in doua trepte
Cu toate acestea, cerintele pentru deversarea caldurii nu au putut fi respectate
Reglementari in decizia de autorizareVa fi permisa o cantitate de caldura mai mare, insa doar intr-o cantitate prin care este exclusa cu mult moartea pestilor
Limitare exigenta a cantitatii de TOC din instalatia de epurare a apei uzate
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 28
Exemplupentru procesele de apreciere
Industria pieliiCum trebuie tratata apa uzata cu continut de crom provenita din tabacarii?
Starea de faptTabacaria cu saruri de crom III nu poate fi inlocuita cu alte procese nelimitat
AlternativePrecipitarea cromului intr-o apa puternic poluata organic, intr-o instalatie de tratare separata, costisitoare
Apar cantitati mari de slam cu continut de crom, ce trebuie indepartat sub forma de deseuri
Co-tratarea apei uzate intr-o instalatie de epurare existenta comunala
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 29
Conflictul din apreciereCantitati mari de namol de precipitare cu continut de crom, drept deseuri, fata de o crestere usoara a cantitatii de crom in namolul comunal de epurare si emisii reduse de crom ina apa inconjuratoareSolutia conflictuluiCo-tratarea apei uzate din tabacarie in instalatia de epurare comunala va fi acceptata ca BAT
Emisiile de crom mai ridicate in apa inconjuratoare si Poluarea ridicata a namolului comunal
Vor fi evaluate ca si compatibile cu mediu, fata de
Cantitati mari de deseuri, Consumul resurselor pentru agenti de precipitare si energieCosturi mari de transport si depozitare permanenta
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 30
Exemplupentru procesele de apreciere
Epurarea gazului de ardereReabilitarea unei instalatii ce nu mai corespunde stadiului tehnicii
Starea de faptO instalatie ce functioneaza de 20 de ani cu pacura grea trebuie sa se conformeze la noile cerinte BAT dpdv al valorilor limita de emisie
Masuri de reabilitare probabile• Montarea unei instalatii de epurare a aerului uzat cu filtru textil in vederea reducerii emisiilor de
pulberi si tratarea gazului neepurat cu hidroxid de calciu pentru reducerea componentelor acide
(SO2, NOx) in gazul evacuat.
• Trecerea la utilizarea pacurii usoare, cu continut redus de sulf cu montajul unui arzator special
pentru reducerea de NOx si modernizarea rezervoarelor existente pentru pacura grea.
• Demolarea instalatiei de ardere existenta si construirea unei noi instalatii cu ardere pe gaz natural
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 31
Aspecte de apreciat in balanta
• Instalatia existenta are un timp de functionare ramas prognosticat de aproximativ 15 ani
• Masurile de prevenire a emisiilor au prioritate in fata masurilor de reducere
• Considerarea costurilor de reabilitare
Solutionarea conflictuluiPlan etapizat de reabilitare
Exploatarea in continuare a instalatiei in forma de astazi maxim 5 ani
Dupa 2 ani prezentarea unei solicitari capabile a fi autorizate pentru trecerea pe pacura usoara sau gaz natural
Perioada de constructie resp. perioada de modernizare ca. 3 ani
Pentru o perioada de tranzitie se va autoriza functionarea neconforma cu BAT: dupa reabilitate se vor obtine emisii foarte reduse
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 32
Exemple de legaturi / intersectariale Directivelor IPPC, LCP, COV si Seveso II
IPPC(Cifra anexei 1) LCP VOC Seveso
1.1 instalaţie de ardere > 50 MW începând cu 50 MW parţialNH3- denitrurare
1.2 rafinării da da da
1.4 gazificare şi lichefiere a cărbunelui da da
2.6 tratarea suprafeţelor de metale şi material plastic > 30m3 da (degresare) da (crom, cianură)
3.1–3.5 industria de prelucrare a mineralelor Aici instalaţii de ardere/cuptoare începand cu 50 MW
4.1-4.6 industria chimică adesea centrala energetică proprie> 50 MW
adesea, mai ales instalaţiile 4.1 adesea
5.2 instalaţii de incinerare a deşeurilor menajere începând cu 50 MW parţialNH3-denitrurare
6.1, 6.2 fabricarea hârtiei şi a celulozeiînnobilarea textilelor
adesea centrală energetică proprie > 50 MW
6.7 tratarea suprafeţelor cu solventi organici da (nivel mai ridicat decât IPPC)
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 33
ExempluTranspunerea Directivei IPPC si a Directivelor COV, LCP si Seveso II
Transpunerea BAT la instalatii mari de ardere considerand Directiva LCP
Cazan 1 cabune 90 MW cazan 2 carbune 40 MWcazan 3 pacura S 58 MW
Cerintele pentru instalatia din exemplu
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 34
Parametrumg/m³
13. BImSchV Directiva LCP BAT
Pulberi 50 100 (50)* 10 - 20
NOX als NO2 800 600 (400)* 200 - 300
SO2 2000 2000 (850)* 200 - 300
Grad de desulfurare (SEG) 85%
CO 250 < 30
Parametermg/m³
13. BImSchV
Directiva LCP BAT
Staub 50 50 (50)* 10 - 20
NOX als NO2 450 450 (400)* 200 - 300
SO2 1700 1700 (850)* 200 - 300
CO 175 30 - 50
* Ins conf. articolului 4 alin 2 Directiva LCP
* Instalatiile noi conf. articolul 4 alin 2 Directiva LCP
Cerintele catre instalatiile de ardere pe carbune
Cerintele catre instalatiile de ardere pe pacura grea
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 35
Plan etapizat de reabilitare
Pasul 1.Premisa pentru introducerea măsurilor de retehnologizare cu un scop precis este cunoaşterea emisiilor, astfel încât să poatăexista posibilitatea măsurării continue a parametrilor pulberi O2, CO, SO2 şi Nox
Pasul 2.Desprăfuire: ciclonul va fi înlocuit cu electrofiltrul valoare limită respectata de125 mg/m³ (cazan 1) Limitarea timpului de funcţionare anuală la 700 de ore (cazan 2) Limitatrea funcţionării anuale la 1000 de ore şi limitarea capacităţii termice la 35 MW (cazanul 3)Pasul 3.Retehnologizarea noilor reactoare, recondiţionarea morii de cărbuni pentru a putea menţine valoarea limită NOX de 650mg/m3 (cazan 1) de aceea nu se impun retehnologizări la cazanele 2 şi 3 pentru doi respectiv trei ani.Pasul 4.Verificarea dacă este posibilă legătura la electrofiltrul cazanului 1 negativ (cazanul 2)Ameninţarea cu scoaterea din funcţiune dacă timp de doi ani nu se poate menţine valoarea limită a pulberilor (cazan 2)Verificarea dacă se poate face transformarea pe păcură usoara (cazan 3), nu, se impune montarea de noi arzatoare cu NOxredusPasul 5.Scoaterea din funcţiune (cazan 2)Construirea unui cazan cu o putere termică de 28 MW, cogenerare, ardere păcură usoaraPasul 6.Trecerea în cazul arderii suport se va face de la păcură grea la păcură usoara (cazan1)
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 36
ExempluTranspunerea Directivei IPPC si a Directivelor COV, LCP si Seveso II
Transpunerea BAT considerand Directiva COV: instalatia de acoperire cu adeeziv
Instalatia de fabricare a benzii de „Krepp“• dizolvarea cauciucului intr-un amestec de benzin/etanol• omogenizarea / amestecarea• aplicarea masei pe suport de hartie
Bilantul solventilor:INPUT / Continutul sistemului OUTPUT/ pierderi (masurate !!!)
Benzina (in sistemul procesului) 12.000 t Deseuri 20 t
Etanol (in sistemul procesului) 400 t Produs 50 t
Suma 1 12.400 t Apa uzata 10 t
Cumparare in 2002 ( = consume) Aer uzat (captat) 20 t
Benzin 240 t
Etanol 380 t Suma 100 t
Suma 2 620 tSuma 1+2 13.020 t
Diferenta dintre (620 t –100 t) = 520 t Emisiile fugitive
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 37
benzină
Separator
Separatorcu apă
Cărbune activ - Adsorbţie - desorbţie
StratificareUscare
amestecaerdizolvarerezervor
etanol
cauciuc
(granulat)
etanol
Aer evacuat
Abur fierbinte apă
benzină
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 38
ExempluTranspunerea Directivei IPPC si a Directivelor COV, LCP si Seveso II
Transpunerea BAT considerand Directiva Seveso-II: Instalatia de galvanizare
Instalatia de fabricare a armaturilor de bucatarie si baiTratarea prin degresare si decapare cu etape de clatire
Cromatare (Cr VI: foarte toxic, >5000kg), la final clatire
Alte etape de galvanizare si clatire
IPPC - BATApa / apa uzata (optimizarea tehnicii de clatire, respectarea valorilor limita de emisie)Deseurile (Mono-precipitarea metalica, reducerea namolurilor de precipitare)
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 39
Cromatare Spalare
spalator
Controlul aerului uzat
produs
Asigurarea recipientelor:• acces: stingere de urgenta• monitorizarea scurgerii
ExhaustareMonitorizareatemperaturii din baie cu doi senzori
produs
degresare spalare decapare spalare Alte etape de galvanizare
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 40
ExempluTranspunerea Directivei IPPC si a Directivelor COV, LCP si Seveso II
Transpunerea BAT considerand Directiva Seveso-II
Cerintele pentru protectia mediului – protectia muncii
Stoff
Einstufung Gefahrstoff MAK-Wert TA-Luft-Wert
Stickoxide (NOx) brandfördernd „O“ ätzend „C“
TRGS 900 5 mg / m3 350 mg / m3
Schwefelsäure (SOx)
ätzend „C“ TRGS 900 1 mg / m3 350 mg / m3
Aerosole mit NaOH
ätzend „C“ TRGS 900 2 mg / m3 nicht begrenzt
Chrom(VI)- Verbindungen
giftig „T“, umwelt-gefährlich „N“
TRGS 900 0,1 mg / m3 0,05 mg / m3
substanta clasificare Subst. periculoasa valoare Valoarea TA Luft
Oxizi de azot
Acid sulfuric
Aerosoli cu
Compusi de crom (VI)
Intretine ardereacausticcaustic
caustic
toxicPericulos pentru mediu N
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 41
IPPC
LCP
Seveso II
COV
Masurile organizatorice:• raport de securitate• plan de alarmare
• valori limita concrete
• contigente SO2, NOX pro stat membru
• Valori limita concrete ca cerinte minime pentru anumite activitati
• Reglementeaza instalatiile ce intra sub pragul IPPC
EU-Twinning Project RO2004/IB/EN-09“Implementation and Enforcement of the Environmental Acquis
at National Level and Coordination of 8 Regional Twinning Projects”
Dr. Georg Lutz, Ansgar DrostSTE s; District Office LörrachCluj-Napoca, 29 – 30 May 2006
Component 4: “Operational Duties, Integrated Permitting Procedure”Activity 4.3/4.4: “Establishment of an Integrated Permitting Procedure, Definition of BAT”Mission 41-3: Workshop – Presentation of the “Manual on Application of BREFs” 42
RezumatDirectiva IPPC
Directiva cea mai importanta referindu-se la instalatii/amplsament pentru activitati relevante pentru mediu, industrialeMai intai se considera aspectele bransei si aspectele locale BAT
Directova LCPfara cerinte suplimentare in afara IPPClimiteaza emisiile pentru für SO2 si NOX in fiecare stat membru
Directiva COVfara cerinte suplimentare peste cele IPPCcerinte pentru instalatii mai mici sub valorile de prag ale Directivei IPPCinfluenta indirecta asupra compozitiei subtantelor
Directiva Seveso-IIstadiul tehnicii de siguranta se gaseste si in BAT (anexa IV, cifra 2, 10, 11)punctul principal sunt aspectele organizatorice de siguranta (rapoarte de siguranta, planuri de alarmare …)