GMC Projects Summaries
!
!
!"#$%&"'"()*++$,"-))./01%&/1")2/3%"4)56)7)58)!/%")9&'""&4):;"'(""14)<1$&"()=$1#(/>?)):@AB)A2:)C/>DE1F)!"#$%&"'"()$1)9,/&GE1(4)H/?)9C)A65555)
"!#$%&'()!*+",!
GMC PROJECTS
Nautilus Minerals
2012 - Present
Location: Papa New Guinea Water Depth: 1500 meters
Designed and fabricated the 1900m, 12” riser system using the GMC mechanical connector and developed and engineered the topside handling equipment and tooling for this new-build mining vessel.
Total –
Moho Nord
2012 - Present
Location: Congo Water Depth: 850 meters
Provided engineering, project management, fabrication support, tooling, and mechanical connectors to assemble 24” tendons for the Congo-based TLP.
SBM (Shell)
Stones
2013
Location: GOM Water Depth: 2900 meters
Designed, engineered and fabricated the FPSO latch assembly for Shell Stones FPSO project as a subcontractor to SBM. The latch was built in Houston, USA and transported to Singapore for integration into the FPSO.
NPCC –
Umlulu Field Development
2013
Location: Persian Gulf Water Depth: 22 meters (72.18 feet)
Installation analysis of 4km of 10” flexible pipe offshore UAE. The line was initiated via a DMA and terminated through a J-tube pull-in in 22m of water. The initiation end was then pulled up through a J-tube as well.
! !!!!!!!!!!!!!!!!!!!!! -./!0121%(3!4)&5($%6!78229)1(6!
) ) IE#")6)/+)AA)!
!
"++!0&:;<9%()!=>(:8(!?!@(931:;A!@-*!B-4A!CD!?!E(FG!!HII!J+K!""L!MI,!+N*+!
JJJ?#>,(""DJE&"'?,/>)
"!#$%&'()!*+",!
OPI –
Shell FYIP
2011 - 2013
Location: Nigeria Water Depth: 13.72 meters (45 feet)
Installation analysis, procedure drawings, and design of all installation aids for a series of 8”, an 18”, and 24” pipelines offshore Nigeria. The maximum (lowest astronomical tide) LAT for the field was approximately 45 feet.
Afren –
OKORO
2012
Location: Nigeria Water Depth: 15 meters (49.21 feet)
The full design of two replacement pipelines connecting a wellhead platform in 15m of water to an FPSO offshore Nigeria. Design included PLET’s, flexible riser global analysis, rigid risers, installation analysis, installation aids, procedure development, and offshore support.
NRG/HESS – Tubular Bells
2012
Location: Gulf of Mexico Water Depth: 4600 feet (1,402.08 meters)
Detailed design for the Tubular Bells DC-09 manifold and suction pile foundation in 4600 feet of water. The manifold is a dual header production manifold, 4-slot/8-hub, complete with valves, hubs, pressure caps and controls-related equipment.
MRTS –
Bonenkovo-Ukhta Gas Mainline System
2012
Location: Russia Water Depth: 14 meters (45.93 feet)
Over the side tie-in installation analysis for a 48” pipeline in a water depth of 14m.
! !!!!!!!!!!!!!!!!!!!!! -./!0121%(3!4)&5($%6!78229)1(6!
) ) IE#")K)/+)AA)!
!
"++!0&:;<9%()!=>(:8(!?!@(931:;A!@-*!B-4A!CD!?!E(FG!!HII!J+K!""L!MI,!+N*+!
JJJ?#>,(""DJE&"'?,/>)
"!#$%&'()!*+",!
NPCC –
Zirku Field Development
2012
Location: Persian Gulf Water Depth: 18 meters (59.05 feet)
Installation analysis of 4.6km of 12” flexible pipe offshore UAE. The line was initiated via a beach pull and terminated through a J-tube pull-in in 18m of water.
BPZ ENERGY –
CX-15
2012
Location: Peru Water Depth: 67.06 meters (220 feet)
Installation analysis of approximately 5km of one 8”, one 6”, and two 4” pipelines in approximately 220 feet of water. The lines went from a buoyant tower to an FPSO.
BPZ ENERGY –
CX-15
2012
Location: Peru Water Depth: 67.056 meters (220 feet)
Detailed design of one 8”, one 6”, and two 4” flexible risers which are to connect a buoyant tower to rigid pipelines on the seabed.
OPI –
Afren WFB/EBOK
2011
Location: Nigeria Water Depth: 42.67 meters (140 feet)
Scope of Work: Installation analysis, installation aid design, and procedure development for one jacket, one topside, two 8” lines, one 6” line, one 4” pipeline, and one umbilical. The average water depth in the field was 140 feet.
! !!!!!!!!!!!!!!!!!!!!! -./!0121%(3!4)&5($%6!78229)1(6!
) ) IE#")8)/+)AA)!
!
"++!0&:;<9%()!=>(:8(!?!@(931:;A!@-*!B-4A!CD!?!E(FG!!HII!J+K!""L!MI,!+N*+!
JJJ?#>,(""DJE&"'?,/>)
"!#$%&'()!*+",!
MRTS –
Sakhalin III
2011
Location: Russia Water Depth: Shoreline - 76.20 meters (250 feet)
Installation analysis, installation aid design, and offshore field support for 29km of a 20” export line, 29km of 4” MEG line, 29km of umbilical, and 14km of 10” flowlines. There were 3 ILT’s installed, as well as a PLET for the 20” pipeline. All lines were centrally connected to a manifold.
TECHNIP –
HYSY 201
2011
Location: South East Asia Water Depth: 1500 meters (4,921.26 feet)
22” Pipeline installation criteria development, wet pipelay evaluation, wet buckle contingency analysis, and procedure development for the installation vessel HYSY201.
COOEC –
HYSY 201
2011
Location: China Water Depth: 1000 meters – 3000 meters (3, 280.84 feet – 9, 842.52 feet)
Deepwater pipeline procedure development for COOEC. A full set of general deep water, 1000 meters to 3000 meters, installation procedures were developed.
Petrobras –
Cascade Chinook
2009 - Present
Location: Gulf of Mexico Water Depth: 2,500 meters (8,202.10 feet)
GMC provided senior consultancy services to manage the integration and commissioning of the subsea infrastructure and FPSO tie-ins. Work executed in Houston and Singapore, where the vessel was built and dockside commissioned.
Cascade Chinook is the first project in the GOM, to be developed with an FPSO.
! !!!!!!!!!!!!!!!!!!!!! -./!0121%(3!4)&5($%6!78229)1(6!
) ) IE#")5)/+)AA)!
!
"++!0&:;<9%()!=>(:8(!?!@(931:;A!@-*!B-4A!CD!?!E(FG!!HII!J+K!""L!MI,!+N*+!
JJJ?#>,(""DJE&"'?,/>)
"!#$%&'()!*+",!
ExxonMobil –
Arkutun Dagi Testing Platform
2011
Location: Houston Water Depth: N/A
Design of pig receivers, work platforms, and handling systems. Fabrication and delivery of piping spools and handling system.
Designed two 20” pig receivers, drying spool, associated work platforms, and flange handling system. Fabrication of the receiver manifold, discharge piping, and handling equipment. The systems are integrated, modular and designed to minimize support vessel requirements.
Stat Marine / Statoil –
SRP Offshore / Landfall 42” Crude Oil Pipeline
2011
Location: Bahamas SRP Crude Terminal Water Depth: 100 meters max. (328.08 feet)
Perform offshore pipeline lateral stability analysis and create pipeline alignment sheet and trench profile. Work also includes the pipeline thermal expansion analysis for the onshore portion of the proposed 42” pipeline to optimize the onshore pipeline system. GMC also completed pipeline stability analysis, pipeline free span analysis and pipeline alignment drawing and details.
In the original design, a massive size of anchor block was designed to restraint the pipeline to prevent the pipeline displacement from pushing the manifold. Detailed screening studies of the pipeline thermal expansion was performed to identify all different options and solutions recommended according to the analysis results. GMC’s solution eliminated the anchor block and used a universal tied expansion joint to reduce stresses on the manifold.
Pacific Energy –
Elly-Eureka
2010
Location: Long Beach, California Water Depth: 200 - 700 meters
(656.17 – 2,296.59 feet)
Engineering & Project Management for pipeline replacement project.
- Integral part of customer’s PMT in support of MMS permit application process
- Developed alternatives for pipeline routing - Provided alternate installation scenarios
including budgets and schedules - Engineered procedures
! !!!!!!!!!!!!!!!!!!!!! -./!0121%(3!4)&5($%6!78229)1(6!
) ) IE#")L)/+)AA)!
!
"++!0&:;<9%()!=>(:8(!?!@(931:;A!@-*!B-4A!CD!?!E(FG!!HII!J+K!""L!MI,!+N*+!
JJJ?#>,(""DJE&"'?,/>)
"!#$%&'()!*+",!
Water Delivery Alliance –
Botany Bay Crossing
2008 - 2009
Location: East Coast of Australia Water Depth: 8 meters (26.25 feet)
Provide consulting during the construction and operation of the purpose built lay barge Nebula. GMC Barge Superintendents supervised offshore operations.
Nebula successfully converted in Lumut Malaysia in 2008. The barge successfully installed dual 56” waterlines across Botany Bay operating in busy ship lanes during 2009.
BP –
Thunder Horse
2004-2009
Location: Gulf of Mexico Water Depth: 1,920 meters (6,299.21 feet)
Consulting and installation services for the installation of subsea PLEMs, PLETs, SCRs, and jumper installations.
The Thunder Horse is the world’s largest floating platform and can process 250,000 barrels of oil per day and 200 million cubic feet per day of natural gas.
Pacific Energy –
Eureka
2007-2008
Location: Long Beach, California Water Depth: 75 – 230 meters
(246.06 – 754.59 feet)
Structural analysis of existing platform. Design of all pipe handling equipment, modifications to the platform and installation of the 7" liner.
Project initiated to restore production from the Eureka platform by pulling a 7” liner through an existing 12” line.
CNOOC –
Dong Fang 1-1
2002 - 2003
Location: South China Sea Water Depth: Shallow Water
Pipelay operation management and training.
GMC provided offshore consultants on the Lan Jiang Laybarge, including barge superintendent, and installation engineers.
! !
! !!!!!!!!!!!!!!!!!!!!! -./!0121%(3!4)&5($%6!78229)1(6!
) ) IE#")M)/+)AA)!
!
"++!0&:;<9%()!=>(:8(!?!@(931:;A!@-*!B-4A!CD!?!E(FG!!HII!J+K!""L!MI,!+N*+!
JJJ?#>,(""DJE&"'?,/>)
"!#$%&'()!*+",!
GMC PRODUCTS
ERT –
Subsea Production Control System
2010 - 2011
Location: Gulf of Mexico Water Depth: 1,280.16 meters (4200 feet)
Supervision and execution of the control module refurbishment, development of function test and operational testing programs, through to offshore installation and start up.
Developed the procedures to fully test a set of refurbished subsea control modules, managed the construction and testing of the completed systems. Developed the detailed test and acceptance procedures to prove the integrity of the system, and write the offshore installation and startup procedures. Completed the project by managing the offshore installation and start up of the full system through to customer hand off.
ENI –
Appaloosa Subsea Pig Launcher
2009 - 2011
Location: Gulf Of Mexico Water Depth: 1280 meters (4,199.48 feet)
Engineering design, manufacture, project management and installation of a subsea pig launcher.
Phase 1: To Design a Pig that would launch utilizing a low flow rate.
Phase 2: Design, Manufacture and carry out the testing of the Pig.
Phase 3: To Design, Manufacture and SIT a Subsea Pig Launcher based on the initial test results.
ENI –
Longhorn Subsea Test Structures
2009 - 2011
Location: Gulf Of Mexico Water Depth: 1280 meters (4,199.48 feet)
Engineering, manufacture, project management of a mock manifold for site integration.
Engineer and construct an accurate representation of the internal pipework diameters of the Longhorn PLET. The structure will be used for the site interface testing, and development of the pig launching philosophies, for dewatering and routine well maintenance.
! !
! !!!!!!!!!!!!!!!!!!!!! -./!0121%(3!4)&5($%6!78229)1(6!
) ) IE#")N)/+)AA)!
!
"++!0&:;<9%()!=>(:8(!?!@(931:;A!@-*!B-4A!CD!?!E(FG!!HII!J+K!""L!MI,!+N*+!
JJJ?#>,(""DJE&"'?,/>)
"!#$%&'()!*+",!
GMC PROJECT MANAGEMENT
Talisman –
Fulmar Platform
2015 - Present
Location: North Sea Water Depth: 82 meters (269.03 feet)
Provided engineering, project management, fabrication support, tooling, and mechanical connectors to assemble 26” & 36" Caisson Connectors.
Nautilus
2015 - Present
Location: Papua New Guinea Water Depth: 1700 meters (5,577.43 feet)
Design, build, and deliver of Riser Cursor system for deepwater mining riser.
Heerema
2015 - Present
Design, build, deliver, and operate 24” tooling system for offshore TLP tendon installation
Nautilus
2015 - Present
Location: Papua New Guinea Water Depth: 1700 meters (5,577.43 feet)
Design, build, and deliver of 12” Tooling System for Riser Installation, including Gimbal, Spider Table, Make/Break Tool, Riser Handling Tool, and Portable Make/Break Tool.
! !!!!!!!!!!!!!!!!!!!!! -./!0121%(3!4)&5($%6!78229)1(6!
) ) IE#")O)/+)AA)!
!
"++!0&:;<9%()!=>(:8(!?!@(931:;A!@-*!B-4A!CD!?!E(FG!!HII!J+K!""L!MI,!+N*+!
JJJ?#>,(""DJE&"'?,/>)
"!#$%&'()!*+",!
Talisman – Fulmar Platform
2015 - Present
Location: North Sea Water Depth: 82 meters (269.03 feet) Design, build, and deliver 26” & 36" tooling system for Caisson Installation, including Make/Break Tools and Caisson Handling Tools.
Deep Star –
Phase XII-B
2014 - Present
Location: N/A Water Depth: N/A
Strength & fatigue testing of 8" 15Ksi mechanically connected steel riser, fiction welded to high strength pipe.
SBM: Joint Development Project
2014 - Present
Location: N/A Water Depth: 3000 meters (9,842.52 feet)
Joint development of 8” 15Ksi 2500m Design & ISO Qualification Testing.
ZPMC
2014 - 2015
Location: China Water Depth: 1500 meters (4,921.26 feet)
Static and dynamic installation analysis for mid- water modular J-lay system. Including rewired tensions, tower angles, and roller placements.
Energean –
Prinos Field Platform Design
2014 - 2015
Location: Greece Water Depth: 48 meters (157.48 feet)
Platform analysis for larger drill rig. Including analysis of Global & Local Strength, Deck, Jacket, Piles, Reinforcement Plan, and Personnel Access Ramp.
! !!!!!!!!!!!!!!!!!!!!! -./!0121%(3!4)&5($%6!78229)1(6!
) ) IE#")AB)/+)AA)!
!
"++!0&:;<9%()!=>(:8(!?!@(931:;A!@-*!B-4A!CD!?!E(FG!!HII!J+K!""L!MI,!+N*+!
JJJ?#>,(""DJE&"'?,/>)
"!#$%&'()!*+",!
NJSC Chornomornaftogaz – GMC Pride Modular Pipelay
Barge
2011 – 2012
Location: Odessa Gas Field, Black Sea Water Depth: 0 – 80 meters (262.46 feet)
The ‘GMC PRIDE’ is a modular pipelay barge designed for the cost effective and efficient installation of pipelines in shallow water. It was delivered in 2012 following a turnkey conversion from a flat deck barge - GMC’s scope of work included the engineering of the barge and pipelay system, supplying all equipment, and providing on-site shipyard management for the barge conversion and commissioning.
SBM –
J-lay System
2006 - 2008
Location: World Wide Water Depth: Up to 3000 meters
(9,842.52 feet)
Conceptual Design and Engineering of pipe handling equipment and J-lay tower. The J-lay system is capable of installing SCRs, offloading lines and tendons in various water depths.
Adamac –
Chevron TIP Project
2005 – 2006
Location: Nigeria Water Depth: Shallow Water
Complete vessel crew including supervision, welding, and rigging for execution of pipeline installation offshore Nigeria. GMC supplied more than 7,000 man-days during operations. Installation of offshore pipeline as part of Chevron’s TIP project in Nigeria.
Chevron –
Lobito Tomboco
2005 - 2006
Location: Angola, Block 14 Water Depth: >1000 meters (>3,280.84 feet)
Engineering, management, offshore supervisory and installation personnel. GMC also supervised the installation of all pipe lay equipment.
Installation of 32 short length pipelines and 24 risers for tieback of subsea facilities to host platform.
! !!!!!!!!!!!!!!!!!!!!! -./!0121%(3!4)&5($%6!78229)1(6!
) ) IE#")AA)/+)AA)!
!
"++!0&:;<9%()!=>(:8(!?!@(931:;A!@-*!B-4A!CD!?!E(FG!!HII!J+K!""L!MI,!+N*+!
JJJ?#>,(""DJE&"'?,/>)
"!#$%&'()!*+",!
ONGC –
RSPPM
2004 - 2006
Location: India Water Depth: 80 meters (262.47 feet)
Project management, engineering, supervision, and final commissioning of a complex range of infield pipelines linking the client’s offshore facilities. The Jascon-5 completed normal pipelay operations and the Smit Borneo completed the riser tie-ins.
Phase 1: Installation of 4” x4.6km, 6” x31.3km & 8” x 7.7km Pipeline Phase 2: Installation of 10” x10.1km, 12”x14.3km & 16” x 15.9km Pipeline
Melrose Resources –
Galata
2003 - 2004
Location: Black Sea, Bulgaria Water Depth: 0 - 35 meters (0 - 114.83 feet)
Turnkey project including installation engineering, lay barge mobilization, project management team, lay barge personnel, onshore pull-in, normal pipe lay, and spool piece installation at platform. Cargo barge converted into low-cost shallow water pipelay vessel. Offshore deployment of a 14” welded pipeline over 23km from beach pull to offshore platform location.
Petrobras –
Marlim P-18
1998
Location: Brazil Water Depth: >1000 meters (>3,280.84 feet)
Installation engineering, procedures, supply of modular J-Lay equipment and supply of installation personnel. The modular J-lay system provided by GMC was installed on the Amethyst Semi drilling vessel. With this system, the first welded SCR in Brazil was installed from a subsea manifold to P-18 FPS. GMC was instrumental in the development and successful installation and deployment of this SCR.