Government of Canada Workplace 2.0 Fit-up Standards Section A: General-purpose Office Space
A-21 March 2016
A3. Standards
Changes Since the Last Update
A3.2 Funding Accountabilities of PSPC and Client Departments Revised tables for PSPC and client department funding accountabilities and
mechanisms for obtaining funding. Clarification to describe the new funding framework
Projects are now managed on a priority basis maximizing the use of existing inventory.
Explanation of the change to management of CRA;’s status as a non- reimbursing client.
Changed wording of “expansion space” to “ Expansion Control Framework”
Statement clarifying that Tenant Services or Tenant Direct projects:
Must comply with the Fit-up Standards and support the renewal of existing client space(support departmental programs and PSPC policy objectives)
Good location to reinforce this message as we move towards a RP1, RP2, RPn contracting environment.
Within the Non-Reimbursing table under “New OI” – “same location” inventory impact:
Existing OI/New OI column was removed
Fit-up for initial occupancy or fit-up of existing space for reuse project description was added.
PSPC will now fund the fit-up of existing space within the same location at OI renewal within the new funding framework regime. The priority is now focused on the reuse of existing client space and PSPC existing inventory.
PSPC now has funding opportunities to refit and optimize space within existing OIs and in crown buildings and long term leases.
Tenant Services will remain to clarify funding accountabilities of tenant service projects that are:
Client driven and initiated after PSPC has identified the projects it will
Government of Canada Workplace 2.0 Fit-up Standards Section A: General-purpose Office Space
A-22 March 2016
fund
Client renewing in an ECF status
A client that has expansion within the same inventory as ECF.
No changes to “New location: expansion or replacement” inventory impact
However, the level of authorization for any expansion now requires CFO/ADM level
To ensure there are no other opportunities to accommodate new growth within existing inventory (client or PWGSC inventory)
Within the “space optimization inventory impact
“with space envelope reduction” from “funding mechanism” column was removed
The space envelope may no longer be reduced as a source of funds within the new funding framework
Headroom is now unfunded
This section was also moved ahead of major renovations since it will be strongly encouraged within the new framework
The annotation: “Payback period of total project cost must justify the investment was removed:
All projects submitted for TB approval will be funded in an order of priority and with an approved investment decision.
PSPC is required to seek funding from TB.
Government of Canada Workplace 2.0 Fit-up Standards Section A: General-purpose Office Space
A-26 March 2016
A3.2 Funding Accountabilities of PWGSC and Client Departments Funding accountabilities for fit-up projects are shared between PSPC, client departments and agencies. Treasury Board approved a new funding framework for the PSPC real property portfolio in the fall of 2014. This funding framework changes the way PSPC is funded for space & fit-up of space for non-reimbursing clients, including the Canada Revenue Agency (CRA).
The following tables are to be used as a reference guide describing PSPC and client department funding accountabilities in terms of the nature of the occupancy instrument, whether for non-reimbursing or reimbursing space; including expansion control framework (ECF) space; as well as funding mechanisms, and apply whether a project is implemented in a Crown-owned or leased facility.
Government of Canada Workplace 2.0 Fit-up Standards Section A: General-purpose Office Space
A-27 March 2016
Non-reimbursing Occupancy Instruments (OIs)
Inventory Impact Project Description Fit-up Components (see Fit-up Standards
A3.3)
Funding Department
Funding Mechanism*
During Term of OI
Tenant Services: Alterations to Existing
Accommodation
Base Building
Client
SSA1
Standard Fit-up
Other
Cyclical Maintenance: Repair or Replacement
Base Building PSPC BMP2,3
Standard Fit-up
Other Client SSA
Space Optimization Base Building
PSPC5
BMP3
Standard Fit-up Other Client SSA
Same Location at OI and/or Lease
Renewal
Tenant Services: Alterations to Existing
Accommodation
Base Building
Client SSA1 Standard Fit-up
Other
Cyclical Maintenance: Repair or Replacement
Base Building PSPC BMP2,3
Standard Fit-up
Other Client SSA
Refit New occupant
Base Building PSPC
BMP3
Standard Fit-up
Other Client SSA
Space Optimization Same occupant
Base Building PSPC5
BMP3
Standard Fit-up
Other Client SSA New Location
at OI and/or Lease Renewal
(expansion or replacement)
Fit-up for Initial Occupancy or
Refit for a New Occupant in Existing Inventory
Base Building PSPC
BMP3
Standard Fit-up
Other Client SSA
Major Renovations
by PWGSC
Fit-up of Swing Space for Initial Occupancy or for
Reuse
Base Building
PSPC
BMP3 Standard Fit-up
Other Client SSA
Fit-up of Long Term Space for Reuse (i.e. move back to
original location)
Base Building PSPC
BMP3
Standard Fit-up
Other Client SSA
Forced Move by PWGSC
Fit-up for Initial Occupancy or
Refit for a New Occupant in Existing Inventory
Base Building
PSPC
BMP3,4
Standard Fit-up
Other
1 Tenant service projects may be identified at any stage of occupancy, and must support departmental programs, PSPC and government policy objectives, PSPC Portfolio Management Strategy and comply with the Space Allocation Standards and these fit-up standards, including the funding accountabilities outlined within this section. All tenant service requests affecting base building components (i.e. mechanical & electrical systems, plumbing, etc) must be approved by the Building Owner or representative.
2 PSPC assumes the costs for relocation of screens and standard furniture, as required to implement cyclical maintenance (e.g. for carpet replacement). Client department pays for dismantling, moving and reassembling of computers, telecommunications and other specialized equipment and furnishings, as required and when provided with sufficient notification to program the required funds.
3 For leased facilities, base building components are funded by the landlord as negotiated in the lease contract. 4 PSPC will replace like-for-like conditional on compliance with Fit-up Standards. 5 Subject to PSPC funding availability.
* Alternate funding mechanisms for projects may be used such as a Purchase Order (PO), Local Purchase Order (LPO), Work Authorization (WA) or equivalent.
* Refer to R1 Glossary for definitions.
Government of Canada Workplace 2.0 Fit-up Standards Section A: General-purpose Office Space
A-28 March 2016
Reimbursing and Expansion Control Framework (ECF) Occupancy Instruments (OIs)
Inventory Impact Project Description
Fit-up Components (see Fit-up Standards
A3.3)
Funding Department
Funding Mechanism*
During Term of OI
Tenant Services: Alterations to Existing
Accommodation
Base Building
Client SSA1 Standard Fit-up
Other
Cyclical Maintenance: Repair or Replacement
Base Building PSPC BMP2,3
Standard Fit-up Client SSA
Other
Space Optimization
Base Building
Client SSA Standard Fit-up
Other
Same Location at OI and/or Lease
Renewal
Tenant Services: Alterations to Existing
Accommodation
Base Building Client SSA1 Standard Fit-up
Other
Cyclical Maintenance: Repair or Replacement
Base Building PSPC BMP2,3
Standard Fit-up Client SSA
Other
Refit New occupant
Base Building PSPC BMP3
Standard Fit-up Client SSA
Other
Space Optimization Same occupant
Base Building Client
SSA Standard Fit-up
Other
New Location: at OI and/or Lease
Renewal (expansion or replacement)
Fit-up for Initial Occupancy or Refit for a New Occupant in
Existing Inventory
Base Building PSPC BMP3
Standard Fit-up Client SSA
Other
Major Renovations by PWGSC
Fit-up of Swing Space for Initial Occupancy or for Reuse
Base Building
PSPC BMP3 Standard Fit-up
Other
Fit-up of Long Term Space for Reuse (i.e. move back to original
location)
Base Building PSPC BMP3
Standard Fit-up
Client SSA Other
Other
Forced Move by PWGSC
Fit-up for Initial Occupancy or Refit for a New Occupant in
Existing Inventory
Base Building
PSPC BMP3,4 Standard Fit-up
Other
1 Tenant service projects may be identified at any stage of occupancy, and must support departmental programs, PSPC and government policy objectives, PSPC Portfolio Management Strategy and comply with the Space Allocation Standards and these fit-up standards, including the funding accountabilities outlined within this section. All tenant service requests affecting base building components (i.e. mechanical & electrical systems, plumbing, etc) must be approved by the Building Owner or representative.
2 PSPC assumes the costs the relocation of screens and standard furniture, as required to implement cyclical maintenance (e.g. for carpet replacement). Client department pays for dismantling, moving and reassembling of computers, telecommunications and other specialized equipment and furnishings, as required and when provided with sufficient notification to program the required funds. 3 For leased facilities, base building components are funded by the landlord as negotiated in the lease contract. 4 PSPC will replace like-for-like conditional on compliance with Fit-up Standards.
* Alternate funding mechanisms may be used for projects such as a Purchase Order (PO), Local Purchase Order (LPO), Work Authorization (WA) or equivalent. * Refer to R1 Glossary for definitions
Government of Canada Workplace 2.0 Fit-up Standards Section A: General-purpose Office Space
R-0 March 2016
R. Resources
Changes Since the Last Update
R Resources
Revised definitions
Expansion Control Framework:
New definition is consistent with funding framework Q&A document
Accommodation and Real Property Services Program:
Added to describe mechanisms for obtaining funding
The Federal Accommodation sub-program:
Added to describe mechanisms for obtaining funding
The Federal Holdings sub-program:
Added to describe mechanisms for obtaining funding
Purchase Order (PO or Local Purchase Order:
Added to define term added in section A3.2 due to RP1, RP2 and RPn
Refit:
Added as per funding framework Q&A document
Term is also recognized by TB in the approval of the New Funding Framework
Essentially same as “fit-up of existing space for reuse” and addresses same location.
Space optimization:
The 2 space optimization scenarios were redefined based on the redefined funding mechanism
Space avoidance (to accommodate more FTEs within the same space)
A business case and payback period are no longer part of the new funding
Government of Canada Workplace 2.0 Fit-up Standards Section A: General-purpose Office Space
R-0 March 2016
framework
Densification (less m2 per FTE to release space and achieve savings)
Work authorization
Added to define term added in section A3.2 due to RP1, RP2 and RPn
March 2016
Resources
Government of Canada Workplace 2.0 Fit-up Standards Resources
R-1 March 2016
R1. Glossary Base Building
The building shell including finished floors, exterior walls, interior core and demising walls, finished ceilings complete with lighting, and other building systems consistent with the designed function and planned general use of the building. In the case of office accommodation, for example, the base building would include exterior window coverings and primary identification signage.
BMP (Building Management Plan)
The BMP is a facility-specific annually costed work plan. BMPs are developed consistent with Asset Management Plans (AMPs) and Community-based Investment Strategies (CBIS). The BMP will normally contain information on costs and revenues, trends, levels of service and planned projects. The BMP is a planning tool for initial allocation. Source: http://source.tpsgc-pwgsc.gc.ca/rps/ims/bis/tcg/content/pgbmp/mmblgdmngd-e.html.
Circulation Space
Space allowed for movement of personnel between workstations. It includes the space for access to support space and building services.
Cyclical Maintenance
Repair or replacement of standard base building and fit-up components at the end of their useful life, on a cyclical basis (normally 10-15 years). Examples of standard base building and fit-up components include: carpet, ceiling tiles, paint, screens (replace or “re-skin” as required). Source: Asset and Facilities Management Services – Glossary/Definitions/References.
Expansion
Increase to the total space in a client department’s inventory to accommodate program growth.
Expansion Control Framework (ECF)
Expansion space for non-reimbursing client departments that is beyond their space envelope limit and, therefore, is funded by client departments. Source: Expansion Control Framework Policy.
Accommodation and Real Property Services Program
PWGSC provides federal departments and agencies with affordable office and common use accommodation that supports the delivery of their programs and services. The department acts as steward for various public works such as buildings, bridges and dams, and national treasures such as the Parliamentary Precinct and other heritage assets across Canada. PWGSC also
Government of Canada Workplace 2.0 Fit-up Standards Resources
R-2 March 2016
provides other federal departments, agencies, and the Parliament of Canada with responsive and cost-effective real property services.
The Federal Accommodation sub-program provides for the accommodation needs of federal organizations by providing and maintaining a cost effective portfolio of office facilities, common use assets and special properties (predominantly conference and training facilities). This sub-program is composed of two primary activities: the provision, on an obligatory basis, of general-purpose accommodation and common use space to support the delivery of government programs; and optimization of real property investments in direct support of the provision of accommodation.
The Federal Holdings sub-program includes a diverse portfolio of federal facilities and activities under the purview of the Minister of PWGSC that are grouped for reporting purposes: the stewardship and management of major engineering assets and wharves, as well as the development of strategies for their divestiture; the administration, capital management and leasing services for residential housing units in the Northwest Territories and Nunavut to support the delivery of federal government programs; appraisals for all acquisitions, dispositions and transfers of real estate, as well as the maintenance of related guidelines and policies; and, the authoritative interpretation of expropriation legislation and regulations and the implementation of the expropriation process on behalf of the federal government.
Fit-up for Initial Occupancy
The preparation of accommodation for initial federal occupancy in accordance with the Government of Canada Workplace 2.0 Fit-up Standards. This fit-up may include alterations or improvements to the base building and/or base building systems, including demolition. A list of fit-up items that PWGSC provides for initial occupancy is included in A3.3 Fit -Up Components and Funding Accountabilities.
Fit-up Rates
PWGSC establishes fit-up rates for general purpose office space in major urban centres across the country. The rates are based on the cost of all standard fit-up components. They are updated annually and are to be used as a budgeting mechanism when preparing cost estimates for fit-up projects for general administrative, public contact and quasi-judicial office space, and as a funding limit for fit-up projects for ministerial and deputy head accommodation. (See A8.1 Workplace 2.0 Fit-up Rates.)
Floor Plate
The size and shape of the floor of a particular building.
Forced Move by PWGSC
A PWGSC initiated move required prior to the termination of an existing occupancy. Source: Forced Moves – Changes in Occupancy Policy.
Government of Canada Workplace 2.0 Fit-up Standards Resources
R-3 March 2016
Functional Program
A detailed statement of the accommodation requirements of a client department or agency in relation to a specific fit-up or tenant service project. It supports the space allocation and fit-up standards by describing any qualitative and quantitative gaps between the standards and what is needed by a department or agency to perform its activities efficiently, effectively and safely. Requirements that do not comply with the standards are highlighted in the functional program and reconciled or addressed as non-compliant. A gap analysis identifies the differences between the stated requirements and fit-up standards. The data collected informs both the investment analysis and the planning and design process.
The scope of work of a functional program may include:
Verification of project requirements; Project schedule; Risk management; Implementation strategies; Sustainability requirements; Workstation requirements; Support space requirements; Special purpose space requirements; Planning alternatives; Communication/data requirements; Security requirements; Proximity/adjacencies requirements; Detailed functional space equation; Scheduling requirements; Class “D” and “C” cost estimate; Schematic design; Vertical/horizontal zoning; and Other special requirements.
Functional programs are funded by PWGSC when required for fit-up projects of non-reimbursing occupancies. Functional programs are funded by client departments when required for fit-up projects of reimbursing occupancies or for tenant service projects.
General Administrative Offices
Offices that accommodate general office functions and activities that do not require special security or other special features. General administrative offices do not have high interface with the public. These offices comprise the majority of PWGSC office space occupied by client departments and agencies.
Government of Canada Workplace 2.0 Fit-up Standards Resources
R-4 March 2016
Heating, Ventilation and Air Conditioning (HVAC) Systems
Mechanical systems that supply or remove heat, supply or remove humidity, and supply outdoor air as required.
Kiosk
Small structure for display or dissemination of information.
Major Renovation
Work undertaken to correct or delay physical or functional obsolescence and/or to extend the useful or economic life of a building. Included are improvements to the building’s structure or systems, such as HVAC, lighting, elevators, sprinkler systems.
Occupancy Instrument (OI)
A formal agreement between a department or agency and PWGSC concerning occupancy in a particular asset. It records the rentable and usable areas, the civic address and the planned general use of the particular parcel of accommodation that is subject to the agreement. It also records the terms and conditions that govern the provision and occupancy of the accommodation, as well as charges for accommodation and agreed upon services.
Office Space
Includes office/workstation areas, general support space and circulation for all four generic office types.
Public Contact Offices
Offices accommodating functions that provide face-to-face services to the public. Functions and operations may include, but are not limited to:
inquiries from walk-in customers; training/testing/meetings; and application/form processing.
Purchase Order (PO) or Local Purchase Order (LPO)
A purchaser's written offer to a supplier, formally stating all terms and conditions of a proposed transaction.
Quasi-judicial Offices
Offices that accommodate adjudicative or legislative functions. They often require confidentiality or enhanced security and are used by organizations that interpret and administer legislation and regulations, conduct inquiries and hearings and/or perform adjudication functions on complaints, appeals and claims. Functions and operations may include, but are not limited to:
Government of Canada Workplace 2.0 Fit-up Standards Resources
R-5 March 2016
management: adjudicative body operates separately from the administrative unit which provides service to the adjudicative body;
meetings: conducted on a scheduled basis with internal staff and members of the public; and
secure and confidential courtroom/hearing room space; physical protection of staff could be required.
Refit The alteration of space previously occupied, to meet the requirements of a different federal organization in accordance with the Government of Canada Workplace 2.0 Fit-up Standards (space assignment) AND the alteration of existing space because the fit-up elements have reached the end of their useful life. The scope of the fit-up for reuse is determined by taking into consideration the life cycle approach, the functional requirements of the new client, existing conditions of the previously occupied space, and the duration of the new occupancy.
Renewal
Renewal of an occupancy instrument or lease agreement at the end of its term to accommodate a client department’s continuing requirement for space at the same location. The decision to renew an occupancy instrument or lease is based on an investment analysis. The new occupancy instrument or lease agreement may be for the same or a reduced amount of space. A renewal may also be combined with a client department’s requirement for expansion.
Rentable Area
The space used to calculate rental payments. Rentable areas include usable areas and areas such as lobbies, washrooms and electrical rooms. Stairways, entrances and elevators or duct shafts are not included in rental areas.
Replacement
Transfer of existing space in a client department’s inventory to a new location at the end of an occupancy instrument. The decision to replace existing space is based on an investment analysis. The relocation may be to new or existing space in the PWGSC inventory.
Secure Administrative Offices
Offices accommodating activities which require enhanced levels of security. Functions and operations may include, but are not limited to:
the review and storage of sensitive files; and little or no public contact.
Government of Canada Workplace 2.0 Fit-up Standards Resources
R-6 March 2016
Space Envelope
The total amount of rentable square metres departments can occupy by fiscal year based on authorities received by PWGSC to provide accommodation in accordance with standards, policies and guidelines.
Space Optimization An accommodation project to maximize the use of a finite quantity of space in an existing facility in accordance with the Government of Canada Workplace 2.0 Fit-up Standards; thus reducing the space utilization rate per FTE. This can be achieved through either densification or expansion avoidance:
Densification: Alterations to maximize the use of a finite quantity of existing space housing existing programs and related FTEs. An accommodation project whose principal intent is to reduce the space utilization rate per FTE in an effort to reduce current inventory levels. For example, at the end of a contract (formerly known as an Occupancy Instrument (OI)), a client department’s office layout is restructured to meet the objectives of the Government of Canada Workplace 2.0 Fit-up Standards and the Space Allocation Standards, thus increasing the density on the floor, lowering the space utilization rate and allowing for the release of surplus inventory.
Expansion avoidance: Alterations to existing space to accommodate additional FTEs, thus reducing the space utilization rate. An accommodation project whose principal intent is to avoid acquiring additional space to house a program expansion and the related additional FTEs. For example, a client department obtains Treasury Board approval for a program expansion based on new FTE salaries. At contract expiry, while meeting the requirements of the Standards, existing space is modified to accommodate the expansion in lieu of renting additional space elsewhere, thus increasing the density on the floor and lowering the space utilization rate.
Special Purpose Space (SPS)
Additional, non-standard areas required by a client department to accommodate specific activities that are unique and essential to departmental programs.
Examples of special purpose spaces include, but are not limited to:
laboratories, health units or clinics; meeting or training complexes which serve outside groups; interview rooms; inspection rooms; processing space; departmental libraries (e.g. Department of Justice libraries); gymnasiums, warehouses (e.g. PWGSC’s Seized Property Management Directorate
warehouse space);
Government of Canada Workplace 2.0 Fit-up Standards Resources
R-7 March 2016
very large file or storage areas other than allowed by the Workplace 2.0 Fit-up Standards (e.g. Canada Revenue Agency (CRA) tax return file storage, Library and Archives storage);
trade shops; large mailrooms (e.g. CRA’s mailroom); computer training rooms; cash offices or similar spaces requiring special service and security features; and hearing rooms.
Specific Service Agreement (SSA)
An internal PWGSC contract between one of the service branches and another government unit. It describes the work to be done, the schedule and the cost of the work.
Support Space
Spaces for office support functions not included in the workstation, or circulation space but necessary for office operation. Support space includes meeting rooms, quiet rooms, collaborative areas, kitchenettes, shared equipment areas, printer stations, reception/waiting areas, and other areas as described in A3.4 Office and Support Space Allocations.
Swing Space
Temporary office space used to accommodate client departments while their long term office space is under renovations or until new office space is available. Minimal fit-up is required for swing space.
Task Lighting
Lighting oriented to or located at a task position is generally called task lighting. Task lights located at the task area are usually used in conjunction with ambient or general lighting and are client funded.
Tenant Services
Alterations to existing accommodation requested and funded by a client and carried out during the term of an occupancy.
Usable Area
Office floor area available to the tenant. Columns and such are not included in usable area.
Work authorization
Written order providing authorization to a contractor to proceed with the performance of a contract.
Government of Canada Workplace 2.0 Fit-up Standards Resources
R-8 March 2016
Workstation
Workspace provided for an individual employee and his/her directly associated furniture and equipment.
Gestion nationale des locaux et solutions pour le milieu de travail | National Accommodation Management and Workplace
Solutions |Direction générale des biens immobiliers | Real Property Branch | Services publics et Approvisionnement Canada
| Public Services and Procurement Canada
1
Questions & Answers
Changes to the Funding Accountabilities Table in Section A3.2 and Resource section of the
Government of Canada Workplace 2.0 Fit‐up Standards
Q1) Why has PSPC (formerly PWGSC) changed the Funding Accountabilities Table in Section A3.2 and
Resource section of the Government of Canada Workplace 2.0 Fit‐up Standards?
A1: The Funding Accountabilities Table was recently revised as a result of the implementation of the
new funding framework, established in 2014. Its goal is to simplify the table for both PSPC and client
departments and to remediate past issues and address the new Real Property environment. We
recognize that there may be exceptions for each inventory impact. These will need to be evaluated
on a case by case basis due to funding and inventory availability, and to ensure best value to the
Crown.
Q2) What is the effective date for this new Funding Accountability Table?
A2: The new table is effective immediately.
Q3) How will the new Funding Accountability Table affect client departments’ existing or planned
optimization projects?
A3: These revisions will provide more flexibility for PSPC to manage its National Portfolio Investment
Strategy and would include the consideration of space optimization projects during the term of a
contract (previously known as an occupancy instrument (OI)) amongst all other types of projects.
Q4) What is the difference between a tenant service project and a mid‐OI space optimization project?
A4: A tenant service project is defined as alterations to existing accommodation requested and funded by a client and carried out during the term of occupancy. A space optimization project’s intent is to maximize the use of a finite quantity of space in an existing facility in accordance with the Government of Canada Workplace 2.0 Fit‐up Standards, thus reducing the space utilization rate per FTE. This can be achieved through either densification or expansion avoidance.
Densification: alterations to maximize the use of a finite quantity of existing space housing existing programs and related FTEs. This applies to an accommodation project whose principal intent is to reduce the space utilization rate per FTE in an effort to reduce current inventory levels. For example, at the end of an OI, a client department’s office layout is restructured to meet the objectives of the Government of Canada Workplace 2.0 Fit‐up Standards and the Space Allocation Standards, thus increasing the density on the floor, lowering the space utilization rate and allowing for the release of surplus inventory.
Expansion avoidance: alterations to existing space to accommodate additional FTEs, thus reducing the space utilization rate. This applies to an accommodation project whose principal intent is to avoid acquiring additional space to house a program expansion and the related
Gestion nationale des locaux et solutions pour le milieu de travail | National Accommodation Management and Workplace
Solutions |Direction générale des biens immobiliers | Real Property Branch | Services publics et Approvisionnement Canada
| Public Services and Procurement Canada
1
additional FTEs. For example, a client department obtains Treasury Board approval for a program expansion based on new FTE salaries. At OI expiry, while meeting the requirements of the Standards, existing space is modified to accommodate the expansion in lieu of renting additional space elsewhere, thus increasing the density on the floor and lowering the space utilization rate.
Q5) What are the steps for clients to request a mid‐OI space optimization project?
A5: Step 1: Ensure the project meets the following criteria:
The client must confirm the availability of their portion of the costs (Section A8.4)
The space optimization represents a reduction of space per FTE within a given location
The project complies with the maximum allocation as per the Space Allocation Standards
The project complies with the Government of Canada Workplace 2.0 Fit‐up Standards
Step 2: If the project meets this criteria, a Client Accommodation Requirement Questionnaire
(CARQ) is completed and submitted to PSPC (Client Accommodation Service
Advisor/Accommodation Manager)
Step 3: The identified project then follows the PSPC investment approval process:
It must be supported by a PSPC approved Investments Analysis Report (IAR)
It must be approved through established RPB governance
The project officially becomes a PSPC project once the funding is confirmed
Q6) What are the funding accountabilities for space optimization projects both during, and at the end
of, an OI?
A6: Subject to the conditions outlined in A5, PSPC would be responsible for funding the standard fit‐
up bundle of goods, associated soft costs and any base building alterations required to facilitate the
space optimization. Clients would fund all other costs consistent with any typical fit‐up project.
Q7) Will money be transferred to client departments for approved space optimization projects?
A7: No, no funding will be transferred. If the project is approved through the PSPC project approval
process, it will be funded as a PSPC project.
Q8) Can PSPC fund typical client costs?
A8: No, clients are responsible for the Fit‐up components as identified in Section A3.3.