Page 1: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 11

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Graitery Tunnel

Use of ZSoil for complex excavations

Dominique TendonAldo BisettiJacques L’Eplattenier

Page 2: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 22

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

A16 – Transjuranne

Graitery Tunnel Tunnel : L = 2’462 m

South portal: L = 18 m

Page 3: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 33

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

N

Tunnel face

Axis

N16

Cut and cover tunnel

L = 18m

South portal excavation

Page 4: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 44

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

South portal - initial project - Front excavation wall

Axe N16

Strand anchors

Bar anchors

Page 5: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 55

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Page 6: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 66

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Page 7: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 77

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Page 8: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 88

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

History of excavation:

Mid 2007: Beginning of the excavation of the south portal of the GraiteryTunnel

October 2007: Movements of the front excavation wallIncrease in the tensile forces of the anchors

Page 9: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 99

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

5th november 2007

Page 10: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 1010

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

History of excavation:

Mid 2007: Beginning of the excavation of the south portal of the GraiteryTunnel

October 2007: Movements of the front excavation wallIncrease in the tensile forces of the anchors

Novembre 2007: Reinforcement of front wall (more anchors are added) Excavation continues

The wall movements and the increase in anchor forces are nothindered

Page 11: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 1111

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Geodesic mesurements – Horizontal displacements

Embankment displacements Front wall displacement (top)

Page 12: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 1212

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Tensile forces in strand anchors

Pinitial = 500 kN

Page 13: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 1313

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

16th november 2007

Page 14: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 1414

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

History of excavation:

Mid 2007: Beginning of the excavation of the south portal of the GraiteryTunnel

October 2007: Movements of the front excavation wallIncrease in the tensile forces of the anchors

Novembre 2007: Reinforcement of front wall (more anchors are added) Excavation continues

The wall movements and the increase in anchor forces are nothindered

Mid-novembre 2007: Partial filling of the excavation to prevent an instability

Page 15: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 1515

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Décember 2007

Page 16: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 1616

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

January - April 2008: Complementary investigations (6 additional borings) More precise geological model

Important laboratory tests campagne carried out by the EPFL

Retrofit Stability analysis using ZSoil performed by GVH

Constant interaction between the geological model, the stabilityanalysis and the scope of the laboratory testing.

Page 17: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 1717

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Geology – Vertical section

Page 18: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 1818

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Retain structure front and lateral walls:

- strand anchors AVT 5T13, Pinitiale = 500 kN

- bar anchors GFK D25mm

- bar anchors GEWI D25mm

Colluvions

Fractured marnymolasse

Compact marny molasse

Limestone

Sandstone molasse

Investigation gallery

ZSoil 3D Model

Page 19: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 1919

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Ground water

Page 20: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 2020

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Level A: 1/2 AA15, AA14, AA13, AA12, AA11 et AA10

Level C:CA12, 1/2 CA11 et CA10

Level D:DA 10

Front wall Lateral wall

Level C:CA1, CA2, CA3 et CA4

Pretressed strand anchors

Page 21: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 2121

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Front wall

Lateral wall

Level B: 3 clousGEWI+ 3 GFK

Level C: 3.5 GFK

Level D: 4 clous GFK

Level E: 3.5 clous GFK

Level A: 2 GEWI

Bar anchors

Level B: 3 GEWI

Level D: 5GEWI

Page 22: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 2222

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Ancrages passifsDisplacements for C molasse marneuse = 20 kN/m2

Page 23: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 2323

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Ancrages passifsDisplacements for C molasse marneuse = 20 kN/m2

Page 24: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 2424

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Tensile forces in prestressed anchorsC molasse marneuse =20 kN/m2

Free portion

Fixed portion

Page 25: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 2525

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Adjustment of cohesion using mesured tensile forces in anchors

φ' = 16°

Page 26: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 2626

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Redesign of the south portal retaining structure

Front wall:Anchored pile wallFireglass reinforcement for piles within the tunnel build

Lateral walls:Secant anchored pile walls

Embankment above tunnel:Permanent prestressed anchors

Page 27: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 2727

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Models for the design of the retaining structures:

2D models for design of piles

2D model for stability of lateral walls

2.5D model for stability of front wall

3D model for acknowledgement of previous results

Page 28: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 2828

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

ZSoil 3D Model

Colluvions

Fractured marnymolasse

Limestone

Sandstone molasse

Sheet-pile walls

Excavation for permanent anchors

Investigation gallery

Compact molasse compacte

Horizontal beam

Page 29: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 2929

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Retaining structuresPermanent anchors

Tunnel face supportFiberglass bolts (GFK)

Superior horizontal beam

Pile walls

Page 30: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 3030

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

1. Initial state

Excavation fillingmodelized by triangular

shaped horizontal forces

Existing retaining structure

(constructed before filling)

Page 31: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 3131

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

2. Construction of the pile walls

Front and lateral pile walls

Page 32: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 3232

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

3. Permanent anchors in embankment

Excavation and anchors

Page 33: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 3333

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Anchors activatedstep by step

4. Step by step excavation

Page 34: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 3434

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

6. Demolition of piles in front of the tunnel crown Construction of the umbrella vault

Umbrella vaultLongitudinal steel tubes

Page 35: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 3535

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

8. Excavation of the tunnel upper half and activation of the initial support

Vue of the tunnel excavation

Page 36: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 3636

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Displacements

Page 37: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 3737

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Bending moments in piles and top beam

Horizontal cross section in beam

Vertical cross section in pile wall

Page 38: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 3838

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Tensile forces in bar anchors on the tunnel face

Tunnel face – GFK bolts

Page 39: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 3939

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Page 40: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 4040

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Tunnel in marny molasse

Page 41: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 4141

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Tunnel cross section

14m94

R =

7m97

Arch supportSteel ribs HEB 240 and concrete filling

Umbrella vaultLongitudinal steel tubes

First drift (upper half)

Second drift (lower half)

Support of the invertSteel ribs HEB 240 and concrete filling

Support of the coreSteel ribs HEB 240 and concrete filling

Support of the coreRock bolts

Page 42: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 4242

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

30 m

18 m MarnyMolasse

ZSoil 2D Model

Page 43: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 4343

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Step 1

Initial state

Page 44: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 4444

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Arch supportBeam modelising the steel ribs and

concrete filling

Invert supportBeam modelising the steel ribs and

concrete filling

Umbrella vaultRadial bars modelizing the flexibility of the

longitudinal steel tubes

Base of arch supportVolumetric elements

Step 2

2a Activation of umbrella vault

2b Excavation of upper half

2c Arch and invert support

Page 45: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 4545

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Step 3

3a Transfer of the efforts from theumbrella vault to the arch support

3b Activation of rock bolts for coresupport

Removal of radial bars modelising theumbrella vault

Rock boltsTruss elements

Page 46: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 4646

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Step 4

4a Removal of first invert support

4b Excavation of lower half

4c Activation of core and final invertsupport

Core and invert supportBeam modelising the steel ribs and

concrete filling

Page 47: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 4747

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Step 5

5a Activation of tunnel lining

5b Transfer of efforts from initial support to lining

Tunnel liningContinuum for structures

Page 48: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 4848

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Problems with 2D model:

Unconfinement rate of upper half: well documented -> assumptions made in 2D ok

Unconfinement rate of core : not well documented - > specific 3D model

Stability of tunnel face - > specific 3D model

Page 49: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 4949

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

30 m

15x2 = 30 m

4 m

5x2 + 10x1 =

20 m

27 m

18 m

MarnyMolasse

Excavation of the core and invert by steps 2m long starting from the south

portal going north.

Excavation of thelower half

ZSoil 3D Model

Page 50: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 5050

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Support systems

Rock boltsConstructed from the first invert

Base of arch supportVolumetric elements

Core and invert supportsShell modelizing steel ribs and

concrete filling

Arch supportShell modelizing the steel ribs and

concrete filling

Page 51: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 5151

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

1. Excavation of upper half in one step 2. Activation of rock bolts

3. Removal of first invert and excavation oflower half by 2m long steps

Excavation steps

4. Activation of core and invert support following the excavation

5. End of excavation and activation ofinner lining

Page 52: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 5252

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Variable

4 m – 18 m

Arch and invert supportShell modelizing steel ribs and

concrete filling

Marny Molasse

30 m

3x2+10x1+4x2 = 24 m

3 models :

27.5 m, 34.5m

et 41.5 m

Umbrella vaultROR steel tubes

Face supportRock bolts

Tunnel face stabilityZSoil 3D Model

Page 53: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 5353

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

1. Initial state 2. Activation of the umbrella vault

3. Activation of face support 4. Step by step excavation and support of the upper half over the first 6 meters

5. Face stability (decrementation ofc molasse from Ck to Cd)

Excavation steps

Page 54: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 5454

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Displacements

Page 55: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 5555

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Tensile forces in tunnel face rock bolts

Page 56: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 5656

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Friction along tunnel face rock bolts

Page 57: Graitery Tunnel– Use of Zsoil for complex excavations · 28th August 2009 1010 Zsoil-Day 2009 Graitery Tunnel– Use of Zsoil for complex excavations History of excavation: Mid

28th August 2009 5757

Graitery Tunnel– Use of Zsoil for complex excavationsZsoil-Day 2009

Conclusion:

• Use of several models adapted to specific problems

• Start with basic model (elastic, no contact, single phase) then add complexity

• Start with small model, then extend to get correct boundary conditions

• Complex models can confirm results of specific models

• For retrofit analysis, complex models cannot be sparedbut when results correspond well to in-situ measurements, the reward is worth the effort

Faster model generationRefined mesh around studied areaFaster calculation allows for more case studies