green building building work shop presentation

Upload: rladdha9401

Post on 08-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/7/2019 Green Building Building Work Shop Presentation

    1/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    GreenGreen BuildingBuilding WorkshopWorkshop

    Presented byPresented by

    Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd

    PreviewPreview

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Th e f r o g d o e s n o t d r i n k u p t h e w a t e r f r o m Th e f r o g d o e s no t d r i n k u p t h e w a t e r f r o m

    w h i ch he l i ves .w h i ch he l ives .

    -- American Indian SayingAmerican Indian Saying

  • 8/7/2019 Green Building Building Work Shop Presentation

    2/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Ecological Debtor & Creditor CountriesEcological Debtor & Creditor Countries

    Debtors Creditors

    Footprint > 1.5 Biocap acity

    Footprint = 1.0 - 1.5 Biocapacity Biocapacity = 1.0 - 1.5 Footpr int

    Biocapacity > 1.5 Footprint

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    IndiaIndias Ecological Footprints Ecological Footprint

    Source: Global Footprint Ne tw ork, USA

    India Footprint, Biocapacity and GDP

    0.00

    0.10

    0.20

    0.30

    0.40

    0.50

    0.60

    0.70

    0.80

    0.90

    1961 1966 1971 1976 1981 1986 1991 1996 2001

    Globalhectarespercapita

    0

    100

    200

    300

    400

    500

    600

    GDPpercapita.constant2000US$

    Footprint

    Biocapacity

    GDP

  • 8/7/2019 Green Building Building Work Shop Presentation

    3/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    WhyWhy SUSTAINABLE DEVELOPMENTSUSTAINABLE DEVELOPMENT..

    n For India to achieve a Developed Country status

    q Need to maintain high GDP growth rates

    n Flipside of higher growth rates

    q Increased use of natural resources

    n Energy, Water, etc.

    q Increased emissions and discharges

    NEED OF THE HOUR!!!

    IN OUR RACE TO SAVE THE PLANET.

    Need to focus on Ecologically Sustainable grow th

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Core PurposeCore Purpose

    To promote and champion

    conservation of Natural

    resources in Indian Industry

    without compromising on

    high and accelerated growth

  • 8/7/2019 Green Building Building Work Shop Presentation

    4/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    What is LEED?What is LEED?

    LLeadershipeadership inin EEnergynergy & E& Environmentalnvironmental DDesignesign Voluntary, Consensus-based, Market driven for developing high

    performance, sustainable buildings

    Based on professional reference standards like NBC, ASHRAE,ECBC etc.,

    Points can be obtained for individual credits categories

    1.1. Sustainable SitesSustainable Sites

    2.2. Water EfficiencyWater Efficiency

    3.3. Energy & AtmosphereEnergy & Atmosphere

    4.4. Material and ResourcesMaterial and Resources

    5.5. Indoor Air QualityIndoor Air Quality

    6.6. InnovationInnovation

    Centre of Excellence for Energy, Environment, Green Buildings,Renewable energy, Water & Climate change activities in India

    CIICII Sohrabji Godrej Green Business CentreSohrabji Godrej Green Business Centre

    A unique Public Private Partnership( CII, Govt of Andhra Pradesh, USAID and Pir ojsha Godrej Foundation )

  • 8/7/2019 Green Building Building Work Shop Presentation

    5/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    the journeythe journey

    2001: 1st Green Building

    20,000 sq.ft. 2010: 508 Green Buildings

    353 Million sq.ft.

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Green Building Movement in IndiaGreen Building Movement in India

    LEED India NC in force effective 1st Jan 2007

    Did not reinvent the wheel

    500+ projects registered under LEED

    Assessment by III Party Assessors & USGBC

  • 8/7/2019 Green Building Building Work Shop Presentation

    6/106

  • 8/7/2019 Green Building Building Work Shop Presentation

    7/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    IGBC Rating Systems Certification LevelsIGBC Rating Systems Certification Levels

    LEED INDIA-NC

    7 Prerequisites

    Certified 26 to 31Silver 32 to 38Gold 39 to 51Platinum 52 to 69

    IGBC GREEN HOMES

    8 Prerequisites

    Certified 30-37Silver 38-44Gold 45-52Platinum 53-75

    LEED INDIA-CS

    7 Prerequisites

    Certified 23 to 27

    Silver 28 to 33

    Gold 34 to 44

    Platinum 45 to 61

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    What is Green?What is Green?Energy Efficiency

    Water Efficiency

  • 8/7/2019 Green Building Building Work Shop Presentation

    8/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    What is Green?What is Green?

    Use of Recycled/recyclableproducts

    Use of Renewable Energy

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    What is Green Building?What is Green Building?Externally : both look alike

    Functionally : both are same

    Differences

    Concern for Human Comfort

    & Indoor Environment

    Operational Savings

    Overall cost (2-3%) but pays for itself

  • 8/7/2019 Green Building Building Work Shop Presentation

    9/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    COST OF GREEN BUILDINGSCOST OF GREEN BUILDINGS -- INDIAN EXPERIENCEINDIAN EXPERIENCE

    6 %

    8 %

    15 %

    20 %

    % increase incost

    3 years

    5 years

    6 years

    7 years

    TypicalPayback

    Gold (42 Points)40,000Grundfos

    Pumps,

    Chennai

    Platinum (57 Points)1,75,000Wipro,

    Gurgaon

    Platinum (52 points)1,70,000ITC Green

    Centre,

    Gurgaon

    Platinum (56 points)20,000CII-Godrej GBC

    RatingSqftBuilding

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Green Building FeaturesGreen Building Features

    Incorporates several Green Features

    Efficient Use of Water

    Efficient Use of Landscape

    Energy Efficient &

    Eco Friendly Equipment

    Use of Renewable Energy

    Use of Recycled/Recyclable

    Materials

    Effective Control & Building

    Management Systems

    Improved indoor air quality

    for health and comfort

    Energy Resource CenterEnergy Resource Center

    Southern California Gas CompanySouthern California Gas Company

    AA SempraSempra Energy CompanyEnergy Company

    Downey, CaliforniaDowney, California

  • 8/7/2019 Green Building Building Work Shop Presentation

    10/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Benefits of Green BuildingBenefits of Green Building

    TangibleTangible Reduce operating costs

    Increased Marketability

    Optimize life cycle of Equipment / Product

    Enhanced Efficiency

    Considers embodied energy

    Savings of investments on equipment

    v Water savings: 40 50 %

    v Energy savings: 20 30 %

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Intangible Environmental benefits

    Reduce impact on environment

    Health and Safety benefits

    Enhance occupant comfort

    Improved productivity

    Reduced Absenteeism

    Employee Retention

    Safety procedures incorporated while construction & measuresafter occupancy

    World Class Standards & Procedures

    Benefits of Green BuildingBenefits of Green Building

  • 8/7/2019 Green Building Building Work Shop Presentation

    11/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Few LEED Rated Projects in IndiaFew LEED Rated Projects in India

    Wipro-Gurgaon Raheja-Mumbai

    L&T-Hazira

    British Gas, Hiranandani

    Mumbai Spectral-Noida

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Project RegistrationProject Registration

    Registration using the form in IGBC website

    v www.igbc.in

    Resources for Registered projects

    v Free reference Guide

    v Templates

    v 2 Free CIRs

    When to register

    v Can register at any stage

    Registration a early stage max. potential for achieving

    certification and benefits

  • 8/7/2019 Green Building Building Work Shop Presentation

    12/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    LEED India Certification ProcessLEED India Certification Process

    30 Days

    Project team appeals thecertification awarded

    within 1 month

    PROJECT REGISTRATION (www.igbc.in )

    PRELIMINARY REVIEW BY III PARTY ASSESSORS

    SUBMIT DOCUMENTS FOR FINAL REVIEW

    FINAL REVIEW BY III PARTY ASSESSORS

    NOTIFY FINAL LEED SCORE BY IGBC

    PROJECT ACCEPTS

    IGBC PRESENTS PLAQUE IN DICATINGCERTIFICATION LEVEL

    YES

    SUBMIT DOCUMENTS FOR PRELIMINARY REVIEW

    30 Days

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    To Sum UpTo Sum Up

    Green Buildings

    Excellent opportunity to

    reduce operating costs

    Sustainability of Business

    Tremendous benefits

    Tangible & Intangible

    Long term benefits

    Bu ild Green, Everyone profits

    http://www.igbc.in/http://www.igbc.in/
  • 8/7/2019 Green Building Building Work Shop Presentation

    13/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Save the planetSave the planet

    Treat softlyTreat softly

    Save the planet

  • 8/7/2019 Green Building Building Work Shop Presentation

    14/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Sustainable SitesSustainable Sites

    Presented byPresented by

    Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit SummaryCredit Summary

    Light pollution reduction

    Heat Islands Effect

    Storm water Design

    Site development

    Alternative transportation

    Brownfield redevelopment

    Development Density & Community Connectivity

    Site selection

    Erosion and Sedimentation Control

    Title

    Total 13

    1Credit 8

    1-2Credit 7

    1-2Credit 6

    1-2Credit 5

    1-3Credit 4

    1Credit 3

    1Credit 2

    1Credit 1

    RequiredPrereq 1

    Point(s)Credit

  • 8/7/2019 Green Building Building Work Shop Presentation

    15/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    SS Prerequisite 1:SS Prerequisite 1: Erosion & SedimentationErosion & Sedimentation

    ControlControlIntent

    Control erosion & sedimentation of soil toreduce negative impacts on

    Water quality

    Air quality dust generation

    Erosion from Construction sites can carry

    toxicants & nutrients polluting the stormwater

    run-off & subsequently the receiving streams.

    Measures should address both construction &post-occupancy

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Requirements

    Erosion control measures as highlighted in

    the National Building Codes of India (NBC)

    Part 10, section 1, chapter 4.

    Topsoil should be stockpiled for reuse

    later.

    Develop appropriate measures to

    address soil erosion , post occupancy

    Erosion Control Techniques

    Stabilization

    Structural Control

    Erosion & Sedimentation ControlErosion & Sedimentation Control

  • 8/7/2019 Green Building Building Work Shop Presentation

    16/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    StabilizationStabilization

    Erosion & Sedimentation ControlErosion & Sedimentation Control

    TEMPORARY

    SEEDINGPERMANENT

    SEEDING MULCHING

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Erosion & Sedimentation ControlErosion & Sedimentation Control

    Structural ControlStructural Control

    EARTH DIKES SILT FENCING SEDIMENTATIONBASIN / TRAP

  • 8/7/2019 Green Building Building Work Shop Presentation

    17/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    SS Credit 1 : Site SelectionSS Credit 1 : Site Selection

    Intentv Not to build on inappropriate sites

    Inappropriate sitesv Prime Farmland

    v Land whose elevation is lower than

    5 feet above the elevation of the

    100-year flood as defined by FEMA

    v Land which provides habitat for any

    species on the threatened or endangered

    list of Wildlife Institute of India

    v Within 100 feet of any wetland as

    defined by local or state lawv Land which prior to acquisition for the

    project was public parkland

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    SS Credit 2: Development density &SS Credit 2: Development density &

    Community ConnectivityCommunity Connectivity

    Intentv Build in areas where infrastructure is

    already developed

    v Avoid occupying green field

    Requirements

    Option 1:

    Minimum development density60,000 sq ft / acre for the building

    (And)Average density > 60000 sft/acre

    Local terminology : FAR =1.38

  • 8/7/2019 Green Building Building Work Shop Presentation

    18/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Project should show development density > 60000

    AND

    Average density also > 60000

    Density radius =

    3 (site area in acres x 43560)

    Empty site

    Area to be considered

    Public places, parks, roads

    No need to consider area

    Radius crossing a site Consider entire area of the site

    & built-up area

    Development DensityDevelopment Density

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    62,199Ave Density (SF/Acres)

    16.04997665Total

    0.244300 z

    0.76-V

    0.5133,650T

    0.3933,425A

    Site Area

    (acres)

    Building Space

    (SF)

    Buildings within

    Density radius

    Building space 30,000 sft

    Site Area 0.44 acres

    DD = 30000 / 0.44

    DD = 68182 sq.ft/acre

    Development DensityDevelopment Density

  • 8/7/2019 Green Building Building Work Shop Presentation

    19/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Community ConnectivityCommunity ConnectivityRequirements

    Option 2:

    Within mile radius of residential zone or Neighborhood with density of 10 units /

    acre net (And)

    10 basic services within mile radius (And)

    Pedestrian access to basic services

    Basic Services

    1. Bank

    2. Place of Worship

    3. Day Care

    4. Fire Station

    5. Cleaners

    6. Library

    7. Medical

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Basic Services8. Park

    9. Post Office

    10. Restaurant

    11. School

    12. Supermarket

    13. Fitness Cent er

    14. ATM

    15. Hardware

    16. Beauty Saloon

    17. Theater

    18. Pharmacy

    19. Museum

    20. Community Center

    The above services are examples and not exhaustive; other services can also be included

    CommunityCommunity ConnectivityConnectivity

  • 8/7/2019 Green Building Building Work Shop Presentation

    20/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    SS Credit 3: Brownfield RedevelopmentSS Credit 3: Brownfield Redevelopment

    Intentv Construct on dilapidated site /

    environmentally damaged sites

    After treatment

    Requirement

    v Site having hazardous substances

    Remediation efforts to be performed

    Water: Pump & Treat

    Soil : Bioreactors, Solar detoxification

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    SS Credit 4: Alternative TransportationSS Credit 4: Alternative TransportationCredit 4.1 : Public Transportation AccessCredit 4.1 : Public Transportation Access

    Intent

    To reduce pollution

    from automobile use

    Requirement

    Building within 0.8 km of

    railway line

    (OR)

    Within 0.4 km of two or

    more bus lines

  • 8/7/2019 Green Building Building Work Shop Presentation

    21/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit 4.2 : Low Emitting & Fuel Efficient VehiclesCredit 4.2 : Low Emitting & Fuel Efficient Vehicles

    Intent

    Reduce pollution from automobile use

    Requirement

    Option 1:

    Low emitting & fuel efficient vehicles

    for 3% of FTE occupants (and)

    Preferred parking also to be provided

    Option 2:

    Provide AFV - Refueling stations

    3% of the total vehicle parking capacity

    Electric charging, liquid or gaseous fuelingfacilities

    SS Credit 4: Alternative TransportationSS Credit 4: Alternative Transportation

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    SS Credit 4: Alternative TransportationSS Credit 4: Alternative TransportationCredit 4.2 : Low Emitting & Fuel Efficient VehiclesCredit 4.2 : Low Emitting & Fuel Efficient Vehicles

    2854908240First Shift

    4

    (hrs)

    60

    Occupants

    Part-time occupants

    1408110Second Shift

    Occupants(hrs)Occupants

    Full-time equivalent

    (FTE) occupants

    Full-time OccupantsShift

    Convert Part time occupants to Full Time Equivalent

    For eg. 90 occupancy for 4 hrs = 90 x 4/8 = 45, which is added to240 occupants which are for full 8 hrs.

    Hence total = 240 + 45 = 285

  • 8/7/2019 Green Building Building Work Shop Presentation

    22/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit 4.3 : Parking CapacityCredit 4.3 : Parking CapacityIntent Reduce pollution from automobile use

    Requirement

    Option 1:

    Parking capacity should not exceed localzoning requirement (AND)

    Preferred parking for Car/Vanpool serving5% of total parking spaces

    Option 2:

    Add no new parking for rehabilitationproject (AND)

    Preferred parking for Car/Vanpool for 5% oftotal parking spaces

    SS Credit 4: Alternative TransportationSS Credit 4: Alternative Transportation

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    SS Credit 4: Alternative TransportationSS Credit 4: Alternative Transportation

    Credit 4.3 : Parking CapacityCredit 4.3 : Parking Capacity

    v Preferred parking

    Places closest to the main entrancePlaces closest to the main entrance

    Should not include spaces designatedShould not include spaces designated

    for handicappedfor handicapped

    (OR)(OR)

    Parking passes at a discounted priceParking passes at a discounted price

  • 8/7/2019 Green Building Building Work Shop Presentation

    23/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    SS Credit 5: Site DevelopmentSS Credit 5: Site Development

    Credit 5.1: Protect or Restore HabitatCredit 5.1: Protect or Restore HabitatIntent

    To minimize disturbance

    Requirements

    Option 1 (Greenfield)

    Limit site disturbance i.e earth

    work and cleaning of vegetation

    40 beyond building perimeter

    5 beyond perimeter roadways and utility branch trenches

    25 beyond constructed areas with permeable surfaces (such as

    pervious paving areas, playing fields)

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Protect or Restore HabitatProtect or Restore Habitat

    Site Disturbance

    Must have off-set

    more than 40 feet

    Buildingfootprint

    Site

    40 ft

    Building

    footprint

    Site40 ft

  • 8/7/2019 Green Building Building Work Shop Presentation

    24/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Option 2 :(Previously developed sites)

    Restore min 50% of the site

    area by replacing impervious surfaces

    with native and adapted vegetation

    {Site Area : Total Site Area Bldg. foot print area}

    Protect or Restore HabitatProtect or Restore Habitat

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit 5.2: Maximize Open AreasCredit 5.2: Maximize Open Areas

    Intent

    Reduce the building foot prints

    Requirements

    Case 1: (where local zoning requirement present)

    Reduce the building footprint to exceed the local zonings open space

    requirement for the site by 25%.

    Open space = Site area Development footprint

    Development footprint

    Building footprint

    Access roads

    Parking

    Utility area

    SS Credit 5: Site DevelopmentSS Credit 5: Site Development

  • 8/7/2019 Green Building Building Work Shop Presentation

    25/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Maximize Open AreasMaximize Open Areas

    Case 2: (Campus situation or No local regulation) Leave vegetated open space equivalent of building footprint

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    SS Credit 6: Stormwater DesignSS Credit 6: Stormwater Design

    Credit 6.1: Quantity ControlCredit 6.1: Quantity Control

    Intent

    To manage stormwater runoffs to limit pollutionof natural water

    Requirements

    Case 1: (existing Imperviousness 50%)

    Implement stormwater management plan that

    results in a 25% decrease in rate and quantity ofstormwater runoff.

    Impervious Area = Surface area x Run-off coefficientImperviousness% = Total Pervious Area / Total Site Area

  • 8/7/2019 Green Building Building Work Shop Presentation

    26/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Stormwater Quantity DesignStormwater Quantity Design

    0.10 0.30Vegetation, Flat-to-Steep

    0.25 0.45Turf, Flat-to-steep

    0.50 0.10Roofs, Garden roof(20in)

    0.95Roofs, conventional

    0.75Pavement, Gravel

    0.85Pavement, Brick

    0.95Pavement, Concrete

    0.95Pavement, Asphalt

    Runoff CoefficientSurface type

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Stormwater Quantity DesignStormwater Quantity Design

    Basecase

    Imperviousness-48.62%

    43,84390,170

    1,20012,0000.10Vegetation, Flat

    11,29345,1700.25Turf, Flat

    31,35033,0000.95Pavement, Asphalt

    ImperviousArea (sft)Run-off co-effSurface

  • 8/7/2019 Green Building Building Work Shop Presentation

    27/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Stormwater Quantity DesignStormwater Quantity Design

    Proposed case

    Imperviousness-20.52%

    18,50090,170

    2,00057,1700.10Vegetation, Flat

    16,50033,0000.50Roof Garden

    ImperviousArea (sft)Run-off co-effSurface

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit 6.2: Quality ControlCredit 6.2: Quality Control

    Intent

    To treat the stormwater before

    discharge

    Requirements

    Construct site stormwater treatment system to remove

    80% TSS (Average annual post development)

    Standards: NBC (Part 10, Section 1,Clause 5.2 StormWater Management & Filtration Techniques)

    Methods: Filtration, Rain Water Harvesting Pits

    SS Credit 6: Stormwater DesignSS Credit 6: Stormwater Design

  • 8/7/2019 Green Building Building Work Shop Presentation

    28/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    BEST MANAGEMENT PRACTICESBEST MANAGEMENT PRACTICES

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    SS Credit 7: Heat Island EffectSS Credit 7: Heat Island EffectCredit 7.1: NonCredit 7.1: Non--RoofRoof

    Intent

    Reduce heat islands (thermal gradient differencesbetween developed and undeveloped areas)

    Requirements

    Provide Shade (within 5yrs) and/or use lightcolored/high albedo material (reflectance of atleast0.3) and/or open grid pavement for atleast 30% ofthe sites non-roof impervious surfaces, includingparking lots, walkways, plazas etc.

    OR

    Place minimum of 50% of parking spaces

    underground or covered by structured parkingOR

    Use an open grid pavement system (less than 50%impervious) for a minimum of 50% of the parking lotarea

  • 8/7/2019 Green Building Building Work Shop Presentation

    29/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    SS Credit 7: Heat Island EffectSS Credit 7: Heat Island EffectCredit 7.2: RoofIntent Reduce heat islands (thermal gradient

    differences between developed and

    undeveloped areas)

    Requirements 75% of the Roof surface should have Roofing material having Solar Reflectance Index

    (SRI) as mentioned in the table below

    OR

    Vegetated Roof for atleast 50% of the roof area

    OR

    Install high-albedo and vegetated roof in combination to meet the following

    (Area of SRI roof/0.75) + (Area of Vegetated roof/0.5) >= Total Roof Area

    29>= 2:12Steep-sloped roof

    78

  • 8/7/2019 Green Building Building Work Shop Presentation

    30/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    SS Credit 7: Heat Island EffectSS Credit 7: Heat Island Effect

    SRI for Typical Roofing MaterialsSRI for Typical Roofing Materials

    104PVC White

    107White Coating 2 Coats, 20 mils

    90White Cement Tile

    36Red Clay Tile

    37Light Gravel on Built-Up Roof

    56Aluminum

    79White-Coated Gravel on Built-Up Roof

    82White Coating on Metal Roof

    84White EPDM

    100White Coating 1 Coat, 8 mils

    28White Granular Surface Bitumen

    25Unpainted Cement Tile

    Solar Reflectance Index (SRI)Generic Roofing Materials

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    SS Credit 8: Light Pollution ReductionSS Credit 8: Light Pollution ReductionIntent Minimize light trespass from building, reduce sky-glow, improve nighttime

    visibility through glare reduction & reduce impact on nocturnalenvironments

    Requirements

    Meet or provide lower light levels and

    than those recommendation by IESNA

    For Interior Lighting

    Maximum candela from each luminaire

    shall intersect opaque building interior

    surfaces and not exit out of windowsOR

    All non-emergency interior lighting, shall be automatically controlled to turn offduring non-business hours. Provide manual override capability

  • 8/7/2019 Green Building Building Work Shop Presentation

    31/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    SS Credit 8: Light Pollution ReductionSS Credit 8: Light Pollution Reduction

    For Exterior Lighting Light areas as required for safety and comfort

    Lighting not to exceed

    ASHRAE/IESNA 90.1 2004

    80% of LPD for exteriors

    Parking areas : 0.15 W/sft

    Walkways:

    1 W /linear foot (< 10 feet width)

    0.2 W/sft (>10 feet width)

    50% of LPD for faade & landscape 0.2 W/sft or 5 W/linear foot (ASHRAE)

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    THANK YOU

  • 8/7/2019 Green Building Building Work Shop Presentation

    32/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Water EfficiencyWater Efficiency

    Presented byPresented by

    Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    70% OF EARTH IS COVERED IN WATER

    OVERVIEW

  • 8/7/2019 Green Building Building Work Shop Presentation

    33/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    FRESH WATER

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    FRESH WATER

    Saltwater

    97.5%

    Freshwater

    2.5%

    Total Surface Freshwater 0.4%

    TOTAL WATERGroundwater

    30.1%

    Surfacewater

    0.4%

    Glaciers

    69.5%

    FRESHWATER

  • 8/7/2019 Green Building Building Work Shop Presentation

    34/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    WATER USAGE

    Only 20 per cent of the water is used for drinking, cooking;

    Over 60 per cent is used for bathing, washing and flushingdown the toilet. Important that our water toilets are still 10-12 litres per each pull of the chain.

    Literally, water down the drain

    ...80% potable water ends up as waste-water

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    IN COMMERCIAL BUILDINGSq Major Water consumers are

    n Plumbing (Flow / Flush Fixtures)

    n HVAC

    n Landscaping

    q Thus efficient use of water can lower water use fees, lowersewage volumes to treat etc. and thus lower capacitycharges and limits

    q Technologies are available to treat gray water, harvest rain

    water and use treated water for landscaping / flushing etc.

    q Potential to reduce water consumption upto 30%

  • 8/7/2019 Green Building Building Work Shop Presentation

    35/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit SummaryCredit Summary

    Water Use Reduction

    Innovative Wastewater Technologies

    Water Efficiency in Air-Conditioning System

    Water Efficient Landscaping

    Title

    Total 6

    1-2Credit 4

    1Credit 3

    1Credit 2

    1-2Credit 1

    Point(s)Credit

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    WE Credit 1 : Water Efficient LandscapingWE Credit 1 : Water Efficient LandscapingCredit 1.1: 50% ReductionCredit 1.1: 50% ReductionIntent

    v Limit or eliminate the use of potable

    water for landscape irrigation

    Requirementsv Demonstrate 50% reduction in potable water

    consumption for irrigation

    Strategiesv Adopt native irrigation

    v Use of recycled wastewater (STP)

    v Use of captured rainwater (RainwaterHarvesting)

    v High Efficient Irrigation systemSprinkler : 0.63

    Drip : 0.90

  • 8/7/2019 Green Building Building Work Shop Presentation

    36/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit 1.2: No Potable Water Use or No IrrigationCredit 1.2: No Potable Water Use or No IrrigationIntentv Eliminate the use of potable

    water for landscape irrigation

    Requirements

    v Use Rain or recycled water to

    eliminate 100% potable water use

    for site irrigation

    OR

    v Install Landscaping that does not

    require permanent irrigation system

    Temporary irrigation is allowed for one year

    WE Credit 1 : Water Efficient LandscapingWE Credit 1 : Water Efficient Landscaping

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    WE Credit 2 :WE Credit 2 :

    Water Efficiency in AirWater Efficiency in Air--Conditioning SystemConditioning System

    50% Reduce50% ReduceIntent

    v Limit or eliminate the use of

    potable water for Air-

    conditioning make-up

    Requirements

    v Use Rain or recycled water to

    reduce the potable water use

    for air-conditioning by 50%

  • 8/7/2019 Green Building Building Work Shop Presentation

    37/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    WE Credit 3 : Innovative Wastewater TechnologiesWE Credit 3 : Innovative Wastewater Technologies

    Intentv Reduce generation of wastewater and

    potable water demand while increasing

    the local aquifer recharge

    Requirements

    v Reduce potable water use for building

    sewage conveying by 50% by use

    of non potable water

    (OR)

    v Treat 100% waste water onsite

    to tertiary standards. Treated water

    must be infiltrated or used on-site

    (Water Balance)

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    RAIN WATER HARVESTING

  • 8/7/2019 Green Building Building Work Shop Presentation

    38/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    RAIN WATER HARVESTING

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    WE Credit 4 : Water Use ReductionWE Credit 4 : Water Use Reduction

    Credit 4.1: 20% ReductionCredit 4.1: 20% Reduction

    Intent

    v Maximize water efficiency within buildings

    by installing water efficient plumbing fixtures

    v Will result in reduction of waste water

    generation also

    Requirements

    v Employ strategies that in aggregate use

    20% less water than the baseline

    calculated for the building (not including

    irrigation)

  • 8/7/2019 Green Building Building Work Shop Presentation

    39/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    WE Credit 4 : Water Use ReductionWE Credit 4 : Water Use Reduction

    Reduction Strategies

    v Select efficient water fixtures

    v The baseline flow requirements to beat are as follows:

    2.5

    2.5

    1.0

    1.6

    Flow Requirement

    Base Case

    Faucets (GPF)*

    Showerheads (GPM)*

    Urinals (GPF)

    Water Closets (GPF)

    Fixture

    * At flowing water pressure of 80 pounds per square inch (psi)

    2.0

    2.0

    0.8

    1.3

    20% less than

    Base Case

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    WE Credit 4 : Water Use ReductionWE Credit 4 : Water Use ReductionCredit 4.2: 30% ReductionCredit 4.2: 30% Reduction

    Intent

    vMaximize water efficiency within

    buildings by installing water

    efficient plumbing fixtures

    Requirements

    vEmploy strategies to minimizewater consumption by 30% vis--

    vis the baseline (Sample Sheet)

  • 8/7/2019 Green Building Building Work Shop Presentation

    40/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Every drop countsEvery drop counts

  • 8/7/2019 Green Building Building Work Shop Presentation

    41/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Energy EfficiencyEnergy Efficiency

    Presented byPresented by

    Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit SummaryCredit Summary

    Green Power

    Measurement & Verification

    Ozone Depletion

    Additional Commissioning

    Onsite Renewable Energy

    Optimize Energy Performance

    Fundamental Refrigerant Management

    Minimum Energy Performance

    Fundamental Building System Commissioning

    Title

    Total 17

    1Credit 6

    1Credit 5

    1Credit 4

    1Credit 3

    1-3Credit 2

    1-10Credit 1

    RequiredPre-req 3

    RequiredPre-req 2

    RequiredPre-req 1

    Point(s)Credit

  • 8/7/2019 Green Building Building Work Shop Presentation

    42/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Prerequisite 1:Prerequisite 1:

    Fundamental CommissioningFundamental Commissioning

    Intent

    v Verify and ensure that fundamental building elements andsystems are designed, installed and calibrated to operate asintended

    Requirementsv Engage Commissioning Team,

    Can be from project team but not responsible for design

    v Develop and implement commissioning plan

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    qWHY COMMISSIONING?

    v Commissioning is a quality based method

    v It is owners means of verifying that the planning, design,

    construction and operational processes are achieving their

    goals

    v It ensures delivery of high quality building with maximum

    asset value

    Prerequisite 1:Prerequisite 1:

    Fundamental CommissioningFundamental Commissioning

  • 8/7/2019 Green Building Building Work Shop Presentation

    43/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    q A commissioned building provides

    v Optimized energy efficiency

    v Indoor Air Quality

    v Occupants comfort

    v And thus sets stage for minimal operation and

    maintenance cost

    Prerequisite 1:Prerequisite 1:

    Fundamental CommissioningFundamental Commissioning

    Properly executed commissioning process often increases

    energy efficiency by 5% - 10%

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    q LEED focuses on systems and assemblies having to do with

    projects operational performance particularly those related

    to LEED pre-requisites and credits

    q HVAC and their associated system

    q Building Management System

    q Lighting systems

    q Renewable and alternative energy technologies

    q Rain water harvesting systems

    q Water treatment systems

    Prerequisite 1:Prerequisite 1:

    Fundamental CommissioningFundamental Commissioning

  • 8/7/2019 Green Building Building Work Shop Presentation

    44/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    COMMISSIONING HVAC

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    COMMISSIONING HVAC

  • 8/7/2019 Green Building Building Work Shop Presentation

    45/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    COMMISSIONING

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EA Prerequisite 2: Minimum Energy PerformanceEA Prerequisite 2: Minimum Energy Performance

    Intent

    v Establish the minimum level of Energy efficiency for the

    proposed building and systems

    Requirements

    v Design to meet standards

    ASHRAE/IESNA 90.1-2004

    Submittals

    v Energy cost budget compliance report

    Visual DOE or any other appropriate simulation software

  • 8/7/2019 Green Building Building Work Shop Presentation

    46/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    n Project design needs to comply withMandatory Provisions & Prescriptive Requirement of ASHRAE

    Std - 90.1, 2004

    Section 5 Building Envelope

    Section 6 HVAC

    Section 7 Service water heating

    Section 8 Power distribution

    Section 9 Lighting

    Section 10 Other equipments

    EA Prerequisite 2: Minimum Energy PerformanceEA Prerequisite 2: Minimum Energy Performance

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    q Two methods to comply to this pre-requisite

    q Performance rating (Whole building Simulation ASHRAE

    90.1, Appendix G)

    q Energy Cost Budget (ASHRAE 90.1, Section 11)

    EA Prerequisite 2: Minimum Energy PerformanceEA Prerequisite 2: Minimum Energy Performance

  • 8/7/2019 Green Building Building Work Shop Presentation

    47/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EA Prerequisite 3:EA Prerequisite 3:

    CFC Reduction In HVAC&R EquipmentCFC Reduction In HVAC&R Equipment

    Intent

    v Reduce Ozone Depletion

    Requirements

    v Zero use of CFC-based refrigerants in new base building

    HVAC&R systems

    Submittals

    v Provide a LEED Template, signed by a Licensed professional

    Engineer, declaring that the Buildings HVAC&R systems donot use CFC based refrigerants

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EA Prerequisite 3:EA Prerequisite 3:CFC Reduction In HVAC&R EquipmentCFC Reduction In HVAC&R Equipment

  • 8/7/2019 Green Building Building Work Shop Presentation

    48/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EA Credit 1: Optimize Energy PerformanceEA Credit 1: Optimize Energy Performance

    Intentv Achieve higher levels of energy efficiency

    vis--vis base lines

    RequirementsvWhole Building Simulation (1-10 Points)

    Demonstrate a percentage improvement

    in the proposed building performance

    rating compared to baseline building

    performance as per ASHRAE/IESNA

    90.1-2004

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    1042

    835

    628

    421

    214

    PointsReduction in design

    energy cost (%)*

    EA Credit 1: Optimize Energy PerformanceEA Credit 1: Optimize Energy Performance

    Distribution of points for this credit are as follows

    The percentage improvement over base building can be

    demonstrated by energy simulation using Building

    performance method as per Appendix G ASHRAE 90.1, 2004

  • 8/7/2019 Green Building Building Work Shop Presentation

    49/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Energy ModelingEnergy Modeling

    v Developing a 3D Model of theproject

    v Developing Base Case Model for the

    project as per the requirements of

    ASHRAE 90.1-2004 standard.

    v Developing the Proposed Case

    model and comparing against the

    Base Case.

    v Identifying and developing Energy

    Conservation Measures (ECM)

    v Combining ECM's for Maximum and

    optimum Energy savings

    (Sample Report)

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Energy Conservation MeasuresEnergy Conservation Measures

    Over Deck Insulation

  • 8/7/2019 Green Building Building Work Shop Presentation

    50/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Energy Conservation MeasuresEnergy Conservation Measures

    Over Deck Insulation

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Energy Conservation MeasuresEnergy Conservation Measures

    Wall Insulation

  • 8/7/2019 Green Building Building Work Shop Presentation

    51/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    GLAZING

    Energy Conservation MeasuresEnergy Conservation Measures

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Energy Conservation MeasuresEnergy Conservation Measures

    DOUBLE GLAZEDARGON FILLED

    DOUBLE GLAZED

    TRIPLE GLAZED

  • 8/7/2019 Green Building Building Work Shop Presentation

    52/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Energy Conservation MeasuresEnergy Conservation Measures

    Demand Controlled Ventilation

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Energy Conservation MeasuresEnergy Conservation Measures

    VFDS for AHUs

    Occupancy & Lux level sensors

  • 8/7/2019 Green Building Building Work Shop Presentation

    53/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EA Credit 2: Renewable EnergyEA Credit 2: Renewable Energy

    Intentv Encourage higher levels of onsite renewable energy in order

    to reduce the environmental impacts associated with fossil

    fuel energy use

    Requirement

    vDemonstrate that atleast 2.5% of Building annual energy cost

    will be derived from on-site Renewable energy.

    1) 2.5 % - 1 Point

    2) 5.0% - 2 Point

    3) 7.5% - 3 Point

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Renewable Energy (Examples)Renewable Energy (Examples)

    SOLAR ENERGY

    WIND ENERGY

  • 8/7/2019 Green Building Building Work Shop Presentation

    54/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Renewable EnergyRenewable Energy

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Renewable Energy (BIOMASS)Renewable Energy (BIOMASS)

  • 8/7/2019 Green Building Building Work Shop Presentation

    55/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EA Credit 3: Additional CommissioningEA Credit 3: Additional Commissioning

    Intentv Verify & ensure that the entire building is designed, constructed and

    calibrated to operate as intended

    Requirement

    v Review of

    Design prior to construction

    Installation documents before completion

    Contract submittals

    v Develop re-commissioning management manual

    v Post occupancy review for 10 months

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EA Credit 4: Ozone DepletionEA Credit 4: Ozone Depletion

    Intent

    v Reduce ozone depletion and support early compliance with

    the Montreal Protocol

    Requirement

    v Install HVAC&R equipments and fire suppression systems thatdo not contain HCFCs & halons

    Submittals

    vManufactures datasheet stating that the refrigerants used in

    the equipments are not HCFC or halons

  • 8/7/2019 Green Building Building Work Shop Presentation

    56/106

  • 8/7/2019 Green Building Building Work Shop Presentation

    57/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    v Provide Metering for the following End -Use Lighting Systems and Controls

    Constant and Variable Motor Loads

    Variable Frequency Drive operation

    Chiller Efficiency at variable loads (KW/ton)

    Cooling Load

    Air and Water economizer and heat recovery cycles

    Air Distribution static pressures and ventilation air volumes

    Building related process energy systems and equipment

    Indoor Water Risers and outdoor irrigation systems

    EA Credit 5: Measurement & VerificationEA Credit 5: Measurement & Verification

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EA Credit 6: Green PowerEA Credit 6: Green Power

    Intentv Encourage investments in off-site

    renewable energy technologies

    to be exported to grid

    Requirementv Invest in off-site Green power

    anywhere in the country

    To meet 50% Energy requirement

    v Investment must be because of

    the rated building GREEN POWERso generated can be counted only

    once

  • 8/7/2019 Green Building Building Work Shop Presentation

    58/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

  • 8/7/2019 Green Building Building Work Shop Presentation

    59/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Materials & ResourcesMaterials & Resources

    Presented byPresented by

    Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit SummaryCredit Summary

    Certified Wood

    Rapidly Renewable Materials

    Regional Materials

    Recycled Content

    Resource Reuse

    Construction Waste Management

    Building Reuse

    Storage & Collection of Recyclables

    Title

    Total 13

    1Credit 7

    1Credit 6

    1-2Credit 5

    1-2Credit 4

    1-2Credit 3

    1-2Credit 2

    1-3Credit 1

    RequiredPrereq 1

    Point(s)Credit

  • 8/7/2019 Green Building Building Work Shop Presentation

    60/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Prerequisite 1MR Prerequisite 1

    Intent

    v Facilitate reduction of the waste

    generated by building occupants

    v Prevent waste being disposed in

    landfills

    Requirements

    v Provide easily accessible area that

    is dedicated for collection, separation

    and storage of the materials

    Minimum - paper, cardboard, glass, plastics & metals

    Storage & Collection of Recyclables

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Recycling Area Guidelines

    What we need to do?

    v Have dedicated place for recycling

    v Recycling program

    v Identification for recycling

    v Tracking & Awareness program for building occupants

    Storage & Collection of RecyclablesStorage & Collection of Recyclables

    500200,001 or more

    275100,001 to 200,000

    22550,001 to 100,000

    17515,001 to 50,000

    Recycling Area Sq.ftBuilding Sq.ft

  • 8/7/2019 Green Building Building Work Shop Presentation

    61/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 1 : Building ReuseMR Credit 1 : Building Reuse

    Intentv Extend the life cycle of existing building

    material

    v To reduce the waste, conserve resources,

    limit or eliminate the impact due

    to materials extraction,

    manufacturing & transport

    Requirements

    v Maintain or Reuse large portions of

    existing structures and shell during

    renovation or redevelopment projects

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 1 : Building ReuseMR Credit 1 : Building ReuseHow many points are at stake?Credit 1.1: Maintain 75% of Existing building structure & shell

    Credit 1.2: Maintain 100% of Existing building structure & shell

    Credit 1.3: Maintain 100% of Existing building structure & shell

    AND 50% non-shell structure

    What includes in structure & shell?

    v Shell- Exterior Walls, Framing, Roof

    v Structure- Foundation, Slab, Beam, Floor deck,

    Roof deck, Basement Wallv Non - Shell

    - Interior Walls, False ceiling, doors,

    Windows, wood flooring

  • 8/7/2019 Green Building Building Work Shop Presentation

    62/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 2: Construction Waste ManagementMR Credit 2: Construction Waste Management

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 2: Construction Waste ManagementMR Credit 2: Construction Waste Management

    Intentv Avoid construction, demolition and land

    clearing debris from reaching landfills

    v Redirect recycled waste back to

    manufacturing process

    v Redirect reusable materials to own or

    other appropriate sites

    How many points are at stake?

    Credit 2.1: Reduce and/or salvage atleast 50% (WT./VOL) of construction,

    demolition and land clearing wasteCredit 2.2: Reduce and/or salvage atleast 75% (WT./VOL) of construction,

    demolition and land clearing waste

    More than 95% would earn one innovation point

  • 8/7/2019 Green Building Building Work Shop Presentation

    63/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 2: Construction Waste ManagementMR Credit 2: Construction Waste Management

    Typical Examples

    v Waste Concrete

    v Broken bricks

    v Scrap Steel

    v Broken Glass

    v Cement Bags

    v Aluminum

    v ACC blocks

    v Packaging material (NEG-Micon)

    Rocks and sand removed from site

    are not considered for calculation

    Commercial constructions generateabout 1 kg of solid waste / sq.ft.

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 2: Construction Waste ManagementMR Credit 2: Construction Waste Management

    Strategies to Earn points

    v Minimize the generation of waste

    v System of Weighing & Disposal

    v Develop a plan at the design stage

    to identify waste and its salvaging

    opportunity

    v At construction site

    - Designate the area for waste

    collection

    - Train site workers for proper disposal

    Reuse / Sale / Donation accepted

    Cement/Concretewaste

    Wooden waste

    Barricade for designating thewaste collection area

  • 8/7/2019 Green Building Building Work Shop Presentation

    64/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 3: Resource ReuseMR Credit 3: Resource Reuse

    Intent

    v Reuse building materials in order to reduce the demand for virgin materials

    and to reduce waste

    Green Building Concern

    v Reduce the waste generated

    v Reduce the landfill space

    v Less Air & Water Contamination

    v Reduce impact on environment

    in producing virgin materials

    v Support the local economy

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 3: Resource ReuseMR Credit 3: Resource Reuse

    How many points are at stake?Credit 3.1: 5% of building materials (by Cost)

    Credit 3.2: 10% of building materials (by Cost)

    Requirementsv Use salvaged or refurbished

    materials for 5-10%

    Examples

    - Broken tiles (China Mosaic)

    - Used carpets

    - In-built furniture (Movable furniture

    like chairs, etc not accounted)

    - Broken bricks (from other sites) for

    construction of retaining walls- Floor panels

    - Decorative items

    Reprocessing is allowed

  • 8/7/2019 Green Building Building Work Shop Presentation

    65/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 3: Resource ReuseMR Credit 3: Resource Reuse

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 4: Recycled ContentMR Credit 4: Recycled Content

    Intent

    v Increase the use of materials that

    incorporate recycled content, therefore

    reducing the demand for virgin materials

    - Post consumer / Post industrial

    How many points are at stake?Use materials that constitutes at least

    Credit 4.1: 5% of total value of building

    material cost

    Credit 4.2: 10% of total value of building

    material cost

  • 8/7/2019 Green Building Building Work Shop Presentation

    66/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 4: Recycled ContentMR Credit 4: Recycled Content

    Post-Consumer / Post-Industrialv Post Consumer (PC)

    v Waste material available after

    consumer use

    - Paper, Tetrapack, Glass etc

    v Post Industrial (PI)

    v Waste material generated during

    manufacturing

    - Fly ash, Gypsum, etc

    v Recycled Content can be calculated as follows:

    PC recycled value + PI recycled value 5-10%

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 4: Recycled ContentMR Credit 4: Recycled Content

    Typical Materials with High Recycled Content

    25-30False roof

    20-25Steel

    15MDF wood

    20-30Ceramic Tiles

    10-15Glass

    30-40Fly ash blocks

    % Recycled contentMaterials

  • 8/7/2019 Green Building Building Work Shop Presentation

    67/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 5: Regional MaterialsMR Credit 5: Regional Materials

    Credit 5.1: Use 20% (by value) of building materials that aremanufactured Regionally within a radius of 800km

    Credit 5.2: Of the above materials, 50% of materials that areextracted, harvested or recovered within same distance

    Intent

    v Increase the use & demand of materials that are manufactured (Locally)

    v Encourage Local economy

    v Reduce the environmental impacts due to transportation

    Manufacturing refers to: Final place of assembly into furnished product

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 6: Rapidly Renewable materialsMR Credit 6: Rapidly Renewable materials

    Intent

    v Reduce the use and depletion of finite

    raw materials (5% by cost)

    v Encourage the use of rapidly

    renewable materials

    Rapidly renewable materials are those

    materials that are planted and replenished

    In less than 10 year cycle

    Requirement

    v Reduce the use and depletion of finite

    raw materials

  • 8/7/2019 Green Building Building Work Shop Presentation

    68/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 6: Rapidly Renewable materialsMR Credit 6: Rapidly Renewable materials

    Examplesv Bamboo products

    v False ceiling

    v Cellulose fiber and cotton

    v Composite wood (bagasse based)

    v Eco Board

    v Vertical Blinds made of woven

    cotton

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 7: Certified WoodMR Credit 7: Certified Wood

    Intent

    v Encourage environmentally responsible

    forest management

    v Reduce the impact on forestry like

    Deforestation, loss of wildlife habitat

    Requirement

    v Use a minimum of 50% of wood-based

    materials and products, - FSC certified

    (virgin wood)

  • 8/7/2019 Green Building Building Work Shop Presentation

    69/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MR Credit 7: Certified WoodMR Credit 7: Certified Wood

    What is FSC?v The Forest Stewardship Council (FSC) is an independent, not for profit,

    non-government organization based in Bonn, Germany

    v So far, 48 million hectares in more than 60 countries have been certified

    v FSC operates in more than 34 countries

    v FSC accredited certification body certifies

    the forest

    v Provides Chain of custody certification

    v Raw materials to Consumers

    Master Material Sheet

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    THANK YOU

  • 8/7/2019 Green Building Building Work Shop Presentation

    70/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Indoor Environmental QualityIndoor Environmental Quality

    Presented byPresented by

    Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit SummaryCredit Summary

    Total 15

    Daylighting and views

    Thermal comfort

    Controllability of systems

    Indoor chemical & pollutant source control

    Low-emitting materials

    Construction IAQ management plan

    Increased ventilation

    Outdoor Air Delivery Monitoring

    Environmental Tobacco Smoke Control

    Minimum IAQ performance

    Title

    1-2Credit 8

    1-2Credit 7

    1-2Credit 6

    1Credit 5

    1-4Credit 4

    1-2Credit 3

    1Credit 2

    1Credit 1

    RequiredPrereq 2

    RequiredPrereq 1

    Point(s)Credit

  • 8/7/2019 Green Building Building Work Shop Presentation

    71/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EQ Prerequisite 1:EQ Prerequisite 1:

    Intent

    v Prevent indoor air quality problems

    v Enhance indoor air quality

    Comfort

    Well-being of the occupants

    Requirement

    v To design based on ASHRAE 62.1-2004

    v Location of Fresh Air intakes

    25 away from any possible contamination areas

    v Minimize growth & dissemination of micro-organisms

    Minimum IAQ PerformanceMinimum IAQ Performance

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Minimum IAQ PerformanceMinimum IAQ PerformanceVentilation systems for Acceptable IAQ

    (Design based on ASHRAE 62.1-2004)

    vMechanically Ventilated System

    Sections 4 through 7 of ASHRAE 62.1-2004

    Specifies minimum ventilation rates & IAQ levels

    v Location of Fresh Air Intakes should be away from contaminantsources like

    Building Exhaust Fans

    Sanitary Vents

    Standing Water

    Outside Smoking rooms

    Cooling Towers

    Vehicular Exhaust

  • 8/7/2019 Green Building Building Work Shop Presentation

    72/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Examples of Typical Fresh Air Requirements

    Calculation of amount of Fresh Air Intake (sample sheet)

    Mall Common areas

    Retail Sales

    Warehouses

    Pharmacy (Preparation

    areas)

    Office space

    Area

    0.06

    0.12

    0.06

    0.18

    0.06

    cfm per sq.ft

    7.5

    7.5

    -

    5

    5

    cfm per person

    Minimum Fresh Air required for each space= (Occupancy x cfm per person) + (Area x cfm per sq.ft)

    Minimum IAQ PerformanceMinimum IAQ Performance

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Minimum IAQ PerformanceMinimum IAQ Performance

    v Naturally Ventilated System

    Comply Paragraph 5.1 of ASHRAE 62.1-2004

    Specifies minimum ventilation rates & IAQ levels

    v Location & Size of Openings

    Spaces permanently open to operable

    wall or roof opening within a distance

    of 8m and area not less than 4%

    of floor area

    Interior spaces without direct openings

    & ventilated thro adjoining rooms

    q Opening between the rooms-permanently obstructed

    q Area NOT less than 8% of the room area and NOT less than 25 sqft

  • 8/7/2019 Green Building Building Work Shop Presentation

    73/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EQ Prerequisite 2: EnvironmentalEQ Prerequisite 2: Environmental

    Intent

    v Prevent exposure of building occupants to Environmental

    Tobacco Smoke (ETS)

    Requirement

    v Zero Exposure of non-smokers to

    Environmental tobacco smoke

    v Restaurants, Pubs, Open Offices,

    Cabins cannot be declared as

    Smoking Areas

    Tobacco Smoke (ETS) ControlTobacco Smoke (ETS) Control

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Option 1:

    v Declare the building as NO SMOKINGbuilding

    OR

    Option 2:

    v Provide designated smoking areas

    Provide deck-to-deck partition

    Operate exhaust sufficient to create a negative pressure of atleast an

    average of 5 Pa (0.02WC)

    Test leakages in smoking rooms

    v Locate exterior designed smoking area atleast 25 ft away

    from entries, fresh air intake, operable windows

    Environmental Tobacco Smoke (ETS) ControlEnvironmental Tobacco Smoke (ETS) Control

  • 8/7/2019 Green Building Building Work Shop Presentation

    74/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EQ Credit 1: Outdoor Air Delivery MonitoringEQ Credit 1: Outdoor Air Delivery Monitoring

    Intentv Provide ventilation system monitoring to help sustain long-term occupant

    health and comfort and well being

    v Sick Building Syndrome (SBS)

    Requirementv Install permanent CO2 monitoring

    systems that provide feedback to ensure

    that minimum design ventilation

    requirements are maintained

    v Configure the monitoring system to

    generate an alarm when the conditions vary by 10% or more from set point

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    CO2 MonitoringCO2 Monitoringv For Mechanically Ventilated System

    Monitor CO2 concentrations within alldensely occupied spaces

    q CO2 locations between 3 and 6above the floor

    Non-densely occupied spaces

    q Install CO2 monitoring sensors (inAHUs) and outdoor airflowmeasurement device

    q Minimum air flow should be as perASHRAE 62.1-2004

    v For Naturally Ventilated System Monitor CO2 concentrations within all

    naturally ventilated spaces

    q CO2 locations between 3 and 6above the floor

    q One CO2 sensor for multiple spaces

  • 8/7/2019 Green Building Building Work Shop Presentation

    75/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    CO2 and VentilationCO2 and Ventilation

    Inside/ outside differential = 1000 ppm Inside/ outside differential = 530 ppm

    equal to : 10 cfm/ person equal to : 25 cfm / person

    Not more than 530 ppm (differential) w.r.t outside

    Case #1 Case #2Poor Ventilat ion Good Ventilat ion

    Outside CO2400 ppm

    930 ppm

    Outside CO2400 ppm

    1400ppm

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EQ Credit 2: Increased VentilationEQ Credit 2: Increased VentilationIntent

    v Provide additional outdoor air ventilation system to improve indoor

    air quality for improved occupant comfort

    Requirementv Increase air ventilation rates to all occupied spaces by at least 30%

    above the minimum rate required by ASHRAE 62.1-2004

  • 8/7/2019 Green Building Building Work Shop Presentation

    76/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Increased VentilationIncreased Ventilation

    Calculation of amount of Fresh Air Intake

    Requirement: 30% more than the above

    Mall Common areas

    Retail Sales

    Warehouses

    Pharmacy (Preparation

    areas)

    Office space

    Area

    0.06

    0.12

    0.06

    0.18

    0.06

    cfm per sq.ft

    7.5

    7.5

    -

    5

    5

    cfm per person

    Minimum Fresh Air required for each space

    = (Occupancy x cfm per person) + (Area x cfm per sq.ft)

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EQ Credit 3:EQ Credit 3:Construction IAQ Management PlanConstruction IAQ Management Plan

    Credit 3.1: During Construction

    Intent

    vAddress IAQ problems during

    construction / renovation to

    help sustain comfort &

    well-being of construction

    workers & building occupants

  • 8/7/2019 Green Building Building Work Shop Presentation

    77/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Construction IAQ during constructionConstruction IAQ during construction

    Requirementv Minimum IAQ to meet control

    measures of the Sheet Metal & Air

    Conditioning Contractors national

    Association (SMACNA) IAQ guidelines

    v Protect materials from moisture

    damage

    Stored & installed materials

    v If AHU used during construction,

    then use filtration media with a

    minimum MERV 8

    Replace before occupancy,with MERV 8

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EQ Credit 3:EQ Credit 3:Construction IAQ Management PlanConstruction IAQ Management Plan

    Credit 3.2: Before Occupancy

    Intent

    vAddress IAQ problems before occupancy

    Requirement

    v After construction ends and prior to occupancy conduct a minimum two-

    week building flush-out with new Minimum Efficiency Reporting Value

    (MERV) 8 filtration media at 100% outside air.

    v After flush-out, new filter with a minimum MERV 8 value, must replace allfilters except those solely processing outside air.

    v For Projects attempting IEQ Credit 5, these filters must be MERV 13 or

    better.

  • 8/7/2019 Green Building Building Work Shop Presentation

    78/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EQ Credit 4: LowEQ Credit 4: Low--Emitting MaterialsEmitting Materials

    Intentv Reduce the use of materials that are

    Odorous

    Potentially irritating

    VOC materials

    High VOCs (Volatile Organic Compounds) content materials cause illness and

    decrease occupant productivity

    How many points are at stake?

    Use materials that contain low VOC materials

    Credit 4.1: Adhesive & Sealants

    Credit 4.2: Paints

    Credit 4.3: CarpetsCredit 4.4: Composite Wood & Agrifiber products

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EQ Credit 4: LowEQ Credit 4: Low--Emitting MaterialsEmitting Materials

  • 8/7/2019 Green Building Building Work Shop Presentation

    79/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit 4.1: Adhesives & SealantsCredit 4.1: Adhesives & Sealants

    50Dry Wall and Panel Adhesives

    100Structural Glazing Adhesives

    70Multipurpose Construction Adhesives

    50VCT and Asphalt Tile Adhesives

    65Ceramic Tile Adhesives

    60Rubber Floor Adhesives

    100Wood Flooring Adhesive

    50Carpet Pad Adhesives

    50Indoor Carpet Adhesives

    Current VOC Limit (g/l)Applications

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit 4.1: Adhesives & SealantsCredit 4.1: Adhesives & Sealants

  • 8/7/2019 Green Building Building Work Shop Presentation

    80/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit 4.1: Adhesives & SealantsCredit 4.1: Adhesives & Sealants

    420Other

    450Single-Ply Roof Membrane

    250Roadway

    300Non-membrane Roof

    250Architectural

    Current VOC Limit (g/l)Sealants

    750Other

    250

    775

    Architectural

    Non Porous

    Porous

    Current VOC Limit (g/l)Sealant Primers

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit 4.2: Paints & CoatingsCredit 4.2: Paints & Coatings

    250Anti corrosive/Anti rust

    50Flat (Mat)

    150Non-Flat

    Current VOC Limit (g/l)Paints

    250

    275

    200

    Sealers

    Water proofing sealer

    Sanding sealer

    Other sealer

    250Stains

    100Floor coatings

    350

    550

    Clear Wood Finishes

    Varnish

    Lacquer

    Current VOC Limit (g/l)Coatings

  • 8/7/2019 Green Building Building Work Shop Presentation

    81/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit 4.2: Paints & CoatingsCredit 4.2: Paints & Coatings

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit 4.3: CarpetsCredit 4.3: CarpetsRequirement

    v Carpet systems must meet or exceed Carpet and Rug Institute

    (CRI), Green Label Plus requirements

    v Carpet adhesives VOC limit of 50 g/L

  • 8/7/2019 Green Building Building Work Shop Presentation

    82/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit 4.3:Credit 4.3:

    Composite Wood & Agrifiber productsComposite Wood & Agrifiber products

    Requirement

    vMust not contain added

    urea-formaldehyde resins

    v Low VOC resins

    Phenol-formaldehyde resins

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EQ Credit 5: Indoor Chemical & PollutantEQ Credit 5: Indoor Chemical & PollutantSource ControlSource Control

    Intent

    vAvoid exposure due to use of potentially hazardous

    particulates & chemical pollutants

    Requirement

    v Permanent entryway systems of 6 ft long

    Grills, grates or slotted systems

    for all exterior entrances

    Rollout mat if when maintained on

    a weekly basis

    v Trapping of dust

  • 8/7/2019 Green Building Building Work Shop Presentation

    83/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Indoor Chemical & Pollutant Source ControlIndoor Chemical & Pollutant Source Control

    Requirementv Deck-to-deck partitions & Independent Ventilation for Chemical

    Rooms/Copy Rooms with ventilation rate of 0.50 cfm/sq.ft.

    v Provision of MERV 13 or better filtration media prior to occupancy MERV - Minimum Efficiency

    reporting Value

    The higher the MERV, the more

    efficient the air filter is in

    capturing particles

    95% or MERV 14

    Final filter in hospital HVAC systems

    85% or MERV 13

    Above average commercial applications

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Indoor Chemical & Pollutant Source ControlIndoor Chemical & Pollutant Source Control

  • 8/7/2019 Green Building Building Work Shop Presentation

    84/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EQ Credit 6: Controllability of SystemsEQ Credit 6: Controllability of Systems

    Credit 6.1: Lighting ControlIntentv Provide a high level of Comfort controls system

    control by individual occupants or specific

    groups in multi-occupant spaces

    Requirementv Provide individual lighting controls for

    minimum 90% of the building occupants

    Strategiesv Provide adjustable task lighting

    Permanently attached fixture

    v For Shared multi-occupants Spaces

    (Conference room), provide controlsto suit their activities

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EQ Credit 6: Controllability of SystemsEQ Credit 6: Controllability of Systems

    Credit 6.2: Thermal Control

    Intent

    v Provide a high level of Comfort controls

    system control by individual occupants or

    specific groups in multi-occupant spaces

    Requirement

    v Provide individual comfort controls

    for minimum 50% of the building

    occupantsv For Shared multi-occupants spaces

    (Conference room), provide controls to

    meet the group needs & preferences

  • 8/7/2019 Green Building Building Work Shop Presentation

    85/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Controllability of SystemsControllability of Systems

    Operable Window

    v Operable Windows in lieu of comfort control for occupant areas that are 20

    ft inside and 10 ft to either side of operable part of the window

    Operable window

    20 ft

    10 ft

    10 ft

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Regularly / NonRegularly / Non

    --regularly Occupied areasregularly Occupied areas

    Regularly Occupied Areas

    n Areas / Spaces where the employees work, either seated or standing

    n Even if occupied for one day in a year

    n Eg. Conference Hall, Training Hall, Cafeteria, Classrooms etc

    Non-Regularly Occupied Areas

    n Eg. Corridors, Walkways, Lobbies, Storage rooms, Kitchen, restrooms,

    Stairwells etc

  • 8/7/2019 Green Building Building Work Shop Presentation

    86/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EQ Credit 7: Thermal ComfortEQ Credit 7: Thermal Comfort

    Credit 7.1: DesignIntentv Provide a comfort thermal environment that

    supports the productivity and well-beingof building occupants

    Requirement

    v Design the HVAC systems and thebuilding envelope to meet the requirementsof ASHRAE standard 55-2004

    v Thermal Comfort to be met throughoutthe year

    v Air temperature , air speed & humidityto be met

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Thermal Comfort: DesignThermal Comfort: Design

    Requirement

    v Permanent Temperature and Humidity monitoring system

    v Thermally comfortable environment

    Comply with ASHRAE standard 55 2004, including humidity control

    Temperature 24 +/- 2

    v RH should be maintained between 50-60%

    Humidification and De-humidification systems to maintain RH

  • 8/7/2019 Green Building Building Work Shop Presentation

    87/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EQ Credit 7: Thermal ComfortEQ Credit 7: Thermal Comfort

    Credit 7.2: VerificationIntent

    v Provide assessment of the building thermal comfort over a

    period of time

    Requirement

    v Survey

    Monitor the thermal performance of the building within a period

    of 6 to 18 months after occupancy

    Install a permanent temperature & humidity monitoring system

    vCorrective plan if more than 20% of occupants dissatisfied Plan in accordance with ASHRAE 55-2004 (sample Sheet)

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    EQ Credit 8: DaylightEQ Credit 8: DaylightCredit 8.1: Daylight 75% of spaces

    Intent

    vDaylight in regularly occupied areasof the building

    Requirement

    vAchieve a minimum daylight

    factor of 2% (excluding all

    direct sunlight penetration)

    in 75% of all spaces occupiedfor critical visual spaces

    (Sample Sheet)

  • 8/7/2019 Green Building Building Work Shop Presentation

    88/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    DaylightDaylight

    Calculation:

    Win Area x Win Geometry Factor x Actual T vis x Win Height Factor

    Floor Area Min T vis

    Spaces excluded:

    Copy rooms

    Storage rooms

    Mechanical plants

    Laundry

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Daylight design criteriaDaylight design criteria

  • 8/7/2019 Green Building Building Work Shop Presentation

    89/106

  • 8/7/2019 Green Building Building Work Shop Presentation

    90/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    THANK YOU

  • 8/7/2019 Green Building Building Work Shop Presentation

    91/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Presented byPresented by

    Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd

    Innovation & DesignInnovation & Design

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Credit SummaryCredit Summary

    LEED Accredited Professional

    LEED Innovation Credits

    Title

    Total 5

    1Credit 2

    1-4Credit 1

    Point(s)Credit

  • 8/7/2019 Green Building Building Work Shop Presentation

    92/106

  • 8/7/2019 Green Building Building Work Shop Presentation

    93/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    THANK YOU

  • 8/7/2019 Green Building Building Work Shop Presentation

    94/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Presented byPresented by

    Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd

    Case StudyCase Study

    CIICII--GBCGBC

    Centre of Excellence for Energy, Environment, Green Buildings, Renewable energy,

    Water & Climate change activities in India.

    CII Sohrabji Godrej Green Business Centre,

    HyderabadA unique Public Private Partnership

    ( CII, Govt of Andhra Pradesh, USAID and Pirojsha Godrej Foundation )

  • 8/7/2019 Green Building Building Work Shop Presentation

    95/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    CIICII--SohrabjiSohrabji Godrej Green Business Centre,Godrej Green Business Centre,

    HyderabadHyderabad

    v First Green Building in India

    First Platinum rated building

    outside US

    First Platinum building in the

    World under version LEED 2.0

    (other 2 buildings are under

    version LEED 1.0)

    CII Godrej GBC building has achieved 56

    points out of 59 points attempted

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    CIICII

    --Godrej GBC BuildingGodrej GBC Building

    vDemonstration of

    Practicing what we preach

    Green buildings are

    possible & viable

    India can reach global

    environmental standards

    Indian construction

    industry can reach global

    standards

  • 8/7/2019 Green Building Building Work Shop Presentation

    96/106

  • 8/7/2019 Green Building Building Work Shop Presentation

    97/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Sustainable SitesSustainable Sites

    v Roof Garden To reduce heat ingress

    into the building

    2 inch deep plastic trays

    filled with earth

    Conventional terrace garden

    6-12 inch deep soil

    Load on the structure

    reduced tremendously

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Sustainable SitesSustainable Sites

    v One Electric Car

    v Two Charging station at site

    v Cater to more than 5%

    building occupants

  • 8/7/2019 Green Building Building Work Shop Presentation

    98/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Features incorporated CIIFeatures incorporated CII--Godrej GBC BuildingGodrej GBC Building

    2. Water Efficiency2. Water Efficiency

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Water EfficiencyWater Efficiencyv Zero water discharge

    Recycling of 100 % grey water reuse for agriculture

    v 35% reduction on potable water use

    High efficient fittings

    Installation of waterless urinals

    v Rain water harvesting

    Collection pond at site

    8 Lacs litres capacity

  • 8/7/2019 Green Building Building Work Shop Presentation

    99/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Water EfficiencyWater Efficiency

    vWaterless urinals

    Cartridge with sealing liquid

    Blue liquid

    q 95% biodegradable

    q Acts as a seal

    q Density lower than urine

    q Cuts of smell

    v Tremendous saving in water

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Water EfficiencyWater Efficiencyv Irrigation Efficiency

    Sprinklers 0.625

    Drip- 0.90

    vWastewater treatment system

    v Root Zone Treatment

    Biological mechanism

    Treated water used for irrigation

    Sprinklers

    Drip

  • 8/7/2019 Green Building Building Work Shop Presentation

    100/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Features incorporated CIIFeatures incorporated CII--Godrej GBC BuildingGodrej GBC Building

    3. Energy Efficiency3. Energy Efficiency

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Energy EfficiencyEnergy Efficiency

    v Overall reduction of 55% on total energy vis--vis ASHRAE

    40 % on Air-conditioning load

    88% on lighting energy

    v High Efficient Chillers used

    Water Cooled Scroll chiller

    COP 4.23

    HFC refrigerant R407 C

  • 8/7/2019 Green Building Building Work Shop Presentation

    101/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    vWind tower

    Fresh air intake through

    towers

    Thermal mass

    Water spray

    Drop in air temperature

    5 7C

    v Results in 2 3 % reduction of air

    conditioning load

    Energy EfficiencyEnergy Efficiency

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    v In-Situ power generation

    v 24 KW capacity

    v Grid connected

    Generates about 100-110 units/day

    v Meets 20 % of total energy requirement of the building

    Detail of PV Panels

    PV array installedon south-west wall

    Energy EfficiencyEnergy Efficiency

  • 8/7/2019 Green Building Building Work Shop Presentation

    102/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    v Reduction of 88% on lighting

    energy

    Maximum day lighting

    Energy efficient light sources (CFLs)

    Occupancy and dimmer controls

    Day lightingDay lighting

    v Fenestration maximized on

    the north orientation to

    Minimize heat gains from windows

    Maximize day lighting

    Day Light Sensors

    Energy EfficiencyEnergy Efficiency

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    v Construction Materials enabling energy savings

    Entire buildings with AAC block

    q U value 0.65 W/Sq.m oK

    vis--vis 1.9 for concrete

    U-values of walls, roof and Glass

    0.573.28Wall

    0.2943.57Roof

    1.76.91Double Glazed Glass

    CII-Godrej GBC

    (W/Sq.m o K )

    ASHRAE 90.1 -2001

    (W/Sq.m o K )

    Type

    Energy EfficiencyEnergy Efficiency

  • 8/7/2019 Green Building Building Work Shop Presentation

    103/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Features incorporated CIIFeatures incorporated CII--Godrej GBC BuildingGodrej GBC Building

    4. Materials & Resources4. Materials & Resources

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    MaterialsMaterialsConstruction Waste Management

    v Recycling of construction waste debris (>50%)

    Brick, masonry waste, concrete

    q Filling up of Undulated site areas

    Paint cans, Packaging material

    q Recycling

    Cement bags

    q Reuse

  • 8/7/2019 Green Building Building Work Shop Presentation

    104/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    v Local Materials

    More than 90% materials sourced within 500 miles from the site

    v Recycled materials

    80% of the building materials

    v Rapidly renewable materials

    10% of the total building construction cost

    q Furniture of Ecoboard made of baggasse

    q False ceiling of cellulose fiber and cotton

    q Vertical Blinds of woven cotton

    v Resource Reuse

    >5% of the total cost

    q Broken china mosaic pieces for pillarsq Salvaged furniture for cafeteria

    MaterialsMaterials

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Features incorporated CIIFeatures incorporated CII--Godrej GBC BuildingGodrej GBC Building

    5. Indoor Air Quality5. Indoor Air Quality

  • 8/7/2019 Green Building Building Work Shop Presentation

    105/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Indoor Air QualityIndoor Air Quality

    v Declared entire site as Non Smoking areav 2 week building flush out carried out before occupancy

    Replaced AHU filters with MERV (Minimum Efficiency Reporting Value)

    of 13

    CO2 monitoring

    Installed CO2 sensors at

    return air ducts and outside

    building

    CO2 sensor

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Low VOC content materials

    v Carpets

    CRI certified - Total VOC is less

    than 0.50 mg/sq.m-hr

    Carpet Adhesives total VOC less

    than 10 mg/sq.mt-hr

    v Paints

    Non Flat

    Flat

    Type

    10 g/l150 g/l

    5 g/l50 g/l

    GBCLEED

    Requirement

    Indoor Air QualityIndoor Air Quality

  • 8/7/2019 Green Building Building Work Shop Presentation

    106/106

    GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES

    Daylight & Views

    v Day lighting

    More than 75 % of

    permanently occupied

    area

    v Views

    90% of permanently

    occupied area

    Indoor Air QualityIndoor Air Quality

    To Sum UpTo