Green Building Design - Gold LEED Award TOYOTA Corporate Real Estate & Facilities Torrance, CA Project Team Owner: Toyota Motor Sales Owner: Toyota Motor Sales Construction Manager Agency: HB & A Construction Manager Agency: HB & A General Contractor: Turner General Contractor: Turner Construction Construction Architect: LPA Architect: LPA Structural Engineer: Culp & Tanner Structural Engineer: Culp & Tanner Structural Steel Subcontractor: Structural Steel Subcontractor: Orange County Erectors Orange County Erectors Tilt-Up Concrete Subcontractor: Guy Tilt-Up Concrete Subcontractor: Guy Yocam Construction Yocam Construction Mechanical/Plumbing Engineer: Glumac Mechanical/Plumbing Engineer: Glumac HVAC Subcontractor: Key Air HVAC Subcontractor: Key Air Conditioning Inc. Conditioning Inc. Electrical Engineer: Konsortium Electrical Engineer: Konsortium Electrical Subcontractor: Sasco Electrical Subcontractor: Sasco General Overview Dates of Construction: Aug.1,2001 Dates of Construction: Aug.1,2001 – March 1, 2003 – March 1, 2003 Primarily Office Space ; Additional Primarily Office Space ; Additional dining and car showroom dining and car showroom Conglomerate of 5 main buildings Conglomerate of 5 main buildings connected through a lobby with two connected through a lobby with two Central Plants Central Plants 3 stories totaling 644,000SF 3 stories totaling 644,000SF Electrical/Lighting System All buildings topped with All buildings topped with Photovoltaic Panels- will be the Photovoltaic Panels- will be the largest array in California – 620,000 largest array in California – 620,000 kwh annual production kwh annual production Two Central Plant buildings house Two Central Plant buildings house all main electrical equipment with all main electrical equipment with two separate electrical utility two separate electrical utility services services 277 V Distribution 277 V Distribution Open Offices constitute most Open Offices constitute most floors- contain Linear Indirect floors- contain Linear Indirect Pendants, T5 standard fluorescents Pendants, T5 standard fluorescents Motion Sensors and Photocells used Motion Sensors and Photocells used Structural System Tilt-Up Cast-In-Place Concrete Tilt-Up Cast-In-Place Concrete Exterior and Interior Panels (45’ Exterior and Interior Panels (45’ height x 30’ long) braced by steel height x 30’ long) braced by steel flange beams - allowed bays of Open flange beams - allowed bays of Open Office space Office space Spread Footing Foundations Spread Footing Foundations Heavily enforced seismic Heavily enforced seismic considerations considerations Mechanical System Jennifer Drilling Construction Management Penn State Architectural Engineering Special Features Project Delivery Shelter In Place” Security system Shelter In Place” Security system locks down indoor environment and locks down indoor environment and protects from outdoor disaster protects from outdoor disaster Use of reclaimed water; two separate Use of reclaimed water; two separate storm drain systems storm drain systems Heavily recycled content of interior Heavily recycled content of interior materials in building materials in building 97% of Construction Waste Recycled 97% of Construction Waste Recycled Energy Performance optimized to Energy Performance optimized to exceed California Title 24 State exceed California Title 24 State Energy Code by over 42% Energy Code by over 42% Electrical Car Stations on-site Electrical Car Stations on-site Tobacco Smoke Control and Carbon Tobacco Smoke Control and Carbon Dioxide Monitoring Dioxide Monitoring Over 75% of indoor space has a view Over 75% of indoor space has a view to the outdoors to the outdoors 2 Central Plants provide exit 2 Central Plants provide exit ability from part of facility” ability from part of facility” Direct Absorption Chillers, 2700 Direct Absorption Chillers, 2700 tons cooling load tons cooling load VAV Boxes with reheat VAV Boxes with reheat System provided with Air/Dirt System provided with Air/Dirt Separator Separator GC/Owner: GC/Owner: Cost Plus Fee Cost Plus Fee Architect/Engineer: Architect/Engineer: Lump Sum Lump Sum Sub/GC: Sub/GC: Lump Sum Lump Sum

Upload: ethelbert-merritt

Post on 24-Dec-2015

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Green Building Design - Gold LEED Award TOYOTA Corporate Real Estate & Facilities Torrance, CA Project Team Owner: Toyota Motor Sales Construction Manager

Green Building Design - Gold LEED Award

TOYOTA Corporate Real Estate & Facilities

Torrance, CA

Project Team• Owner: Toyota Motor SalesOwner: Toyota Motor Sales• Construction Manager Agency: HB & AConstruction Manager Agency: HB & A• General Contractor: Turner General Contractor: Turner ConstructionConstruction• Architect: LPAArchitect: LPA• Structural Engineer: Culp & TannerStructural Engineer: Culp & Tanner•Structural Steel Subcontractor: Orange Structural Steel Subcontractor: Orange County ErectorsCounty Erectors•Tilt-Up Concrete Subcontractor: Guy Tilt-Up Concrete Subcontractor: Guy Yocam ConstructionYocam Construction•Mechanical/Plumbing Engineer: Mechanical/Plumbing Engineer: GlumacGlumac•HVAC Subcontractor: Key Air HVAC Subcontractor: Key Air Conditioning Inc.Conditioning Inc.•Electrical Engineer: KonsortiumElectrical Engineer: Konsortium•Electrical Subcontractor: Sasco electricElectrical Subcontractor: Sasco electric

General Overview• Dates of Construction: Aug.1,2001 – Dates of Construction: Aug.1,2001 – March 1, 2003March 1, 2003•Primarily Office Space ; Additional Primarily Office Space ; Additional dining and car showroomdining and car showroom• Conglomerate of 5 main buildings Conglomerate of 5 main buildings connected through a lobby with two connected through a lobby with two Central PlantsCentral Plants•3 stories totaling 644,000SF3 stories totaling 644,000SFElectrical/Lighting System• All buildings topped with All buildings topped with Photovoltaic Panels- will be the largest Photovoltaic Panels- will be the largest array in California – 620,000 kwh array in California – 620,000 kwh annual productionannual production•Two Central Plant buildings house all Two Central Plant buildings house all main electrical equipment with two main electrical equipment with two separate electrical utility servicesseparate electrical utility services• 277 V Distribution277 V Distribution• Open Offices constitute most floors- Open Offices constitute most floors- contain Linear Indirect Pendants, T5 contain Linear Indirect Pendants, T5 standard fluorescentsstandard fluorescents•Motion Sensors and Photocells usedMotion Sensors and Photocells usedStructural System•Tilt-Up Cast-In-Place Concrete Tilt-Up Cast-In-Place Concrete Exterior and Interior Panels (45’ Exterior and Interior Panels (45’ height x 30’ long) braced by steel height x 30’ long) braced by steel flange beams - allowed bays of Open flange beams - allowed bays of Open Office spaceOffice space•Spread Footing FoundationsSpread Footing Foundations•Heavily enforced seismic Heavily enforced seismic considerationsconsiderationsMechanical

System

Jennifer Drilling

Construction Management Penn State

Architectural Engineering

Special Features

Project Delivery

•““Shelter In Place” Security system Shelter In Place” Security system locks down indoor environment and locks down indoor environment and protects from outdoor disaster protects from outdoor disaster •Use of reclaimed water; two separate Use of reclaimed water; two separate storm drain systemsstorm drain systems•Heavily recycled content of interior Heavily recycled content of interior materials in buildingmaterials in building•97% of Construction Waste Recycled97% of Construction Waste Recycled•Energy Performance optimized to Energy Performance optimized to exceed California Title 24 State Energy exceed California Title 24 State Energy Code by over 42%Code by over 42%•Electrical Car Stations on-site Electrical Car Stations on-site •Tobacco Smoke Control and Carbon Tobacco Smoke Control and Carbon Dioxide MonitoringDioxide Monitoring•Over 75% of indoor space has a view Over 75% of indoor space has a view to the outdoorsto the outdoors

•2 Central Plants provide exit ability 2 Central Plants provide exit ability from part of facility”from part of facility”•Direct Absorption Chillers, 2700 Direct Absorption Chillers, 2700 tons cooling load tons cooling load •VAV Boxes with reheatVAV Boxes with reheat•System provided with Air/Dirt System provided with Air/Dirt SeparatorSeparator

•GC/Owner: GC/Owner: Cost Plus FeeCost Plus Fee•Architect/Engineer:Architect/Engineer: Lump SumLump Sum•Sub/GC: Sub/GC: Lump SumLump Sum