Page 1: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

Project Launch Webcast

5/29/2012

Green Button Download and Automated Data Exchange Conformance Suite

Page 2: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

2 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Green Button

• Green Button is A policy

• Whitehouse initiative A brand

• Green Button Logo implies specific capabilities • Interoperability standards and testing and

certification ensure those expectations are met A set of technologies and associated standards

• Green Button Download My Data (ESPI data file) • Green Button Connect My Data (ESPI automated exchange)

• Green Button is an industry-led effort to provide electricity customers with access to their energy usage data via a "Green Button" on electric utilities' websites.

Page 3: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

3 © 2012 Electric Power Research Institute, Inc. All rights reserved.

An overnight success … years in the making

OpenADE (Open Automated Data Exchange) Early requirements effort for securely sharing

energy information with third parties • NIST SGIP Priority Action Plan Accelerates issue resolution and consensus

development • OpenADE / SGIP inputs to NAESB standard

REQ21 Energy Services Provider Interface (ESPI) Privacy: REQ22 Third Party Access to Smart-

Meter-based Information

• Flexible file format basis for Green Button initial implementation use a subset of ESPI and

energy usage information.

Page 4: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

4 © 2012 Electric Power Research Institute, Inc. All rights reserved.

OpenADE TF formed

OpenADE Reqs PAP10

NAESB PAP10 Standard Ratified

PAP10 Accepted to NIST CoS

NAESB ESPI Standard Ratified

US CTO Green Button Initiative

PG&E, SCE, SDG&E Implement

Green Button TimeLine

Oracle

Microsoft

Google

Tendril

GreenBox

Control4

EnerNex

Xtensible

PG&E

Oncor

Duke

Reliant

Consumers

Centerpoint

AEP

FPL

SCE

Sempra

Many companies pushing Utilities for proprietary 3rd

party interfaces

2009 2010 2011 2012 2008

GB User and Conformance Development Group

ADE Concept Meeting

Page 5: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

5 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Green Button Adopters

Page 6: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

6 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Green Button Developers

• UCAIug represents a large user community (200 corporate members, >5000 affiliates) of utilities and product developers; key stakeholders in Green Button

• UCAIug is the home of the OpenADE working group that utilities and vendors created to develop original ADE requirements used to create ESPI

• Since September, >70 companies large and small have developed early Green Button (ESPI) compatible products, tools, and services based on first specifications

• Many of these early adopters are supplying Green Button-related technology to utilities

• OpenADE utility/vendor collaboration on testing and certification is now underway using volunteer resources

Page 7: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

7 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Problem Statement

• Utilities committed to implementing Green Button reach 20 million customer accounts

• Customer feedback extremely positive because of the basic principal, simplicity, and ease of access

• Non-uniform deployment and unmet expectations will be detected and exploited by utility critics

• Non-interoperable implementations reduces the ability to capitalize on the app community and integrator tools – this will increase rather than decrease implementation cost

• Need to act quickly!

Page 8: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

8 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Project Objective and Benefits

This project will accelerate the development of a comprehensive conformance test suite for the

standards that underlie Green Button •Accelerate the development of third party, value-added

tools and service •Accelerate the creation of an International Testing /

Certification Authority •Reduce utility implementation costs

Page 9: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

9 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Why Be a Project Funder?

•Project Funders: Have early access to project

findings and deliverables

Have immediate access to experts in implementing project results

Have a seat on the project Steering Committee

Have a direct and active role in ensuring that your deployment is interoperable with the apps your customers choose

Reduces business risk

Page 10: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

10 © 2012 Electric Power Research Institute, Inc. All rights reserved.

•Partner Test development vendor to accelerate test script

development

•Collaborate Working with and coordinating through

• UCAIUG • SGIP

•Leverage Existing standard (NAESB Req 21) Requirements Test harness

Approach

Page 11: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

11 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Organizational Relationships

UCAIug EPRI Project

Team Contributions

OpenESPI / Green Button Apache Licensed Open Source Development Project

OpenADE Task Force

Requirements and Test Plan

SW Development Test Implementation

Commercial Products ESPI

Implementations

Commercial Products Certification Test

Tools

Commercial Products Certifications

Commercial $$ Products and Services

Open Source

Apache 2.0

License

Page 12: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

OpenADE/ESPI Engineering Test Suite

QualityLogic

Smart Grid Test Solutions

Page 13: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

13 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Why Interoperability Problems Exist?

Vendor 2 Tests

Vendor 1 Tests Certification Tests

No Boolean Test

Vendor 1: Boolean = T,F,1,0

Vendor 2: Boolean = Y,N,ON, Off

Page 14: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

14 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Integrated Conformance Testing & Certifications

Industry Standard Engineering

Conformance Tests

Certification Tests

Certification Tests a Subset of Engineering Tests

Boolean = True,False,1,0

No Boolean but it doesn’t matter

Page 15: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

15 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Benefits of Integrated Model

Improved efficiency and effectiveness of industry interoperability: • Certification preparation embedded in development process • Certification process streamlined for vendors Self-certification (with independent audit) Preferential, accelerated certification

• Engineering feedback on certification tests will be earlier and broader, rapidly improving certification tests

Combination of standardized engineering tests and certification tests accelerate and best insure interoperability of products

Page 16: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

16 © 2012 Electric Power Research Institute, Inc. All rights reserved.

ESPI Engineering Test Suite

• Comprehensive set of ESPI engineering conformance test cases and tools

• Certification tests PLUS More comprehensive than typical certification tests

• Subsets for certification Green Button Download My Data (ESPI data file) Profile Green Button Connect My Data (ESPI automated exchange) Profile Others TBD

• Leverage/extend work of EPRI and UCA OpenADE Work Group

Page 17: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

17 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Project Deliverables

• ESPI conformance test specification Critical interpretation of the REQ.21 standard Library of feature/functional test definitions

• ESPI test harness Leverage and build upon existing EPRI test harness

• ESPI test procedures and/or automated test scripts One or more subsets utilized by the UCA ITCA for specific certifications Detailed documentation and structure for test cases and procedures

• Support and maintenance Tech transfer to UCA and early implementers

Page 18: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

18 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Benefits

•Confidence Vendors that comply with testing can deliver results

•Consistent Core requirements are met – not a “one off” or custom solution

•Competitive With conformance testing as lowest common denominator vendors

compete on: • Price • Value-adds • Service

Page 19: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

19 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Schedule / Cost

• Project will start as soon as adequate funding is secured • Funders get: Immediate access to Green Button/ESPI experts Early releases

• Staged development as directed by funding sources / UCA Early releases for implementers Green button tests? ESPI tests?

• Total Cost: $400,000 Expected Funders: 10 Cost / Funder : $40,000

Page 20: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

20 © 2012 Electric Power Research Institute, Inc. All rights reserved.

For More Information on this Project

Don Von Dollen (650) 855-2210

[email protected]

Gerald Gray (865) 218-8113 [email protected]

Page 21: Green Button Download and Automated Data Exchange ...osgug.ucaiug.org/sgsystems/OpenADE/Shared Documents... · • Interoperability standards and testing and ... Early requirements

21 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Together…Shaping the Future of Electricity