Page 1: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

  

 

 

   

  

   

Submission 

Green Star – Design and As Built 

Consultation paper 

 

                

 

Prepared by: 

The Australian Institute of 

Refrigeration Air Conditioning 

and Heating 

 

AIRAH Strategic aim #1 ‐ Claim the sustainability space  

November 

2013 

Page 2: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

  

 

Prepared and Co‐ordinated by 

Vincent Aherne, M.AIRAH 

Australian Institute of Refrigeration Air Conditioning and Heating (AIRAH) 

Level 3/1 Elizabeth Street, Melbourne, VIC 3000 

Tel: 03 8623 3000 | www.airah.org.au | email: [email protected] 

 

 

About AIRAH 

AIRAH is the recognised voice of the Australian air conditioning, refrigeration and heating industry. 

We aim to minimise the environmental footprint of our vital sector through communication, 

education and encouraging best practice. 

 

 

AIRAH – Strategic Aims 

Claim the sustainability space Through its conferences, publications, manuals and training, AIRAH will educate and motivate the HVAC&R industry and related fields about achieving sustainability. Many organisations talk about sustainability as a concept. Our aim is to be the HVAC&R organisation whose values are aligned with sustainability in a practical sense 

Close the skills gaps At a time of rapid change of new technology and standards and a shifting regulatory landscape, AIRAH will provide appropriate and relevant professional development for HVAC&R industry personnel, and work alongside government and other providers to ensure the voids, where they exist in formal training, are filled. 

Inform regulation and policy decisions As the key industry organisation representing HVAC&R in Australia, it is essential AIRAH collaborate with government at both the state and federal levels. In this way the collective skills and specialist knowledge contained with the Institute can better inform the decisions that affect society in general and the HVAC&R industry in particular.  Build and engage membership AIRAH will become the institute of choice for HVAC&R professionals in Australia. This means ensuring that formal connection with AIRAH provides benefits – actual and intangible – that are valuable, worthwhile and attractive to our members throughout their professional lives. 

 

Page 3: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

  

 

Acknowledgements 

AIRAH would like to thank the following people and organisations who have contributed to the 

development of this submission at one or more stages: 

 

Vince Aherne, M.AIRAH – AIRAH 

From the AIRAH ESD special technical group: 

Paul Graham, M.AIRAH 

Alex Harrington, M.AIRAH  

Ania Hampton, M.AIRAH  

Paul Davy, M.AIRAH  

Renata Dobrowolska, M.AIRAH  

Andrew Scerri, App.AIRAH 

Borzou Shahsavand, M.AIRAH 

Chris Wallbank, M.AIRAH 

Other contributors: 

Clare Parry, M.AIRAH 

Michael Shaw 

 

 

 

 

 

 

 

 

 

Disclaimer 

Information contained in this submission may be copied or reproduced for study, research, 

information or educational purposes, subject to inclusion of an acknowledgment of the source. 

While reasonable efforts have been made to ensure that as many opinions and solutions have been 

canvassed AIRAH does not accept responsibility for the accuracy or completeness of the contents, 

and shall not be liable for any loss or damage that may be occasioned directly or indirectly through 

the use of, or reliance on, the contents of this publication. 

© AIRAH 2013 

Page 4: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star Design & As Built Rating Tool Consultation Paper September 2013

initiator:[email protected];wfState:distributed;wfType:email;workflowId:271897d68abc8d45a4fda022b8807ff4
Page 5: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

2

Consultation Paper Contacts

Robert Milagre Manager Green Star Development Phone: (02) 8239 6220 Email: [email protected]

Rachel Lindup Green Star Technical Manager Phone: (02) 8239 6291 Email: [email protected]

Version Control

Version Date Description of changes

0.1 August 2013 Consultation with TAG

1 September 2013

Use of Trademarks

All third-party trademarks are the property of their respective owners. All third-party trademarks referenced in this document are used in an editorial fashion and not to the detriment of the trademark holders.

Intellectual Property Rights & Confidentiality

© Copyright Green Building Council of Australia 2013. This document and the information it contains are confidential to Green Building Council of Australia. No part of this document or the information contained within it may be (a) used for any purpose other than that stated within this document by the recipient; or (b) reproduced, transmitted or translated in any form or by any means, electronic, mechanical, manual, optical or otherwise, without prior written permission of Green Building Council of Australia.

Page 6: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

3

Contents

Consultation Paper Contacts ................................................................................................................................................................. 2

Contents ................................................................................................................................................................................................ 3

Thanks to our Green Star 2014 Thought Leaders ................................................................................................................................. 4

Executive Summary .............................................................................................................................................................................. 5

Providing your feedback ........................................................................................................................................................................ 5

Green Star 2014 .................................................................................................................................................................................... 6

Green Star – Design & As Built ............................................................................................................................................................. 7

Project objectives .................................................................................................................................................................................. 9

Project outcomes .................................................................................................................................................................................. 9

Project drivers ..................................................................................................................................................................................... 10

Delivering on project outcomes: scope and approach ......................................................................................................................... 12

Get involved in Green Star - Design & As Built ................................................................................................................................... 23

Appendix 1: Delivering on project outcomes: proposed timeline

Appendix 2: Roadmap

Appendix 3: Green Star - Performance Online Submission System Interface

Appendix 4: Green Star - Design & As Built Technical Advisory Group (TAG) and Expert Reference Panel (ERP)

Page 7: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green

Th

n Star - Design

hanks to

n & As Built Co

o our G

onsultation Pap

Green S

per

Star 20114 Thou

ught Leeaders

4

Page 8: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

5

Executive Summary

Building on the improvements that we made to Green Star during 2012/13, and guided by the feedback provided by users as part of

our most recent stakeholder review, we've committed to a range of ambitious projects that will improve the Green Star user

experience in 2013/14. One of the three main projects that we are undertaking as part of our Green Star 2014 program of works is

the development of a single, streamlined rating tool for the assessment of building design and construction: Green Star Design & As

Built.

This consultation paper seeks to initiate public discussion about the Green Star – Design & As Built project. Its purpose is to gain

industry feedback on the proposed scope, objectives, major features and proposed development process for the rating tool.

Providing your feedback

As you read this consultation paper, you will be asked to provide feedback on a range of issues and topics. Feedback prompts are

presented as follows:

Tell us what you think

What would a successful Green Star - Design & As Built rating tool look like to you?

Please provide your feedback by filling in the text box that is provided after each question. Some additional text boxes will be

provided where you can make general comments or suggestions about the issues covered in that section. Once you finish providing

feedback, please click the 'submit form' button. This will send us an email with your comments. If you are unable to submit your

feedback using the text boxes or have additional documents that you'd like to share with us, you can do so by emailing us at:

[email protected]

Please provide your feedback by 25th November 2013

Your details

Name

Job Title

Organisation

State

Page 9: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

6

Green Star 2014

The GBCA has committed to a range of ambitious projects to improve your Green Star user experience: the Green Star 2014 program of works. From July 2013 through to December 2014, Green Star 2014 will deliver:

• A single, streamlined Design & As Built rating tool that can assess buildings across a range of sectors

• Hours of time saved and easier access to information via the online delivery of Green Star rating tools including Green Star – Performance, Communities, Interiors and the new Design & As Built.

• Updated benchmarks and credits to reflect the market’s needs – now and into the future

• Less documentation required to achieve certification when your project progresses from a Green Star - Design to a Green Star - As Built rating.

• Increased quality assurance and stronger governance with a commitment to the achievement of ISO 9001 certification for Green Star

• More consistent, cost-effective and flexible assessment methods.

To discover more about the consultation schedules for the Green Star 2014 projects for the delivery of online rating tools or improvements to assessment and certification and to find out how you can get involved, please visit www.gbca.org.au

Page 10: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

7

Green Star – Design & As Built

Green Star - Design & As Built is a new generation Green Star rating tool that will assess the sustainability of building design and construction. It will be able to assess most building uses in Australia with the exception of single-unit dwellings (BCA Classes 1a and 1b) and will cover single- and mixed-use buildings.

Green Star - Design & As Built is being developed in response to:

The feedback we have received from industry about the current suite of Green Star rating tools for design and construction via satisfaction surveys, detailed stakeholder interviews and internal and external scoping workshops

The need to continue and build upon the improvement outcomes delivered as part of our Green Star Revolution program of works in 2012/13

The learnings from the development of 12 Green Star - Custom rating tools for the design and construction of a diverse range of building types

The development of the Green Star - Communities, Green Star - Interiors and Green Star - Performance rating tools

The priorities and outcomes identified within the GBCA's 2013-2018 Strategic Plan.

Green Star – Design & As Built is more than just an amalgamation of the existing rating tools for the design and construction of buildings. It will aim to address new sustainability issues, and reflect current industry best practice. It will be delivered via an online platform that will host all technical content and information and ensure a streamlined submission process.

Green Star - Design & As Built will be designed to reduce the cost of certification while also encouraging innovation and world leadership in the delivery of sustainable outcomes for our built environment.

The development process for Green Star - Design & As Built is scheduled to take place from April 2013 to August 2014. It is expected that a first draft of all credits will be released for public comment in April 2014. Once draft credits are released, stakeholders will be invited to provide feedback on all the technical details and approach taken to achieving best practice sustainable outcomes.

It is currently expected that Green Star – Design & As Built rating tool will be available for use by project teams in late 2014.

Page 11: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

8

Tell us what you think

What would a successful Green Star - Design & As Built rating tool look like to you? In other words, on what outcomes does the success of this project rely?

What kinds of issues do you think the new Green Star - Design & As Built rating tool should address that are not currently or adequately addressed by the existing suite of Green Star rating tools?

Page 12: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

9

Project objectives

The development of Green Star – Design & As Built is an important part of GBCA’s strategic plan and consistent with our key objective to drive the transition of the Australian property industry towards:

• Sustainability by promoting sustainable buildings programs, technologies, design practices and operation

• Integration of sustainable building initiatives into the mainstream design, construction and operation of buildings

Project outcomes

One developed and delivered, Green Star – Design & As Built will:

• Assess the design and construction attributes of buildings of all uses and sizes

• Integrate and align with Green Star – Communities, Green Star – Interiors and Green Star – Performance

• Provide a pathway for ensuring design attributes are implemented throughout construction

• Provide a simpler, more user friendly and cost effective user experience

• Help to ensure that Green Star remains the rating system of choice for the built environment by redefining current best practice and promoting innovation

• Allow issues, features and design solutions to be clearly and accurately compared through the implementation of a revised weighting system.

Tell us what you think:

Do you agree with the above project objectives and outcomes? Are there any other outcomes or objectives that you believe should be addressed by Green Star - Design & As Built?

Page 13: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

10

Project drivers

The need to update

Over the past ten years, the GBCA has developed a range of sector-based Green Star rating tools in consultation with industry to assess the sustainable design and construction of buildings. Improvements upon the first rating tools have informed the development of more recent rating tools such as Green Star - Public Building, but it is recognised that the older rating tools within the suite are now in need of an upgrade.

New definitions of standard practice

Industry practices have progressed, many sustainable building elements and approaches have become standard practice. Increased expectations of what quality buildings should deliver, increased legislative requirements and improved building standards have all contributed to the changing definitions of 'standard practice' and subsequent industry-wide improvements to the way buildings are designed and delivered.

An expanded definition of sustainability

In addition to improvements to standard practice, the definition of what constitutes 'world leadership' in building design and construction has also expanded to encompass many socio-economic considerations that were not addressed within the original Green Star Design and As Built rating tools. Some of these issues are already being explored through Green Star – Communities, as well as via the recent expansion of the Green Star Innovation category. In line with these changes to the definition of 'best practice' sustainability, it is expected that some social and economic sustainability-focussed credits will be incorporated into the Green Star - Design & As Built rating tool.

Incorporating improvements and suggestions

The GBCA has received substantial feedback and suggestions for improvements to benchmarks, credits and delivery approaches via our annual Green Star satisfaction surveys, review panels, stakeholder interviews and internal and external workshops. The collective industry experience gained from the certification of over 600 Green Star projects has also provided us with a wealth of information and alternative approaches to reducing environmental impacts via the formal Green Star process of Credit Interpretation Requests (CIRs) and Technical Clarifications (TCs), and through informal anecdotal feedback.

Learning from Green Star - Custom

The Green Star – Custom process has also provided us with further feedback and understanding as it has allowed us to develop Green Star rating tools to rate the sustainable design and construction of a number of complex or a-typical building types, including quick service restaurants, supermarkets, above-ground train stations, hotels and retirement villages.

A universal approach

Following the development in recent years of our 'new generation' Green Star rating tools; Green Star – Communities, Green Star – Interiors and Green Star – Performance, we have received feedback that a cross-sector approach to rating tool development is preferred by the majority of industry stakeholders. That is, rather than developing rating tools based on a particular sector or market (office or education for instance), most stakeholders prefer that our rating tools are developed to be 'universal'; rating many types of buildings, communities, fitouts or existing buildings in operation, irrespective of their end-use, as shown here:

Page 14: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

11

Reducing costs

The GBCA has received consistent feedback from project teams, building owners and developers that the cost of certifying projects using the current Green Star Design and As Built rating tool buildings is high and in some instances preclusive. As a result, we're conducting research and interviews to try to pinpoint where costs might be reduced during the development of Green Star – Design & As Built, without compromising on the rigor of the rating tool or the sustainability outcomes achieved.

Tell us what you think:

Do you have any other suggestions about these or other project drivers for Green Star - Design & As Built?

Page 15: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

12

Delivering on project outcomes: scope and approach

Green Star - Design & As Built will assess the design and construction attributes of buildings of all uses and sizes

Green Star - Design & As Built will assess the design and construction of most building types via a 'universal' approach, ie: one cross-sector rating tool. The key exception identified to date is single unit dwellings or townhouses where no common areas exist (BCA Classes 1a and 1b).

Examples of building types covered by this rating tool include currently addressed sectors such as education facilities, healthcare facilities, industrial buildings, commercial office buildings, retail centres, public buildings, and multi-unit residential. In addition, it will have the capacity to assess sectors and building types that are not covered by the existing Green Star rating tools for design and construction, such as student housing, restaurants and hotels. Green Star - Design & As Built will also assess buildings that are undergoing significant refurbishment (buildings where works undertaken render more than 50% of the building unable to be occupied under normal operating conditions).

Green Star - Design & As Built will address buildings delivered as 'shell and core', 'integrated fitouts' and ‘conventional delivery’. We define these terms as follows:

• Shell and Core: Finishes and services are applied to common areas only. Spaces are delivered with no ceilings, floor coverings, lighting systems and partition walls, and ducts from air supply and return risers finish within 1m of the face of the riser. This is common in industrial, retail centres and retail buildings.

• Conventional Delivery: Finishes and services are applied to common areas. Occupied areas are delivered with ceilings, floor coverings, finishes and a standard design for supply and return ducts, with a lighting system installed on a grid. Typically in the case of commercial office buildings, the tenant comes in and adjusts the delivered services and finishes. This delivery method is common for commercial office buildings or spaces that will be tenanted.

• Integrated Fitout: Where the design and construction brief addresses, in addition to typical building elements, ceilings, floor coverings, lighting systems, mechanical, electrical and hydraulic services, partition walls, finishes, and fitout elements to all (or most) areas. In most cases, the design and construction involves significant coordination with the client or tenant. This is common for education, hospitality and healthcare facilities, but is also seen in premium grade commercial office buildings.

Green Star Design & As Built will assess buildings of all sizes and complexities.

Tell us what you think

What types of buildings do you think should or should not be eligible for assessment under the new Green Star - Design & As Built rating tool?

http://svc136.bookeasy.com/accom_result1/mercure-kooindah-waters-golf-spa-resort/

Page 16: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

13

Should refurbishments be eligible for assessment under this rating tool?

How should 'significant refurbishments' be defined?

Are the definitions of 'shell and core', 'integrated fitout' and 'conventional delivery' still appropriate today? If not, why not and what other definitions should be considered?

Considering the universal application of the rating tool, should Green Star - Design & As Built address the full scope of deliveries, from shell and core to integrated fitouts? What are the benefits or drawbacks of this approach?

Do you think there should be a size limit for the buildings that can be assessed by Green Star - Design & As Built?

Page 17: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

14

Please provide any additional feedback on the proposed scope of assessment here

Green Star - Design & As Built will integrate and align with Green Star – Communities, Green Star – Interiors and Green Star – Performance

The new Green Star - Design & As Built rating tool will integrate and align with the Green Star – Communities, Green Star – Interiors, and Green Star – Performance rating tools. Green Star - Design & As Built will:

• Reduce documentation and reward and buildings that build within Green Star – Communities rated sites where applicable

• Encourage and make easy the transition from an attributes-only sustainability assessment to one that also incorporates sustainable performance in operation, in alignment with Green Star – Performance.

• Facilitate the development of fitouts that comply with the requirements of Green Star – Interiors within the Green Star - Design & As Built certified projects and minimise the challenges and risks associated with achieving a subsequent Green Star - Interiors rating.

Tell us what you think

What other opportunities for alignment of the rating tools exist? Do you have any suggestions for how alignment can be increased to ensure better and more consistent project and sustainability outcomes?

What other challenges or frustrations that project teams face when progressing their project through the different rating tools exist? How could these challenges or frustrations be minimised through Green Star - Design & As Built ?

Page 18: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

15

Green Star - Design & As Built will provide a pathway for ensuring design attributes are implemented throughout construction

The Green Star rating tools for building design have been instrumental in encouraging Australia's property and construction industry to design and build green over the past ten years. Green Star - Design ratings have encouraged project teams to consider sustainability from the initial stages of project development and have provided a set of holistic, best practice benchmarks to guide the design approach of project teams.

The current Green Star - Design rating is intended to serve as guide and provide the groundwork for the eventual construction of a building, which will then go on to achieve a Green Star – As Built certification to demonstrate that the sustainability objectives and potential of the sustainable design has been fulfilled. The ‘As Built’ rating then provides a foundation for the sustainable operation of the building, which can be assessed and certified using Green Star - Performance.

Currently, a building can be awarded a Green Star – Design rating, a Green Star – As Built rating, or both. The ratings are achieved through two separate assessments, and some of the same information must be provided for a building's ‘As Built’ assessment as is provided for its 'Design' assessment. Recent amendments to the current Green Star rating tools have introduced some 'deemed-to-satisfy' criteria in an effort to streamline the transition from Design certification to As Built assessment and reduce the duplication of time and effort by project teams. It is intended that this approach should continue, and that the Green Star - Design & As Built rating tool will be developed in such as way as ensures a smooth transition between assessments.

The current Green Star rating tools for building design award ratings on the basis of documentation provided by project teams at the tender stage. That is, the documentation needs to show building elements have been designed to a high degree of certainty. If a form of assessment at the design stage should exist, it is proposed that the requirements for a Green Star - Design rating are relaxed so that it becomes a rating signalling commitment, rather than achievement.

In 2012, and after extensive stakeholder research, the GBCA modified the terms of achievement for Green Star - Design ratings, introducing a 24 month time limit for projects that achieve Green Star – Design certification. This change aimed to encourage projects to follow through and demonstrate that the sustainability 'commitments' of the design have been delivered at the construction stage. Green Star - As Built ratings currently have no time limit on their validity and Green Star building owners can therefore use their Green Star certification to market their project on an ongoing basis.

In an effort to expand the reach and influence of Green Star and its relevant benchmarks, recent feedback indicates that there would be support for an expansion of Green Star Design & As Built certification to all Star levels; from 1 Star Green Star through to 6 Star Green Star. Such a change would allow stakeholders, who have achieved a 3 Star Green Star certified rating (representing 'Good Practice' in sustainable design or construction) to market their building as such.

Tell us what you think

Do you think that there is still a need to offer some form of assessment and certification for building design? Why, why not?

Page 19: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

16

Which of the following statements do you agree with?

Green Star - Design ratings should continue to be awarded without a requirement for a subsequent As Built rating. The current time limit of two years on the validity of Green Star ratings is a sufficient measure to address the issue of lack of delivery.

Yes N o

Green Star - Design ratings should be awarded only upon the condition of the future achievement of an As Built rating.

Yes N o

There should be no Green Star - Design rating. It should be replaced with a design stage pre-certification to assess whether the project is on course to achieve an As-Built rating. This pre-certification should not allow project teams to market their project as Green Star - Design certified.

Yes N o

There should be no Green Star assessment at the design stage

Yes N o

Please provide further comments or feedback to support your view on the future of Green Star - Design ratings below

What is the relevant purpose of a 'Design' rating? Would a commitment suffice? Should it be addressed at the design brief stage? Schematic design? Other?

Do you agree with the current approach to design ratings whereby a time limit applies? If so, is 24 months still an appropriate period? Should a time limit exist for Green Star - As Built ratings?

Page 20: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

17

Do you believe that the rating scale for Green Star - Design & As Built certified ratings should be expanded to include 1 Star - 3 Star ratings?

Do you believe there is a need to recognise achievements in excess of 6 Stars in some way?

Green Star - Design & As Built will provide a simpler, more user-friendly and cost-effective user experience

The Green Star - Design & As Built rating tool and submission process will be delivered entirely online. This means that there will be no traditional technical manual or scorecard, and that technical content and submission guidelines will be integrated within the rating tool. Green Star - Design & As Built will be created within a similar online system to the Green Star – Performance PILOT. The online platform will:

• Streamline the submission processes, making it easy for users to submit the required inputs

• Streamline the certification process, utilising upload facilities to reduce the amount of documentation required for a certified rating

• Reduce the amount of time required for project certification, reducing costs

• Allow easy access and updates of all technical documentation related to assessment methodology, including manuals and guides

• Allow other resources such as standards, case studies and other external resources to be directly referenced within the assessment methodology

See Appendix 3 for screenshot examples of the Green Star – Performance online interface upon which the Green Star - Design & As Built online system will be modelled.

The current method of delivering Green Star rating tools means that a significant amount of technical guidance, clarifications and corrections must be delivered independently of the Technical Manual. Moving our rating tools to an online delivery system should allow for more frequent updates, improving the accuracy and integration of technical information. It is proposed the new rating tool be updated at least once a year to incorporate relevant amendments, with a two year review cycle for major amendments and updates.

Page 21: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

18

In addition, the GBCA hopes to work with software or other service providers to integrate enhanced features into the online rating tool system, that can assist project teams with:

• Managing the project delivery

• Collecting and coordinating documentation

• Improve building design through modelling practices that align with Green Star requirements.

We are currently scoping how best to work with software and service providers and will be engaging in consultation with interested parties in late 2013 and early 2014.

Tell us what you think

What features should be included as part of the Green Star - Design & As Built online system?

\

Do you agree with the proposed timeframe/schedule for updates to the rating tool? If not, what is your preferred schedule for updates?

Green Star - Design & As Built will help to ensure that Green Star remains the rating system of choice for the built environment by redefining current best practice and promoting innovation

Over the past few years, our work with a range of organisations to develop Green Star – Custom rating tools has helped us to identify a range of potential improvements that can be integrated into the Green Star - Design & As Built rating tool, such as the removal of outdated credits like 'High Frequency Ballasts' and 'Insulant ODP'. Feedback from project teams also indicates the need to revise approaches in the 'Land Use and Ecology' category and to develop common methodologies for assessing greenhouse gas emissions and potable water use. Finally, recent discussion papers on Construction and Demolition Waste and Material Life Cycle Impacts indicate the industry is ready to explore and embrace new impact reduction approaches.

The development of Green Star - Design & As Built rating provides an opportunity to redefine Australian 'best practice' for sustainable design and construction and explore opportunities for expanding the rating tool's scope of assessment beyond environmental impacts to incorporate social and economic sustainability impacts such as adaptation and resilience, cultural heritage, employment creation and community engagement.

Page 22: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

19

A high-level roadmap on the potential approach to credit development is included at Appendix 2. The roadmap is a snapshot of our current thinking, and will not reflect necessarily reflect the final Green Star - Design & As Built rating tool.

The rating tool roadmap proposes a number of alternative performance options for a variety of credits. These are shown as a ‘performance path’ surrounding a ‘prescriptive path’. Currently, alternative performance path options are expected to be adopted for ‘Greenhouse Gas Emissions’, ‘Potable Water’, ‘Material Lifecycle Impacts’, ‘Carbon Emissions from Transport’, and ‘Land Use and Ecology’. For these impact issues, a project may, for example, be able to demonstrate compliance solely through ‘Carbon Emissions from Transport’ or via three credits: ‘Impacts from Car Parking’, ‘Alternatives to Private Transport’ and ‘Commuting Mass Transport'. The performance approach would provide more flexibility to project teams in demonstrating compliance, allowing them to prove compliance in ways that are most relevant to their projects. Meanwhile, project teams seeking a simpler, more conservative path will be able to address the prescriptive options

As part of our broader Green Star 2014 program of works, the Green Star Innovation category been recently relaunched in order to encourage and direct investment in new sustainable solutions, and assist project teams working with the current suite of Green Star rating tools to embed innovative sustainable goals and outcomes into their projects as early as possible by taking Innovation Challenges. There maximum number of points available within the Innovation category has increased from 5 to 10 points and the category has been expanded to address new social and/or economical issues. The changes to the Green Star Innovation category are allowing us to test new approaches and credits, which will be incorporated into the development of Green Star - Design & As Built where appropriate.

Tell us what you think

Please provide comments on the contents and approach of the roadmap directly by marking it up using Acrobat Reader.

While details about scope of specific credits are currently limited, please provide feedback on the following:

Should the scope of the rating tool be limited to environmental issues, or should this scope be expanded to include socio-economic sustainability impacts?

Are there any issues or credits that you think should not be included in the new Green Star - Design & As Built rating tool because they are now just 'business as usual'? Do you believe they should be removed entirely, or should they become minimum requirements for other credits (Eg. High frequency ballasts could become a requirement for other lighting credits)?

Page 23: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

20

Are there any other issues or impacts that are not covered by the roadmap that should be considered for inclusion in the new rating tool? If so, please provide links to resources that will assist the Technical Advisory Group (TAG) in assessing the relevance of such issues.

Currently, there are only two minimum requirements in the Green Star rating tools for design and construction - the Greenhouse Gas Emissions Conditional Requirement and the Land Use and Ecology Conditional Requirement. Should there be any additional minimum requirements required for the achievement of particular Star ratings? For example, should a mandatory Greenhouse Gas Emissions score be achieved in order for a project to be awarded a 5 or 6 Star Green Star certification?

Are there any other opportunities for providing performance or prescriptive paths to address the issues highlighted in the roadmap? If so, please provide details below.

Green Star - Design & As Built will allow issues, features and design solutions to be clearly and accurately compared through the implementation of a revised weighting system

As part of the development project for Green Star – Design & As Built, the current Green Star weighting system will be reviewed. Key reasons for this review include:

• The current system of weighting can make it difficult to compare the impacts that one solution will have across multiple categories, making communication difficult between all relevant parties and requiring significant expertise to interpret.

• The current weighting system varies across different building sectors which does not allow for a clear comparison across different building types, and makes the assessment of mixed-use buildings complex.

Page 24: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

21

• The current weighting system is state based and does not account for the significant climate zone variations within each Australian state and territory. Similarly, the current system means that cities that lie within close proximity, share the same or similar climate and even the same infrastructure, but that lie within different states may be awarded different weighted points.

Feedback to date indicates that current weightings system should be radically simplified. The current preference is to simplify the weighting system in a manner similar to the Green Star – Performance and Green Star – Communities rating tools, where 1 point is comparable across categories. The issue of regional or climatic variations can then be resolved through the Innovation category or variations within credits themselves.

Tell us what you think

Should the current system of weighting, whereby different states and territories have different weightings remain? If so, how could climate factors and power supply be accounted for within the rating tool?

Should one point in one category be equal to one point in another category, i.e. no weightings?

Page 25: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

22

Delivering on project outcomes: development and testing

The GBCA aims to have all revised and new credits for Green Star – Design & As Built available in draft format for public comment and feedback by April 2014. Once these draft credits are released, project teams who are using the current rating tools may choose to test these new draft credits contribute their feedback to the development process. This approach will allow for ‘beta testing’ of the new rating tool prior to its full release in August/October 2014. This would also mean that the rating tool would not be subject to a formal PILOT phase, as has been the customary approach for new Green Star rating tools in the past. This means that the market will be able to reap the benefits of the new Green Star - Design & As Built rating tool sooner.

Tell us what you think

Do you agree with the 'beta testing' approach to development and testing? If not, please provide details of the alternative approach you would suggest.

Delivering on project outcomes: other feedback or suggestions

The Green Star rating tools are only successful insofar as they meet and respond to the needs of the market. The GBCA welcomes your feedback and suggestions on any other aspects of Green Star - Design & As Built's scope, content or development, and how we might can use this development phase to address issues within the current Green Star rating tools for design and construction or improve the user experience.

Tell us what you think

Please provide your feedback or suggestions on any additional issues or opportunities that should be addressed or considered during the development and review of Green Star - Design & As Built.

Page 26: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

23

Get involved in Green Star - Design & As Built

There are many ways you can contribute to the Green Star - Design & As Built project.

• Provide your feedback on this consultation paper.

• Attend a briefing session and provide your feedback. Industry briefings will be scheduled in capital cities around the country in October and November. Keep an eye on the GBCA website for details and to book.

• Make sure you're signed up to receive our Green Building Voice newsletter and Green Star eUpdate for regular announcements on project consultation periods, progress updates and additional opportunities to get involved.

• Request a briefing for your staff. GBCA member organisations can request for a member of our Green Star Technical Development team to present to you on the Green Star – Design & As Built rating tool. If you're interested or have a project in development that you think may benefit from the new approach, request a briefing online via: www.gbca.org.au/speaker-request.asp

• Follow our progress via our website. We're keen to share our work with you so we'll be providing regular updates, meeting minutes, surveys and more via our Green Star 2014 progress calendar. You can already see the minutes of our first Technical Advisory Group meetings here: www.gbca.org.au/green-star/green-star-2014/progress/

Tell us what you think

How else would you like to be informed or participate in the development of Green Star - Design & As Built? If so, please provide details below.

Page 27: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

Appendix 1: Delivering on project outcomes: proposed timeline

Milestone Projected Delivery Date

Expression of Interest for Technical Advisory Group (TAG) and Expert Reference Panel (ERP)

May 2013

Consultants briefs for greenhouse gas, potable water, land use and ecology.

July 2013

TAG and ERP engagement completed August 2013

Draft consultation paper released to industry for comment

September 2013

Final version of consultation paper released December 2013

Rating tool released for public comment to industry April 2014

Rating tool approval process begins June 2014

Rating tool approved by GBCA Board August 2014

Page 28: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

Appendix 2: Roadmap

Page 29: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Current Future

Man-1 Green Star Accredited Professional

Man-2 Commissioning

Man-3 Building Tuning

Man-4 Independent Commissioning Agent

Man-5 Building User's Guide

Man-6 Environmental Management System

Man-7 Waste Management

Man-8 Waste and Recycling Management Plan

Man-9 Building Management System

Man-10 Learning Resource

Man-11 Maintainability

Man-12 Construction Indoor Air Quality Plan

Man-13 Sustainable Procurement Guide

Man-16 Metering

WMP

Green Star Accredited Professional

Commissioning & Tuning

Building Information

Construction Environmental Management

Commitment to Performance

Metering and Monitoring

Construction and Demolition Waste

ManagementManagement

The

Operational Waste

Mat-1 Recycling Waste Storage

a Credit found in other categorya Credit in Category

LEGEND

Issue not found in Green Stara

Leasing & other commitments

Description of proposed credit

Recognises the appointment and active involvement of a Green Star Accredited

Professional (GSAP) in all stages of the project to ensure a successful submission.

Recognises the high quality maintainability, commissioning, handover and tuning

inititiatives, including the development of future operational tuning plans

Recognises the development and provision of relevant information to visitors, users

and facilities managers to utilise the building to optimal performance

Recognises the processes to reduce energy, water, indoor air, and waste impacts

during construction in line with established guidelines and standards.

An element of this credit has been moved to the Materials category.

Recognises good practices that ensure buildings perform well during operation. This

is done through good leasing practices, or development of operational guides.

Recognises the development of processes to minimise waste during building

operations. This includes providing a space for waste collection and recycling.

Successful projects provide systems and processes that facilitate future monitoring,

operation and maintenance of energy and water consumption.

aProposed for

deletion

Page 30: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

IEQ-1 Ventilation Rates

IEQ-2 Air Change Effectiveness

IEQ-3 Indoor Pollutants Monitoring & Control

IEQ-4 Daylight

IEQ-5 Thermal Comfort

IEQ-6 Hazardous Materials

IEQ-7 Internal Noise Levels

IEQ-8 Volatile Organic Compounds

IEQ-9 Formaldehyde Minimisation

IEQ-11 Daylight Glare Control

IEQ-12 High Frequency Ballasts

IEQ-13 Electric Lighting Levels

IEQ-14 External Views

IEQ-15 Individual Thermal Comfort Control

IEQ-16 Tenant Exhaust Riser

IEQ-10 Mould Prevention

IEQ-13 Air Supply Ductwork

IEQ-17 Air Distribution System

IEQ-18 Outdoor Pollutant Source Control

IEQ-19 Places of Respite

IEQ-19 Breakout Spaces

IEQ-22 Natural Ventilation

IEQ-20 Private External Space

IEQ-21 Dwelling Ventilation

IEQ-23 Small Occupied Spaces

Quality of Internal Air

Visual Comfort

Thermal Comfort

Hazardous Materials

Acoustic Comfort

Reduced Exposure to Pollutants

Lighting Comfort

Quality of Amenities

Indoor Environment QualityIndoor Environment Quality

Eco-5 Outdoor Communal Facilities

Current Future

The a Credit found in other categorya Credit in Category

LEGEND

Issue not found in Green Stara

Description of proposed credit

aProposed for

deletion

Recognises providing good amounts of fresh air, while providing good exhaust of

pollutant sources. It also encourages best practice design of ventilation solutions.

Connection to nature (plants)

Recognises increased thermal comfort through systems that balance, and provide

occupant controls, of temperature, ventilation and humidity within a space.

Recognises lighting design that takes into account the impact of luminaire glare, and

appropriate light levels at work surfaces and within the space as a whole.

Recognises reduced noise from the outside, reduced noise from sources inside the

building, and the provision good acoustic privacy in all spaces.

Recognises removing all indoor lead, asbestos, and PCBs from an existing building

and dispose of them in accordance with best practice standards

Recognises providing most occupants with daylight and a connection to nature,

while also minimising discomfort glare from the sun.

Reduces the use of paints, adhesives, sealants, joinery, and flooring with low levels

of VOCs. Also encourages reducing exposure from operational sources.

Encourages spaces that are conducive to social interaction, well designed,

comfortable, and encourage a level of active movement.

Page 31: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Performance Path

Prescriptive Path

Ene-Con Conditional Requirement

Ene-1 Greenhouse Gas Emissions

Ene-3 Peak Electricity Demand Reduction

Ene-4 Lighting Zoning

Ene-5 Lighting Power Density

Ene-6 Car Park Ventilation

Ene-7 Unoccupied Areas

Ene-8 Stairs

Ene-9 Efficient External Lighting

Ene-10 Shared Energy Systems

Ene-11 Energy Efficient Appliances

Greenhouse Gas Emissions

Peak Electricity Demand Reduction

EnergyEnergy

Current Future

The a Credit found in other categorya Credit in Category

LEGEND

Issue not found in Green Stara

Description of proposed credit

aProposed for

deletion

Recognises building designs that reduce their peak load.

Lighting Power Density

Lighting Zoning

Supplementary Systems

Appliances and Equipment

Building Fabric

Recognises a holistic, modelled, approach at reducing the building’s operational

greenhouse gas emissions through maximising energy efficiency practices, while

encouraging the use of on-site and off-site renewable energy.

HVAC Systems

Where a holistic, modelled, approach is not relevant, a partial number of points will

be made available through a prescriptive path. This path will reward improving over

the requirements found in the Building Code of Australia, and the use of renewable

energy use whether on-site, or off-site.

Renewable Energy

Page 32: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Prescriptive PathTra-1 Provision of Car Parking

Tra-2 Fuel-Efficient Transport

Tra-3 Cyclist Facilities

Tra-4 Commuting Mass-Transport

Tra-5 Trip Reduction Mixed-Use

Tra-6 Transport Design and Planning

Car Parking

Commuting Mass-Transport

Walkable Neighbourhood

Alternative Transport

TransportTransport

Current Future

The a Credit found in other categorya Credit in Category

LEGEND

Issue not found in Green Stara

Description of proposed credit

aProposed for

deletion

Where a holistic, modelled, approach is not relevant, a partial number of points will

be made available through a prescriptive path. This path will reward specific

solutions such as reduced car parking use, commuting mass transport, the

walkability of the neighbourhood, and providing alternatives such as cycling, virtual

conferencing facilities, electric vehicles, etc.

Performance Path

Carbon Emissions from Transport

Recognises a holistic, modelled, approach at reducing the building’s transport

greenhouse gas emissions through an assessment of all available transport impacts,

and through the use of transport minimisation strategies.

Page 33: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Wat-1 Occupant Amenity Water

Wat-3 Landscape Irrigation

Wat-4 Heat Rejection Water

Wat-5 Fire System Water Consumption

Wat-6 Potable Water Use in Equipment

Wat-7 Water Efficient Appliances

Wat-8 Swimming Pool/Spa Water Efficiency

Potable Water

Fire System Test Water

WaterWater

Current Future

The a Credit found in other categorya Credit in Category

LEGEND

Issue not found in Green Stara

Description of proposed credit

aProposed for

deletion

Other water sources

Prescriptive Path

Where a holistic, modelled, approach is not relevant, a partial number of points will

be made available through a prescriptive path. This path will reward specific

solutions such as efficient amenities, low water use from heat rejection systems, low

water landscaping design, and water reuse systems.

Performance PathRecognises a holistic, modelled, approach at reducing the building’s operational

potable water use through an assessment of all available potable water uses, and

through the use of water collection and reuse strategies.

Occupant amenities

Heat rejection systems

Landscape irrigation

Water reuse systems

Page 34: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Mat-1 Recycling Waste Storage

Mat-2 Building Re-use

Mat-3 Recycled Content & Re-used Products & Materials

Mat-4 Concrete

Mat-5 Steel

Mat-6 PVC

Mat-7 Timber

Mat-8 Design for Disassembly

Mat-9 Dematerialisation

Mat-10 Shell and Core or Integrated Fitout

Mat-11 Flooring

Mat-12 Joinery

Mat-14 Ceilings, Walls & Partitions

Mat-14 Internal Walls

Mat-13 Loose Furniture

Mat-15 Universal Design Design for Adaptability

Materials Life Cycle Impacts

Construction and Demolition Waste

MaterialsMaterials

Flooring

Assemblies

Furniture

Performance Path

Prescriptive Path

Operational Waste

Man-7 Waste Management

Current Future

The a Credit found in other categorya Credit in Category

LEGEND

Issue not found in Green Stara

Description of proposed credit

aProposed for

deletion

Recognises a holistic, modelled, approach at reducing the building’s material

lifecycle impacts use through an assessment of all available structural materials, and

showing an improvement over key environmental impact categories.

Where a holistic, modelled, approach is not relevant, a partial number of points will

be made available through a prescriptive path. This path will reward specific

solutions such as low impact concrete and steel, chain of custody certified

materials (PVC and timber) or materials with environmental product declarations,

and dematerialisation strategies.

This credit has been moved to the Management category, as it deals more with a

process, rather than a specific material impact.

Recognises minimise construction and demolition waste through initiatives including

the refurbishment of buildings, and reduction of overall waste going to landfill.

Recognises selection of fitout elements that are reused, have an eco-label, or that

have a reduced impact in the built environment.

Recognises strategies that minimise refurbishment waste by allowing the building to

be adapted to many uses over time.

Concrete

Steel

PVC

Timber

Dematerialisation

Page 35: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Eco- Conditional Requirement

Eco-1 Topsoil

Eco-2 Reuse of Land

Eco-3 Reclaimed Contaminated Land

Eco-4 Change of Ecological Value

Eco-5 Outdoor Communal Facilities

Site Selection

Land Ecology

Quality of Amenities

Land Use and EcologyLand Use and Ecology

Climate Adaptation and Resilience

Current Future

The a Credit found in other categorya Credit in Category

LEGEND

Issue not found in Green Stara

Description of proposed credit

aProposed for

deletion

Recognises the selection of land that is not greenfield, while actively promoting the

use of land that is of lower ecological value (such as contaminated, or reused).

Recognises solutions that enhance the ecology of the site, and enhances the

biodiversity of the area.

This credit has been moved to the Indoor Environment Quality category.

Recognises building solutions that address the impact of extreme weather events,

and develop processes in place to address them during operations.

Page 36: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Emi-1 Refrigerant ODP

Emi-2 Refrigerant GWP

Emi-3 Refrigerant Leaks

Emi-4 Insulant ODP

Emi-5 Watercourse Pollution

Emi-6 Discharge to Sewer

Emi-7 Light Pollution

Emi-8 Legionella

Emi-9 Trade Waste Pollution

Emi-10 Noise Pollution

Impacts from Refrigeration

Stormwater

Light Pollution

EmissionsEmissions

Current Future

The a Credit found in other categorya Credit in Category

LEGEND

Issue not found in Green Stara

Description of proposed credit

aProposed for

deletion

Recognises reduction of impacts from ozone layer degradation, global warming, and

health impacts to people arising from bacteria such as legionella.

Recognises reduction of pollutants and flows from stormwater.

Recognises reduction from Glow, glare and light flicker through the elimination of all

indirect light to the night sky.

Page 37: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Current Future

The a Credit found in other categorya Credit in Category

LEGEND

Issue not found in Green Stara

Description of proposed credit

aProposed for

deletion

Inn-1 Innovation Strategies and Technologies

Inn-2 Exceeding Green Star Benchmarks

Inn-3 Environmental Design Initiatives

Innovation

InnovationInnovation

Recognises solutions that enhance the sustainability credentials beyond the

requirements in the rating tool. The new innovation category will be modelled after

the newly released credits, and include the opportunity to address a number of

innovation challenges as well.

Employment creation

Social Return on Investment

Community Benefits

Contractor Education

Affordable Housing

Culture, Heritage and Identity

Innovation Challenges

Environmental Product Declarations

Material Lifecycle Impacts

Adaptation and Resilience

Construction and Demolition Wate

Financial Transparency

Marketing Excellence

Market Intelligence

Design for Active Living

Manufacturer and supplier responsibility

Materials Life Cycle Impacts

Adaptation and Resilience

Construction and Demolition Waste

Integration to the Urban Fabric

Inclusive Design

Employment creation

Social Return on Investment

Community Benefits

Contractor Education

Affordable Housing

Culture, Heritage and Identity

Integration to the Urban Fabric

Financial Transparency

Marketing Excellence

Market Intelligence

Quality of Amenities

Effective Space Use

Inclusive Design

Effective Space Use

Innovation Challenges

It is expected this challenge will graduate to the Materials category

It is expected this challenge will graduate to the Materials category

It is expected this challenge will graduate to the Land Use and Ecology category

It is expected this challenge will graduate to the Materials category

It is expected this challenge will graduate to the Indoor Environment Quality category

For more information see: http://www.gbca.org.au/green-star/innovation/

For more information see: http://www.gbca.org.au/green-star/innovation/

For more information see: http://www.gbca.org.au/green-star/innovation/

For more information see: http://www.gbca.org.au/green-star/innovation/

For more information see: http://www.gbca.org.au/green-star/innovation/

For more information see: http://www.gbca.org.au/green-star/innovation/

For more information see: http://www.gbca.org.au/green-star/innovation/

For more information see: http://www.gbca.org.au/green-star/innovation/

For more information see: http://www.gbca.org.au/green-star/innovation/

This issue has been highlighted as potential Innovation Challenge

This issue has been highlighted as potential Innovation Challenge

This issue has been highlighted as potential Innovation Challenge

Page 38: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

Appendix 3: Green Star - Performance Online Submission System Interface

Page 39: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH
Page 40: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH
Page 41: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH
Page 42: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star - Design & As Built Consultation Paper

Appendix 4: Green Star - Design & As Built Technical Advisory Group (TAG) and Expert Reference Panel (ERP)

Page 43: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star – Design & As Built Technical Advisory Group

Julien Lepetit AECOM Australia Pty Ltd Anne Kovachevich Arup Australasia Digby Hall Aurecon Australia Alicia Jones Australand Ross Davies BlueScope Steel Limited

Nikki Paton Broad Construction Services (QLD) Pty Ltd

Owen Grace Brookfield Multiplex Australasia Pty Ltd

Steven McKellar City of Port Phillip Alan Ashby Colliers International Pty Ltd Caimin McCabe Cundall Hannah Morton Cundall

Eddie Yick Department for Transport, Energy & Infrastructure (SA)

Marlon Kobacker Edge Environment David Sanders FDC Construction & Fitout Pty Ltd Brendan Coates Grocon Dru Spork Grocon James Wewer Lend Lease Rocio Bona Mirvac Paul Edwards Mirvac David Palin Mirvac Chris Nunn Norman Disney & Young Suzanna Remmerswaal Northrop Consulting Engineers Pty Ltd Ian Adams Organica Engineering Pty Ltd Rob Bunting SA Health Timothy W. Bush SKM Ben Jones Steensen Varming Greg Johnson Stockland Davina Cameron Umow Lai Pty Ltd Adriaan Window Umow Lai Pty Ltd Jonathan Dalton Viridis E3 Pty Ltd Phillip Cook Wood & Grieve Engineers Patrick Campbell WSP Rob Gration WSP

Page 44: Green Star Design and As Built Consultation paper - AIRAH · Green Star – Design and As Built Consultation paper ... Renata Dobrowolska, M.AIRAH

Green Star – Design & As Built Expert Reference Panel

Matthew Low AE Smith

Nicki Parker AECOM Australia Pty Ltd Peter Byron Armstrong World Industries Pty Ltd Chris Field Arup Australasia Shomo Sen Arup Australasia Quentin Jackson Aurecon Australia Darrin Schreier Aurecon Australia Paolo Bevilacqua Australand Sophi MacMillan Australian Vinyls Corporation Limited Nicole Sullivan BlueScope Steel Limited Haris Moraitis Building Services Engineers Pty Ltd Janet Wilson Business Improvement Strategy Vyt Garnys CETEC Pty Ltd Paul Davy D Squared Consulting Pty Ltd Brian Brown DECOR BLINDS AUSTRALIA Kevin Yee Department of Planning (Green Group) David Blakemore Forbo Floorcoverings Pty Ltd Graham Agar Full Circle Design Services Pty Ltd John Mabb Gold Coast City Council Carl Gray Gray Light David Fletcher Gunnersen Fin Robertson John Holland Pty Ltd Karen Hovenga Karen Hovenga Max Deuble Macquarie University Patrick Carpenter Marshall Day Acoustics Richard Jelbert Norman Disney & Young Claire Bird Octeif Anthony Ng ONESTEEL Manufacturing Matthew Stead Resonate Acoustics Mark Thomson Schiavello Stefan Preuss Sustainability Victoria Shane Esmore Umow Lai Pty Ltd Jian Zuo University of South Australia Stephen Choi Viridis E3 Pty Ltd John Penny Viscon Systems Atena Malamiri Watpac Construction (NSW) Pty Ltd Nigel Justins Woodhead Pty Ltd