greenway missing links update...in october 2015 the greenway missing links report was adopted by the...

2
ST CARLTON SMITH RD Petersham Park P BROWN CR CR RD CANT RBURY RAILWAY TCE WE T R A F A LGA R WEST BRIGHTON ST RAILW AY CRYSTAL JUNCTION E Petersham F1 F2 H1 H2 G Petersham Summer Hill Lewisham West Hill Lewisham M What’s the GreenWay? The GreenWay is a 5km urban environmental corridor linking the Parramatta River at Iron Cove with the Cooks River at Earlwood. Following the route of the Inner West Light Rail, the GreenWay features bike paths and foreshore walks, cultural and historical sites, cafes, bushcare sites and a range of parks, playgrounds and sporting facilities. GREENWAY MISSING LINKS UPDATE September 2016 How much of the GreenWay shared use path is in place? Nearly half of the 5km GreenWay shared use path is already in place, mostly the sections extending north of Parramatta Rd to Iron Cove and the popular Bay Run. Some southern sections are in place, but a lot more needs to be done. Most southern sections of the GreenWay are temporarily routed along quiet local streets. There are 8 wayfinding signs at intervals along the GreenWay. The route is also identified by marker signs and white stencils painted on the surface of local streets and off-road shared use paths. How long does it take to ride the GreenWay? It takes about 45 minutes on a bike if you don’t stop along the way (other than at busy road crossings). It can take a lot longer if you stop to relax in a park, grab a coffee or visit a shop or local art gallery! When will the remaining sections of the GreenWay be completed? In October 2015 the Greenway Missing Links Report was adopted by the former Leichhardt, Marrickville, Ashfield and Canterbury councils. The Report identifies 11 priority missing links which are expected to be built over the next 5 years. The links were assessed in consultation with the State Government to enhance pedestrian and cycle safety, connect with regional cycleways along the Cooks River and Parramatta River and improve local access to the 9 Inner West Light Rail stops. The councils commissioned a multi-disciplinary team led by the NSW Government Architects Office to develop a concept design for the most complex links F to J, (see map overleaf) which will create a continuous off-road shared path between Parramatta Road and Old Canterbury Road. New GreenWay funding announced The Inner West community and local councils have been campaigning for over 10 years to complete the GreenWay. In July 2016 the NSW Government and the new Inner West Council announced a joint commitment of $14.5 million towards the cost of completing the GreenWay Missing Links. Detailed designs for the Central and Southern Missing Links are now being prepared. The timing of construction of individual links will depend on further detailed studies, planning approvals and development timetables. It is expected that most of the GreenWay Missing Links will be completed by 2020. How can I find out more about the GreenWay Program? Visit the website www.greenway.org.au for information about the many active transport, bushcare, schools education and local cultural activities taking place along your GreenWay. Detailed information about the missing links is contained in the GreenWay Missing Links Report adopted by the four councils in October 2015 see: www.greenway.org.au/publications

Upload: others

Post on 06-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GREENWAY MISSING LINKS UPDATE...In October 2015 the Greenway Missing Links Report was adopted by the former Leichhardt, Marrickville, Ashfield and Canterbury councils. The Report identifies

l

Cooks

River

Iron CoveRobson

Park

BlackmorePark

LINKMORTLEYAV

BOO

MER

AN

G

ST

PERRYST

JAM

ES

NO

RTO

N

L ILYFIELD R D

C I T Y W E S T

Ash�eldPark

Johnso

nPk

YeoPark

ArlingtonRecGnd

LaxtonPark

EwenPark

BeamanPark

J a c kShanahanPark

MARRICKVILLE

GOLF CLUB

TrinityGrammar

SummerHill PS.

InfantsSch

DulwichHill PS.

CONSTITUTIO

N

ROSEDALE

BEACH

CHALLISFLOSS

DALHO

US

IE

(HUME HWY)

SLOANE

GOWER

STANTON

RAMSAY ST

O’CONNORKINGSTON

ALT

WARATAH

G R OSVENOR

ST

CARLTON

SMITH

RD

ST RDA R L I N G T O N

PRO

SPEC

T

STQ

UE

EN

OLD

CA

NTER

UN

ION

ST

GA

RNET

ST

WIN

DSOR

TENNEN

T

B UR Y

NEW C A N TER B U R Y

CRINAN

ST

EWART ST

NESS AV

ST

WARDELL

RD

HoskinsPk

LambertPark

PioneersMemorial

Park

PetershamPark

LeichhardtPub. Sch

Lewisham

P ub.Sc hChris

tian

Broth

ers H.Sch

Petersham

Pub.Sch

Fort StHighSch

Dulwic

h

Hill

H igh

S c h

Marrickvil leWestPub.S

ST

STMARION

DARLEY

RD

ALLEN

WILLIAM ST

ST

NO

RTON

ST

TEBB

UTT

R A MA T T A PA R R A M AT TA

W E S

BROW

N

R ETSOF

FLO

OD

ELSW

ICK

ST

ST

LORDS RD

NO

RTON

ST

BALM

AIN

RD

CRCR

RD

CANT

RBURY

NEW

CA

NT

ERBURY

RD

RAILWAY TCE

TOOTHILL

DAVIS

PIGOTT ST

VICTORIA

ST

ST

GO

RDO

N

WEST ST

TR AF A LGA R

OLD

WEST

BRIGHTON ST

RAIL

W A

YST

CRY

STA

L

MARR ICKVILLE

RD

WARDELL

HER

CU

LES

S

T

RD

EWART

ST

ST

B E AU C H A M P

WHARF ST

JUNCTION

HEN

SON

RD

RD

HAWTH

ORNE

PDE

E

KegworthPub.Sch

HAW

THOR

NE C

ANAL

PDE

P A RG T

HurlstonePark

Sydenham

Petersham

LIGHT

RAIL

C

B3 B1B2

D

E

F1F2

J2 J1

K

H1 H2

G

I

L

to Bay Run

to City

to Botany Bay& Cronulla

to Homebush

Haber�eld

Leichhardt

DulwichHill

Petersham

Summer Hill

Leichhardt Nth

Lily�eld

Hawthorne

Marion

Taverners Hill

Lewisham West

Waratah Mills

Arlington

Dulwich Grove

Dulwich Hill

Summer Hill

Lewisham

N

M

missing links:

N

F1

H1

G

Cadigal Reserve

Parramatta Road Crossing 1

Hawthorne Canal South

Longport Street Feeder

J1

I

KM

Old Canterbury Road Crossing 1

Lewisham West

Longport Street Crossing 1

Leichhardt North Feeder

high priority

med/high priority

A

CDEL

Cooks River Crossing

Cooks River 3

Jack Shanahan North

Arlington

Johnson Park

Ewart Lane Feeder

medium priority

other link options

A

B2

F2

H2

J2

B3

B1 Cooks River 1

Cooks River 2

Old Canterbury Road Crossing 2

Longport Street Crossing 2

Parramatta Road Crossing 2

key:GreenWay corridorGreenWay catchmentExisting shared path Proposed GreenWay shared pathRegional cycle routes

Bushcare sites

Light Rail stops

Train stationsThe Western & Bankstown lines

Feeder Links to priority regional routesN M L

What’s the GreenWay?The GreenWay is a 5km urban environmental corridor linking the Parramatta River at Iron Cove with the Cooks River at Earlwood. Following the route of the Inner West Light Rail, the GreenWay features bike paths and foreshore walks, cultural and historical sites, cafes, bushcare sites and a range of parks, playgrounds and sporting facilities.

GREENWAY MISSING LINKS UPDATE September 2016

How much of the GreenWay shared use path is in place?Nearly half of the 5km GreenWay shared use path is already in place, mostly the sections extending north of Parramatta Rd to Iron Cove and the popular Bay Run. Some southern sections are in place, but a lot more needs to be done. Most southern sections of the GreenWay are temporarily routed along quiet local streets. There are 8 wayfinding signs at intervals along the GreenWay. The route is also identified by marker signs and white stencils painted on the surface of local streets and off-road shared use paths.

How long does it take to ride the GreenWay? It takes about 45 minutes on a bike if you don’t stop along the way (other than at busy road crossings). It can take a lot longer if you stop to relax in a park, grab a coffee or visit a shop or local art gallery!

When will the remaining sections of the GreenWay be completed?In October 2015 the Greenway Missing Links Report was adopted by the former Leichhardt, Marrickville, Ashfield and Canterbury councils. The Report identifies 11 priority missing links which are expected to be built over the next 5 years. The links were assessed in consultation with the State Government to enhance pedestrian and cycle safety, connect with regional cycleways along the Cooks River and Parramatta River and improve local access to the 9 Inner West Light Rail stops. The councils commissioned a multi-disciplinary team led by the NSW Government Architects Office to develop a concept design for the most complex links F to J, (see map overleaf) which will create a continuous off-road shared path between Parramatta Road and Old Canterbury Road.

New GreenWay funding announcedThe Inner West community and local councils have been campaigning for over 10 years to complete the GreenWay. In July 2016 the NSW Government and the new Inner West Council announced a joint commitment of $14.5 million towards the cost of completing the GreenWay Missing Links. Detailed designs for the Central and Southern Missing Links are now being prepared. The timing of construction of individual links will depend on further detailed studies, planning approvals and development timetables. It is expected that most of the GreenWay Missing Links will be completed by 2020.

How can I find out more about the GreenWay Program?Visit the website www.greenway.org.au for information about the many active transport, bushcare, schools education and local cultural activities taking place along your GreenWay. Detailed information about the missing links is contained in the GreenWay Missing Links Report adopted by the four councils in October 2015 see: www.greenway.org.au/publications

Page 2: GREENWAY MISSING LINKS UPDATE...In October 2015 the Greenway Missing Links Report was adopted by the former Leichhardt, Marrickville, Ashfield and Canterbury councils. The Report identifies

Cooks

River

Iron Cove

L INK

MORTLEY AV

BOO

ME R

AN

G S

T

PERRYST

JAM

ES

NO

RTO

N

L ILYFIELD R D

C I TY WEST

JackShanahanPark

CONSTITUTION

ROSEDALE

BEACH

CHALLISFLOSS

DAL HO

US

IE

SLOANE

GOWER

STANTONRAM

SAY ST

O’CONNORKINGSTON

WARATAH

G R OSVENO R

ST

CARLTON

SMITH

ST RDA R L I N G T O N

PRO

SPEC

T

QU

EE

N

OLD

CA

NTE

R

UN

ION

ST

GA

RNET

ST

WIN

DSOR

RD

TENN

ENT

B UR Y

N E W C A N TER B U R Y RD

CRINANST

EWART ST

NESS AV

WARDELL

RD

ST

STMARION

DARLEY

RD

ALLEN

WILLIAM ST

ST

NO

RTON

ST

TEBB

UTT

R A MA T T A PA R R A M AT TA

BROW

N

R ETSOF

FLO

OD

ELSW

ICK

ST

ST

L ORDS RD

NO

RTON

ST

BALM

AIN

RD

CRCR

RD

CANT RBURY

NEW

CA

NT

ERBU

RY RD

RAILWAY TCE

TOOTHILL

DAVIS

PIGOTT ST

VICTORIA

ST

ST

GORDON

WEST ST

T R A F A LG A R

O LD

WEST

BRIGHTON ST

RAIL

W A

YST

CRYS

TAL

MARR

ICKV ILLERD

WARD

ELL

HER

CU

LES

ST

RD

EWART

ST

ST

B E A U C H A M P

WHARF ST

JUNCTION

HEN

SON

RD

HA

WTH

OR

NE

PDE

E

HAW

THOR

NE

C

ANAL

PDE

P A R

C

B3

D

E

F1

J1

K

G

I

L

F2

J2

H2

B1 B3B2

A

HABERFIELD

LEICHHARDT

DULWICHHILL

HURLSTONEPARK

PETERSHAM

SUMMER HILL

HurlstonePark

MarrickvilleSydenham

Petersham Stanmore

Leichhardt Nth

Lilyfield

Hawthorne

Marion

Taverners Hill

Lewisham West

Waratah Mills

Arlington

Dulwich Grove

Dulwich Hill

Summer Hill

LewishamH1

N

M

A

key:GreenWay corridorGreenWay catchmentExisting shared path Proposed GreenWay shared pathRegional cycle routes

Bushcare sites

Light Rail stops

Train stationsThe Western & Bankstown lines

Feeder Links to priority regional routesN M L

other link optionsB2

B3

F2

H2

J2

Cooks River 2

Cooks River 3

Old Canterbury Road Crossing 2

Longport Street Crossing 2

Parramatta Road Crossing 2

missing links:

N

F1

H1

G

Cadigal Reserve

Parramatta Road Crossing 1

Hawthorne Canal South

Longport Street Feeder

J1

I

KM

Old Canterbury Road Crossing 1

Lewisham West

Longport Street Crossing 1

Leichhardt North Feeder

high priority

med/high priority

A

CDEL

Cooks River Crossing

Cooks River 1

Jack Shanahan North

Arlington

Johnson Park

Ewart Lane Feeder

medium priority

B1

Link H2 pedestrian/cycle tunnel under Longport St. Summer Hill.

Artist impressions of Missing Links courtesy of Tyrrell Studio and NSW Office of the Government Architect.

Link J1 pedestrian/cycle bridge under Battle Bridge, Parramatta Rd.

MISSING LINKS MAP