In 2010, the GSA commissioned a feasibility study of the Robert C. Weaver Federal Building, the 1.2 million-square-foot home of the Department of Housing and Urban Development. The HUD Building currently is home to 3,000 HUD employees with 700 more scattered through the federal district. Using Macro BIM to perform detailed analysis of occupancy and existing space, the project team created a new maximized space plan to accommodate all 3,700 staffers. Several major modernization plans were also studied. Webinar attendees will learn how Macro BIM was used: • With traditional “Problem Seeking” programming strategies • Gathering and verifying data • Analyzing multiple alternatives • Developing cost estimates Examples from the Robert C. Weaver Federal Building Feasibility Study and Program of Requirements project will be used to demonstrate these concepts. Additionally, lessons learned, other potential uses for the BIM, and a BIM roadmap for the project will be presented.

TRANSCRIPT

Page 1: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Beck Technology

Page 2: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

GSA HUD Feasibility Study Presentation Agenda

I. Overview of GoToWebinar Controls

II. Who is Beck Technology

II. What is Macro BIM

III. Concept behind DProfiler

IV. HUD Feasibility Study

Page 3: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

GoToWebinar Attendee Control Panel

Page 4: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

In operation since 1912

Privately held - 3rd generation

Consistently ranked among the top building

companies in the United States

85% repeat customers

Award winning Design and Construction firm

“Integrated Enterprise”

Development/Arch/Construction/Technology

Hunt Oil Company Headquarters | Dallas, Texas

About Beck…

Page 5: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

About Beck Technology…

Beginning in 1996

Member of the Beck Group of Companies

Technology Development Company

BIM Authoring Software - DProfiler

Commercially Available since 2006

Consulting Services since 2008

GSA Contract Holder

Offices in Dallas, Atlanta, D.C., Tampa, and

Rio/Sao Paulo

Page 6: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

BIM IDIQ Contract InformationContract No. GS-00P-09-CY-D-0283

Laser Scanning Contract InformationContract No. GS-00P-09-CY-D-0300

Zones AZones BZones C

Zones B

Page 7: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Macro Building Information Modeling

“A computer model, assembled of

higher level components, used for

macro level analysis including

visualization, spatial validation,

cost modeling/estimating,

phasing/sequencing, energy

performance, and risk.”

“…rapidly assembled models for analysis…”

MACRO MICRO

Page 8: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

The Concept Behind DProfiler

…a simple 3D computer model

Page 9: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

The Concept Behind DProfiler

…tied to data

• Program

• Spaces

• Cost

• Energy

• Sequencing

• And other…

Page 10: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Software Demo

Page 11: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Benefits – Macro Analysis

Monthly Electric Consumption

Page 12: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Benefits - Accurate Conceptual Cost ModelingPerformance Case Studies

Page 13: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Benefits - Evaluating Alternatives

Page 14: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Concept Analysis

Wilford Hall – San Antonio Military Medical Center

Page 15: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Concept Analysis

Wilford Hall – San Antonio Military Medical Center

Page 16: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Design Development Cost Estimating

• Establishing early budget

• Begin with conceptual design studies

• Identify and define all assumptions

University of Texas at Arlington – Reaction Lab

Begin at Planning

Facilitates “Target-Based Design”

Page 17: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Design Development Cost Estimating

• Continue through Schematic Design

• Update budget

• Re-Validate or adjust assumptions

University of Texas at Arlington – Reaction Lab

Schematic Design

Facilitates “Target-Based Design”

Page 18: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Master Planning

Integrating Macro BIM alongside

traditional processes

South Texas College – McAllen, Texas

Page 19: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Master Planning

Aerial Photo Planning Model Macro Cost Model

Page 20: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Master Planning

- Existing Buildings

- 20 Year Build Out

- 15 Year Build Out

- 10 Year Build Out

Phasing Model

South Texas College – McAllen, Texas

Page 21: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Master Planning

Communicate the Information

Page 22: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Master Planning

656a Library Expansion 50,000 $200.34 $10,017,075.28

656a Library Expansion 50,000 $200.34 $10,017,075.28

Page 23: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Feasibility Case Study

Integrating Macro BIM & Traditional Programming

A Case Study on the Robert C. Weaver Federal Building

Washington, D.C.

Page 24: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Robert C. Weaver Feasibility Project

“To determine the viability of a potential modernization project.”Statement of Work - Objective #1

Page 25: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

REFERENCE KEY

Washington Mon.

US Capitol Building

GSA NCR

Air & Space

HUD

Robert C. Weaver Feasibility Project

1

2

3

4

1

2

3

4

5

5

Page 26: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

General Project Information:

Robert C. Weaver Feasibility Project

SW District of DC Metro Area

Designed by Architect Marcel Breuer

Iconic example of “Brutalist” design

Construction completed in 1968

Page 27: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Robert C. Weaver Feasibility Project

Construction Information:

1.3 Million GSF

900,000+USF

Hybrid CIP concrete and precast frame/skin

Load bearing, precast window modules

Punched openings

Page 28: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Robert C. Weaver Feasibility Project

Dark/lighting issues

IAQ issues

Limited access to views

Compartmentalized

Lack of meeting space

Poor space standards

Poor utilization

Fan-coil units

“10 Floors of Basement”

Notable Notes:

Page 29: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Robert C. Weaver Feasibility Project

Purpose:

Explore a range of

building strategies

to support the

customer’s

mission

Page 30: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

0

200000

400000

600000

800000

1000000

1200000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

HQ

Po

rtfo

lio U

seab

le S

qu

are

Fe

et

(USF

)

HUD HQ Space Supply + Demand (Useable Square Feet)

SUPPLY TOTAL

EFFICIENT DEMAND TOTALSTATUS QUO DEMAND TOTALWEAVER SUPPORT

TOTAL

270,000 USF SPACE SAVINGS

Existing Lease Expirationsover next 4 years

Robert C. Weaver Feasibility Project

Page 31: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Robert C. Weaver Feasibility Project

*From HUD CAFM

Page 32: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Robert C. Weaver Feasibility Project

Page 33: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Robert C. Weaver Feasibility Project

4D Sequencing (BIM)

Modernization Phases:

-Move Out

-Area Under Construction

-Move Back In

-Area Complete

Page 34: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

*From DProfiler BIM

Robert C. Weaver Feasibility Project

Page 35: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Robert C. Weaver Feasibility Project

Page 36: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Exploring Alternatives

Design concepts

incorporated into the

BIM for Cost Estimating

Atrium roof w/

glazing to allow

light into the space.

Explore the

Curtainwall

Concept

*From Cannon Study

*From Cannon Study

*From Cannon Study

*From DProfiler BIM

Robert C. Weaver Feasibility Project

Page 37: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Cost Evaluation of Design ConceptsThe cost model communicates design and

estimating assumptions for better analysis!

*From Cannon Study

*From DProfiler BIM

*From DProfiler BIM

Robert C. Weaver Feasibility Project

Page 38: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

***Provide a roadmap for Design Excellence team & knowledge transfer***

Robert C. Weaver Feasibility Project

Page 39: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Preferred

Alternative -

Uniformat Cost

Elements

Breakdown

Robert C. Weaver Feasibility Project

Page 40: GSA Study uses Macro BIM

Beck TechnologyInnovation in all Dimensions

Value Added through Integration of BIM and Problem Seeking:

• Speed of delivery

• Precision of budget

• Analysis of a wider range of alternatives

• Streamlining of decision-making

• Improved ability to secure funding

• Customer confidence in results and team

Robert C. Weaver Feasibility Project