gujarat international finance tec-city (gift)
TRANSCRIPT
Gujarat International Finance Tec‐City (GIFT)
Presentation at R i l B P i S i
1
Regional Best Practices SeminarManila, Philippines 29 – 30 April, 2009
Transport
G j t’ St th
Gujarat International Finance Tec‐City
Gujarat’s Strengths
Traditional Business Community
High Growth Economy‐‐ >10 % over last five years
Pool of Trained Manpower
CAs
Commerce Graduates
Active Capital Markets‐‐Gujarat contributes 30% of stock marketActive Capital Markets Gujarat contributes 30% of stock market capitalization
Proactive Government
2
2
Proactive Government
• Following sectors have been acknowledged as high growth for India:
Need for Finance City in India
Following sectors have been acknowledged as high growth for India:
• Financial Services
• IT/ITeS
• BPO/KPO
• As per McKinsey Study by 2020, : p y y y ,
• The sector could provide a potential 10 million to 11 million jobs• About 800 mn sq ft of office space • GDP contribution could outperform at a rate of 15 to 20 per cent p p
• Opportunities are constrained:
I f t t b ttl k• Infrastructure bottlenecks • Overcrowded Cities
• Solution: Setting up Self‐sustaining Cities
3
3
g p g
“If India builds an
Need for Finance City in India
“If India builds an International financial center, with suitable rules and regulations the earnings out of financial sector exports will surpasssector exports will surpass that of IT”– Percy Mistry, (Fmr) World Bank
“Offshoring industry needs at least five new ‘Gurgaon’ and gfive to seven new ‘Pune plus’”
Nasscom McKinsey
4
4
– Nasscom–McKinsey report
5
Gujarat has Potential to Access a Large Financial Services Opportunity
Financial Services Opportunities
Gujarat has Potential to Access a Large Financial Services Opportunity
Estimated No f J bSr.
No. Financial Servicesof Jobs
(Thousands)Year 2020
1Core
Financial Services
Financial Services Operations 125-150
2 Financial Services Corporate Centre 100-125
Services3 Select Product Markets 10-154 Capital Markets & Trading 2-45 IT for Financial Services 200 2255 IT for Financial Services 200-2256 ITeS for Financial Services 75-100
Total 500-600
5
5
An additional 5,00,000 indirect jobs is expected to be created by 2020
Transport
Gujarat International Finance Tec‐City Company Limited
Gujarat International Finance Tec‐City
j y p y(GIFTCL) incorporated in June 2007
50: 50 Joint Venture between
Gujarat Urban Development Co. Ltd. (GUDC) and
Infrastructure Leasing and Financial Services Ltd (IL&FS)Infrastructure Leasing and Financial Services Ltd. (IL&FS)
Share Capital: Rs. 5 Cr and PDF of Rs. 40 CrShare Capital: Rs. 5 Cr and PDF of Rs. 40 Cr
Management
4 Directors nominated by Government of Gujarat
4 Directors nominated by IL&FS
6
6
4 Independent Directors
Location of GIFT
k f h d b d12 km from Ahmedabad
8 km from Gandhinagar8 km from Gandhinagar
GIFT Area: 550 acresGIFT Area: 550 acres
7
7
8Master Planning
30 Building Blocks
125 Buildings
3 Landmark Buildings above 350 mt
27 Buildings above 150 mt
46 Buildings above 100 mt
3 Schools
200 Bed Hospital
8
8
p
4 Hotels (~2500 rooms)
Landmark Buildings
55
34
4
5 Diamond Tower1
6
12
River front2
Convention Centre3
6
Gateway Towers4
Transit Node5
9
9
Crystal Tower6
Diamond Tower
Plot Area (Sq. Mt) 28,628
Total Area (Sq. ft) 4,286,056
- Above Ground (Sq. ft) 2,721,372
- Below Ground (Sq. ft) 1,564,684
Max Height in Meters 405Max Height in Meters 405
Max No. of Floors 86
Offi ithBuilding Use Office with support facilities
10
10
Package – D / Diamond Tower
Gateway Towers
Plot Area (Sq. Mt) 39,864
A (S f ) 7 184 602Total Area (Sq. ft) 7,184,602
- Above Ground (Sq. ft) 5,356,978
- Below Ground (Sq. ft) 1,827,624
Max Height in Meters 350
Max No. of Floors 75
Building Use Office with support facilities
11
11
Package – C / Gateway Towers
Transit Node
Plot Area (Sq. Mt) 28,628
Total Area (Sq. ft) 4,286,056
- Above Ground (Sq. ft) 2,721,372
- Below Ground (Sq. ft) 1,564,684
Max Height in Meters 231Max Height in Meters 231
Max No. of Floors 55
Hotel OfficeBuilding Use
Hotel, Office &
Commercial
12
12
Package – G / Transit Node
Crystal Towers
Plot Area (Sq. Mt) 45,390
Total Area (Sq. ft) 8,484,407
- Above Ground (Sq. ft) 6,502,149( q ) , ,
- Below Ground (Sq. ft) 1,982,258
Max Height in Meters 276
Max No. of Floors 65
Building Use Office with support facilities
13
13
Package – H / Crystal Towers
Convention Centre
Package – W/Convention Centre/ Museum
Plot Area (Sq. Mt)
Total Area (Sq. ft)
Above Ground (Sq. ft)
Below Ground (Sq. ft)
Max Height in Meters
Max No. of Floors
Building Use
14
14
214,550 6,545,388 3,548,233 2,997,165 65 16 Convention Center*
* Musuem, Auditorium, Cultural Center, Exhibition spaces with Support Facilities
River Front
Package – V1 / Dream RiverPackage V1 / Dream River
Plot Area (Sq. Mt)
Total Area (Sq. ft)
Above Ground (Sq. ft)
Below Ground (Sq. ft)
Max Height in Meters
Max No. of Floors
Building Use
15
15
31, 540 2,493,662 216,333 2,277,329 17 4 Recreational Place with support facilities
The GIFT Real Estate Component comprises Office, Service and Residential facilities
37%
11%
19%GIFT Land use (in %)
Residential+ Commercial
Green space + Water bodies
PSP
Transpotation
BUA Component Area (Million Sq.Ft.)* In %
Residential 20.94 23%
33%Commercial 54.0 5 60%
Hotel 2.05 2%
Retail 4.78 5% 9% 1%Built-up Area
Public Building 7.49 9%
Recreation 1.02 1%
Total 91 2 100 %
23%5%
2% 9% 1%ResidentialCommercialRetailHotel
Total 91.2 100 %
60%
Public BuildingsRecreationalFor ~91 Mn. Sq.Ft., balance area is basement
16
16
Compared to the best CBD’s of the world
Paris La Defense Tokyo London Pudong GIFT
Paris LaDefense
Tokyo London Pudong GIFT
Land use Scale (sqkm) 1.6 1.6 1.05 1.7 2.04
C t ti 2 5 1 6 1 1 4 5 8 48Construction Scale(sqm)
2.5 mn 1.6 mn 1.1mn 4.5 mn 8.48 mn
Floor-area Ratio 1.56 1.00 1.05 2.65 4.13
G b lt ( ) 40 000 120 000 50 000 363 500 517 821Greenbelt (sqm) 40,000 120,000 50,000 363,500 517,821
Height (m) 200 250 250 490 405
17
17
GIFT Infrastructure Development Overview
Core Infrastructure
‐ Site Development
Landscaping‐ Landscaping
‐ Maintenance Systems
lTransportation & Utilities
‐ Roads and Transportation
‐ Water Systems
‐ Waste Management Systems
‐ Power Generation and Distribution
‐ District Cooling System
‐ ICT
‐ Domestic Gas Distribution
18
18
TRANSPORT CONNECTIVITY
Transportation …………………………………………………………. (1/8)
Direct Access fromall directions
Extension of BRTSto GIFT
External planned Road Network for GIFT connectivity
MRTS Plan
• External Connectivity at 6 i t
19
19
EXTERNAL ROAD CONNECTIVITY
points• Grade Separators to support the network
• Proposed RoW: 60-80m
Transportation ………………………………………………………. (2/8)
Extension of BRTS upto GIFT City
20
20PHASE 1
BRTS Extension – 37 km
Transportation …………………………………………………………… (3/8)
• Additional link of 25 km between GIFT Airportbetween GIFT, Airport, Ahmedabad and Gandhinagar
• Transport Demand GeneratedTransport Demand Generated by GIFT between Ahmedabad & Gandhinagar
• 2.5 lakhs trips per day one way by Year 2012
• 5 lakhs trips per day one way by Year 2018
THALTEJ
KALUPUR
21
21
Transport
TRANSPORT VISION TRANSPORT ELEMENTS
Transportation ……………………………………………………………. (4/8)
Segregating vehicular & pedestrian movement to maximum
TRANSPORT VISION TRANSPORT ELEMENTS
Surface Roads (2/4 lane – 14 km)
Recessed Roads underground (15 5Modal Split of 10:90 between private and public transport
Walk to work concept
Recessed Roads ‐ underground (15.5 km)
Intelligent Transport System
210 CCTV CamerasAiming Zero Fatal Accident City
Transit Oriented Development
210 CCTV Cameras
96 HR Cameras
22
22Recessed Road
23Transportation ……………………………………………………………. (5/8)
GIFT Building Basements:
PARKING HUBS
GIFT Building Basements: Total Car parks capacity 85,000 cars
• 4 External Parking Hubs: • Total capacity of 30 000 cars• Total capacity of 30,000 cars
LOGISTIC HUB■ Serve to receive – store – distribute supplies to
the city
■ Area = 12 acreCapacity : 800 ton
Logistic Centre
LOGISTIC HUB
■ Area 12 acreCapacity : 800 ton
■ Located at junction of NH8 & main arterialroad to GIFT
■ 3 Lane entry/exit road with lay bye from NH8
23
23
■ 3 Lane entry/exit road with lay bye from NH8
NH 8
Living Bridge:
Transportation ……………………………………………………………. (6/8)
The ‘Living Bridge’ would have a length of 600 m,8 lanes of divided carriageway with verticalsegregation of public transport and pedestrianwalkwaywalkway
24
24
Signature Bridge:
Transportation …………………………………………………………. (7/8)
The ‘Signature Bridge’ would be approximately550m in length , have four lane dividedcarriageway with footpath on either side
Tunnel:
Total Length of Tunnel – 800m
25
25
Transport
PRT PERSONAL RAPID TRANSPORT
Transportation …………………………………………………………. (8/8)
PRT – PERSONAL RAPID TRANSPORT
Innovative Technology
■ Automatic personal transit service■ Automatic personal transit service
■ Intelligent vehicle
■ Available on demand 24 x 7
■ Dedicated guide‐way network
■ Non stop travel direct to destination
■ Stations are offline
26
26
Video
Water Source, Promenade and Water Front Development
Total Water Requirement : 20 MGDTotal Water Requirement : 20 MGD
Water Sources:
Narmada Main canalNarmada Main canal
Recycling and Reuse of Wastewater
Rainwater Harvesting
GIFT Master Reservoir
Concept of Zero Discharge CityConcept of Zero Discharge City
Perennial Water Front ensured through construction of three barrages on river Sabarmatico st uct o o t ee ba ages o e Saba at
Proposed Landscaped promenade at the river bank along GIFT
27
27
C t f Z Di h Cit3 STAGES
Sewage treatment
Concept of Zero Discharge City3 STAGESStage I: Primary treatment
Screening and Degritting
Stage 2: Secondary treatment
Includes biological process to remove organic matterto remove organic matter and BOD
Stage 3: Tertiary S T
M d l D i
treatment Polish the treated sewage after secondary treatment to bring the water quality
38 MLD (8.44 MGD) capacity
Sewage TreatmentPlant
Modular DesignRecycled Water Use
Treated Water would be used for Flushing, Landscaping and as Make-up Water for AC
g q yup to the level of reuse
MGD) capacity
28
28
Landscaping and as Make-up Water for AC Cooling Towers
Projected Waste Quantity of GIFT: 488 TPD
Solid Waste Management
Projected Waste Quantity of GIFT: 488 TPD
Minimize impact on environment, human intervention, space
requirement, impact on health hazard
Automatic Collection and Transportation System
111
2
1
233
2
1. The waste is thrown into a disposal chute
2. Computer controlled access
3 Waste sucked through pipes at a speed of 90 km/hr
29
29
3. Waste sucked through pipes at a speed of 90 km/hr
Plasma Technology would be used for Waste TreatmentVideo
Planned Captive Power Plant Capacity‐ 1000 MW
Power
Planned Captive Power Plant Capacity 1000 MW
Underground cabling for power distribution within the area of GIFT
Substation and Distribution Automation
Indoor substationIndoor substation
Reliability – 99.999% which means outage of 5 3 minutes/annumoutage of 5.3 minutes/annum
1 MRSS (Main Receiving Substation) 2 nos1. MRSS (Main Receiving Substation) 2 nos.
2. UG (Underground cabling system) 584 km.
3. ASS (Area Sub station) 14 nos.
Power Distribution Network in GIFT
4. PSS(Package Substation) 850 nos.
5. CCR ( Central Control Room) 1 nos.
30
30
Power Distribution Network in GIFTCentral Control Centre
Centralized Air Conditioning System
District Cooling
Centralized Air Conditioning System• Conventional AC System not Required
• Efficiency through economies of scale
• Reduces energy costs by 30%• Reduces energy costs by 30%
• Reduces maintenance costs
• Improves air quality and temperature control
• Reduces noise and vibration• Reduces noise and vibration
• Total Capacity : 3.25 Lakh Ton
31
31
Service Trenches
I t t d U d d S i T h
• 7.5 Km in length,6.5 mt height and width varying from 24 to 36 mts
Integrated Underground Service Trenches
width varying from 24 to 36 mts
• Supply of services in a sub‐surface regular grid
B ildi i h id h• Buildings to tap in the grid wherever required
• All services housed in various di i i f b f dit hdivisions of sub‐surface ditch
• No service lines aboveground• Alternate sources & technology to beAlternate sources & technology to be used for resource management –water & power in particular
32
32
Information and Communication Technology (ICT)
GIFT O t ld h t f ll i ICT S i• GIFT Occupants would have access to following ICT Services
Infrastructure Platforms ServicesHigh Speed Fibre *
Network
Financial Extranets
CUG to Exchanges
Data
Voice
Diverse Local and International Connectivity
VoiceIndustry Specific Platforms
Wi‐Fi
Tier‐4 Data Centres
Business ContinuityPervasive Wireless and Mobile Network
Data Centres
City e‐Portal
Sensor Networks
IPTV Internet Gateway
Business Continuity
Security High Speed Internet AccessIPTV Internet Gateway Access
Monitoring
* About 8000 km fibre ( equivalent to Ahmedabad – Chicago Distance! )
34
34
35
GIFT will exceed the ICT capabilities of comparator cities
Information & Communication Technology (ICT)
Trading Sub Sea DataMobile/Smart Faster CompetitiveOvertakingAll Fibre
Trading Platform
Sub Sea Connectivity
Data Centre
Mobile/ Wireless
1 GIFT
2
3
DIFC
DIC
Triple PlaySmart
BuildingsFaster Set‐up
Competitive Service Provision
Overtaking "Place"
3
4
5
6
DIC
SONGDO
New WTC – New York
Canary Wharf ‐ London
7
8
9
10
Pudong ‐ Shanghai
La‐Defense Paris
Singapore
London Stock Exchange
Source: Study by British TelecomPoor Reasonable Excellent Not Applicable
12
g
11 New York Stock Exchange
Tokyo
35
35
20,000 workers can be employed during construction at peak
Construction Work Force Development
Specialized workforce required for
Construction of tunnel & Under ground roads
Construction of building having height of 300 ‐ 400 Mt
Specialized experts for Survey, Quantity & Lab testing
Installation of huge Glass work/facades
Meetings held with various stakeholders for skill set development of constructionworkforce
State Government to strengthen ITI’s
A separate institution to be set up for specialized construction work force
36
36
Talent Development Road Map
Talent Development and Preference Study was undertaken by Hewitt Associates. Following Talent Development Road Map is recommended to match the growing
Nodal Agency
Following Talent Development Road Map is recommended to match the growing Talent Demand in the State of Gujarat.
Nodal Agency• To act as integrator for all Talent Development Initiatives• To Liaise with Education Department and Universities• To Create of Long Term Talent Development Plan
Finishing SchoolsIndustry Specific Short Term Courses for Fresh Graduates as Interim Solution– Industry Specific Short Term Courses for Fresh Graduates as Interim Solution
Training Schools– Skill Augmentation Courses for Specific Domains for Entry & Middle level Management Talent
Ed ti Cit D l tEducation City Development– Development of Education City that would offer Courses to ensure Sustainable Supply of Talent
School Education Infrastructure Development
37
37
– Development of School Education Infrastructure in the State to ensure Long Term Talent Availability
Total Estimated Project Cost : Rs. 70,270 Cr
Project Cost and Structuring
Core Infrastructure User Pay Utilities Real Estate
Total Estimated Project Cost : Rs. 70,270 Cr
• Power Generation• Power DistributionW t M t S t
• Office• CommercialR id i l
• Site Development• Landscape• Roads
Rs.10,475Cr Rs. 25,021 Cr Rs. 34,774Cr
• Waste Mgmt System• District Cooling• Gas System• ICTP ki S t
• Residential• Hotels
• Roads• Storm Water Drainage• River Training
• Parking System
To be developed PPP basis
i h 26% i
To be developed by
/by GIFTCL
with 26% equity
by GIFTCL
occupiers /
developers
38
38
Means of Finance
fSource of Fund Rs. Crores
GIFT Unit Fund 12,426
Strategic Investors 5,555
Debt 17,514
Developers 34 774Developers 34,774
Total 70,270
39
39
Implementation
• Phased: 1st phase 20m sq feet• Core infrastructure 3000 croresCore infrastructure 3000 crores• Agreement with IL&FS to build 7.3 m sq’
D i d l t f• Design development for core infrastructure completed
• Proposed bond issue by June end
40
40