DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 1
GGUUJJAARRAATT SSTTAATTEE WWAATTEERRSSHHEEDD MMAANNAAGGEEMMEENNTT AAGGEENNCCYY YYeeaarr :: 22001111--1122
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 2
Contents Table no.1: Basic project information ................................................................................................................................................................................... Error! Bookmark not defined.
Table no.2: Weightage of the project .................................................................................................................................................................................................................................................. 11
Table no.3: Watershed information .................................................................................................................................................................................................................................................... 11
Table no.4: Developmental programmes running in the project area: ................................................................................................................... Error! Bookmark not defined.
Table no. 5: Previous Watershed programmes in the project area: ...................................................................................................................................................................................... 12
Table no. 6: PIA:........................................................................................................................................................................................................................................................................................... 20
Table no. 7: Staff at PIA level: ................................................................................................................................................................................................................................................................ 26
Table no. 8: Land use pattern: ............................................................................................................................................................................................................................................................... 28
Table no. 9: Soil type and topography: .............................................................................................................................................................................................................................................. 30
Table no. 10: Flood and drought condition: .................................................................................................................................................................................................................................... 31
Table no. 11.1: Soil Erosion .................................................................................................................................................................................................................................................................... 34
Table no. 11.2: Soil Salinity/Alkalinity (Salinity ingress) .......................................................................................................................................................................................................... 34
Table no. 11.3: Waterlogging Conditions .......................................................................................................................................................................................................................................... 35
Table no. 12: Climatic conditions: ........................................................................................................................................................................................................................................................ 35
Table no. 13: Physiography and relief ............................................................................................................................................................................................................................................... 36
Table no. 14: Land ownership details ................................................................................................................................................................................................................................................ 37
Table no. 15: Agriculture ......................................................................................................................................................................................................................................................................... 39
Table no. 16: Irrigation ............................................................................................................................................................................................................................................................................. 39
Table no. 17: Crop details: ...................................................................................................................................................................................................................................................................... 40
Table no. 18: Livestock ............................................................................................................................................................................................................................................................................. 42
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 3
Table no. 19: Drinking water ................................................................................................................................................................................................................................................................. 44
Table no. 20: Details of Common Property Resources ................................................................................................................................................................................................................ 44
Table no. 21: Demographic information ........................................................................................................................................................................................................................................... 45
Table no. 22: Literacy rate ...................................................................................................................................................................................................................................................................... 47
Table no. 23: Migration details ............................................................................................................................................................................................................................................................. 48
Table no. 24: Poverty ................................................................................................................................................................................................................................................................................ 49
Table no. 25: Village infrastructure .................................................................................................................................................................................................................................................... 50
Table no. 26 : Facilities / HH assets .................................................................................................................................................................................................................................................... 51
Table no. 27: Income ................................................................................................................................................................................................................................................................................. 52
Table no.28: Dependence on Forest/CPR ......................................................................................................................................................................................................................................... 53
Table no. 29: Livelihood pattern (Occupational distribution) ................................................................................................................................................................................................. 54
Table no. 30: Details of Scientific Planning and Inputs in IWMP projects* ........................................................................................................................................................................ 54
Table no. 31: Watershed Committee details ................................................................................................................................................................................................................................... 79
Table no. 32: SHG detail .............................................................................................................................................................................................................. Error! Bookmark not defined.
Table no. 33: UG detail .............................................................................................................................................................................................................................................................................. 99
Table no.34: Entry point activities (EPA) (All financial figures in lakh Rs.) ................................................................................................................................................................... 103
Table no.35: Details of activities of preparatory phase (All financial figures in lakh Rs.) .......................................................................................................................................... 65
Table no.36: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.) ......................................................................................... 103
Table no.37: Activities related to recharging ground water resources in the project areas (all financial figures in lakh Rs.) .................................................................. 125
Table no. 38: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas .................................................................. Error! Bookmark not defined.
Table no. 39: Other activities of watershed works phase – Proposed target ....................................................................................................... Error! Bookmark not defined.
Table no.40: Details of engineering structures in watershed works* ..................................................................................................................... Error! Bookmark not defined.
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 4
Table no.41: Details of activities connected with vegetative cover in watershed works .......................................................................................................................................... 145
Table no.42: Details of allied / other activities ........................................................................................................................................................................................................................... 127
Table no.43: Details of activities in the CPRs in the project areas ...................................................................................................................................................................................... 146
Table no. 44: Capacity Building Institution: ................................................................................................................................................................................................................................. 146
Table no. 45: Capacity Building plan: .............................................................................................................................................................................................................................................. 160
Table no.46: Information, education and Communication Activities: ............................................................................................................................................................................... 160
Table no. 47: Village wise- activity wise budget ............................................................................................................................................................... Error! Bookmark not defined.
Table no. 48: Budget at a glance ........................................................................................................................................................................................................................................................ 162
Table no.49: Details of Convergence of IWMP with other Schemes ................................................................................................................................................................................... 177
Table no. 50: Public-Private Partnership in the IWMP projects* ........................................................................................................................................................................................ 177
Table no. 51: Employment in Project area: ......................................................................................................................................................................... Error! Bookmark not defined.
Table no. 52: Details of seasonal migration from Project area ................................................................................................................................... Error! Bookmark not defined.
Table no. 53: Details of average ground water table depth in the project areas (in meters) .................................................................................................................................. 187
Table no. 54: Status of Drinking water* ......................................................................................................................................................................................................................................... 183
Table no. 55: Details of Kharif crop area and yield in the project areas ........................................................................................................................................................................... 185
Table no. 56: Area under horticulture ............................................................................................................................................................................................................................................ 183
Table no. 57: Forest/vegetative cover ........................................................................................................................................................................................................................................... 187
Table no. 58: Details of livestock in the project areas * (for fluids please mention in litres, for solids please mention in kgs. and income in Rs.) ......................... 188
Table no. 59: Backward-Forward linkages ......................................................................................................................................................................... Error! Bookmark not defined.
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 5
Chapter - 1
Project Background
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 6
11..11 PPrroojjeecctt bbaacckkggrroouunndd KKhheeddaa DDiissttrriicctt iiss ssiittuuaatteedd iinn cceennttrraall GGuujjaarraatt.. TThhiiss ddiissttrriicctt iiss ssuurrrroouunnddeedd bbyy RRaajjaasstthhaann,, SSaabbaarrkkaanntthhaa,, PPaanncchhaammaahhaall,, VVaaddooddaarraa,, AAnnaanndd &&
AAhhmmeeddaabbaadd ddiissttrriiccttss.. TThhiiss ddiissttrriicctt hhaass 1100 ttaalluukkaass nnaammeellyy 11 NNaaddiiaadd,, 22 KKaappaaddvvaannjj,, 33 KKaatthhllaall,, 44 VViirrppuurr,, 55 BBaallaassiioorr,, 66 TThhaassaarraa,, 77 MMaahheemmddaabbaadd,, 88
MMaattaarr,, 99 KKhheeddaa 1100 MMaahhuuddhhaa.. TThhee rriivveerrss iinn tthhiiss ddiissttrriicctt aarree oonnee MMaahhii,, VVaattrraakk,, SShheetthhii,, MMaahhoorr tthheessee rriivveerrss fflloowwiinngg tthhrroouugghh tthhee aarreeaa aarree mmoossttllyy
sseeaassoonnaall.. TThheessee rriivveerrss hhaavvee wwaatteerr iinn iitt dduurriinngg rraaiinnyy sseeaassoonn ii..ee tthhaatt iiss ffrroomm JJuunnee--JJuullyy ttoo NNoovv--DDeecc.. TThheerree aarree nnoo bbiigg ddaammss oonn tthhiiss rriivveerr.. EExxcceepptt
VVaannaakkbboorrii ddaamm oonn MMaahhii rriivveerr.. TThhiiss ddaamm iiss mmaaiinnllyy ffoorr VVaannaakkbboorrii PPoowweerr SSttaattiioonn aanndd aa lliittttllee ppoorrssaann ooff iitt iiss uusseedd iinn ffoorr iirrrriiggaattiioonn.. FFrroomm tthhiiss ddaamm
tthheerree iiss aa nneettwwoorrkk ooff ccaannaall kknnoowwnn aass MMaahhii ccaannaall wwhhiicchh oorriiggiinnaatteess ffrroomm KKaaddaannaa ddaamm ooff PPaanncchhaammaahhaall ddiissttrriicctt.. NNaarrmmaaddaa mmaaiinn ccaannaall iiss fflloowwiinngg
tthhrroouugghh tthhee ddiissttrriicctt ffrroomm SSeevvaalliiyyaa--BBaallaassiinnoorr--KKaatthhllaall--KKaappaaddvvaannjj.. TThhee ttooppooggrraapphhyy ooff tthhee aarreeaa iiss hhiigghheerr oonn tthhee vviirrppuurr ttaalluukkaa ooff ddiissttrriicctt aanndd tthhee
lloowweerr ssiiddee iiss ttoowwaarrddss mmaattaarr ttaalluukkaa.. OOuutt ooff tthhiiss 1100 ttaalluukkaass tthheessee pprroojjeeccttss ooff yyeeaarr 22001111--1122 aarree iinn tthhee ffoolllloowwiinngg ttaalluukkaass..
SSrr.. NNoo.. NNaammee ooff PPrroojjeecctt TTaalluukkaa NNoo ooff vviillllaaggeess ccoovveerreedd
11 IIWWMMPP--99 JJoorraappuurraa BBaallaassiinnoorr 1100
22 IIWWMMPP--1100 KKhhaarroodd VViirrppuurr 1111
33 IIWWMMPP--1111 VVaaddooll KKaappaaddvvaannjj 88
44 IIWWMMPP--1122 VVaagghhaass KKaappaaddvvaannjj 1133
TToottaall...... 44 pprroojjeeccttss 4422 vviillllaaggeess
IInn tthhee yyeeaarr 22001111--1122 44 pprroojjeeccttss iinn tthhrreeee ttaalluukkaass wwiillll bbee ttaakkeenn uupp aanndd 4422 vviillllaaggeess wwiillll bbee ccoovveerreedd uunnddeerr tthhiiss pprroojjeeccttss.. TThhee pprroojjeecctt ppeerriioodd iiss
ffrroomm 22001111--1122 ttoo 22001177--1188 ppeerriioodd ooff 77 yyeeaarrss.. DDuurriinngg tthhiiss pprroojjeecctt ttiimmee aass ddeessccrriibbeedd iinn tthhee gguuiiddeelliinnee aaccttiivviittiieess aanndd wwoorrkkss wwiillll bbee ccaarrrriieedd oouutt.. AA
ddeettaaiill pprroojjeecctt rreeppoorrtt ooff IIWWMMPP--1122 VVaagghhaass iiss aass aa uunnddeerr..
VVaagghhaass ((IIWWMMPP –– 1122)) pprroojjeecctt iiss llooccaatteedd iinn KKaappaaddwwaannjj ttaalluukkaa ooff KKhheeddaa ddiissttrriicctt iinn GGuujjaarraatt.. TThhiiss pprroojjeecctt iiss ddeessiiggnneedd wwiitthh aa vviieeww ooff
cclluusstteerr aapppprrooaacchh iinn wwhhiicchh mmiinniimmuumm 1133 --wwaatteerrsshheedd ooff 1133 vviillllaaggeess wwiillll bbee ttrreeaattiinngg.. TToottaall pprroojjeecctt aarreeaa ooff tthhee wwaatteerrsshheedd iiss 44992233..0000 hhaa.. WWiillll
bbee ttrreeaatteedd uunnddeerr tthhiiss pprroojjeecctt ppeerriioodd ffrroomm 22001111--22001122 ttoo 22001177 -- 22001188..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 7
TThhee nneeaarreesstt ttoowwnn ooff tthhee pprroojjeecctt iiss KKaappaaddwwaannjj wwhhiicchh iiss oonn aann aavveerraaggee 2200 kkmm aawwaayy ffrroomm tthheessee vviillllaaggeess.. KKaappaaddwwaannjj iiss wweellll
ccoonnnneecctteedd bbyy rrooaadd aanndd hhaass aa wweellll eessttaabblliisshheedd mmaarrkkeett.. PPaatteell,, VVaannkkaarr,, BBhhaarrvvaadd,, VVaallmmiikk aanndd PPaarrmmaarr ccoommmmuunniittiieess aarree tthhee pprriimmaarryy
iinnhhaabbiittaannttss ooff tthheessee vviillllaaggeess.. TThhee lliivveelliihhoooodd ooff tthheessee ppeeooppllee aarree rraaiinnffeedd aaggrriiccuullttuurree aanndd ppaarrttllyy iirrrriiggaatteedd aaggrriiccuullttuurree.. MMaaiinnllyy ppeeddddyy aanndd
vveeggeettaabblleess,, aanniimmaall hhuussbbaannddrryy aalloonngg wwiitthh ddaaiirryy wwoorrkkss iiss tthhee sseeccoonnddrryy mmaaiinn lliivveelliihhoooodd ooff tthhee ppeeooppllee tthhrroouugghh oouutt tthhee yyeeaarr.. TThhiiss ddiissttrriicctt
oorrrriiggiioonnaallyy wwaass kknnoowwnn aass KKhheeddaa ddiissttrriicctt wwhhiicchh hhaadd tthhee ppaarrtt ooff AAnnaanndd ddiissttrriicctt,, wwhhiicchh wwaass ffaammoouuss ffoorr tthhee wwhhiittee mmiillkk rreevvoolluuaattiioonn ooff AAmmuull
ddaaiirryy.. NNooww aafftteerr tthhee bbiiffuurrccaattiioonn ooff tthhee ddiissttrriicctt AAnnaanndd iiss aa sseeppeerraattee ddiissttrriicctt.. TThheerree iiss nnoo bbiigg ddaaiirryy iinn tthhee ddiissttrriicctt.. AA nnuummbbeerr ooff pprriivvaattee
ddaaiirriieess hhaavvee ccoommee uupp iinn tthhee ddiissttrriicctt.. TThhee mmiillkk pprroodduuccttiioonn ffrroomm tthhee vviillllaaggeess eeiitthheerr ggooeess ttoo tthhee AAmmuull ddaaiirryy oorr tthhee pprriivvaattee ddaaiirryy ffoorr ffuurrtthheerr
pprroocceessss..
TThhee vviillllaaggeess ccoovveerreedd uunnddeerr tthhee pprroojjeecctt aanndd tthheeiirr bbaassiicc iinnffoorrmmaattiioonn aarree aass uunnddeerr..
Table no.1: Basic project information
Sl No.
Name of the project
Villages Gram
Panchayats Taluka District
Area of the
project
Area proposed to be treated
Total project
cost (12000)
PIA Name Census code
1
IWMP-12
Vaghas
Aboch 01080800 Aboch
Kapadvanj Kheda
541.00 541;00 64.92
DWDU-Kheda, Nadiad
2 Bhungaliya 01082500 Bhungaliya 775.20 775.20 93.024 3 Dandiyapur 01082300 Dandiyapur 186.70 186.70 22.404 4 Khanpur 01085000 Khanpur 362.30 162.30 19.476
5 Kotwalana na muvada 01082400
Kotwalana na muvada 79.00
79.00 9.48
6 Ladujina muvada 01082700
Ladujina muvada 185.20
110.70 13.284
7 Lalpur(Nirmali) 01080600 Lalpur(Nirmali) 304.50 304.50 36.54 8 Pathoda 01082000 Pathoda 486.10 486.10 58.332 9 Suki 01081900 Suki 122.40 122.40 14.688
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 8
10 Sulatanpur (Taiyabpura)
01084900 Sulatanpur (Taiyabpura) 298.30
298.30 35.796
11 Vaghas 01082100 Vaghas 913.60 683.60 82.032
12 Vyas vasana 01082200 Vyas vasana 588.10
588.10 70.572
13 Zanda 01080700 Zanda 585.10 585.10 70.212
Total 5427.50 4923.00 590.76
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 9
Figure 1: Geographical Location of the IWMP–12 Vaghas Project.
IWMPIWMPIWMPIWMP----12121212 , , , ,
Vaghas Vaghas Vaghas Vaghas ProjectProjectProjectProject
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 10
1.2 Need of watershed development programme WWaatteerrsshheedd DDeevveellooppmmeenntt PPrrooggrraammmmee iiss pprriioorriittiizzeedd oonn tthhee bbaassiiss ooff tthhiirrtteeeenn ppaarraammeetteerrss nnaammeellyy PPoovveerrttyy IInnddeexx,, PPeerrcceennttaaggee ooff SSCC//SSTT,, AAccttuuaall
wwaaggeess,, PPeerrcceennttaaggee ooff ssmmaallll aanndd mmaarrggiinnaall ffaarrmmeerrss,, GGrroouunndd wwaatteerr ssttaattuuss,, MMooiissttuurree IInnddeexx,, AArreeaa uunnddeerr rraaiinn--ffeedd aaggrriiccuullttuurree,, DDrriinnkkiinngg wwaatteerr
ssiittuuaattiioonn iinn tthhee aarreeaa,, PPeerrcceennttaaggee ooff tthhee ddeeggrraaddeedd llaanndd,, PPrroodduuccttiivviittyy ppootteennttiiaall ooff tthhee llaanndd,, CCoonnttiinnuuiittyy ooff aannootthheerr wwaatteerrsshheedd tthhaatt hhaass aallrreeaaddyy bbeeeenn
ddeevveellooppeedd//ttrreeaatteedd,, CClluusstteerr aapppprrooaacchh ffoorr ppllaaiinn aanndd CClluusstteerr aapppprrooaacchh ffoorr hhiillllyy tteerrrraaiinn.. BBaasseedd oonn tthheessee tthhiirrtteeeenn ppaarraammeetteerrss aa ccoommppoossiittee rraannkkiinngg
wwaass ggiivveenn ttoo VVaagghhaass WWaatteerrsshheedd pprroojjeecctt aass ggiivveenn iinn ttaabbllee nnoo.. 22..
AAllll tthhee ppaarraammeetteerrss sseelleecctteedd wweerree ggiivveenn tthhee wweeiigghhttaaggee iinnddiivviidduuaallllyy aanndd ccuummuullaattiivvee ssccoorree ooff 7788 wwaass ggiivveenn ttoo tthhee wwaatteerrsshheedd ((rreeffeerreennccee TTaabbllee 22..11
bbeellooww
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 11
Area proposed to be treated
Table no.2: Weightage of the project
S. No. District
Name
of the project
No. of
micro-
watersheds
proposed
to be
covered
Proposed project area
(ha)
Type of
project
(Hilly/
Desert/
Others)
Weightage
1 Kheda IWMP –
12 13 4923.00 590.786 i Ii iii iv v vi vii viii ix x xi xii xiii Total
5 3 0 5 5 0 15 5 5 10 10 15 0 73
Project type: Hilly/desert/Other
Table no.3: Watershed information
S. No. Name of the Village No. Of watersheds to be
treated Watershed code
Watershed regime/type/order
1 Aboch 1 5F2B5a2a
2 Bhungaliya 1 5F2B5a2B Mini Watershed 3 Dandiyapur 1 5F2B5a2c Mini Watershed
4 Khanpur 1 5F2B5a1b Mini Watershed
5 Kotwalana na muvada
1 5F2B5b1a Mini Watershed
6 Ladujina muvada 1 5F2B5b1b Mini Watershed 7 Lalpur(Nirmali) 1 5F2B5b1c Mini Watershed
8 Pathoda 1 5F2B5b1d Mini Watershed 9 Suki 1 5F2B5b1d Mini Watershed
10 Sulatanpur (Taiyabpura)
1 5F2B5a2a Mini Watershed
11 Vaghas 1 5F2B5b1d/5F2B5b1b Mini Watershed
12 Vyas vasana 1 5F2B5b1b Mini Watershed
13 Zanda 1 5F2B5a2c Mini Watershed
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 12
1.3 Other developmental projects and schemes running in Vaghas project KKaappaaddwwaannjj ttaalluukkaa hhaass bbeeeenn oonn ttoopp pprriioorriittyy ooff aa nnuummbbeerr ooff ddeevveellooppmmeennttaall pprroojjeeccttss.. TThheessee pprrooggrraammmmeess aarree nnaammeellyy IInnddiirraa AAwwaass YYoojjaannaa ((IIAAYY)),,
TToottaall SSaanniittaattiioonn CCaammppaaiiggnn ((TTSSCC)),, MMaahhaattmmaa GGaannddhhii NNaattiioonnaall RRuurraall EEmmppllooyymmeenntt GGuuaarraanntteeee SScchheemmee ((MMGGNNRREEGGSS)),, IInnddiirraa AAwwaass YYoojjnnaa,, SSaarrddaarr
AAwwaass YYoojjnnaa,, AAmmbbeeddkkaarr AAwwaass YYoojjnnaa aanndd WWaatteerr aanndd ssaanniittaattiioonn mmaannaaggeemmeenntt oorrggaanniissaattiioonn ((WWAASSMMOO)).. NNooww wwaatteerrsshheedd pprrooggrraammmmee uunnddeerr IIWWMMPP
FFoorr tthhee yyeeaarr 22000099--1100,, 22001100--1111 aarree iinn wwhhiicchh ttoottaall 3300 vviillllaaggeess oouutt ooff -------- vviillllaaggeess aarree ttaakkeenn uupp..
II.. MMGGNNRREEGGSS:: VVaarriioouuss kkiinnddss ooff aaccttiivviittiieess hhaavvee bbeeeenn ttaakkeenn uupp uunnddeerr NNRREEGGAA aanndd wwiitthh aarroouunndd 440000 bbeenneeffiicciiaarriieess..
IIII.. TToottaall SSaanniittaattiioonn CCaammppaaiiggnn ((TTSSCC)):: aarree ccoonnssttrruucctteedd uunnddeerr TTSSCC pprrooggrraammmmee iinn eevveerryy vviillllaaggee aatt eeaacchh hhoouusseehhoolldd lleevveell..
III. Different Awas Yojana: Provide home with toilet to the BPL families under the different Awas Yojnas like Indira Awas Yojna, Sardar Awas Yojna and
Ambedkar Awas Yojna.
Table no.4.1: Developmental programmes running in the project area:
Sl no
Village Name
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of commencement
Estimated number of
beneficiaries
1 Aboch
N.R.E.G.A. D.R.D.A. Employment & Infrastructure
2008 40
T.S.C. D.R.D.A. Health Mission 2008 8
Indira Awaas Yojna D.R.D.A. Village Housing Scheme 1972 15
Sardar Awaas Yojna District
Panchayat Village Housing Scheme 1989 25
S.G.S.Y. D.R.D.A. 00
Ambedkar Awaas Yojna Social
Wellfare Department
Village Housing Scheme 1989 2
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 13
Table no.4.2: Developmental programmes running in the project area:
Sl no
Village Name
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of commencement
Estimated number of
beneficiaries
2
Bhgadiya
N.R.E.G.A. D.R.D.A. Employment & Infrastructure
2008 30
T.S.C. D.R.D.A. Health Mission 2008 4
Indira Awaas Yojna D.R.D.A. Village Housing Scheme 1972 35
Sardar Awaas Yojna District
Panchayat Village Housing Scheme 1989 22
S.G.S.Y. D.R.D.A.
Ambedkar Awaas Yojna Social
Wellfare Department
Village Housing Scheme 1989 2
Table no.4.3: Developmental programmes running in the project area:
Sl no
Village Name
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of commencement
Estimated number of
beneficiaries
3
Dandiyapur
N.R.E.G.A. D.R.D.A. Employment & Infrastructure
2008 25
T.S.C. D.R.D.A. Health Mission 2008 00
Indira Awaas Yojna D.R.D.A. Village Housing Scheme 1972 25
Sardar Awaas Yojna District
Panchayat Village Housing Scheme 1989 35
S.G.S.Y. D.R.D.A.
Ambedkar Awaas Yojna Social
Wellfare Department
Village Housing Scheme 1989 0
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 14
Table no.4.4: Developmental programmes running in the project area:
Sl no
Village Name
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of commencement
Estimated number of
beneficiaries
4
Khanpur
N.R.E.G.A. D.R.D.A. Employment & Infrastructure
2008 15
T.S.C. D.R.D.A. Health Mission 2008 00
Indira Awaas Yojna D.R.D.A. Village Housing Scheme 1972 10
Sardar Awaas Yojna District
Panchayat Village Housing Scheme 1989 12
S.G.S.Y. D.R.D.A.
Ambedkar Awaas Yojna Social
Wellfare Department
Village Housing Scheme 1989 00
Table no.4.5: Developmental programmes running in the project area:
Sl no
Village Name
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of commencement
Estimated number of
beneficiaries
5
Kotwalana na muvada
N.R.E.G.A. D.R.D.A. Employment & Infrastructure
2008 15
T.S.C. D.R.D.A. Health Mission 2008 00
Indira Awaas Yojna D.R.D.A. Village Housing Scheme 1972 15
Sardar Awaas Yojna District
Panchayat Village Housing Scheme 1989 8
S.G.S.Y. D.R.D.A.
Ambedkar Awaas Yojna Social
Wellfare Department
Village Housing Scheme 1989
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 15
Table no.4.6: Developmental programmes running in the project area:
Sl no
Village Name
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of commencement
Estimated number of
beneficiaries
6
Ladujina muvada
N.R.E.G.A. D.R.D.A. Employment & Infrastructure
2008 20
T.S.C. D.R.D.A. Health Mission 2008
Indira Awaas Yojna D.R.D.A. Village Housing Scheme 1972 20
Sardar Awaas Yojna District
Panchayat Village Housing Scheme 1989 15
S.G.S.Y. D.R.D.A.
Ambedkar Awaas Yojna Social
Wellfare Department
Village Housing Scheme 1989 0
Table no.4.7: Developmental programmes running in the project area:
Sl no
Village Name
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of commencement
Estimated number of
beneficiaries
7 Lalpur(Nirmali)
N.R.E.G.A. D.R.D.A. Employment & Infrastructure
2008 46
T.S.C. D.R.D.A. Health Mission 2008 00
Indira Awaas Yojna D.R.D.A. Village Housing Scheme 1972 20
Sardar Awaas Yojna District
Panchayat Village Housing Scheme 1989 15
S.G.S.Y. D.R.D.A.
Ambedkar Awaas Yojna Social
Wellfare Department
Village Housing Scheme 1989 0
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 16
Table no.4.8: Developmental programmes running in the project area:
Sl no
Village Name
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of commencement
Estimated number of
beneficiaries
8 Pathoda
N.R.E.G.A. D.R.D.A. Employment & Infrastructure
2008 7
T.S.C. D.R.D.A. Health Mission 2008 00
Indira Awaas Yojna D.R.D.A. Village Housing Scheme 1972 15
Sardar Awaas Yojna District
Panchayat Village Housing Scheme 1989 15
S.G.S.Y. D.R.D.A.
Ambedkar Awaas Yojna Social
Wellfare Department
Village Housing Scheme 1989 2
Table no.4.9: Developmental programmes running in the project area:
Sl no
Village Name
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of commencement
Estimated number of
beneficiaries
9 Suki
N.R.E.G.A. D.R.D.A. Employment & Infrastructure
2008 10
T.S.C. D.R.D.A. Health Mission 2008
Indira Awaas Yojna D.R.D.A. Village Housing Scheme 1972 20
Sardar Awaas Yojna District
Panchayat Village Housing Scheme 1989 12
S.G.S.Y. D.R.D.A. 00
Ambedkar Awaas Yojna Social
Wellfare Department
Village Housing Scheme 1989 1
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 17
Table no.4.10: Developmental programmes running in the project area:
Sl no
Village Name
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of commencement
Estimated number of
beneficiaries
10 Sulatanpur (Taiyabpura)
N.R.E.G.A. D.R.D.A. Employment & Infrastructure
2008 15
T.S.C. D.R.D.A. Health Mission 2008 0
Indira Awaas Yojna D.R.D.A. Village Housing Scheme 1972 20
Sardar Awaas Yojna District
Panchayat Village Housing Scheme 1989 8
S.G.S.Y. D.R.D.A.
Ambedkar Awaas Yojna Social
Wellfare Department
Village Housing Scheme 1989 0
Table no.4.11: Developmental programmes running in the project area:
Sl no
Village Name
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of commencement
Estimated number of
beneficiaries
11 Vaghas
N.R.E.G.A. D.R.D.A. Employment & Infrastructure
2008 30
T.S.C. D.R.D.A. Health Mission 2008 0
Indira Awaas Yojna D.R.D.A. Village Housing Scheme 1972 25
Sardar Awaas Yojna District
Panchayat Village Housing Scheme 1989 15
S.G.S.Y. D.R.D.A.
Ambedkar Awaas Yojna Social
Wellfare Department
Village Housing Scheme 1989 2
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 18
Table no.4.12: Developmental programmes running in the project area:
Sl no
Village Name
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of commencement
Estimated number of
beneficiaries
12 Vyas vasana
N.R.E.G.A. D.R.D.A. Employment & Infrastructure
2008 50
T.S.C. D.R.D.A. Health Mission 2008 2
Indira Awaas Yojna D.R.D.A. Village Housing Scheme 1972 50
Sardar Awaas Yojna District
Panchayat Village Housing Scheme 1989 30
S.G.S.Y. D.R.D.A.
Ambedkar Awaas Yojna Social
Wellfare Department
Village Housing Scheme 1989 6
Table no.4.13: Developmental programmes running in the project area:
Sl no
Village Name
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of commencement
Estimated number of
beneficiaries
13 Zanda
N.R.E.G.A. D.R.D.A. Employment & Infrastructure
2008 50
T.S.C. D.R.D.A. Health Mission 2008 2
Indira Awaas Yojna D.R.D.A. Village Housing Scheme 1972 50
Sardar Awaas Yojna District
Panchayat Village Housing Scheme 1989 30
S.G.S.Y. D.R.D.A.
Ambedkar Awaas Yojna Social
Wellfare Department
Village Housing Scheme 1989 6
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 19
Table no. 5: Previous Watershed programmes in the project area:
Sl no
Project name
Year started
Name of
villages
No. Of micro
watershed
Watershed codes
Area under
treatment
Funding source
Nodal agency
PIA Total cost
Expenditure incurred up to start of
IWMP
% financial completion
% physical completion
N.A
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 20
FFiigguurree 22:: GGeeooggrraapphhiiccaall ccoonnddiittiioonnss ooff tthhee pprroojjeecctt aarreeaa..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 21
Chapter - 2 Project Implementing Agency
(PIA)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 22
2.1. Project Implementing Agency
The Project Implementing Agencies (PIA) is selected by an appropriate mechanism by Gujarat State Watershed Management Agency
(GSWMA), the State Level Nodal Agency (SLNA) for Integrated Watershed Management Programme (IWMP) in Gujarat. The PIAs are
responsible for implementation of watershed project. These PIAs may include relevant line departments, autonomous organizations under
State/ Central Governments, Government Institutes/ Research bodies, Intermediate Panchayats, Voluntary Organizations (VOs). The PIA for
(IWMP-12) Vaghas Watershed Project is District Watershed Development Unit, Kheda - Nadiad.
2.2 About District Watershed Development Unit (DWDU), Kheda - Nadiad
2.2.1 The organization and its objectives: The District Watershed Development Unit (DWDU), Kheda is a district level nodal agency and was established on December 2008 to oversee
the smooth implementation of watershed projects in the district. The District Development Officer (DDO) is the chairman of the DWDU. The
DWDU has dedicated and experienced staff comprising one Project Director (on deputation from Gujarat Forest Department), a Technical
Expert and a multidisciplinary team of Agriculture Expert, Community Mobilization expert, Civil Engineer, MIS Coordinator, System Analyst,
Surveyor, Accountant and Data Entry Operator. The objectives of the DWDU – Kheda are supervising, planning, implementing, documenting and
promoting watershed development projects and related developmental activities in the district as per guidelines. The DWDU – Kheda also
works as a PIA for this project.
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 23
2.2.2 Programmes/Projects of DWDU – Kheda: At present IWMP projects of the year 2009-10 & 2010-11 project watershed projects have been sanctioned by Government of India in for
Kheda district. The entry point activities in these projects are on going as per the DPR senction. Workphase activities in the senction project are
also in progress.
Apart from 8 IWMP projects, DWDU – Kheda is involved in a total of 52 Pre-Hariyali & Hariyali projects (IWDP) and all area currently under
implementation stage in the Kapadwanj, Kathlal and Virpur talukas of the district.
2.2.4 Roles and Responsibilities of the PIA as per New Co mmon Guideline – 2008 The Project Implementing Agency (PIA) will provide necessary technical guidance to the Grampanchayat for preparation of development plans
for the watershed through Participatory Rural Appraisal (PRA) exercise, undertake community organization and training for the village
communities, supervise watershed development activities, inspect and authenticate project accounts, encourage adoption of low cost
technologies and build upon indigenous technical knowledge, monitor and review the overall project implementation and set up institutional
arrangements for post-project operation and maintenance and further development of the assets created during the project period. PIA, after
careful scrutiny, shall submit the Action Plan for Watershed Development Project for approval of the DWDU/DRDA and other arrangements.
(As per Para - 38)
The PIA shall submit the periodical progress report to DWDU. The PIA shall also arrange physical, financial and social audit of the work
undertaken. It will facilitate the mobilization of additional financial resources from other government programmes, such as NREGA, BRGF,
SGRY, National Horticulture Mission, Tribal Welfare Schemes, Artificial Ground Water Recharging, Greening India, etc. (As per Para - 39)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 24
2.3 SWOT Analysis of the DWDU: Strength:
1. Dedicated and experienced staff and a multi – disciplinary team,
2. Independent District Level Nodal Agency,
3. Strong Linkages with National and State level institutions, Agricultural Universities and NGOs for capacity building and technical
guidance,
4. Scientific planning in watershed projects with the help of BISAG, Gandhinagar, and
5. District level monitoring, coordination & Co-operation Committee Opportunities:
1. A number of different other developmental schemes of the government are being implemented; so, there can be horizontal
integration and convergence of programmes,
2. Better financial provision under IWMP, and
3. Usage of new ICT tools like GIS, GPS.
Threats:
1. Rainfall being very scarce and unreliable in the project area,
2. Lack of contribution and cooperation from local people, and
3. Low literacy rate in the project.
4. High temperature variation
5. Soil health
6. Cattle population
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 25
Table no. 6: PIA: Sl. No. Names of project Details of PIA
1 IWMP 12
Vaghas Project
(i) Type of organization District Level Nodal Agency
(ii) Name of organization DWDU, Kheda
(iii) Designation & Address Project Director, DWDU, Opp. Utkarsh Hospital, Nana Kumbhnath Road, Nadiad Dist. Kheda
(iv) Telephone (O) 0268 – 2527771
(v) Fax 0268 – 2527771
(vi) E-mail [email protected]
2 Project office at Taluka level (i) Address
PIA District Watershed Devlopment Unit,In ,In Parvinbhai “s HouseJoshi faliya ,At.Po.vyas vasana Ta.Kapadwanj,Di.Kheda
(ii) Telephone 09712989609
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 26
Table no. 7.1: Staff at DWDU level:
Sl no Name Age Sex Designation Qualification Experience Job assigned Monthly remuneration (Rs.)
1 Mr. N.K.Nanda (GFS) 57 M Project Director B.Sc., 33 yrs exp. in forest dept. & 3 yrs exp. as Project Director
Project Implementing 58,010
2 Mr. Mayank P. Chauhan 23 M Technical Expert M.Sc. (ICT-ARD)
1 Year
To assist P.M in day to day function and providing Technical Support
25,000
3 Mrs Nimishaben K. Patel 27 F MIS Co-Ordinator MCA 5 Years
Create GIS Lab, Updating of MIS, Making online Reports, Web GIS
17,000
4 Mr. Toshif F. Pathan 27 M MDT (Civil Engineer) Diploma in Civil Eng.
3 Years
Guide the WDTs,
Monitoring,
Reviewing and
Evaluating of WDT
Activities
16,000
5 Mr. Pravinbhai M. Parmar 43 M MDT (Civil Engineer) B.E(Civil) 6 Years 23,000
6 Mr. Harishchandra S. Hajuri 33 M MDT (Agriculture) BRS, MSW 9 Years 12,000
7 Mrs. Naynaben D. Patel 38 F MDT(Community Mobilizer)
BRS 5 Years 15,295
8 Miss Jayvinaben Ka. Patel 27 F MDT (Account) M.Com 3 Years Maintaining Project Account
12,000
9 Mrs. Hetashree A. Shah 33 F MDT (Account) B.Com 3 Years 11,000
10 Mr. Nileshbhai Mecwan 28 M System Analyst B.Com, A.D.C.A., C.O.P.A.
7 Years Control of CUG, Landline & Internet
11,000
11 Mr. Avinashbhai G. Pandya 27 M Data Entry Operator B.A, PGDCA, CCC
3 Years Computer Data Entry 7,700
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 27
Table no. 7.2: Staff at PIA level: Sl no
Name Age Sex Designation Qualification Experience Job assigned Monthly remuneration
1 Pravinbhai .M.Parmar 43 M Nodal Officer & MDT-Civil Engg.
B.E-Civil Engg. 7 Years Nodal Officer 23,000
2 Vahora Ajit A. 31 M WDT Civil Engg Diploma Civil Engg. 10 Year Engineering Works 12,000
3 Pranami HIteshbhai k 33 M WDT Agriculture BRS B.Ed 2 Year
Agriculture Works & Livelihood &
Micro enterprise works
10,000
4 Patel Daxaben M. 28 F WDT Commodity
Mobilizer BRS, MSW 1 Year
Maintain SHGs and Livelihood & Micro enterprise works
8,000
5 Divyaben H. Gadani 28 F WDT- Accountant M.Com 1 Year Maintaining Project
Account
6 Vaghela jayshree R . 36 F Data Entry Operator copa .b.c.a 10 Year Computer Data Entry 8,500
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 28
Chapter - 3 Basic Information of the Project Area
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 29
3.1. Geography and Geo-hydrology 3.1.1 Land use pattern: TThhee nneett ggeeooggrraapphhiiccaall aarreeaa ooff ((IIWWMMPP--1122)) VVaagghhaass WWaatteerrsshheedd iiss aabboouutt 55442277..5500 hhaa aanndd tthheerree iiss nnoo ffoorreesstt aarreeaa iinn tthhee pprroojjeecctt.. AAbboouutt 7733..1122%% ooff
llaanndd iiss uunnddeerr aaggrriiccuullttuurree oouutt ooff wwhhiicchh 9911..2222%% aarreeaa iiss rraaiinn--ffeedd;; mmaaiinnllyy aa KKhhaarriiff aanndd RRaabbii ccrroopp aarree ttaakkeenn.. HHaarrddllyy ZZaaiidd ccrrooppss aarree ccuullttiivvaatteedd iinn tthhee
pprroojjeecctt aarreeaa.. AAbboouutt 1188%% ooff tthhee ttoottaall llaanndd iiss ccllaassssiiffiieedd uunnddeerr wwaasstteellaanndd ooff wwhhiicchh 6677%% iiss ccuullttiivvaabbllee aanndd rreesstt iiss uunnccuullttiivvaabbllee..
Table no. 8: Land use pattern:
S. No. Name of watersheds
Names of villages
Geographical Area of the
village
Forest Area
Land under agricultural
use
Rainfed area
Perm-anent
pastu-res
Wasteland
Cultivable Non-
cultivable 1
IWMP -12
Aboch 541.00 0 478.40 444.00 19.40 19.40 43.20
2 Bhungaliya 775.20 0 696.90 368.80 31.40 31.40 46.90
3 Dandiyapur 186.70 0 171.50 85.00 1.20 1.20 14.00
4 Khanpur 362.30 0 307.40 287.40 50.90 50.90 4.00
5 Kotwalana na muvada 79.00 0 72.90 70.50 5.60 5.60 0.40
6 Ladujina muvada 185.20 0 150.00 105.50 25.70 25.70 9.50
7 Lalpur(Nirmali) 304.50 0 283.80 137.10 17.80 17.80 27.10
8 Pathoda 486.10 0 375.60 363.60 12.80 12.80 98.20
9 Suki 122.40 0 93.60 53.60 12.60 12.60 16.20
10 Sulatanpur (Taiyabpura) 298.30 0 42.00 42.00 18.90 18.90 0.00
11 Vaghas 913.60 0 747.50 517.50 39.30 39.30 126.50
12 Vyas vasana 588.10 0 487.20 478.00 60.20 60.20 40.70
13 Zanda 585.10 0 566.50 478.50 6.30 6.30 12.30
TOTAL...... 5427.50 0 4473.3 3431.5 302.1 302.1 439
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 30
3.1.2 Soil and topography: ((IIWWMMPP--1122)) VVaagghhaass WWaatteerrsshheedd PPrroojjeecctt ((NNWWPP)) ffaallllss uunnddeerr NNoorrtthh GGuujjaarraatt AAggrroo CClliimmaattiicc ZZoonnee.. TThhee ssooiill iiss mmaaiinnllyy GGoorraadduu aanndd RReeaacchh BBllaacckk.. TThhee
ssooiill iiss ggrreeyyiisshh ttoo ddaarrkk bbllaacckk iinn ssuurrffaaccee ccoolloouurr.. TThhee ddeepptthh ooff ssooiill iiss mmooddeerraattee ttoo ddeeeepp aabboouutt 2255 ttoo 7755 ccmm.. TThhee pprreeddoommiinnaanntt tteexxttuurree ooff ssooiill iiss ssiilltt
aanndd ccllaayy.. TThhee ssooiill ffeerrttiilliittyy iiss aavveerraaggee wwiitthh mmooddeerraattee ccoonntteenntt ooff nniittrrooggeenn,, pphhoosspphhoorruuss aanndd ppoottaasshh.. TThhee ttooppooggrraapphhyy ooff tthhee aarreeaa iiss uunndduullaattiinngg..
Table no. 9: Soil type and topography:
S. No. Name of the Agro-climatic zone
covers project area Area in ha
Names of the villages
Major soil types Topo-graphy
a)Type b) Area in ha
1
North Gujarat
541.00 Aboch Goradu,reach black 541.00
Undulating
2 775.20 Bhungaliya Goradu 775.20
3 186.70 Dandiyapur Goradu 186.70
4 362.30 Khanpur Reach black,Black Soil 362.30
5 79.00 Kotwalana na muvada
Goradu,reach black 79.00
6 185.20 Ladujina muvada Goradu,reach black 185.20
7 304.50 Lalpur(Nirmali) Goradu,reach black,Black Soil 304.50
8 486.10 Pathoda Goradu,reach black 486.10
9 122.40 Suki Goradu,reach black 122.40
10 298.30 Sulatanpur (Taiyabpura)
Goradu,reach black 298.30
11 913.60 Vaghas Goradu,reach black 913.60
12 588.10 Vyas vasana Goradu,reach black 588.10
13 585.10 Zanda Goradu,reach black 585.10
Total… 5427.50 5427.50 # Flat, undulating, moderate slope, Steep slope
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 31
Table no. 10: Flood and drought condition:
Sr. No. Particulars Villages Periodicity
Not affected Annual Any other (please specify)
1 Flood No. of villages
NIL Name(s) of villages
2 Drought
Aboch
Once in four year
Bhungaliya
Dandiyapur Khanpur Kotwalana na muvada
Ladujina muvada
Lalpur(Nirmali)
Pathoda
Suki
Sulatanpur (Taiyabpura)
Vaghas
Vyas vasana
Zanda
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 32
Figure 4: Existing Structures and its condition in the project area.
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 33
Figure 5: Biophysical survey/Transect Walk of the project area.
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 34
11. Edaphic Factors Table no. 11.1: Soil Erosion
Cause Type of erosion Area affected (ha) Run off
(mm/ year) Average soil loss (Tonnes/
ha/ year) Water erosion
a Sheet
Will be Provided with DPR
30-40%
Will be Provided with DPR
b Rill
c Gully
Sub-Total
Wind erosion NA
Total
Table no. 11.2: Soil Salinity/Alkalinity (Salinity ingress)
Name of the Village Survey Number Soil pH Type of Salinity
(Inherent/Ingress)
Aboch,Bhungaliya ,Dandiyapur ,Khanpur Kotwalana na muvada,Ladujina muvada Lalpur(Nirmali),Pathoda ,Suki ,Sulatanpur Vaghas ,Vyas vasana, Zanda
Avarage Total Land 6.50 to 7.7
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 35
Table no. 11.3: Waterlogging Conditions Name of the Village Survey Number Reasons
Aboch, Bhungaliya ,Dandiyapur,Khanpur Kotwalana na muvada ,Ladujina muvada Lalpur(Nirmali),Pathoda,Suki, Sulatanpur Zanda aghas, Vyas vasana, Zanda
Nill Nill
Table no. 12: Climatic conditions:
Name of project Year
Average rainfall- last 5 years
Average temperature
Summer Winter
Max Min Max Min
IWMP-12,Vaghas Project
2011 840 38-42 31-34 16-20 8-15
2010 720 38-39 32-35 15-18 12-15
2009 996 35-38 30-31 16-20 11-15
2008 1560 34-37 29-32 13-16 11-14
2007 1720 33-36 25-30 14-17 12-15
2006 1530 36-38 30-35 17-20 14-16
TThhee rraaiinnffaallll iiss ssccaannttyy wwhhiicchh hhaass rreessuulltteedd iinn rreeccuurrrreenntt pphheennoommeennoonn ooff ddrroouugghhtt iinn eevveerryy tthhrreeee oorr ffoouurr yyeeaarrss.. TThhee aavveerraaggee rraaiinnffaallll iinn tthheessee aarreeaa
iiss aabboouutt 11226677..4400 mmmm ((ffrroomm ppaasstt ffiivvee yyeeaarr ddaattaa)).. TThhiiss uunneevveenn ddiissttrriibbuuttiioonn ooff rraaiinn aanndd tteemmppeerraattuurree iiss rreessuullttiinngg rruunnooffff ooff ssooiill ttoo tthhee ssttrreeaammss
aanndd rriivvuulleettss..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 36
Table no. 13: Physiography and relief Project name Village Name Elevation Slope range (%) Major streams
IWMP-12 Vaghas Project
Aboch 270 ft 2.5% varansi river
Bhungaliya 28 f t 5.10% varansi river
Dandiyapur 278 ft 2% varansi river
Khanpur 277 ft 1.3% varansi river
Kotwalana na muvada 0 4% 0
Ladujina muvada 275 ft 1.2%
Lalpur(Nirmali) 273 ft 1%
Pathoda 276 ft 5.4%
Suki 271 ft 5% Mahor river
Sulatanpur (Taiyabpura) 272 ft 2%
Vaghas 280 ft 1.3%
Vyas vasana 283 ft 2.10%
Zanda 285 ft 2.1%
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 37
3.1.3 Land and Agriculture:
LLaacckk ooff ssuurrffaaccee wwaatteerr ssoouurrccee aanndd lliimmiitteedd ssttoorraaggee ssttrruuccttuurreess oonn tthhee llaanndd ssuurrffaaccee hhaass lliimmiitteedd tthhee ssuuffffiicciieenntt bbaassee ffoorr iirrrriiggaattiioonn aass wweellll aass ffoorr
ddrriinnkkiinngg ppuurrppoossee.. NNoo ccaannaall iiss fflloowwiinngg tthhrroouugghh tthhee aarreeaa rreessuullttiinngg llaakkee ooff iirrrriiggaattiioonn ffaacciilliittyy.. TThhee aavveerraaggee llaanndd hhoollddiinngg iiss aabboouutt 11..4400 hhaa rraannggiinngg
ffrroomm 11 ttoo 44 hhaa.. LLaacckk ooff iirrrriiggaattiioonn ffaacciilliittiieess ffoorrcceess tthhee ffaarrmmeerrss iinn tthhee aarreeaa ffoorr aanndd aalltteerrnnaattiivvee ssoouurrccee ooff iinnccoommee eennssuurriinngg tthheeiirr lliivveelliihhoooodd ffoorr
tthheeiirr aanndd tthheeiirr ccaattttllee ssuurrvviivvaall.. WWhhiicchh ddiirreeccttllyy eeffffeeccttss tthhee ddeemmooggrraapphhiicc pprrooffiillee ooff tthhee vviillllaaggee.. TThhee mmaajjoorr ccrrooppss iinn tthhee pprroojjeecctt aarreeaa JJoowwaarr
((SSoorrgghhuumm)),, CCoottttoonn aanndd BBaajjrraa ((PPeeaarrll mmiilllleett)),, rriiccee,, aanndd vveeggeettaabbllee ccuullttiivvaattiioonn iiss ddoonnee aass ccaasshh ccrrooppee iinn ssoommee aarreeaass bbyy tthhee ffaarrmmeerrss.. SSooiill aanndd
mmooiissttuurree ccoonnsseerrvvaattiioonn mmeeaassuurreess ssuucchh aass eeaarrtthheenn bbuunnddss aanndd ffaarrmm bbuunnddss aanndd ssmmaallll cchheecckkddaammss aalloonngg tthhee ddrraaiinnaaggee lliinnee wwiillll hheellpp tthhee aarreeaa aanndd
tthhee ccrrooppppiinngg ppaatttteerrnn ooff tthheessee vviillllaaggeess.. AAss aa rreessuulltt tthhee ffaarrmmeerrss mmaayy ttaakkee uupp rraabbii ccrroopp ooff TTuuvveerr aanndd WWhheeaatt iinn tthhee rreessiidduuaall mmooiissttuurree..
OOuutt ooff tthhee ttoottaall ffaarrmmeerrss iinn tthhee pprroojjeecctt aarreeaa,, 999955 ffaarrmmeerrss ggrroowwss ccrroopp oonnee ttiimmee iinn aa yyeeaarr.. SSiimmiillaarrllyy,, 227733 aanndd 1199 ffaarrmmeerrss ggrroowwss ccrroopp ttwwoo oorr
tthhrreeee ttiimmee aa yyeeaarr..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 38
Table no. 14: Land ownership details Sl no
Village Total owned land HHs giving land
on lease HHs taking land
on lease Gen OBC SC ST
1 Aboch 1 435 39 1 0 0
2 Bhungaliya 81 594 24 2 0 0
3 Dandiyapur 0 198 0 0 0 0
4 Khanpur 3 226 0 0 0 0
5 Kotwalana na muvada 0 77 0 0 0 0
6 Ladujina muvada 1 180 1 0 0 0
7 Lalpur(Nirmali) 114 142 116 4 0 0
8 Pathoda 47 157 46 7 0 0
9 Suki 54 94 1 0 0 0
10 Sulatanpur (Taiyabpura) 0 0 12 1 0 0
11 Vaghas 0 0 0 0 0 0
12 Vyas vasana 135 226 56 0 0 0
13 Zanda 182 303 44 0 0 0
Total 618 2632 339 15
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 39
Table no. 15: Agriculture
Sl no Village
Net sown area in Ha. One time Two times Three times
1 Aboch 444 285.49
2 Bhungaliya 368.8 237.14
3 Dandiyapur 85 54.66
4 Khanpur 287.4 184.8
5 Kotwalana na muvada 70.5 45.33
6 Laduji na muvada 105.5 67.84
7 Lalpur(Nirmali) 137.1 88.16
8 Pathoda 363.6 233.79
9 Suki 53.6 34.46
10 Sulatanpur (Taiyabpura)
42 27.01
11 Vaghas 0
12 Vyas vasana 478 307.35
13 Zanda 478.5 307.68
Total 3431.5 1873.71
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 40
Table no. 16: Irrigation
Sl no Village
Source 1 : Canal Source 2 : Check dam / Pond Source 3 : Well Availability
months Net area Gross area
Availability months
Net area Gross area Availability
months Net area
Gross area
1 Aboch
No canal is flowing through the project
area NA
6-7 26 26
2 Bhungaliya 6.-7 29 29
3 Dandiyapur 7-8 15 15
4 Khanpur 7-8 20 20
5 Kotwalana na muvada
5-6 16 16
6 Ladujina muvada 5-6 8 8
7 Lalpur(Nirmali) 6-7 12 12
8 Pathoda 9-8 10 10
9 Suki 6-8 15 15
10 Sulatanpur (Taiyabpura)
7-9 20 20
11 Vaghas 8-9 25 25
12 Vyas vasana 5-8 22 22
13 Zanda 8-9 14 14
5-6 235 235
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 41
Table no. 17.1: Crop details (Kharif)
Sl no Village
Kharif (Monsoon) Bajri Tur Paddy
Area Production Productivity Area Production Productivity Area Production Productivity
1 Aboch 100.3 65195 650 50.1 10020 200 200.4 240480 1200
2 Bhungaliya 90.1 58565 650 40.12 8024 200 150.1 180120 1200
3 Dandiyapur 25.5 16575 650 10.1 2020 200 30.12 36144 1200
4 Khanpur 70.15 45597.5 650 32.15 6430 200 130.15 156180 1200
5 Kotwalana na muvada 20.5 13325 650 8.2 1640 200 25.12 30144 1200
6 Ladujina muvada 30.5 19825 650 12.18 2436 200 35.14 42168 1200
7 Lalpur(Nirmali) 32.7 21255 650 14.15 2830 200 38.2 45840 1200
8 Pathoda 90.1 58565 650 40.17 8034 200 150.17 180204 1200
9 Suki 25.11 16321.5 650 18.22 3644 200 30.13 36156 1200
10 Sulatanpur (Taiyabpura) 65.2 42380 650 22.14 4428 200 110.18 132216 1200
11 Vaghas
12 Vyas vasana 110.1 71565 650 70.18 14036 200 210.12 252144 1200
13 Zanda 108.7 70655 650 70.2 14040 200 208.14 249768 1200
TOTAL 768.96 499824 650 387.91 77582 200 1317.97 1581564 1200
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 42
Table no. 17.2: Crop details (Rabi):
Sl no Village Rabi (Winter)
Wheat Castor Area Production Productivity Area Production Productivity
1 Aboch 185.57 463925 2500 99.92 149880 1500
2 Bhungaliya 154.14 385350 2500 83 124500 1500
3 Dandiyapur 35.53 88825 2500 19.13 28695 1500
4 Khanpur 120.12 300300 2500 64.68 97020 1500
5 Kotwalana na muvada 29.47 73675 2500 15.87 23805 1500
6 Ladujina muvada 44.09 110225 2500 23.74 35610 1500
7 Lalpur(Nirmali) 57.3 143250 2500 30.85 46275 1500
8 Pathoda 151.97 379925 2500 81.83 122745 1500
9 Suki 22.4 56000 2500 12.06 18090 1500
10 Sulatanpur (Taiyabpura) 17.55 43875 2500 9.45 14175 1500
11 Vaghas 0 0
12 Vyas vasana 199.78 499450 2500 107.57 161355 1500
13 Zanda 199.99 499975 2500 107.69 161535 1500
TOTAL 1217.91 3044775 2500 655.79 983685 1500
Source: - Base Line Surve
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 43
3.1.4 Livestock:
TThhee vviillllaaggeess iinn tthhee pprroojjeecctt aarreeaa hhaavvee 6762 ccoowwss,, 3422 bbuuffffaallooeess,, 933 bbuulllloocckkss,, 1902 ggooaattss aanndd 1751 sshheeeepp.. TThhee sseeccoonnddrryy ssoouurrccee ooff lliivveelliihhoooodd
iinn tthhee ddiissttrriicctt aass wweellll aass iinn tthhee pprroojjeecctt aarreeaa iiss aanniimmaall hhuussbbuunnddaarryy wwhhiicchh hhaass hhiigghh mmiillkk ccoolllleeccttiioonn dduuee ttoo tthhee aavveerraanneessss iinn tthhee ppeeooppllee wwhhiicchh
yyiieellddss aa lloott ooff ccaasshh ttoo tthheemm.. OOnn tthhee ootthheerr hhaanndd iinn tthhee pprroojjeecctt aarreeaa rraaiinn ffaallll iiss iinnaaddeeqquuaattee aanndd ppaassttuurree ffaacciilliittiieess aarree llooww.. AAggrriiccuullttuurree wwaassttee aanndd
ggrreeeenn ggrraassss oorr ffooddddeerr ccuullttiivvaatteedd dduurriinngg tthhee rraaiinnss iiss aa mmaajjoorr ssoouurrccee ffoorr ggrreeeenn ffooddddeerr ttoo tthhee ccaattttlleess.. IImmpprroovviinngg ffooddddeerr ffaacciilliittiieess ssuucchh aass ppaassttuurree
ddeevveellooppmmeenntt,, ssttaallll ffeeeeddiinngg aanndd mmiixxuurree ooff mmiinneerraallss iinn tthhee ffooddddeerr wwiillll hheellpp iinn iinnccrreeaassiinngg tthhee mmuullcchhiinngg ccaappaacciittyy ooff tthhee aanniimmaallss.. AA nnoo ooff ssmmaallll
pprriivvaattee ddaaiirryy oorr mmiillkk ccoolllleeccttiioonn cceennttrree aarree iinn tthhee aarreeaa aanndd aallssoo ddaaiirryy ccoo--ooppeerraattiivveess eexxiissttss iinn tthhee aarreeaa iimmpprroovviinngg aanniimmaall hheeaalltthh iiss aallssoo aa mmaajjoorr
pprroobblleemm ooff tthhee aarreeaa..
Table no. 18: Livestock
Sl no
Village
Buffalo Cow Total Milk (Buffalo+Cow)
(in Ltr)
Goat
Sheep Bullock Hen Others No milk No Milk No Milk
1 Aboch 230 2200 150 800 3000 ltr 382 573 283 150 5 120
2 Bhungaliya 350 1750 1000 3550 5300 ltr 200 300 10 45 0 175
3 Dandiyapur 125 600 150 900 1500 ltr 100 150 400 50 2 50
4 Khanpur 20 100 440 3080 3180 ltr 0 0 0 50 0 25
5 Kotwalana na muvada 150 875 15 105 980 ltr 20 35 0 25 0 22
6 Ladujina muvada 80 375 150 600 975 ltr 200 300 45 40 5 15
7 Lalpur(Nirmali) 200 380 1000 2000 2380 ltr 0 0 0 150 0 120
8 Pathoda 592 2500 1405 8000 10500 ltr 450 675 98 58 45 160
9 Suki 70 350 450 3025 3375 lt 0 0 0 55 0 45
10 Sulatanpur (Taiyabpura) 30 150 12 510 660 ltr 50 7.5 15 8 5 12
11 Vaghas 120 720 150 750 1470 ltr 100 15 250 32 2 12
12 Vyas vasana 1105 6650 840 4800 11450 ltr 100 15 250 120 15 150
13 Zanda 350 2100 1000 6500 8600 ltr 300 45 400 150 0 15
Total 3422 18750 6762 34620 53370 1902 2115.5 1751 933 79 921
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 44
1.1.5 Drinking water:
SSoouurrccee ooff ddrriinnkkiinngg wwaatteerr iinn tthhee pprroojjeecctt aarreeaa aarree Well, Hand Pump, Borewell, Water Tank..((ssmmaallll vviillllaaggee ppoonndd))wwhhiicchh pprroovviiddeess ddrriinnkkiinngg wwaatteerr ttoo
tthhee vviillllaaggeerrss uupp ttoo 88 –– 1100 mmoonntthhss,, aanndd tthheerree iiss aaccuuttee ssoorrttaaggee ffoorr ddrriinnkkiinngg wwaatteerr iinn tthhee vviillllaaggeess iinn wwhhiicchh wwaatteerr iiss bbrroouugghhtt ffrroomm nneeaarr bbyy ssoouurrcceess
tthhrroouugghh ttaannkkeerrss aanndd ootthheerrss aavvaaiillaabbllee ffaacciilliittiieess.. TThhee qquuaalliittyy ooff wwaatteerr iiss ppoorrttaabbllee..
Table no. 19: Drinking water
Sl no Village Ground water table (mt) Source of drinking water Availability in months Quality
1 Aboch
40 - 100 mtr Well, Hand Pump, Borewell,
Water Tank 8-10 Months Potable
2 Bhungaliya 3 Dandiyapur 4 Khanpur
5 Kotwalana na muvada
6 Ladujina muvada 7 Lalpur(Nirmali) 8 Pathoda 9 Suki
10 Sulatanpur (Taiyabpura)
11 Vaghas 12 Vyas vasana 13 Zanda
Sourse: - GWSSB
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 45
Table no. 20: Details of Common Property Resources
S. No.
Names of project
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons Govt.
(specify deptt.)
PRI Any other
(Pl. Specify) Pvt.
persons
Govt. (specify deptt.)
PRI Any other
(Pl. Specify)
1 IWMP-12
Vaghas
Wasteland/ degraded land 787.8
Pastures 348.8
Orchards
Village Woodlot
Forest
Village Ponds/ Tanks 15
Community Buildings
Weekly Markets
Permanent markets
Temples/ Places of worship 16 5
Others (Pl. specify) 6 4
3.2. Socio-Economic Profile 3.2.1 Demographic Status: ((IIWWMMPP--1122)) VVaagghhaass pprroojjeecctt ccoovveerrss 1133 vviillllaaggeess ooff KKaappaaddwwaannjj ttaalluukkaa.. IItt hhaass aa ttoottaall ooff 33993388 hhoouusseehhoolldd wwiitthh 17449 ppooppuullaattiioonn ((aass ppeerr bbaassee--lliinnee
ssuurrvveeyy)) oouutt ooff wwhhiicchh 99331100 aarree mmaallee aanndd 88003399 aarree ffeemmaallee.. SSeexx rraattiioo ooff tthhee aarreeaa iiss 991111 ffeemmaallee ttoo 11000000 mmaallee.. TThhiiss rraattiioo vvaarriieess ffrroomm vviillllaaggee ttoo
vviillllaaggee.. PPrroojjeecctt aarreeaa ccoovveerrss SSCC ppooppuullaattiioonn aabboouutt 77..4400 %%,, wwhhiicchh aallssoo vvaarriieess ffrroomm 22%% ttoo 3399%%.. SSCC ppooppuullaattiioonn iiss vveerryy lleessss iinn tthhee pprroojjeecctt aarreeaa.. TThhee
aavveerraaggee ffaammiillyy ssiizzee iiss 55.. TThheerree aarree 11443355 BBPPLL ffaammiilliieess iinn tthhee pprroojjeecctt aarreeaa.. TThhee lliitteerraaccyy rraattee ooff tthhee aarreeaa iiss 5566..7755%%,, oouutt ooff wwhhiicchh mmaallee lliitteerraaccyy rraattee
iiss 6633..5566%% aanndd ffeemmaallee lliitteerraaccyy rraattee iiss 3366..4433%%.. HHiigghh sscchhooooll iiss ffaarr aawwaayy ffrroomm tthhee vviillllaaggeess iinn pprroojjeecctt aarreeaa aanndd ttrraannssppoorrtt ffaacciilliittiieess aavvaaiillaabbllee iinn tthhee
vviillllaaggeess aarree ggoooodd wwhhiicchh iiss tthhee rreeaassoonn bbeeccaauussee ooff wwhhiicchh lliitteerraaccyy rraattee iiss ggoooodd.. MMaajjoorriittyy ooff ppooppuullaattiioonn iiss iinnvvoollvveedd iinn aaggrriiccuullttuurree aanndd aanniimmaall
hhuussbbaannddrryy ffoorr lliivveelliihhoooodd..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 46
Table no. 21: Demographic information
Sl no
Village Population SC ST
Total Male Female Total Male Female % Total Male Female %
1 Aboch 1914 995 919 145 80 65 7.58 30 16 14 1.57
2 Bhungaliya 3056 1600 1456 27 17 10 0.88 0 0 0 0
3 Dandiyapur 898 490 408 0 0 0 0 0 0 0 0
4 Khanpur 392 212 180 0 0 0 0 0 0 0 0
5 Kotwalana na muvada
360 200 160 0 0 0 0 0 0 0 0
6 Laduji na muvada
798 422 376 5 3 2 0.62 0 0 0 0
7 Lalpur(Nirmali) 1298 662 636 146 89 57 11.2 0 0 0 0
8 Pathoda 1261 645 616 206 106 100 16.33 0 0 0 0
9 Suki 980 446 434 0 0 0 0 0 0 0 0
10 Sulatanpur (Taiyabpura)
457 289 168 35 22 13 7.66 24 15 9 5.25
11 Vaghas 2284 1442 842 384 230 154 16.81 0 0 0 0
12 Vyas vasana 1507 770 737 185 102 83 12.27 0 0 0 0
13 Zanda 2244 1137 1107 163 98 65 7.26 0 0 0 0
Total 17449 9310 8039 1296 747 549 7.42 54 31 23 6.82
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 47
Table no. 22: Literacy rate
Sl no Village
Literacy
Total % Male % Female %
1 Aboch 1104 57.69 709 71.55 395 35.77
2 Bhungaliya 1643 53.77 1062 64.63 581 35.36
3 Dandiyapur 348 38.75 271 77.87 77 22.12
4 Khanpur 219 55.87 150 68.49 69 31.5
5 Kotwalana na muvada 151 41.94 111 73.5 40 26.49
6 Ladujina muvada 485 60.78 306 63.09 179 36.9
7 Lalpur(Nirmali) 860 66.26 517 60.11 343 39.88
8 Pathoda 587 46.55 371 63.2 216 36.79
9 Suki 417 42.55 257 61.63 160 38.36
10 Sulatanpur (Taiyabpura) 253 55.37 173 68.37 80 31.62
11 Vaghas 1249 54.69 819 65.57 430 34.42
12 Vyas vasana 1066 70.74 625 58.63 441 41.36
13 Zanda 1521 67.79 924 60.74 597 39.25
Total 9903 56.75 6295 63.56 3608 36.43
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 48
Table no. 23: Migration details
Sl no Village Total
population
Migration Migration by months Main reason for migration
Income during
migration / month
Total HH Male Female Up to 3 months
3-6 months More than 6
months
1 Aboch 1914 0 0 0 0 0 0 0 0
2 Bhungaliya 3056 0 0 0 0 0 0 0 0
3 Dandiyapur 898 0 0 0 0 0 0 0 0
4 Khanpur 392 0 0 0 0 0 0 0 0
5 Kotwalana na muvada 360 0 0 0 0 0 0 0 0
6 Ladujina muvada 798 0 0 0 0 0 0 0 0
7 Lalpur(Nirmali) 1298 0 0 0 0 0 0 0 0
8 Pathoda 1261 0 0 0 0 0 0 0 0
9 Suki 980 0 0 0 0 0 0 0 0
10 Sulatanpur (Taiyabpura)
457 0 0 0 0 0 0 0 0
11 Vaghas 2284 0 0 0 0 0 0 0 0
12 Vyas vasana 1507 0 0 0 0 0 0 0 0
13 Zanda 2244 0 0 0 0 0 0 0 0
Total 17449 0 0 0 0 0 0 0 0
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 49
Table no. 24: Poverty
Sl no Village Total Household BPL
% of BPL HH Total Land less HH % of land less HH 0-16 16-20 Total
1 Aboch 475 91 96 191 40.21 10 2.10
2 Bhungaliya 708 225 275 500 70.63 298 42.10
3 Dandiyapur 165 20 62 82 49.70 98
4 Khanpur 226 105 45 150 66.38 82 36.28
5 Kotwalana na muvada
77 10 30 49 63.64 16 20.77
6 Ladujina muvada
189 3 28 30 15.87 48 25.40
7 Lalpur(Nirmali) 276 15 80 90 32.61 52 18.85
8 Pathoda 260 22 79 101 38.84 71 27.30
9 Suki 240 61 24 85 35.42 142 59.17
10 Sulatanpur (Taiyabpura)
120 44 27 71 59.17 18 15
11 Vaghas 483 266 167 433 89.64 288 59.61
12 Vyas vasana 500 120 89 209 41.8 98 19.60
13 Zanda 450 68 161 229 336.77 49 10.88
Total 4169 1050 1163 2220 54.10 1270 130.46
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 50
Infrastructure facilities: ((IIWWMMPP--1122)) VVaagghhaass WWaatteerrsshheedd PPrroojjeecctt vviillllaaggee’’ss aarreeaa iiss wweellll ccoonnnneecctteedd wwiitthh KKaappaaddwwaannjj TTaalluukkaa wwiitthh rrooaaddss.. AAllll tthhee vviillllaaggeess hhaavvee eelleeccttrriicciittyy
ccoonnnneeccttiivviittyy uunnddeerr JJyyoottiiggrraamm YYoojjaannaa ooff tthhee SSttaattee GGoovveerrnnmmeenntt.. ((IIWWMMPP--1122)) VVaagghhaass WWaatteerrsshheedd PPrroojjeecctt vviillllaaggeess hhaavvee pprriimmaarryy sscchhoooollss wwiitthh
ffaacciilliittiieess lliikkee ccoommppuutteerrss,, lliibbrraarryy,, ppllaayy ggrroouunndd eettcc.. FFoorr ffuurrtthheerr eedduuccaattiioonn ssuucchh aass mmiiddddllee aanndd hhiigghheerr sseeccoonnddaarryy eedduuccaattiioonn,, tthhee ssttuuddeennttss hhaavvee ttoo
ggoo ttoo KKaappaaddwwaannjj wwhhiicchh iiss aabboouutt 2200 kkiilloommeettrreess aawwaayy.. TThhiiss rreessuullttss iinn ttoo ddrroopppp oouuttss rreessuullttiinngg iinnttoo lloowweerr lleevveell eedduuccaattiioonn qquuaalliiffiiccaattiioonn.. TThhoouugghh
tthhee lliitteerraaccyy rraattee iiss hhiigghheerr iinn tthhee pprroojjeecctt aarreeaa wwhhiicchh iiss oonnllyy dduuee ttoo pprriimmaarryy eedduuccaattiioonn aatt tthhee vviillllaaggee lleevveell..
Table no. 25: Village infrastructure
Sl no
Village
Pucca road
to the village (Y/N)
Schools
Colleges (Number)
Post Office (Distance)
Banks (Numbe
r)
Distance from
nearest market
yard(Km)
Milk collection centre (Number
)
Milk cooperativ
e (Number)
Other cooperative
s / CBIs (Number)
Any other
institution
LP UP HS
1 Aboch No Yes No - No No 16 No 1 0 No
2 Bhungaliya Yes No No - Yes No 10 Yes 1 0 No
3 Dandiyapur no Yes No - Yes No 10 Yes 1 0 No
4 Khanpur Yes Yes No - No(7Km) No 6 Yes 1 0 No
5 Kotwalana na muvada
No Yes No - Yes No 10 Yes 1 0 No
6 Ladujina muvada
Yes Yes No - No(3 Km) No 10 Yes 1 0 No
7 Lalpur(Nirmali)
no Yes No - No(2 Km) No 5 Yes 1 0 No
8 Pathoda no Yes No No - NO (3 km) NO (3 km)
18 Yes 0 0 No
9 Suki yes no No no No 17 No 1 1 No
10 Sulatanpur (Taiyabpura)
No yes No No No 5 No No No no
11 Vaghas no yes Yes - Yes Yes 27 Yes 1 0 No
12 Vyas vasana No Yes No yes Yes 15 Yes 1 1 No
13 Zanda No Yes NO YES YES 26 YES 1 0 No
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 51
Table no. 26 : Facilities / HH assets
Sl no
Village HHs with
electricity
HHs with safety
latrines
HHs with phones HHs with vehicle HHs with TV set
HHs with cooking
gas
HHs with Drinking
water
HHs with
freedge Land line Mobile 2-wheeler 4-wheeler
1 Aboch 400 350 5 470 350 12 245 248 475 10
2 Bhungaliya 708 458 15 542 306 25 588 200 700 2
3 Dandiyapur 165 239 4 345 345 15 288 156 467 5
4 Khanpur 219 165 3 123 245 12 167 125 324 4
5 Kotwalana na muvada 74 178 4 178 244 15 177 134 45 5
6 Ladujina muvada 179 245 3 300 267 34 304 245 34 6
7 Lalpur(Nirmali) 266 134 2 450 56 12 534 367 188 17
8 Pathoda 260 125 10 159 20 5 190 150 250 9
9 Suki 200 152 1 50 25 15 230 200 238 2
10 Sulatanpur (Taiyabpura) 50 5 0 45 2 0 10 5 50 2
11 Vaghas 389 7 510 278 30 380 300 312 45
12 Vyas vasana 400 256 2 400 152 45 425 400 456 45
13 Zanda 400 250 2 430 256 239 220 330 385 56
3.3. Livelihood pattern:
IInn tthhee vviillllaaggeess iinnhhaabbiittaannccee oonn tthheeiirr lliivveelliihhoooodd oorr aarree ddeeppeennddeenntt oonn aaggrriiccuullttuurree aanniimmaall hhuussbbuunnddaarryy aanndd ootthheerr wwoorrkkss ssuucchh aass llaabboouurr wwoorrkkss iinn
GGoovvtt.. WWoorrkkss oorr ffaarrmm llaabboouurrss tthheerree iiss nnoo iinndduussttrryy nneeaarr aabboouutt wwhhiicchh ccaann ggiivvee tthheemm ppeerrmmeennaanntt llaabboouurr.. LLooookkiinngg tthhee lliitteerraaccyy rraattee ooff aa lloowweerr lleevveell
eedduuccaattiioonn iinn tthhee aarreeaa,, tthhee iinnhhaabbiittaannccee aanndd tthheeiirr llaanndd hhoollddiinnggss wwhhiicchh iiss ssmmaallll aanndd tthhee ppooppuullaattiioonn bbootthh ppeeooppllee aanndd aanniimmaall iiss hhiigghh aass aa rreessuulltt
ccaassuuaall llaabboouurrss ssuuffffiicciieenntt iinn nnuummbbeerr iinn tthhee pprroojjeecctt aarreeaa..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 52
Table no. 27: Per capita Income
Sl no Village Agriculture Animal husbandry Casual labour Others Total
1 Aboch 2,851.95 2345.6 55.7 2.10 5,255.35
2 Bhungaliya 610.66 91.53 16.57 5.88 724.64
3 Dandiyapur 1288.7 1437.6 14.44 254.05 2994.79
4 Khanpur 2308.10 1,567.15 46.7 4.82 3926.77
5 Kotwalana na muvada 2230.91 1,617.30 69.10 24.88 3942.19
6 Ladujina muvada 737.08 1,150.05 1,9.47 32.94 1920.07
7 Lalpur(Nirmali) 840.67 484.90 30.24 13.05 1368.86
8 Pathoda 3067.56 1245.50 15.80 10.06 4338.92
9 Suki 2435.40 2341.6 45.23 12.45 4834.68
10 Sulatanpur (Taiyabpura) 1230.00 1243.6 13.88 14.89 2502.37
11 Vaghas 2234.89 2215.90 34.67 23.78 4509.24
12 Vyas vasana 6,936.13 1,488.37 679.74 6,612.23 15,716.47
13 Zanda 2,705.62 5,166.29 52.81 187.08 8,111.80
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 53
3.4 Dependence on forest/Common Property Resource AAss tthheerree iiss nnoo ffoorreesstt aarreeaa iinn tthhee WWaatteerrsshheedd PPrroojjeecctt VViillllaaggeess,, tthheerree iiss nnoo qquueessttiioonn ooff ddeeppeennddeennccee oonn iitt.. PPeeooppllee uussee tthhee CCoommmmoonn PPrrooppeerrttyy
RReessoouurrcceess aavvaaiillaabbllee ttoo tthheemm ffrroomm ggaauucchhaarr aanndd wwaasstteellaanndd,, ffoorr ffooddddeerr aanndd ffuueell ppuurrppoossee..
Table no.28: Dependence on Forest/CPR
Sl no Village Benefit type 1 Benefit type 2 Benefit type 2
Total income % sells Income % sells Income % sells Income
1 Aboch N A
2 Bhungaliya N A
3 Dandiyapur N A
4 Khanpur N A
5 Kotwalana na muvada
N A
6 Ladujina muvada
N A
7 Lalpur(Nirmali) N A
8 Pathoda N A
9 Suki N A
10 Sulatanpur (Taiyabpura)
N A
11 Vaghas N A
12 Vyas vasana N A
13 Zanda N A
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 54
Table no. 29: Livelihood pattern (Occupational distribution)
Sl no Village Total
workforce Agriculture
Animal husbandry
(AH)
Agriculture + AH
Casual labour
Services Handicraft Others
1 Aboch 1047 500 50 450 26 20 0 1
2 Bhungaliya 1600 240 540 680 115 15 0 10
3 Dandiyapur 368 150 80 110 20 2 0 6
4 Khanpur 262 116 15 95 13 3 0 20
5 Kotwalana na muvada 527 250 6 206 58 2 0 5
6 Ladujina muvada 283 105 3 112 45 10 0 8
7 Lalpur(Nirmali) 637 300 10 300 15 8 0 4
8 Pathoda 306 65 50 110 71 5 0 5
9 Suki 847 400 10 400 16 12 0 9
10 Sulatanpur (Taiyabpura) 627 300 25 275 18 6 0 3
11 Vaghas 0 0 0 0 0 0 0 0
12 Vyas vasana 851 350 50 250 161 25 0 15
13 Zanda 1369 550 60 550 127 60 0 22
Total 8724 3326 899 3538 685 168 0 108
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 55
Figure 6: Livelihood pattern (Occupational distribution) of the project area. 3.5. Comparative data of the crop productivity of the area: project area vs. District vs. State vs. Country vs. World ““TThhee tteerrmm pprroodduuccttiivviittyy iinn ggeenneerraall mmeeaannss tthhee ttoottaall oouuttppuutt ppeerr uunniitt ooff ffaaccttoorr iinnppuutt.. FFoorr eexxaammppllee llaanndd pprroodduuccttiivviittyy mmeeaannss oouuttppuutt ppeerr hheeccttaarree ooff
llaanndd.. PPrroodduuccttiivviittyy iiss aann aavveerraaggee aanndd iiss ccaallccuullaatteedd bbyy ddiivviiddiinngg tthhee ttoottaall oouuttppuutt ooff aa ppaarrttiiccuullaarr ccrroopp bbyy tthhee ttoottaall ccuullttiivvaatteedd aarreeaa uunnddeerr tthhaatt ccrroopp..””
DDaattaa iiss mmaaddee aavvaaiillaabbllee bbyy tthhee BBaasseelliinnee ssuurrvveeyy ((ooff aallll tthhiirrttyynn vviillllaaggeess)),, HHaannddbbooookk ooff AAggrriiccuullttuurree,, IICCAARR ppuubblliiccaattiioonn 22000066 ((FFoorr GGuujjaarraatt aanndd IInnddiiaa)),,
aanndd FFiinnaall ddiissttrriicctt ppllaann ((DDAAPP)) ooff DDeepptt.. ooff AAggrriiccuullttuurree ((ffoorr KKhheeddaa)).. TThhee rreessuullttss iinnddiiccaattee tthhaatt ((IIWWMMPP--1122)) VVaagghhaass WWaatteerrsshheedd PPrroojjeecctt vviillllaaggeess hhaavvee
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 56
vveerryy llooww pprroodduuccttiivviittyy ccoommppaarreedd ttoo IInnddiiaa,, GGuujjaarraatt aanndd KKhheeddaa.. TThhee pprroodduuccttiivviittyy iiss llooww nnoott oonnllyy bbeeccaauussee tthhaatt tthhee ffaarrmmeerr’’ss llaacckk ooff sskkiillllss ttoo mmaannaaggee
tthheeiirr ccrroopp bbuutt aallssoo dduuee ttoo llaacckk ooff ssoouurrccee ooff iirrrriiggaattiioonn aanndd ssccaarrcciittyy ooff rraaiinn..
MMoosstt ooff tthhee ffaarrmmeerrss ggrrooww ccrroopp aaccccoorrddiinngg ttoo tthhee rraaiinnffaallll aass tthheeyy mmoossttllyy ddeeppeenndd oonn tthhee rraaiinnffaallll ffoorr tthhee aaggrriiccuullttuurree.. IIff tthheeyy ggeett ggoooodd rraaiinnffaallll tthheeyy
hhaavvee hhiigghh yyiieelldd ccoommppaarreedd ttoo iinn ccaassee ooff ssccaarrcciittyy ooff rraaiinn..
TThhee pprroodduuccttiivviittyy ooff ccoottttoonn iinn IInnddiiaa iiss 552266 kkgg//hhaa,, wwhheerreeaass tthhee pprroodduuccttiivviittyy iinn GGuujjaarraatt iiss 663333 kkgg//hhaa wwhhiicchh iiss vveerryy hhiigghh ccoommppaarreedd ttoo tthhee IInnddiiaa’’ss
pprroodduuccttiivviittyy.. PPrroojjeecctt aarreeaa hhaass tthhee pprroodduuccttiivviittyy ooff 338822..66 kkgg//hhaa ccoommppaarreedd ttoo 668800 kkgg//hhaa ooff tthhee ddiissttrriicctt.. IItt iiss vveerryy llooww ccoommppaarree ttoo ddiissttrriicctt,, SSttaattee
aanndd IInnddiiaa..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 57
SSiimmiillaarrllyy,, tthhee pprroodduuccttiivviittyy ooff wwhheeaatt,, bbaajjaarraa aanndd mmaaiizzee iinn IInnddiiaa iiss 22889911 kkgg//hhaa,, 11113344 kkgg//hhaa aanndd 22335555 kkgg//hhaa rreessppeeccttiivveellyy.. wwhheerreeaass tthhee
pprroodduuccttiivviittyy iinn GGuujjaarraatt iiss 22445500 kkgg//hhaa,, 11007733 kkgg//hhaa aanndd 11448811 kkgg//hhaa rreessppeeccttiivveellyy wwhhiicchh iiss llooww ccoommppaarreedd ttoo tthhee IInnddiiaa’’ss pprroodduuccttiivviittyy.. PPrroojjeecctt aarreeaa
hhaass tthhee pprroodduuccttiivviittyy ooff 227755..4433 kkgg//hhaa,, 224455..33 kkgg//hhaa aanndd 119933..2233 kkgg//hhaa rreessppeeccttiivveellyy ccoommppaarreedd ttoo 22550000 kkgg//hhaa,, 22000000 kkgg//hhaa aanndd 11550000 kkgg//hhaa
rreessppeeccttiivveellyy ooff tthhee ddiissttrriicctt.. IItt iiss vveerryy llooww ccoommppaarree ttoo ddiissttrriicctt,, SSttaattee aanndd IInnddiiaa..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 58
Vaghas project has low productivity because of following reason:
1 Traditional old Farming Method:
FFaarrmmeerrss ooff ((IIWWMMPP--1122)) VVaagghhaass WWaatteerrsshheedd PPrroojjeecctt aarreeaa mmoossttllyy uussee oolldd ttrraaddiittiioonnaall ffaarrmmiinngg mmeetthhoodd.. DDuuee ttoo llaakkee ooff aawwaarreenneessss tthheeyy aarree nnoott
ssuussssiittaabbllee ttoo tthhee uussee nneeww tteecchhnnoollooggyy aanndd hhiigghh yyiieelldd vvaarriieettiieess ooff ccrroopp,, wwhhiicchh rreessuulltt iinn llooww yyiieellddiinngg ccaappaacciittyy..
2 Soil erosion:
DDuuee ttoo tthhee uunndduullaattiinngg llaanndd,, eerroossiioonn ooff tthhee ssooiill iiss vveerryy hhiigghh.. SSoo ttoopp llaayyeerr ooff tthhee ssooiill// ffeerrttiillee ssooiill iiss eerrooddeedd..
3 Dependency on monsoon:
VViillllaaggeess iinn ((IIWWMMPP--1122)) VVaagghhaass WWaatteerrsshheedd PPrroojjeecctt aarree mmoossttllyy ddeeppeennddeenntt oonn mmoonnssoooonn.. WWaatteerr iiss eesssseennttiiaall iinnppuutt iinn aaggrriiccuullttuurree.. DDuuee ttoo tthhee llaakkee ooff
iirrrriiggaattiioonn ffaacciilliittiieess aanndd uunncceerrttaaiinn mmoonnssoooonn aanndd hhiigghh tteemmppeerraattuurree vvaarriiaattiioonn rreessuullttss iinn llooww pprroodduuccttiivviittyy ooff tthhee aarreeaa.. TThheerreeffoorree,, tthhee ssuucceeeessss oorr
ffaaiilluurree ooff tthhee mmoonnssoooonn ddeetteerrmmiinneess tthhee ssuucccceessss oorr ffaaiilluurree ooff aaggrriiccuullttuurree pprroodduuccttiioonn iinn tthhee aarreeaa..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 59
4 Lack of adequate farm machinery:
EEvveenn ttooddaayy aa llaarrggee nnuummbbeerr ooff ffaarrmmeerrss iinn vviillllaaggeess ooff ((IIWWMMPP--1122)) VVaagghhaass WWaatteerrsshheedd PPrroojjeecctt uussee oolldd ttrraaddiittiioonnaall pprraaccttiisseess ffoorr ccuullttiivvaattiioonn ooff tthheeiirr
llaanndd wwhhiicchh rreeqquuiirreedd mmuucchh lloonnggeerr ppeerriioodd,, eevveenn ffoorr wweeeeddiinngg tthheeiirr ffiieelldd iiss ddoonnee mmaannuuaallllyy.. TThhiiss pprraaccttiissee iiss dduuee ttoo llaakkee ooff aawwaarreenneessss iiff pprrooppeerr
ddeemmoonnssttrraattiioonn aanndd aawwaarreenneessss ccrreeaatteedd aanndd sshhoowwnn mmaayy iinnccrreeaassee tthhee pprroodduuccttiivviittyy..
5 Lack of finances for farmers:
TThhee vviillllaaggeess iinn ((IIWWMMPP--1122)) VVaagghhaass WWaatteerrsshheedd PPrroojjeecctt aarreeaa,, ppooppuullaattiioonn iiss mmoossttllyy BBPPLL,, ffaarrmmeerrss aarree mmaarrggiinnaall aanndd ssmmaallll.. HHaass hhiigghh nnuummbbeerr ooff
llaannddlleessss ppooppuullaattiioonn aass aa rreessuulltt ooff ppoovveerrttyy aanndd llaakkee ooff ffiinnaannccee rreessoouurrcceess,, tthhee ffaarrmmeerrss aarree iinnccaappaabbllee ooff ppuurrcchhaassiinngg hhiigghh ccoosstt tteecchhnniiqquuee pprroovviiddiinngg
lliinnkkaaggeess ffoorr bbeetttteerr ffiinnaanncceess ffrroomm bbaannkkss aanndd ootthheerr ggoovveerrnnmmeenntt iinnssttiittuuttiioonn mmaayy hheellpp tthheemm..
6 Limited irrigation facilities:
TThheerree aarree nnoo bbiigg ddaamm aanndd ccaannaallss iinn tthhee pprroojjeecctt aarreeaa ffoorr iirrrriiggaattiioonn tthheeyy hhaavvee ttoo ddeeppeenndd oonn llooccaall rreessoouurrcceess .. MMoonnssoooonn iiss vvoonnrraabbllee aanndd eevveerryy
ffoorrtthh hhoouurr iiss aa ddrroouugghhtt.. TTooppooggrraapphhyy ooff tthhee aarreeaa iiss uunndduullaattiinngg ssooiill,, rruunn--ooffff iiss vveerryy hhiigghh.. SSooiill ddeepptthh iiss llooww rreetteennccaattiioonn ccaappaacciittyy bbeeiinngg llooww aanndd
aavvaaiillaabbllee wwaatteerr ccoonnsseerrvvaattiioonn ssttrruuccttuurreess aarree eeiitthheerr lleessss iinn nnuummbbeerr oorr,, eexxiissttiinngg ssttrruuccttuurree aarree eeiitthheerr aarree iinn vveerryy bbaadd ccoonnddiittiioonnss oorr hhaavvee bbeeeenn
ttoottaallllyy ddaammaaggeedd.. SSoo iirrrriiggaattiioonn ffaacciilliittyy iiss vveerryy llooww iinn tthhee pprroojjeecctt aarreeaa.. FFaarrmmeerrss hhaavvee ttoo ddeeppeenndd oonn rraaiinn ffoorr pprroodduuccttiioonn iinn tthheeiirr ffiieellddss..
7 Ground water table low:
DDuuee ttoo uunndduullaattiinngg tteerrrraaiinn,, lleessss rraaiinn ffaallll,, nnoo bbiigg ddaammss oorr ccaannnnaallss,, aabbsseenncceess ooff wwaatteerr hhaarrvveessttiinngg ssttrruuccttuurree aanndd hhiigghh rruunn--ooffff dduurriinngg mmoonnssoooonn hhaass
rreessuulltteedd iinn ssooiill eerrrroossiioonn rreessuullttiinngg ttoo lloowweerr mmooiissttuurree rreetteennttiioonn ccaappaacciittyy ooff tthhee ssooiill dduuee ttoo wwhhiicchh tthhee ggrroouunndd wwaatteerr ttaabbllee ooff tthhee vviillllaaggeess iiss vveerryy
llooww..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 60
Chapter - 4 Watershed Activities
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 61
Watershed Activities
WWaatteerrsshheedd mmaannaaggeemmeenntt aass aa ssttrraatteeggyy hhaass bbeeeenn aaddoopptteedd bbyy GGoovveerrnnmmeenntt ooff IInnddiiaa eessppeecciiaallllyy iinn tthhee rraaiinn--ffeedd rreeggiioonnss ooff sseemmii--aarriidd ttrrooppiiccss..
TThheessee rreeggiioonnss aarree cchhaarraacctteerriizzeedd bbyy llooww aanndd uunnddeeppeennddaabbllee rraaiinn,, llooww ssooiill ffeerrttiilliittyy,, ppoooorr iinnffrraassttrruuccttuurree ddeevveellooppmmeenntt,, llooww lliitteerraaccyy aanndd hhiigghh
iinncciiddeennccee ooff mmiiggrraattiioonn.. SSeevveerraall ssttuuddiieess hhaavvee iiddeennttiiffiieedd tthhaatt tthheerree iiss aa ddiirree nneeeedd ooff aa ssyysstteemmaattiicc aanndd sscciieennttiiffiicc aapppprrooaacchh ttoo ddeeaall wwiitthh wwaatteerrsshheedd
ddeevveellooppmmeenntt.. TThhee ccoommmmoonn gguuiiddeelliinneess ggeenneerraattee aa ffrreesshh aanndd fflleexxiibbllee ffrraammeewwoorrkk ffoorr tthhee nneexxtt ggeenneerraattiioonn wwaatteerrsshheedd ddeevveellooppmmeenntt..
4.1. Scientific Planning:
i) Cluster Approach
TThhiiss eennvviissaaggeess aa bbrrooaaddeerr vviissiioonn ooff GGeeoo--hhyyddrroollooggiiccaall uunniitt wwhhiicchh iinnvvoollvveess ttrreeaattiinngg aa cclluusstteerr ooff mmiiccrroo--wwaatteerrsshheedd.. TThhee VVaagghhaass
PPrroojjeecctt ccoonnssiissttss ooff eelleevvaann mmiiccrroo-- wwaatteerrsshheeddss F2B5a2a,2B5a2B,5F2B5a2c,5F2B5a1b,5F2B5b1a,F2B5b1b, B5b1c,
F2B5b1d, F2B5b1d ,5F2B5a2a, F2B5b1d/5F2B5b1b 5F2B5b1b,F2B5a2c nnaammeellyy aass tthheeiirr rreessppeeccttiivvee ccooddeess..
ii) Base line Survey
TToo aacccceessss tthhee iimmppaacctt ooff aannyy wwaatteerrsshheedd ddeevveellooppmmeenntt pprrooggrraammmmee aa ddeettaaiilleedd bbaasseelliinnee ssuurrvveeyy hhaass ttoo bbee ccoonndduucctteedd.. TThhiiss aaccttss aa
bbeenncchhmmaarrkk ffoorr aannyy iinntteerrvveennttiioonn dduurriinngg aanndd ppoosstt iimmpplleemmeennttaattiioonn ooff aannyy ddeevveellooppmmeenntt pprrooggrraammmmee.. AA ddeettaaiilleedd bbaasseelliinnee ssuurrvveeyy wwaass
uunnddeerrttaakkeenn wwhhiicchh iinnvvoollvveedd hhoouusseehhoolldd cceennssuuss ssuurrvveeyy,, BBiioo--pphhyyssiiccaall ssuurrvveeyy aanndd VViillllaaggee lleevveell ddaattaa ccoolllleeccttiioonn ffrroomm TTaallaattii ––ccuumm
mmaannttrrii.. HHoouusseehhoolldd cceennssuuss ssuurrvveeyy iinncclluuddeess aa ddeettaaiilleedd qquueessttiioonnnnaaiirree wwhhiicchh wwaass ffiilllleedd uupp bbyy vviissiittiinngg eeaacchh aanndd eevveerryy hhoouusseehhoolldd iinn
tthhee vviillllaaggee.. TThhiiss pprroovviiddeedd tthhee ddeettaaiillss ooff tthhee ddeemmooggrraapphhiicc pprrooffiillee ooff tthhee vviillllaaggee,, tthhee lliitteerraaccyy ppeerrcceennttaaggee,, SSCC//SSTT ppooppuullaattiioonn,, nnuummbbeerr
ooff BBPPLL hhoouusseehhoolldd,, ccaattttllee ppooppuullaattiioonn,, nneett ccoonnssuummppttiioonn rraattee iinn tthhee vviillllaaggee,, aavveerraaggee mmiillkk pprroodduuccttiioonn ooff tthhee ccaattttllee aanndd vvaarriioouuss
sscchheemmeess rruunnnniinngg aanndd tthheeiirr bbeenneeffiittss BBiioo--pphhyyssiiccaall ssuurrvveeyy wwaass uunnddeerrttaakkeenn ttoo iiddeennttiiffyy vvaarriioouuss nnaattuurraall rreessoouurrcceess aavvaaiillaabbllee iinn tthhee vviillllaaggee.. IItt iinncclluuddeedd tthhee ssooiill ttyyppoollooggyy,,
wweellll iinn tthhee aarreeaa,, ccrroopp rraaiisseedd iinn tthhee ffiieelldd,, CCrrooppppiinngg ppaatttteerrnn,, ffeerrttiilliizzeerr uusseedd aanndd vvaarriioouuss ssoouurrcceess ooff iirrrriiggaattiioonn iinn tthhee ffiieelldd..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 62
iiiiii)) PPaarrttiicciippaattoorryy RRuurraall AApppprraaiissaall ((PPRRAA))
TThhee ppaasstt eexxppeerriieennccee ooff wwaatteerrsshheedd hhaass ggiivveenn ttrreemmeennddoouuss iinnppuutt ttoo ffooccuuss oonn ccrreeaattiinngg aaccccoouunnttaabbiilliittyy ooff tthhee ssttaakkeehhoollddeerrss ttoowwaarrddss tthhee
pprrooggrraammmmee.. TThhiiss hhaass ccrreeaatteedd aann eemmpphhaassiiss ttoo iinncclluuddee aallll tthhee ssttaakkeehhoollddeerr ccoommmmuunniittiieess aanndd tthheeiirr llooccaall aanndd IInnddiiggeennoouuss
TTeecchhnnoollooggiiccaall KKnnoowwlleeddggee ((IITTKK)) wwhhiillee ppllaannnniinngg ffoorr aannyy aaccttiivviittyy.. PPaarrttiicciippaattoorryy aapppprrooaacchh pprroovviiddeess aa nneeww ppaatthh ffoorr ppllaannnniinngg,,
iimmpplleemmeennttiinngg,, mmoonniittoorriinngg aanndd ppoosstt-- wwiitthhddrraawwaall aaccttiivviittiieess wwiitthh aa ccoommpplleettee aaccccoouunnttaabbiilliittyy ooff tthhee ssttaakkeehhoollddeerrss.. VVaarriioouuss PPRRAA
tteecchhnniiqquueess lliikkee rreessoouurrccee mmaappppiinngg,, ssoocciiaall mmaappppiinngg,, aanndd sseeaassoonn ccaalleennddaarrss wweerree uusseedd ttoo uunnddeerrssttaanndd tthhee pphhyyssiiccaall aanndd ssoocciiaall
oorriieennttaattiioonn ooff tthhee vviillllaaggee iinn ggeenneerraall aanndd wwaatteerrsshheedd iinn ssppeecciiffiicc.. TThheessee ttoooollss ppuutt tthhee vviillllaaggeerrss iinn eeaassee tthhaann tthhee ccoommpplliiccaatteedd
qquueessttiioonnnnaaiirreess.. VVaarriioouuss ttoooollss lliikkee MMaattrriixx rraannkkiinngg,, VVeennnn DDiiaaggrraamm wweerree uusseedd ttoo iiddeennttiiffyy vvaarriioouuss llooccaall vveeggeettaattiioonnss ((aapptt ffoorr
aaffffoorreessttaattiioonn)) ,, FFooddddeerrss ccrrooppss ,, vvaarriioouuss iinnssttiittuuttiioonn aanndd tthheeiirr ssiiggnniiffiiccaannccee iinn tthhee lliiffee ooff tthhee ffaarrmmeerrss
iv) Use of GIS and Remote Sensing for planning
UUssee ooff vvaarriioouuss hhiigghh sscciieennccee ttoooollss hhaass bbeeeenn pprroommootteedd aatt vvaarriioouuss ssttaaggeess ooff wwaatteerrsshheedd
ddeevveellooppmmeenntt..
aa)) PPrriioorriittiizzaattiioonn
GGeeooggrraapphhiiccaall IInnffoorrmmaattiioonn SSyysstteemm ((GGIISS)) hhaass bbeeeenn uusseedd ffoorr pprriioorriittiizzaattiioonn pprroocceessss.. VVaarriioouuss llaayyeerr mmaappss wweerree ccrreeaatteedd lliikkee GGeeoo--
mmoorrpphhoollooggiiccaall,, SSooiill,, BBPPLL PPooppuullaattiioonn,, SSCC//SSTT ppooppuullaattiioonn,, GGrroouunndd wwaatteerr SSttaattuuss,, DDrriinnkkiinngg wwaatteerr ssiittuuaattiioonn,, SSllooppee ppeerrcceenntt.. PPrrooppeerr wweeiigghhttaaggee
wwaass ggiivveenn ttoo tthheessee ffaaccttoorrss aaccccoorrddiinngg ttoo tthhee DDooLLRR ssppeecciiffiiccaattiioonn.. TThhiiss hheellppeedd iinn pprriioorriittiizzaattiioonn ooff vvaarriioouuss wwaatteerrsshheedd aarreeaass..
b) Planning
AA aaccttiioonn ppllaann mmaattrriixx wwaass ffoorrmmuullaatteedd bbyy SSttaattee LLeevveell NNooddaall AAggeennccyy ((SSLLNNAA)) ttaakkiinngg iinnttoo aaccccoouunntt vvaarriioouuss ffeeaattuurreess lliikkee tthhee ssllooppee ppeerrcceenntt,, ssooiill
DDeepptthh,, SSooiill TTeexxttuurree,, SSooiill eerroossiioonn iinn tthhee aarreeaa ooff wwaasstteellaanndd,, ffoorreesstt llaanndd aanndd aaggrriiccuullttuurraall llaanndd.. GGlloobbaall ppoossiittiioonniinngg SSyysstteemm ((GGPPSS)) wwaass uusseedd ttoo
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 63
iiddeennttiiffyy eeaacchh aanndd eevveerryy wwaatteerr ccoonnsseerrvvaattiioonn ssttrruuccttuurreess aavvaaiillaabbllee iinn tthhee pprroojjeecctt aarreeaa.. TThhiiss wwaass uusseedd ttoo ccrreeaattee aa mmaapp.. CCoonnttoouurr MMaapp ooff
vveerrttiiccaall iinntteerrvvaall ooff 11 mmeetteerr aatt aa ssccaallee ooff 11::88000000 wwaass uusseedd ffoorr iiddeennttiiffyyiinngg vvaarriioouuss llooccaattiioonnss ffoorr ssooiill aanndd wwaatteerr ccoonnsseerrvvaattiioonn ssttrruuccttuurreess..
Hydrological modelling
HHyyddrroollooggyy mmooddeelllliinngg tteecchhnniiqquuee wwaass uusseedd ffoorr llooccaattiinngg ddrraaiinnaaggee,, ssttrreeaamm lleennggtthh,, ffllooww ddiirreeccttiioonn,, ssiinnkk,, FFllooww aaccccuummuullaattiioonn.. TThhiiss mmooddeell
oovveerrllaaiidd oovveerr ccaaddaassttrraall mmaapp ttoo ccaallccuullaattee tthhee ccaattcchhmmeenntt aarreeaa ooff eeaacchh ssttrruuccttuurreess lliikkee tthhee cchheecckk ddaamm eettcc.. TThhiiss hhaass hheellppeedd ttoo rreemmoovvee tthhee
hhuummaann eerrrroorr wwhhiicchh ggeenneerraallllyy ooccccuurrss wwhhiillee ccaallccuullaattiinngg tthhee ccaattcchhmmeenntt aarreeaa ooff aa cchheecckk ddaamm..
Table no. 30: Details of Scientific Planning and Inputs in IWMP projects
S. No. Scientific criteria/ inputs used Whether scientific criteria was
used
(A) Planning
Cluster approach Yes
Whether technical back-stopping for the project has been arranged? If yes, mention the name of the Institute
Baseline survey Yes
Hydro-geological survey Yes
Contour mapping Yes
Participatory Net Planning (PNP) Yes
Remote sensing data-especially soil/ crop/ run-off cover Yes
Ridge to Valley treatment Yes
Online IT connectivity between
(1) Project and DRDA cell/ZP Yes
(2) DRDA and SLNA Yes
(3) SLNA and DoLR Yes
Availability of GIS layers Yes
1. Cadastral map Yes
2. Village boundaries Yes
3. Drainage Yes
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 64
4. Soil (Soil nutrient status) Yes
5. Land use Yes
6. Ground water status Yes
7. Watershed boundaries Yes
8. Activity Yes
Crop simulation models# No
Integrated coupled analyzer/ near infrared visible spectroscopy/ medium spectroscopy for high speed soil nutrient analysis
No
Normalized difference vegetation index (NDVI)# No
Weather Station
No
(B) Inputs
1. Bio-pesticides No
2. Organic manures Yes
3. Vermicompost Yes
4. Bio-fertilizer Yes
5. Water saving devices No
6. Mechanized tools/ implements Yes
7. Bio-fencing Yes
8. Nutrient budgeting No
9. Automatic water level recorders & sediment samplers No
Any other (please specify) No
#NDVI - Ratio of the differences of the response of vegetation in the near infrared & red regions of the electromagnetic spectrum
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 65
44..22.. IInnssttiittuuttiioonn bbuuiillddiinngg ii)) WWaatteerrsshheedd CCoommmmiitttteeee ((WWCC))
IItt iiss aa ccoommmmiitttteeee tthhaatt iiss ccoonnssttiittuutteedd iinn GGrraamm SSaabbhhaa ttoo iimmpplleemmeenntt tthhee wwaatteerrsshheedd pprroojjeecctt wwiitthh tteecchhnniiccaall ssuuppppoorrtt ooff WWDDTT iinn tthhee vviillllaaggee..
TThhiiss ccoommmmiitttteeee iiss rreeggiisstteerreedd uunnddeerr ssoocciieettyy RReeggiissttrraattiioonn AAcctt 11886600.. TThhee GGrraamm SSaabbhhaa ooff tthhee vviillllaaggee sseelleeccttss tthhee cchhaaiirrmmaann ooff tthhee wwaatteerrsshheedd
ccoommmmiitttteeee wwiitthh tthhee sseeccrreettaarryy wwhhoo wwiillll bbee aa hhoouunnaarraallllyy ppaaiidd,, aanndd wwiillll rreessppoonnssiibbllee ffoorr mmaaiinnttaaiinn aallll rreeccoorrddss aatt tthhee vviillllaaggee lleevveell.. AA
wwaatteerrsshheedd CCoommmmiitttteeee ffoorrmmuullaattiioonn wwiillll bbee ddoonnee aass ppeerr tthhee gguuiiddeelliinnee aanndd wwiillll bbee ffoorrmmeedd aaccccoorrddiinnggllyy iinn ((IIWWMMPP--1122)) VVaagghhaass pprroojjeecctt
vviillllaaggeess.. TThhee WWaatteerrsshheedd CCoommmmiitttteeee ((WWCC)) wwiillll ccoommpprriissee ooff aatt lleeaasstt 1100 mmeemmbbeerrss,, hhaallff ooff tthhee mmeemmbbeerrss sshhaallll bbee rreepprreesseennttaattiivveess ooff SSHHGGss aanndd UUsseerr
GGrroouuppss,, SSCC//SSTT ccoommmmuunniittyy,, wwoommeenn aanndd llaannddlleessss ppeerrssoonnss iinn tthhee vviillllaaggee.. OOnnee mmeemmbbeerr ooff tthhee WWDDTT sshhaallll aallssoo bbee rreepprreesseenntteedd iinn tthhee WWaatteerrsshheedd
CCoommmmiitttteeee ((WWCC)).. CCaappaacciittyy bbuuiillddiinngg ttrraaiinniinngg ttoo tthhee wwaatteerrsshheedd ccoommmmiitttteeee iiss ggiivveenn bbyy WWDDTT ((CCMM)) rreessppeeccttiivveellyy..
TThhee wwaatteerrsshheedd ccoommmmiitttteeee hhaass aa ppiivvoottaall rroollee ttoo ppllaayy dduurriinngg aanndd aafftteerr tthhee pprroojjeecctt iimmpplleemmeennttaattiioonn ppeerriioodd..
Table no.31.1: Details of PRA Activities conducted in the project area
Sr.
No.
Village
Name
Name of the PRA Activity /
FGD Date
Number of
people
present
Lessons learnt / Understanding of the problem/situation
1
Aboch
Village Map
08/12/2012 84
Chapatti Map Water Which is use in Agriculture
Seasons circle Map Employment Facility is not available
Map of Lendless,SF,MF,LF Grass Problem which is not available as much for animal
Map of Resource which is
available in village Less Literacy rate in Village
Daily activity of man and
female Camp of animal husbandry arrangement is less
Transect Work There is no facility available for medical treatment
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 66
Table no.31.2: Details of PRA Activities conducted in the project area
Sr. No.
Village Name
Name of the PRA Activity / FGD
Date Number of
people present
Lessons learnt / Understanding of the problem/situation
2 Bhungliya
Village Map
08/12/2012 76
Chapatti Map Labour rate is less
Seasons circle Map
Fertilizer and Seeds bay from Outside
Map of Lendless,SF,MF,LF
Soil Erosion
Map of Resource which is available
in village Doctor is not come at primary health centre
Daily activity of man and female
Anganvadi House is not available
Transect Work Drinking Water Tank is Damage
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 67
Table no.31.3: Details of PRA Activities conducted in the project area
Sr. No.
Village Name
Name of the PRA Activity / FGD
Date Number of people present
Lessons learnt / Understanding of the problem/situation
3
Dadiyapur
Village Map
04/02/2012 66
Chapatti Map Grass Problem which is not available as much for animal
Seasons circle Map
Soil Erosion
Map of Lendless,SF,MF,LF
Employment Facility Which is not available
Map of Resource which is available in village
Water Which is not available for Agriculture as well as livestock
Daily activity of man and female
Less Literacy Rate
Transect Work
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 68
Table no.31.4: Details of PRA Activities conducted in the project area
Sr.
No.
Village Name
Name of the PRA
Activity / FGD Date
Number of
people
present
Lessons learnt / Understanding of the problem/situation
4 Khanpur
Village Map
22/12/2012
54
Chapatti Map Water Which is not available for Agriculture as well as livestock
Seasons circle
Map Employment Facility Which is not available
Map of
Lendless,SF,MF,LF Soil Erosion
Map of Resource
which is available
in village
Less Literacy Rate
Daily activity of
man and female There is no facility available for medical treatment
Transect Work
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 69
Table no.31.5: Details of PRA Activities conducted in the project area
Sr.
No.
Village Name
Name of the PRA
Activity / FGD Date
Number of
people
present
Lessons learnt / Understanding of the problem/situation
5 Kotwalna muvada
Village Map
31/12/2012 46
Chapatti Map Water Which is not available for Agriculture as well as livestock
Seasons circle
Map Employment Facility Which is not available
Map of
Lendless,SF,MF,LF Road Facility is not available
Map of Resource
which is available
in village
Less Literacy Rate
Daily activity of
man and female Smashan Facility is not available
Transect Work Grass Problem which is not available as much for animal
Camp of animal husbandry arrangement is less
Soil Erosion
There is no facility available for medical treatment
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 70
Table no.31.6: Details of PRA Activities conducted in the project area
Sr.
No.
Village Name
Name of the PRA
Activity / FGD Date
Number of
people
present
Lessons learnt / Understanding of the problem/situation
6
Laduji na muvada
Village Map
23/01/2012 79
There is no facility available for medical treatment
Chapatti Map There is no facility available for medical treatment
Seasons circle
Map Drinking Water
Map of
Lendless,SF,MF,LF Water Which is not available for Agriculture as well as livestock
Map of Resource
which is available
in village
Less Literacy Rate
Daily activity of
man and female Employment Facility Which is not available
Transect Work Camp of animal husbandry arrangement is less
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 71
Table no.31.7: Details of PRA Activities conducted in the project area
Sr.
No.
Village Name
Name of the PRA
Activity / FGD Date
Number of
people
present
Lessons learnt / Understanding of the problem/situation
7
Lalpur (nirmali)
Village Map
29/12/2012 83
Chapatti Map Water Which is not available for Agriculture as well as livestock
Seasons circle
Map Soil Erosion
Map of
Lendless,SF,MF,LF Less Literacy Rate
Map of Resource
which is available
in village
Employment Facility Which is not available
Daily activity of
man and female Productivity is less in Agriculture
Transect Work
Camp of animal husbandry arrangement is less
Road Facility is not available
Electricity Problem
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 72
Table no.31.8: Details of PRA Activities conducted in the project area
Sr.
No.
Village Name
Name of the PRA
Activity / FGD Date
Number of
people
present
Lessons learnt / Understanding of the problem/situation
8 Pathoda
Village Map
31/12/2012 98
Chapatti Map Drinking Water
Seasons circle
Map Water Which is not available for Agriculture as well as livestock
Map of
Lendless,SF,MF,LF Pond Deeping
Map of Resource
which is available
in village
Smashan Facility is not available
Daily activity of
man and female Less Literacy Rate
Transect Work Outsources say pig and any other which are harmful for agriculture
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 73
Table no.31.9: Details of PRA Activities conducted in the project area
Sr.
No.
Village Name
Name of the PRA
Activity / FGD Date
Number of
people
present
Lessons learnt / Understanding of the problem/situation
9
Suki
Village Map
28/12/2012 54
Chapatti Map Drinking Water
Seasons circle
Map Water Which is not available for Agriculture as well as livestock
Map of
Lendless,SF,MF,LF Less A forestation Rate
Map of Resource
which is available
in village
Smashan Facility is not available
Daily activity of
man and female Less Literacy Rate
Transect Work
Employment Facility Which is not available
Camp of animal husbandry arrangement is less
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 74
Table no.31.10: Details of PRA Activities conducted in the project area
Sr.
No.
Village Name
Name of the PRA
Activity / FGD Date
Number of
people
present
Lessons learnt / Understanding of the problem/situation
10
Sulatanpur
Village Map
28/12/2012 61
Chapatti Map Drinking Water
Seasons circle
Map Water Which is not available for Agriculture as well as livestock
Map of
Lendless,SF,MF,LF Soil Erosion
Map of Resource
which is available
in village
Less Literacy Rate
Daily activity of
man and female Employment Facility Which is not available
Transect Work Camp of animal husbandry arrangement is less
Road Facility is not available
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 75
Table no.31.11: Details of PRA Activities conducted in the project area
Sr.
No.
Village Name
Name of the PRA
Activity / FGD Date
Number of
people
present
Lessons learnt / Understanding of the problem/situation
11 Vaghas
22/12/2012 00
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 76
Table no.31.11: Details of PRA Activities conducted in the project area
Sr.
No.
Village Name
Name of the PRA
Activity / FGD Date
Number of
people
present
Lessons learnt / Understanding of the problem/situation
12
Vyas Vasana
Village Map
23/12/2012 74
Chapatti Map Water Which is use in Agriculture
Seasons circle
Map Employment Facility
Map of
Lendless,SF,MF,LF Road Facility is not available
Map of Resource
which is available
in village
Less Literacy Rate
Daily activity of
man and female Smashan Facility is not available
Transect Work
Grass Problem which is not available as much for animal
Camp of animal husbandry arrangement is less
Soil Erosion
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 77
Table no.31.11: Details of PRA Activities conducted in the project area
Sr.
No.
Village Name
Name of the PRA
Activity / FGD Date
Number of
people
present
Lessons learnt / Understanding of the problem/situation
13
Zanda
Village Map
27/12/2012 82
Chapatti Map Water Which is use in Agriculture
Seasons circle
Map Employment Facility
Map of
Lendless,SF,MF,LF Road Facility is not available
Map of Resource
which is available
in village
Less Literacy Rate
Daily activity of
man and female Smashan Facility is not available
Transect Work
Grass Problem which is not available as much for animal
Camp of animal husbandry arrangement is less
Soil Erosion
Note:
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 78
Figure 8: PRA in the project area.
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 79
Problem Tree Analysis for Low Agriculture Production
Low Agriculture ProductionLow Agriculture ProductionLow Agriculture ProductionLow Agriculture Production
Low Land ProductivityLow Land ProductivityLow Land ProductivityLow Land Productivity
Low water Low water Low water Low water
TableTableTableTable
LLLLess of water ess of water ess of water ess of water
conservetion conservetion conservetion conservetion
measuresmeasuresmeasuresmeasures Soil ErosionSoil ErosionSoil ErosionSoil Erosion Traditional Traditional Traditional Traditional
FarmingFarmingFarmingFarming
Less CapitalLess CapitalLess CapitalLess Capital
Small Land Small Land Small Land Small Land
HoldingHoldingHoldingHolding
Less IrrigationLess IrrigationLess IrrigationLess Irrigation
Less use of Less use of Less use of Less use of
TechnologyTechnologyTechnologyTechnology
Lack of IrrigationLack of IrrigationLack of IrrigationLack of Irrigation
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 80
Object Tree Analysis for Agriculture Production
Farm bunding, Farm bunding, Farm bunding, Farm bunding, Stone bunding etc.Stone bunding etc.Stone bunding etc.Stone bunding etc.
LaLaLaLand Improvement nd Improvement nd Improvement nd Improvement
measuresmeasuresmeasuresmeasures
Moisture index Moisture index Moisture index Moisture index
increaseincreaseincreaseincrease Adoption of New Adoption of New Adoption of New Adoption of New
TechnologiesTechnologiesTechnologiesTechnologies
BioBioBioBio---- Farming/ Farming/ Farming/ Farming/
Organic FarmingOrganic FarmingOrganic FarmingOrganic Farming
Increase per capita Income Increase per capita Income Increase per capita Income Increase per capita Income
and Employmentand Employmentand Employmentand Employment
Productivity Productivity Productivity Productivity
EnhancementEnhancementEnhancementEnhancement
Repairing and Repairing and Repairing and Repairing and construction ofconstruction ofconstruction ofconstruction of
Water bodyWater bodyWater bodyWater body
Use Water,Use Water,Use Water,Use Water, Use efficiency Use efficiency Use efficiency Use efficiency
measuresmeasuresmeasuresmeasures
Capacity Building Capacity Building Capacity Building Capacity Building
and IEC Activityand IEC Activityand IEC Activityand IEC Activity
Vermi Compost Vermi Compost Vermi Compost Vermi Compost proper proper proper proper
agro processing, agro processing, agro processing, agro processing,
intercropping, Low cost intercropping, Low cost intercropping, Low cost intercropping, Low cost
green house and othersgreen house and othersgreen house and othersgreen house and others
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 81
44..22.. IInnssttiittuuttiioonn bbuuiillddiinngg
ii)) WWaatteerrsshheedd CCoommmmiitttteeee ((WWCC)) :: IItt iiss aa ccoommmmiitttteeee tthhaatt iiss ccoonnssttiittuutteedd bbyy GGrraamm SSaabbhhaa ttoo iimmpplleemmeenntt tthhee wwaatteerrsshheedd pprroojjeecctt wwiitthh tteecchhnniiccaall ssuuppppoorrtt ooff WWDDTT iinn tthhee
vviillllaaggee.. TThhiiss ccoommmmiitttteeee iiss rreeggiisstteerreedd uunnddeerr ssoocciieettyy RReeggiissttrraattiioonn AAcctt 11886600.. TThhee GGrraamm SSaabbhhaa ooff tthhee vviillllaaggee sseelleeccttss tthhee cchhaaiirrmmaann ooff tthhee
wwaatteerrsshheedd ccoommmmiitttteeee wwiitthh tthhee sseeccrreettaarryy wwhhoo wwiillll bbee aa ppaaiidd ffuunnccttiioonnaarryy.. AA wwaatteerrsshheedd CCoommmmiitttteeee wwaass ffoorrmmeedd aaccccoorrddiinnggllyy iinn BBaarr
pprroojjeecctt vviillllaaggeess.. TThhee WWaatteerrsshheedd CCoommmmiitttteeee ((WWCC)) wwiillll ccoommpprriissee ooff aatt lleeaasstt 1100 mmeemmbbeerrss,, hhaallff ooff tthhee mmeemmbbeerrss sshhaallll bbee rreepprreesseennttaattiivveess ooff SSHHGGss aanndd
UUsseerr GGrroouuppss,, SSCC//SSTT ccoommmmuunniittyy,, wwoommeenn aanndd llaannddlleessss ppeerrssoonnss iinn tthhee vviillllaaggee.. OOnnee mmeemmbbeerr ooff tthhee WWDDTT sshhaallll aallssoo bbee rreepprreesseenntteedd iinn tthhee WWaatteerrsshheedd
CCoommmmiitttteeee ((WWCC)).. CCaappaacciittyy bbuuiillddiinngg ttrraaiinniinngg ttoo tthhee wwaatteerrsshheedd ccoommmmiitttteeee iiss ggiivveenn bbyy WWDDTT..
TThhee wwaatteerrsshheedd ccoommmmiitttteeee hhaass aa ppiivvoottaall rroollee ttoo ppllaayy dduurriinngg aanndd aafftteerr tthhee pprroojjeecctt iimmpplleemmeennttaattiioonn ppeerriioodd
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 82
Table no. 32.1 : Aboch Watershed Committee details
Sl. No.
Names of WCs
Date of Registratio
n as a Society
(dd/mm/ yyyy)
Name Designation
M/F
SC
ST
OB
C
Gen
eral
SF
MF
LF
Lan
d-l
ess
UG
SHG
GP
An
y ot
her
Educa-tional
qualifi-cation
Function
/s assigned#
1 Aboch
Watershed
Committee
Under Process
Rathod Laxamiben Ramanbhai
President F √
√ Literate B &
D
Vice - President
M √
√ Literate
Zala Ranjitsinh gulabsinh
Secretary M √
√ Literate C &
H
Barot Ushaben Manubhai
Member F
√ √ Literate
Bhrambhatt Maheshabhai Babubhai
Member M √
√ Illiterate
Vankar Bhartbhai Ambalala
Member M √
√ Illiterate
Prajapati Kaushikbhai Kodarbhai
Member M
√ Literate
Goswami Shushilaben Sukhadevgiri
Member F
√ √ Literate
Rathod Dilipbhai Takhatasinh
Member M
√ √ Literate
Rathod Vitthalbhai Ghelabhai
Member M √
√ Literate
Zala Kanubhai Magnabhai
Member M
√ √ Literate
Rathod Chunabhai Somabhai
Member M
√ Literate
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 83
Rathod Ramanbhai Gantabhai
Member M
√ Literate
Rohit Punjabhai Virabhai
Member M √
` Literate
Raval Raijibhai Kadabhai
Member M
√ Literate
Pranami Hiteshabhai K
Wdt Agri M √
BRS Bed
Table no. 32.2 : Bhungaliya Watershed Committee details
Sl. No.
Names of WCs
Date of Registratio
n as a Society
(dd/mm/ yyyy)
Name Designation
M/F
SC
ST
OB
C
Gen
eral
SF
MF
LF
Lan
d-l
ess
UG
SHG
GP
An
y ot
her
Educa-tional
qualifi-cation
Function
/s assi
gned#
2 Bhugadiya
Watershed Committee
Under Process
Solanki Dhudabhai Vajabhai
President M
√
Literate B &
D
Vice - President
F √
Literate
Chouhan Udesinh Badesinh
Secretary M
√
Literate C &
H
Parmar Budhaji Shelaji
Member M
√
Literate
Sharama Rameshabhai Chimanbhai
Member M √
Literate
Solanki Sangitaben Bhtabhai
Member F
√ Literate
Parmar Budhaji Shankaraji
Member M
√
Literate
Barot Dineshabhai Fakirabhai
Member M
√
Literate
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 84
Rohit harishabhai Punjabhai
Member M √
√ Literate
Patel Madhuben Devajibhai
Member F
√ √ Literate
Solanki Dinubhai Kadabhai
Member M
√
Literate
Zala Kantibhai Dahayabhai
Member M
√
Literate
Vahora Ajitbhai A
WDT Civil Engg.
M
Diploma
Civil Engg. A,B,D
,F,J
Table no. 32.3 : Dandiyapura Watershed Committee details
Sl. No.
Names of WCs
Date of Registratio
n as a Society
(dd/mm/ yyyy)
Name Designation
M/F
SC
ST
OB
C
Gen
eral
SF
MF
LF
Lan
d-l
ess
UG
SHG
GP
An
y ot
her
Educa-tional
qualifi-cation
Function
/s assigned#
3
Dandiyapu
ra Watershed Committee
Under Process
Parmar Kantibhai Shankarbhai
President M √
√ Literate B &
D
Parmar Vice - President
M √
√ Literate
Parmar Laxamanbhai Kadabhai
Secretary M √
√ Literate C &
H
PArmar Vinubhai dsakadbhai
Member M √
√ Literate
Rathod Kalabhai Ratnabhai
Member M √
√ Illiterate
Parmar Kadiben Juvansinh
Member F √
√
Parmar Taraben Karansinh
Member F √
√ √
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 85
Parmar mangadabhai Jesangbhai
Member M √
√ Literate
Parmar Mahendrbhai Aitabhai
Member M √
√ Literate
Parmar Udabhai Bababhai
Member M √
√ √ Literate
Parmar Rameshabhai Bhathibhai
Member M
√
√ Literate
Pranami Hiteshabhai K )
Member M √
√
BRS Bed A,B,D
,F,J
Table no. 32.4. : Khanpur Watershed Committee details
Sl. No.
Names of WCs
Date of Registratio
n as a Society
(dd/mm/ yyyy)
Name Designation
M/F
SC
ST
OB
C
Gen
eral
SF
MF
LF
Lan
d-l
ess
UG
SHG
GP
An
y ot
her
Educa-tional
qualifi-cation
Function
/s assigned#
4 Khanpur
Watershed Committee
Under Process
Parmar Bhavansinh Prabhatasinh
President M √
√ √ Literate B &
D
Parmar Jagdishbhai Budhabhai
Vice - President
M √
√ Literate
Parmar Kiranbhai Abhesinh
Secretary M √
√ Literate C &
H
Parmar Bhudarbhai Becharaji
Member M √
√ Literate
Parmar Shanaji Dolaji
Member M √
√ 0
Solanki Bharatbhai Kantibhai
Member M √
√ Literate
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 86
Parmar Nanajibhai Arjanji
Member M √
√ Literate
Sodha ramilaben Kesabhai
Member F √
√ Literate
Paramar Ashaben Dineshabhai
Member F √
√ Literate
Parmar Lalabhai Fulabhai
Member M √
√ Literate
Patel Daxaben M (WDT Community Mobiliser)
Member F
√
BRS MSW A,B,D
,F,J
Table no. 32.5. : KOTWALNA MUVADA Watershed Committee details
Sl. No.
Names of WCs
Date of Registratio
n as a Society
(dd/mm/ yyyy)
Name Designation
M/F
SC
ST
OB
C
Gen
eral
SF
MF
LF
Lan
d-l
ess
UG
SHG
GP
An
y ot
her
Educa-tional
qualifi-cation
Function
/s assigned#
5
Kotwalana
muvaDa
Watershed Committee
Under Process
Rathod Kailashben Dasharthabhai
President F √
√ Literate B &
D
Solanki Kanubhai MOhanbhai
Vice - President
M √
√ Literate
Solanki Ranchodbhai Jenabhai
Secretary M √
√ Literate C &
H
Solanki Kadabhai Ramanbhai
Member M √
√ Illiterate
Solanki Ghelabhai Leharabhai
Member M √
√ Literate
Solanki Laxamannbhai Kohyabhai
Member M √
√ Literate
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 87
Solanki Jashubhai Chandubhai
Member M √
√ √ Literate
Solanki Bhupatbhai Fulabhai
Member M √
√ Literate
Solanki Vinubhai Bababhai
Member M √
√ √ Literate
Solanki Khodabhai Mahijibhai
Member M √
√ Literate
Rathod Babubhai Kodarabhai
Member M √
√ Literate
Rathod Kokilaben Javanbhai
Member f
Patel Daxaben M (WDT Community Mobilizer)
Member F √
BRS, MSW A,B,D
,F,J
Table no. 32.6. : Ladujina muvada Watershed Committee details
Sl. No.
Names of WCs
Date of Registratio
n as a Society
(dd/mm/ yyyy)
Name Designation
M/F
SC
ST
OB
C
Gen
eral
SF
MF
LF
Lan
d-l
ess
UG
SHG
GP
An
y ot
her
Educa-tional
qualifi-cation
Function
/s assigned#
6
Ladujia muvada Watershed Committee
Under Process
Chouhan Dhanvantsinh
budhaji
President M √
√ Literate B &
D
Prjapati punam chand shankarbhai
Vice - President
M √
√ Literate
Chouhan Kiratkumar Dolatsinh
Secretary M √
√ Literate C &
H
Rathod Jesangbhai Shanabhai
Member M
√ Literate
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 88
Ravd Antabhai Kodarabhai
Member M √
Illiterate
Chouhan Rameshabhai
Nathabhai Member m
√ √ Illiterate
Rathod Kadabhai Revabhai
Member M √
√ √ Literate
Chouhan Kesabhai Vaghabhai
Member M √
√ Literate
Chouhan Vanitaben Hitendrbhai
Member F √
√ √ Literate
Chouhan Sudhaben digvijaysinh
Member F √
√ √ Literate
Chouhan KIritkumar Dolatsinh
Member M
√ √ Literate
Patel daxaben M . (WDT C.M .)
Member F
√
Brs/msw A,B,D
,F,J
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 89
Table no. 32.7. : LALPUR (Nirmali ) Watershed Committee details
Sl. No.
Names of WCs
Date of Registratio
n as a Society
(dd/mm/ yyyy)
Name Designation
M/F
SC
ST
OB
C
Gen
eral
SF
MF
LF
Lan
d-l
ess
UG
SHG
GP
An
y ot
her
Educa-tional
qualifi-cation
Function
/s assigned#
7
Lalpur Nirmali Watershed Committee
Under Process
Patel Rajendrbhai Trikambhai
President M
√
√ √ Literate B &
D
Rathod Punambhai Raijibhai
Vice - President
M
√
√ √ Literate
Rathod dasharthabhai
Mangalbhai Secretary M
√
√ √ Literate
C &
H
Vankar Mithabhai Revabhai
Member M √
√ √ Literate
Patel Ishwerbhai Bhagabhai
Member M
√ Literate
Valand Mahendrbhai
Jayantibhai Member M √
√
√ Literate
Patel Bhagabhai lallaubhai
Member M
√ √ Literate
Patel Jyotsanaben Subhashabhai
Member F
√ √ √ Literate
Patel raxaben Babubhai
Member F
√ Illiterate
Patel Bhavikaben Ashikbhai
Member F
√ √ Illiterate A,B,D
,F,J
Patel Bhavanaben Rajeshabhai
F
√ √
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 90
Rathod Kasdabhai Kanabhai
M
√ √
Rathod Dineshbhai Bhathibhai
M √ √
Rathod Gopalbhai Abhabhai
M √ √
Patel Daxaben M WDT C.M
F √ BRS/ MSW
Table no. 32.8. : Pathoda Watershed Committee details
Sl. No.
Names of WCs
Date of Registratio
n as a Society
(dd/mm/ yyyy)
Name Designation
M/F
SC
ST
OB
C
Gen
eral
SF
MF
LF
Lan
d-l
ess
UG
SHG
GP
An
y ot
her
Educa-tional
qualifi-cation
Function
/s assigned#
8
(IWMP-12)
Pathoda Watershed Committee
Under Process
Bihola Jashvantbhai Abhesinh
President M √
√ √ Literate B &
D
Valand Kevalabhai Abhabhai
Vice - President
M √
√ Literate
Sisodiya balavantsinh vakhatasinh
Secretary M √
√ Literate C &
H
Chouhan Bhupatbhai Ramabhai
Member M
√ √ Literate
Vankar Baladevbhai Lallaubhai
Member M √
√ Literate
Zala Lakhabhai Bhemabhai
Member M √
√ Literate
Bihola janakaben Karansinh
Member F √
√ Literate
Sisodiya Namsinh Laxamanbhai
Member M √
√ √ Literate
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 91
Chouhan Govindbhai Abhabhai
Member M √
√ √ Literate
Vahora Ajit M (WDT Civil Engg.) Member M
√
Diploma
Civil Engg.
A,B,D
,F,J
Table no. 32.9. :Pathoda Watershed Committee details
Sl. No.
Names of WCs
Date of Registration as a Society (dd/mm/
yyyy)
Name Designation
M/
F
SC
ST
OB
C
Ge
ne
ral
SF
MF
LF
La
nd
-les
s
UG
SH
G
GP
An
y o
the
r Educa-tional
qualifi-cation
Function/
s assigned#
9 Suki
Watershed Committee
Under Process
Patel Vinubhai Magabhai
President M
√ √ Literate B &
D
Patel Pareshabhai Iashwerbhai
Vice – President
M
√ √ Literate
Patel Hiteshabhai Govindabhai
Secretary M
√ √ Literate C &
H
Patel Neetaben Ravindrbhai
Member F
√ √ Literate
Patel Kokilaben Arvindbhai
Member F
√ √ √ Literate
Thakor Galabhai Ramabhai
Member M
√
√ Illiterate
Patel Nitinabhai Ramabhai
Member M
√ √ Literate
Zala Jitendrbhai Prabhatbhai
Member M
√ √ Literate
Thakor Vinubhai Ambalala
Member M
√
√ √ Literate
Patel Ashokbhai Kalidas
Member M
√
√ √ Literate
Pranami Hiteshbhai K (WDT Agri )
Member M √ BRS,Bed A,B,D
,F,J
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 92
Table no. 32.10. : Sulatanpura Watershed Committee details
Sl. No.
Names of WCs
Date of Registration as a Society (dd/mm/
yyyy)
Name Designation
M/
F
SC
ST
OB
C
Ge
ne
ral
SF
MF
LF
La
nd
-les
s
UG
SH
G
GP
An
y o
the
r Educa-tional
qualifi-cation
Function/
s assigned#
10
Sulatanpur
Taiyabpur
a Watershed Committee
Under Process
Parmar Bhavanasinh Prbhatasinh
President M
√
Literate B &
D
Sindhi Javendmiya Najiramahamad
Vice - President
M
√
Literate
Solinki Nitirajsinh Manubhai
Secretary M
√
Literate C &
H
Vankar Paulbhai Kasnabhai
Member M √
Literate
Malek Kadarmiya kalumiya
Member M
√
√ Literate
Sindhi Safimiya Gulumiya
Member M
√
Literate
Sindhi Resamabanu Fakir mahamd
Member F
√
Literate
Sindhi Mumtajbanu Abadulbhai
Member F
√
Literate
Solanki Mahendrrbhai
Bhudaraji Member M
√
√ Literate
Sindhi rahim miya nanumiya
Member M
√
√ Literate
Pranami hiteshabhai K (WDT Agri)
Member M √ BRS,MSW A,B,D
,F,J
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 93
Table no. 32.11. :Vyasavasana Watershed Committee details
Sl. No.
Names of WCs
Date of Registratio
n as a Society
(dd/mm/ yyyy)
Name Designation
M/F
SC
ST
OB
C
Gen
eral
SF
MF
LF
Lan
d-l
ess
UG
SHG
GP
An
y ot
her
Educa-tional
qualifi-cation
Function
/s assigned#
11
Vyasvasan
a
Watershed Committee
Under Process
Solanki Bhupatbhai Dahyabhai
President M √
Literate B &
D
Parmar Bhalabhai Mangalbhai
Vice - President
M √
Literate
Solanki Takhatsinh Babubhai
Secretary M √
Literate C &
H
Solanki Shivabhai Dahyabhai
Member M √
Literate
Raval Maheshbhai Ravajibhai
Member M √
√ Literate
Solanki Kailashben Bharatbhai
Member F √
Literate
Solanki Indiraben Rasikbhai
Member F √
√ Illiterate
Solanki Kariben Dhanabhai
Member F √
Illiterate
Parmar Balvantbhai Lalabhai
Member M √
√ Literate
Raval Chaganbhai Kantibhai
Member M √
√ Literate
Solanki Kanubhai Budhabhai
Member M √
Literate
Solanki Govindbhai Bhikhabhai
Member M √
Literate
Sodhaparmar Alpeshbhai R.
(WDT Civil Engg.) Member M
√
Literate A,B,D
,F,J
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 94
Table no. 32.12. :Vaghas Watershed Committee details
Sl. No.
Names of WCs
Date of Registratio
n as a Society
(dd/mm/ yyyy)
Name Designation
M/F
SC
ST
OB
C
Gen
eral
SF
MF
LF
Lan
d-l
ess
UG
SHG
GP
An
y ot
her
Educa-tional
qualifi-cation
Function
/s assigned#
11 Vghas
Watershed Committee
Under Process
Solanki Bhupatbhai Dahyabhai
President M √
Literate B &
D
Parmar Bhalabhai Mangalbhai
Vice - President
M √
Literate
Solanki Takhatsinh Babubhai
Secretary M √
Literate C &
H
Solanki Shivabhai Dahyabhai
Member M √
Literate
Raval Maheshbhai Ravajibhai
Member M √
√ Literate
Solanki Kailashben Bharatbhai
Member F √
Literate
Solanki Indiraben Rasikbhai
Member F √
√ Illiterate
Solanki Kariben Dhanabhai
Member F √
Illiterate
Parmar Balvantbhai Lalabhai
Member M √
√ Literate
Raval Chaganbhai Kantibhai
Member M √
√ Literate
Solanki Kanubhai Budhabhai
Member M √
Literate
Solanki Govindbhai Bhikhabhai
Member M √
Literate
Sodhaparmar Alpeshbhai R.
(WDT Civil Engg.) Member M
√
Literate A,B,D
,F,J
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 95
Table no. 32.13. : Zanda Watershed Committee details
Sl. No.
Names of WCs
Date of Registratio
n as a Society
(dd/mm/ yyyy)
Name Designation
M/F
SC
ST
OB
C
Gen
eral
SF
MF
LF
Lan
d-l
ess
UG
SHG
GP
An
y ot
her
Educa-tional
qualifi-cation
Function
/s assigned#
11
Zanda
Watershed Committee
Under Process
Solanki Bhupatbhai Dahyabhai
President M √
Literate B &
D
Parmar Bhalabhai Mangalbhai
Vice - President
M √
Literate
Solanki Takhatsinh Babubhai
Secretary M √
Literate C &
H
Solanki Shivabhai Dahyabhai
Member M √
Literate
Raval Maheshbhai Ravajibhai
Member M √
√ Literate
Solanki Kailashben Bharatbhai
Member F √
Literate
Solanki Indiraben Rasikbhai
Member F √
√ Illiterate
Solanki Kariben Dhanabhai
Member F √
Illiterate
Parmar Balvantbhai Lalabhai
Member M √
√ Literate
Raval Chaganbhai Kantibhai
Member M √
√ Literate
Solanki Kanubhai Budhabhai
Member M √
Literate
Solanki Govindbhai Bhikhabhai
Member M √
Literate
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 96
Sodhaparmar Alpeshbhai R.
(WDT Civil Engg.) Member M
√
Literate A,B,D
,F,J
# Only the letter assigned, as below, needs to be typed, except for `J’, where the type may be specifically mentioned. A. PNP and PRA B. Planning C. Maintenance of Accounts D. Signing of cheques and making payments E. Supervision of construction activities F. Cost Estimation G. Verification & Measurement H. Record of labour employed I. Social Audit J. Any other (please specify).
ii )Self Help Group
SSeellff HHeellpp GGrroouuppss aarree mmoottiivvaatteedd,, ssmmaallll hhoommooggeennoouuss ggrroouuppss oorrggaanniizzeedd ttooggeetthheerr tthhrroouugghh ccrreeddiitt aanndd tthhrriifftt aaccttiivviittiieess.. SSeellff hheellpp ggrroouupp
iinniittiiaattiivvee eessppeecciiaallllyy ffoorr wwoommeenn hheellpp uupplliifftt tthheeiirr lliivveelliihhoooodd.. GGeenneerraallllyy sseellff hheellpp ggrroouuppss iinncclluuddee llaannddlleessss aanndd ppoooorr wwoommeenn..
BBeeffoorree ffoorrmmaattiioonn ooff tthhee SSHHGGss,, dduurriinngg PPRRAA aaccttiivviittiieess,, FFooccuusssseedd GGrroouupp DDiissccuussssiioonnss ((FFGGDDss)) wweerree hheelldd wwiitthh tthhee wwoommeenn,, wwhhiicchh ccaammee uupp
wwiitthh tthhee ffoolllloowwiinngg oobbsseerrvvaattiioonnss::
aa)) LLaacckk ooff pprrooppeerr ccrreeddiitt ffaacciilliittiieess dduuee ttoo llooww iinntteerrvveennttiioonn ooff ffoorrmmaall ffiinnaanncciiaall ccrreeddiitt iinnssttiittuuttiioonn..
bb)) EExxcceessssiivvee eexxppllooiittaattiioonn ooff wweeaakkeerr sseeccttiioonn bbyy mmoonneeyy lleennddeerrss
cc)) LLaacckk ooff aattttiittuuddee ffoorr ssaavviinngg aammoonngg ppoooorr ppeeooppllee
dd)) LLaacckk ooff kknnoowwlleeddggee oonn ccrreeddiitt aanndd tthhrriifftt aaccttiivviittyy aanndd bbaannkkiinngg
ee)) llaacckk ooff aawwaarreenneessss ooff ddiiffffeerreenntt sscchheemmeess
WWiitthh aa ddeettaaiilleedd ddiissccuussssiioonn wwiitthh tthhee llooccaall ppeeooppllee aanndd lleeaaddeerrss ooff tthhee aarreeaa,, iitt wwaass ppllaannnneedd ttoo hhaavvee ssoommee ccaappaacciittyy bbuuiillddiinngg ttrraaiinniinngg
rreeggaarrddiinngg SSHHGG aaccttiivviittiieess.. IItt wwaass aallssoo pprrooppoosseedd ttoo hhaavvee ssoommee lliivveelliihhoooodd aaccttiivviittiieess wwhhiicchh wwiillll pprroommoottee wwoommeenn eemmppoowweerrmmeenntt aanndd eennhhaannccee
tthheeiirr lliivveelliihhoooodd pprrooggrraammeess aanndd wwiillll aadddd ttoo tthheeiirr iinnccoommee
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 97
Table no. 33.1: SHG detail
S. No. Name of village Total no. of SHGs No. of members
No. of SC/ST in each category
No. of BPL in each category
Men Women Both Total Categories M F Total M F Total M F Total
1 Aboch 1 1 0 2
(i)Landless 2 0 2 1 0 1
(ii) SF 2 3 5
(iii) MF 0 0 0
(iv) LF 6 7 13
Total 10 10 20 1 0 1 0 0 0
2 Bhungaliya 1 2 0 2
(i) Landless 5 5 10
(ii) SF 5 6 11
(iii) MF 1 4 8
(iv) LF 4 3 7
Total 10 16 26 5 5 10
3 Dadiyapura 0 0 1 1
(i) Landless 3 3
(ii) SF 0 6 6
(iii) MF 8 1 9
(iv) LF 0 0 0
Total 8 7 15 3 3
4 Khanpur 0 1 0 1
(i) Landless 0 3 3 3 3
(ii) SF 0 4 4
(iii) MF 0 3 3
(iv) LF 0 0 0
Total 0 1 0 1 0 10 10 3 3
5 Kotwal na muvada
0 1 0 1
(i) Landless 0 1 1 4 4
(ii) SF 0 4 4
(iii) MF 0 3 3
(iv) LF 0 2 2
Total 0 1 0 1 0 10 10 4 4
6 Laduji na muvad
0 2 0 2
(i) Landless 0 2 2
(ii) SF 0 4 4
(iii) MF 0 3 3
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 98
(iv) LF 0 11 11
Total 0 2 0 2 0 20 20
Table no. 33.2: SHG detail
S. No. Name of village
Total no. of registered SHGs No. of members No. of SC/ST in each
category No. of BPL in each
category With only Men
With only Women
With both
Total Categories M F Total M F Total M F Total
7.
Lalpur Nirmali
1 1 1 3
(i) Landless
(ii) SF 17 16 33 2 3 5
(iii) MF
(iv) LF
Total 1 1 1 3 17 16 33 2 3 5
8.
Pathoda 2 2 1 5
(i) Landless 5 0 5
(ii) SF 20 20 40 3 3 6 4 10 14
(iii) MF 2 8 10
(iv) LF
Total 2 2 1 5 27 28 55 3 3 6 4 10 14
9. Sulatanpur 0 2 1 3
(i) Landless - - -
(ii) SF 2 36 38 1 36 37
(iii) MF 1 1
(iv) LF
Total 0 2 1 3 2 37 39 1 36 37
10. Suki
0 1 0 1
(i) Landless 12 0 12
(ii) SF 7 0 7
(iii) MF 0 3 3
(iv) LF
Total 0 1 0 1 19 3 22
11. Vaghas
0 0 4 4
(i) Landless
(ii) SF 30 14 44 10 10 20
(iii) MF
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 99
(iv) LF
Total 0 0 4 4 30 14 44 10 10 20
12 Vyas vasana 1 1 0 2
(i) Landless
(ii) SF 30 14 44 10 10 20
(iii) MF
(iv) LF
Total 1 1 0 2 30 14 44 10 10 20
13 Zanda 1 1 0 2
(i) Landless
(ii) SF 30 14 44 10 10 20
(iii) MF
(iv) LF
Total 1 1 0 2 30 14 44 10 10 20 User Group:
UUsseerr GGrroouuppss aarree nnoorrmmaallllyy ffoorrmmeedd ttoo mmaannaaggee aann aaccttiivviittyy oorr aasssseett ccrreeaatteedd uunnddeerr tthhiiss pprrooggrraammmmee oonn aa lloonngg tteerrmm bbaassiiss.. TThhee uusseerr ggrroouupp wwiillll
ccoolllleecctt uusseerr cchhaarrggeess ffrroomm tthhee mmeemmbbeerrss,, aass ddeecciiddeedd oorr aass ppeerr tthhee gguuiiddeelliinnee tthheessee cchhaarrggeess mmaayy bbee oonn uussee bbaassiisseess oorr oonnee ttiimmee iinn tthhee yyeeaarr wwhhiicchh
mmaayy bbee aaccccoorrddiinngg ttoo tthhee gguuiiddeelliinnee.. TThhiiss wwiillll ccrreeaattee ffuunnddss wwhhiicchh wwiillll hheellpp tthheemm ttoo oovveerrsseeee tthhee wwoorrkkss aanndd mmaannaaggee tthhee bbeenneeffiittss aanndd mmaannaaggee tthhee
aasssseettss ccrreeaatteedd oonn aa lloonngg tteerrmm bbaassiiss..
IItt wwaass ddeecciiddeedd tthhaatt eeaacchh ggrroouupp wwoouulldd ffoorrmmuullaattee cceerrttaaiinn iinntteerrnnaall rruulleess aanndd hhaavvee aa ffeeeelliinngg ooff oowwnneerrsshhiipp wwiitthh ccoommmmuunniittyy ssppiirriitt..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 100
Table no. 34.1: UG detail
S. No. Name of village Total no. of UGs No. of members
No. of SC/ST in each category
No. of BPL in each category
Men Women Both Total Categories M F Total M F Total M F Total
1 Aboch
(i)Landless
(ii) SF
(iii) MF
(iv) LF
Total
2 Bhungaliya
(i) Landless
(ii) SF
(iii) MF
(iv) LF
Total
3 Dadiyapura
(i) Landless
(ii) SF
(iii) MF
(iv) LF
Total
4 Khanpur
(i) Landless
(ii) SF
(iii) MF
(iv) LF
Total
5 Kotwal na muvada
(i) Landless
(ii) SF
(iii) MF
(iv) LF
Total
6 Laduji na muvad
(i) Landless
(ii) SF
(iii) MF
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 101
(iv) LF
Total
Table no. 34.2: UG detail
S. No. Name of villageTotal no. of UGs No. of members
No. of SC/ST in each category
No. of BPL in each category
Men Women Both Total Categories M F Total M F Total M F Total
7 Lalpur Nirmali
(i) Landless
(ii) SF
(iii) MF
(iv) LF
Total
8 Pathoda
(i) Landless
(ii) SF
(iii) MF
(iv) LF
Total
9 Sultanpur
(i) Landless
(ii) SF
(iii) MF
(iv) LF
Total
10 Suki
(i) Landless
(ii) SF
(iii) MF
(iv) LF
Total
11 Vaghas
(i) Landless
(ii) SF
(iii) MF
(iv) LF
Total
12 Vyas vasana (i) Landless
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 102
(ii) SF
(iii) MF
(iv) LF
Total
13 Zanda
(i) Landless
(ii) SF
(iii) MF
(iv) LF
Total
4.3. Physical activities to be undertaken under IWMP, Vaghas Project 4.3.1 Entry Point activity (EPA) (4%)
EEPPAA aaccttiivviittiieess aarree ttaakkeenn uupp uunnddeerr wwaatteerrsshheedd pprroojjeeccttss ttoo bbuuiilldd aa rraappppoorrtt wwiitthh tthhee vviillllaaggee ccoommmmuunniittyy aatt tthhee bbeeggiinnnniinngg ooff tthhee pprroojjeecctt;; ggeenneerraallllyy,,
cceerrttaaiinn iimmppoorrttaanntt wwoorrkkss wwhhiicchh aarree iinn uurrggeenntt ddeemmaanndd ooff tthhee llooccaall ccoommmmuunniittyy aarree ttaakkeenn uupp.. AA ggrroouupp DDiissccuussssiioonn wwaass ccoonndduucctteedd wwiitthh wwaatteerrsshheedd
DDeevveellooppmmeenntt CCoommmmiitttteeee aanndd vviillllaaggee ppeeooppllee rreeggaarrddiinngg tthhee EEPPAA aaccttiivviittyy,, IItt wwaass ccoonnvveeyyeedd ttoo tthhee WWCC tthhaatt aann aammoouunntt ooff RRss.. 33..993311 LLaakkhh,, RRss.. 11..110000
LLaakkhh,, RRss.. 11..559933 LLaakkhh,, RRss.. 00..884455 LLaakkhh,, RRss.. 11..668800 LLaakkhh aanndd RRss.. 11..772288 LLaakkhh,, RRss.. 11..117711 LLaakkhh,,RRss.. 55..229933,,RRss.. 00..772200 LLaakkhh,, RRss 33..119944 LLaakkhh,, RRss.. 00..990022
LLaakkhh aaccccoorrddiinnggllyy AAllwwaa,,DDaannaa,,FFaattiiyyaabbaadd,,JJaaggdduuppuurr,,KKaallaajjii,,MMaahhaammaaddppuurraa,,MMiirraappuurraa,,((IIWWMMPP--1122)) VVaagghhaass,,PPiirroojjppuurr,,TTaaiiyyaabbppuurraa aanndd VVaassnnaa wwaass
aallllootttteedd ffoorr EEPPAA aaccttiivviittyy,, wwhhiicchh wwaass 44 ppeerr cceenntt ooff ttoottaall aallllooccaatteedd bbuuddggeett.. TThhee vviillllaaggeerrss ddiissccuusssseedd vvaarriioouuss aaccttiivviittiieess wwhhiicchh tthheeyy ffeelltt iiss iimmppoorrttaanntt
bbuutt aafftteerr aa bbrriieeff ddiissccuussssiioonn iitt wwaass ccoonnvveeyyeedd ttoo tthheemm tthhaatt oonnllyy tthhoossee aaccttiivviittiieess ccaann bbee ttaakkeenn,, wwhhiicchh rreevviivvee tthhee ccoommmmoonn nnaattuurraall rreessoouurrcceess.. IItt wwaass
aallssoo ttaakkeenn iinnttoo pprriioorriittyy tthhaatt tthheerree sshhoouulldd bbee aann iinnssttrruummeenntt ooff ccoonnvveerrggeennccee wwhhiicchh wwiillll rreessuulltt iinn ssuussttaaiinnaabbiilliittyy ooff aaccttiivviittiieess..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 103
Table no.35.1: Entry point activities (EPA) (All financial figures in lakh Rs.)
S. No. Names of Villages Amount earmarked for EPA Entry Point Activities planned Estimated cost
1 Aboch 2.6 Gutter line 1.4
Bore Well with Pump 1.2
Total 2.6
2 Bhungliya 3.73
Pvc pipe line (1000 mtr) 1.40
Bore Well with Pump 0.85
Dhobi Ghat 0.80
Animal Water Trough 0.68
Total 3.73
3 Dadiyapura 0.90 Bore Well 0.90
Total 0.90
4 Khanpur 0.78 Pvc pipe line 0.78
Total 0.78
5 Kotvalna muvada 0.38 Hvada repairing 0.38
Total 0.38
6 Lalpur (Niramali) 1.46 Pvc pipe line (500 mtr) 0.66
Wire Fencing in Smashan 0.80
Total 1.46
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 104
Table no.35.2: Entry point activities (EPA) (All financial figures in lakh Rs.)
S. No. Names of Villages Amount earmarked for EPA Entry Point Activities planned Estimated cost
7 Laduji na muvada 0.53 Animal Water Trough 0.53
Total 0.53
8 Pathoda 2.33 Well repairing 1.53 Dhobi ghat 0.80
Total 2.33
9 Suki 0.59 Animal Water Trough 0.59
Total 0.59
10
Sulatanpura (Taiyabpura)
1.43
Handpump 0.65
Pvc pipe line (500 mtr) 0.78
Total 1.43
11 Vyas Vasana 2.82
Dhobighat 0.80
Pvc pipe line (500 mtr) 0.78
Bore Well 1.24
Total 2.82
12 Zanda 2.8 Protection Wall 2.80
Total 2.80
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 105
4.3.2. Watershed Development Works (56%): WWaatteerrsshheedd ddeevveellooppmmeenntt wwoorrkkss aarree ttoo bbee ttaakkeenn uupp dduurriinngg sseeccoonndd pphhaassee ooff wwaatteerrsshheedd pprroojjeecctt.. AA mmuullttii--ttiieerr rriiddggee ttoo vvaalllleeyy sseeqquueennccee aapppprrooaacchh
sshhoouulldd bbee aapppprrooaacchheedd ttoowwaarrddss iimmpplleemmeennttaattiioonn ooff wwaatteerrsshheedd ddeevveellooppmmeenntt pprroojjeeccttss.. AA nneett bbuuddggeett ooff 5500 ppeerrcceenntt iiss aallllootttteedd ffoorr tthhiiss wwoorrkk..
Ridge Area Treatment Plans: IItt iiss vveerryy iimmppoorrttaanntt ttoo ttrreeaatt tthhee rriiddggee aass tthhiiss iiss wwhheerree tthhee mmaajjoorr wwaatteerr rreessoouurrcceess oorriiggiinnaattee.. FFoorr tthhee rriiddggee aarreeaa ttrreeaattmmeenntt ooff ((IIWWMMPP--1122)) VVaagghhaass
WWaatteerrsshheedd ffoolllloowwiinngg ssttrruuccttuurree aarree bbeeeenn pprrooppoosseedd aafftteerr iinntteerraaccttiioonn aammoonngg GGrraamm ssaabbhhaa,, WWaatteerrsshheedd CCoommmmiitttteeee,, PPrroojjeecctt MMaannaaggeerr aanndd ootthheerr ffiieelldd
ssttaaffff ooff pprroojjeecctt..
11.. CChheecckk ddaamm
22.. NNaallaa PPlluugg
33.. EEaarrtthheenn BBuunndd
44.. GGuullllyy pplluugg
55.. FFaarrmm PPoonndd
66.. PPrrootteeccttiioonn wwaallll
77.. AAffffoorreessttrraattiioonn
88.. NNeeww ppoonndd
99.. CCaauussee wwaayy
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 106
1. Check dams
CChheecckk DDaamm iiss aa ssttrruuccttuurree ccoonnssttrruucctteedd uussiinngg cceemmeenntt aanndd ccoonnccrreettee aaccrroossss tthhee rriivveerr// bbiigg nnaallllaass ooff ccoommppaarraattiivveellyy wwiiddeerr wwaatteerr cchhaannnneell.. TThhiiss
ssttrruuccttuurree iiss pprreeffeerrrreedd wwhheerree tthhee hheeiigghhtt ooff bbootthh tthhee bbaannkkss ooff rriivveerr iiss ccoonnssiiddeerraabbllyy hhiigghh aanndd tthhee wwiiddtthh ooff rriivveerr cchhaannnneell oorr ssttrreeaamm iiss lleessss..
Advantages of check dams
TThhee aaddvvaannttaaggeess ooff cchheecckk ddaammss aarree tthhaatt tthheeyy ssttoorree ssuurrffaaccee wwaatteerr ffoorr uussee bbootthh dduurriinngg aanndd aafftteerr tthhee mmoonnssoooonn.. TThheeyy hheellpp iinn ggrroouunndd wwaatteerr rreecchhaarrggee
ooff tthhee aarreeaa.. RReecchhaarrggee ooff wwaatteerr hheellppss iinn rraaiissiinngg tthhee wwaatteerr ttaabbllee iinn tthhee aarreeaa.. AAvvaaiillaabbiilliittyy ooff wwaatteerr eennssuurreess tthhee iinnccrreeaassee ooff aaggrriiccuullttuurraall yyiieelldd bbyy
mmuullttii--ccrrooppppiinngg..
2. Gully plug
AA ssmmaallll gguullllyy bbuunndd lliikkee tthhiiss oonnee PPrreevveennttss aa nneeww GGuullllyy bbeeiinngg ffoorrmmeedd iinn tthhee mmiiddddllee ooff tthhee ffaarrmm,, tthhuuss pprreevveennttiinngg eerroossiioonn ffrroomm tthhee bbeeggiinnnniinngg iittsseellff..
SSuucchh bbuunnddss wwoouulldd mmaakkee ttwwoo ppaarrttss ooff oonnee ffiieelldd,, tthhuuss mmaakkiinngg iitt ddiiffffiiccuulltt ttoo pplloouugghh,, bbuutt ssoommee ffaarrmmeerrss aarree rreeaaddyy ttoo ddoo iitt..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 107
Table no.36.1: Details of ridge line treatment / land based activities in watershed works*
S. No. Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl.
specify)
No. of units (No./ cu.m./ rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
1 Aboch
Staggered trenching
Contour bunding
Graded bunding
Bench terracing
Earthern bunding
Masonry stop dams
Gully plug D C 2 Nos 3.00 0.5 3.50
Gabion structures
Underground dykes
Field bunds
Afforastration with
Wire Fencing L - C - 1 Ha. 4.00 1.00 0.0 5.00 2012-2015
Total 7.00 1.50 0.0 8.50
(M – Materials, W- wages, O- others, T – Total)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 108
Table no.36.2: Details of ridge line treatment / land based activities in watershed works*
S. No. Village name
Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl.
specify)
No. of units (No./
cu.m./ rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
2. Bhungaliya
Staggered trenching
Contour bunding
Graded bunding
Bench terracing
Earthern bunding
Nala Plug
Gully plug - D C - 10 Nos 13.60 3.40 0 17.00 2013-14
Gabion structures
Underground dykes
Field bunds
Afforastration with
Wire Fencing L C - 1 Ha., 4.00 1.09 0 5.09 2013-14
Total 11 17.60 4.49 0 22.09
(M – Materials, W- wages, O- others, T – Total)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 109
Table no.36.3: Details of ridge line treatment / land based activities in watershed works*
S. No. Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl.
specify)
No. of units (No./
cu.m./ rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
3. Dadiyapura
Staggered trenching
Contour bunding
Graded bunding
Bench terracing
Earthern bunding
Masonry stop dams
Gully plug - D C - 1Nos. 1.20 0.30 0.0 1.50 2013-14
Gabion structures
Underground dykes
Field bunds
Nala Plug
Afforastration with
Wire Fencing L C 0.5 Ha. 1.70 0.304 0 2.04 2014-15
Total 2. 2.90 0.604 0.0 3.54 (M – Materials, W- wages, O- others, T – Total)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 110
Table no.36.4: Details of ridge line treatment / land based activities in watershed works*
S. No. Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl.
specify)
No. of units (No./ cu.m./
rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
4. Khanpur
Staggered trenching
Contour bunding
Graded bunding
Bench terracing
Earthern bunding
Masonry stop dams
Gully plug
Gabion structures
Underground dykes
Field bunds
Afforastration with
Wire Fencing L C 1 Ha. 4.20 1.00 0 5.20 2013-14
Total 1 4.2 1.00 0 5.2
(M – Materials, W- wages, O- others, T – Total)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 111
Table no.36.5: Details of ridge line treatment / land based activities in watershed works*
S. No. Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl.
specify)
No. of units (No./ cu.m./
rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
5. Kotwalna
muvada
Staggered trenching - - - -- - -- - - - -
Contour bunding - - - -- - -- - - - -
Graded bunding - - - -- - -- - - - -
Bench terracing - - - -- - -- - - - -
Earthern bunding - - - -- - -- - - - -
Masonry stop dams - - - -- - -- - - - -
Gully plug - - - -- - -- - - - -
Gabion structures - - - -- - -- - - - -
Underground dykes - - - -- - -- - - - -
Field bunds - - - -- - -- - - - -
Any others (pl. specify) Fancing
- - - -- - -- - - - -
Total
(M – Materials, W- wages, O- others, T – Total)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 112
Table no.36.6: Details of ridge line treatment / land based activities in watershed works*
S. No. Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others
(pl. specify)
No. of units (No./ cu.m./ rmt)
Estimated cost (Rs. in lakh)Expected month & year of
completion (mm/yyyy)
M W O T
6. Ladujina muvada
Staggered trenching
Contour bunding
Graded bunding
Bench terracing
Earthern bunding D C 1 2.70 0.30 0 3.00 2014-15
Masonry stop dams
Gully plug
Gabion structures
Underground dykes
Field bunds
Nalaplug
Afforastration with
Wire Fencing L C
0.50 Ha.
2.00 0.50 0 2.50 2013-14
Total 4.70 0.80 0 5.50
(M – Materials, W- wages, O- others, T – Total)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 113
Table no.36.7: Details of ridge line treatment / land based activities in watershed works*
S. No. Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl.
specify)
No. of units (No./ cu.m./ rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
7.
Lalpur
(Niramali)
Staggered trenching
Contour bunding
Graded bunding
Bench terracing
Earthern bunding
Masonry stop dams
Gully plug
Gabion structures
Underground dykes
Field bunds
Afforastration with
Wire Fencing L C 1 Ha. 3.66 0.80 0.0 4.46
Total 1 Ha. 3.66 0.80 0.0 4.46
(M – Materials, W- wages, O- others, T – Total)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 114
Table no.36.8: Details of ridge line treatment / land based activities in watershed works*
S. No.
Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl.
specify)
No. of units (No./ cu.m./ rmt)
Estimated cost (Rs. in lakh)
Expected month & year of completion
(mm/yyyy) M W O T
8.
Pathoda
Staggered trenching
Contour bunding
Graded bunding
Bench terracing
Earthern bunding
Masonry stop dams
Gully plug - D C - 4Nos. 5.60 1.20 0.0 6.80
Gabion structures
Underground dykes
Field bunds
Land Devlopment
Nala Plug - -
Afforastration with
Wire Fencing - - L C - 1.50 Ha. 5.00 1.00 0.0 6.00
Total 5 Nos 10.60 2.20 0.0 12.80 (M – Materials, W- wages, O- others, T – Total)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 115
Table no.36.9: Details of ridge line treatment / land based activities in watershed works*
S. No. Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl.
specify)
No. of units (No./ cu.m./ rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
9.
Suki
Staggered trenching
Contour bunding
Graded bunding
Bench terracing
Earthern bunding
Masonry stop dams
Gully plug
Gabion structures
Underground dykes
Field bunds
Afforastration with
Wire Fencing - - L - C - 1 Ha. 3.20 0.80 0.0 4.00
Total 1 Nos 3.20 0.80 0.0 4.00 (M – Materials, W- wages, O- others, T – Total)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 116
Table no.36.10: Details of ridge line treatment / land based activities in watershed works*
S. No. Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl.
specify)
No. of units (No./
cu.m./ rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
10. Sulatanpura(
Taiyabpura)
Staggered trenching
Contour bunding
Graded bunding
Bench terracing
Earthern bunding
Masonry stop dams
Gully plug - D C - 3Nos. 4.20 0.90 0.0 5.10
Gabion structures
Underground dykes
Field bunds
Afforastration with
Wire Fencing L C 1 ha 3.50 0.70 0.0 4.20
Total 4 Nos. 7.70 1.60 0.0 9.30
(M – Materials, W- wages, O- others, T – Total)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 117
Table no.36.11: Details of ridge line treatment / land based activities in watershed works*
S. No. Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others
(pl. specify)
No. of units (No./
cu.m./ rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
11. Vyas Vasana
Staggered trenching
Contour bunding
Graded bunding
Bench terracing
Earthern bunding
Masonry stop dams
Gully plug D C 2 Nos 2.70 0.70 0.0 3.40
Gabion structures
Underground dykes
Field bunds
Afforastration with
Wire Fencing L C 1 Ha. 4.20 0.80 0.0 5.00
Total 3 Nos. 6.90 1.50 0.0 8.40
(M – Materials, W- wages, O- others, T – Total)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 118
Table no.36.12: Details of ridge line treatment / land based activities in watershed works*
S. No. Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others (pl.
specify)
No. of units (No./ cu.m./
rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
12. Vaghas
Staggered trenching - - - -- - -- - - - -
Contour bunding - - - -- - -- - - - -
Graded bunding - - - -- - -- - - - -
Bench terracing - - - -- - -- - - - -
Earthern bunding - - - -- - -- - - - -
Masonry stop dams - - - -- - -- - - - -
Gully plug - - - -- - -- - - - -
Gabion structures - - - -- - -- - - - -
Underground dykes - - - -- - -- - - - -
Field bunds - - - -- - -- - - - -
Horticulture with
Wire Fencing - - - -- - -- - - - -
Total
(M – Materials, W- wages, O- others, T – Total)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 119
Table no.36.13: Details of ridge line treatment / land based activities in watershed works*
S. No. Village name Name of structures
Type of treatment Type of land Target
(i) Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev.
(L)
(i) Pri-vate
(ii) Community
(iii) Others
(pl. specify)
No. of units (No./
cu.m./ rmt)
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/yyyy)
M W O T
13. Zanda
Staggered trenching
Contour bunding
Graded bunding
Bench terracing
Earthern bunding
Masonry stop dams
Gully plug D C 3 Nos 3.80 0.90 0.0 4.70
Gabion structures
Underground dykes
Field bunds
Horticulture with
Wire Fencing L C 1 ha. 5.00 1.00 0.0 6.00
Total 4Nos. 8.80 1.90 0.0 10.70
(M – Materials, W- wages, O- others, T – Total)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 120
Table no.37.1: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
S. No.
Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost(Lakh)
Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh
Estimated cost(Lakh)
1. Aboch
Pond Deepening 3 0.20 11.00
Check dem 3 0.015 9.00
Protection Wall 2 6.00
Cause Way 1 1.85
Total 3 0.20 11.00 6 0.015 16.85
Table no.37.2: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
S. No.
Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost
Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
2. Bhungaliya
New Pond 2 0.18 10.00
Check Dem 5 3750 15.00
Protection Wall 3 5.00
Total 10 30.00
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 121
Table no.37.3: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
S. No.
Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost(Lakh)
Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
3. Dandiyapura Pond Deepening 2 0.10 6.00
Check Dem 1 750 3.00
Total 2 0.10 6.00 1 750 3.00
Table no.37.4: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
S. No.
Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh
Estimated cost(Lakh)
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost(Lakh)
Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh
Estimated cost(Lakh)
4. Khanpur Pond Deepening 1 0.09 4.00
Protection Wall 1 1.70
Total 1 0.09 4.00 1 1.70
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 122
Table no.37.5: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
S. No.
Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost(Lakh)
Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
5. Kotwala na
muvada New Pond 1 0.10 5.40
Total 1 0.10 5.40
Table no.37.6: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
S. No.
Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost(Lakh)
Area to be irrigated
(ha)
Storage capacity(Litter
in Lakh)
Estimated cost(Lakh)
6. Ladujina muvada
Protection Wall 1 1.94
Total 1 1.94
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 123
Table no.37.7: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
S. No.
Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost(Lakh)
Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
7. Lalapur
(Nirmali)
New pond 1 0.07 4.00
Check Dam 2 0.015 6.00
Protection Wall 1 3.00
Cause way 1 750 3.00
Total 5 16.00
Table no.37.8: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
S. No.
Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost(Lakh)
Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
8. Pathoda Pond 2 0.11 6.00 1 0.09 5.00
Check Dam 3 0.023 8.86
Total 2 0.11 6.00 4 13.86
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 124
Table no.37.9: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
S. No.
Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost(Lakh)
Area to be irrigated
(ha)
Storage capacity Litter in
Lakh)
Estimated cost(Lakh)
9. Suki
Pond 1 0.054 3.00
Protection Wall 1 1.23
Total 2 0.054 4.23 Table no.37.10: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
S. No.
Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost(Lakh)
Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
10. Sulatanpura
(Taiyabpura) Check Dam 3 0.022 9.00
Protection Wall 1 1.70
Total 4 0.022 10.70
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 125
Table no.37.11: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
S. No.
Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost(Lakh)
Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
11 Vyas vasana Pond 2 0.084 4.62 1 0.07 4.00
Check Dam 6 0.06 22.50
Total 2 0.084 4.62 7 0.13 26.50
Table no.37.12: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
S. No.
Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost(Lakh)
Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
12 Vaghas - - - -- - -- - - - -
- - - -- - -- - - - -
Total - - - -- - -- - - - -
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 126
Table no.37.13: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)
S. No.
Village name Type of structures
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No. Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
No. Area to be irrigated
(ha)
Storage capacity
Estimated cost(Lakh)
Area to be irrigated
(ha)
Storage capacity (Litter in
Lakh)
Estimated cost(Lakh)
13 Zanda Check Dam 1 0.015 6.00
Cose Way 2 0.014 10.00
Total 3 0.029 16.00
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 127
Table no.38: Activities related to recharging ground water resources in the project areas (all financial figures in lakh Rs.)
S. No.
Name of Villages
Problems Identified from
PRA & HH Survey
Type of structures
Proposed target Farmers (BPL/AL/LL
/MF/SF/Med.F/LF AR)
Executing agency formed
UG/ SHG/
Others
(pl.
specify)
Details (Annexure and Page Number)
Augmentation/ repair of existing
recharging structures
No.
Annxure-1, Page-
144 No.
Area to be
irrigated (ha)
Estimated cost
Area to be
irrigated (ha)
Estimated cost
1
Aboch,
Bhungaliya,
Dadiyapura,
Khanpur,
Kotwalna
Muvada,
Ladujina muvada,
Lalpura(Nramali)
Pathoda ,
Suki,
Sulatanpura,
Vyasvasana ,
Vaghas,
Zanda
(i)Open wells 0 0 0 0 0 0 0 0
0 0
(ii)Bore wells 0 0 0 0 0 0 0 0
0 0
(iii)Any others (Pl. specify)
0 0 0 0 0 0 0 0
0 0
Total for the village
0 0 0 0 0 0 0 0 0 0
Total for the
Project
0 0 0 0 0 0 0 0 0 0
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 128
Table no.39.1: Details of activities related to Livelihood, production system and micro-enterprises
Name of Villages
Activity to be Carried Out Unit Unit Cost
Total Cost (Rs.
Lakhs)
Funds from
IWMP (Rs.
Lakhs)
Fund from Convergence (Rs. Lakhs)
Conver-gence
Scheme Beneficiaries
Ab
och
Agriculture Development
Crop Demonstration (Cotton) 1 0.15 0.15 0.15 0 -
Drip Irrigation 6 0.24 1.44 1.44 5.16 GGRC+
Farmers Ind.
Vermi Compost Unit 10 0.16 1.60 1.60 0 Ind.
Spray Pump 60 0.025 1.50 1.50 0 Ind.
Chaff Cutter 39 0.015 0.585 0.585 0
Agro Center 1 2.00 2.00 2.00 0 SHG
Floriculture 10 0.24 2.40 2.40 0 -
Dairy Development
Animal Health Camp 2 0.24 0.48 0.48 0 All Village
Cattle Feed and Nutrition Store
1 2.00 2.00 2.00 SHG
Cattle Stand 2 0.09 0.18 0.18 0 All Village
Total 12.34 12.34 5.16 -
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 129
Table no.39.2: Details of activities related to Livelihood, production system and micro-enterprises
Name of Villages
Activity to be Carried Out Unit Unit Cost
Total Cost (Rs. Lakhs)
Funds from
IWMP (Rs.
Lakhs)
Fund from Convergence (Rs. Lakhs)
Conver-gence
Scheme Beneficiaries
Bh
un
gali
ya
Agriculture Development
Crop Demonstration (Cotton, Tuwer)
2 0.25 0.25 0.25 0 -
Drip Irrigation 10 0.24 2.40 2.40 8.6 GGRC+
Farmers Ind.
Vermi Compost Unit 10 0.16 1.60 1.60 0 Ind.
Spray Pump 57 0.025 1.425 1.43 0 Ind.
Electrict Chaff Cutter 12 0.15 1.80 1.80 0 Ind.
Chaff Cutter 2 0.015 0.03 0.03 0 Ind.
Agro Center 1 2.00 2.00 2.00 0 SHG
Green House 2 2.00 4.00 4.00 SHG
Floriculture 2 0.24 0.48 0.48 0 Ind.
Dairy Development Ind.
Animal Health Camp 4 0.24 0.96 0.96 0 All Village
Cattle Feed and Nutrition Store
1 2.00 2.00 2.00 Ind.
Cattle Stand 8 0.09 0.72 0.72 0 All Village
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 130
Total 17.665 17.665 8.6 -
Table no.39.3: Details of activities related to Livelihood, production system and micro-enterprises
Name of Villages
Activity to be Carried Out Unit Unit Cost
Total Cost (Rs. Lakhs)
Funds from
IWMP (Rs.
Lakhs)
Fund from Convergence (Rs. Lakhs)
Convergence Scheme
Beneficiaries
Dan
diy
apu
r
Agriculture Development
Crop Demonstration (Cotton) 1 0.15 0.15 0.15 0 Ind.
Drip Irrigation 2 0.24 0.48 0.48 1.72 GGRC+
Farmers Ind.
Spray Pump 38 0.025 0.95 0.95 0 Ind.
Chaff Cutter 23 0.015 0.345 0.345 0 Ind.
Dairy Development Ind.
Animal Health Camp 1 0.24 0.24 0.24 0 All Village
Cattle Stand 1 0.09 0.09 0.09 0 All Village
Cattle Feed and Nutrition Store
1 2.00 2.00 2.00 SHG
Total 4.255 4.255 1.72 -
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 131
Table no.39.4: Details of activities related to Livelihood, production system and micro-enterprises
Name of Villages
Activity to be Carried Out Unit Unit Cost
Total Cost (Rs. Lakhs)
Funds from IWMP (Rs.
Lakhs)
Fund from Convergence (Rs. Lakhs)
Convergence Scheme
Beneficiaries
Kh
anp
ur
Agriculture Development
Spray Pump 64 0.025 1.60 1.60 0 Ind.
Chaff Cutter 10 0.015 0.15 0.15 0 Ind.
Dairy Development
Cattle Feed and Nutrition Store
1 2.00 2.00 2.00 SHG
Total 3.75 3.75 0 -
Table no.39.5: Details of activities related to Livelihood, production system and micro-enterprises
Name of Villages
Activity to be Carried Out Unit Unit Cost
Total Cost (Rs. Lakhs)
Funds from IWMP (Rs.
Lakhs)
Fund from Convergence (Rs. Lakhs)
Convergence Scheme
Beneficiaries
Kot
val N
a M
uva
da
Agriculture Development
Drip Irrigation 1 0.24 0.24 0.24 0.86 GGRC+
Farmers Ind.
Spray Pump 62 0.025 1.55 1.55 0 Ind.
Chaff Cutter 1 0.015 0.02 0.02 0 Ind.
Total 1.8 1.8 0.86 -
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 132
Table no.39.6: Details of activities related to Livelihood, production system and micro-enterprises
Name of Villages
Activity to be Carried Out Unit Unit Cost
Total Cost (Rs. Lakhs)
Funds from IWMP (Rs.
Lakhs)
Fund from Convergence (Rs. Lakhs)
Conver-gence Scheme
Beneficiaries
Lad
uji
Na
Mu
vad
a Agriculture Development
Drip Irrigation 1 0.24 0.24 0.24 0.86 GGRC+
Farmers
Spray Pump 10 0.025 0.25 0.25 0 Ind.
Chaff Cutter 2 0.015 0.03 0.03 0 Ind.
Agro Center 1 2.00 2.00 2.00 0 SHG
Total 2.52 2.52 0.86 -
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 133
Table no.39.7: Details of activities related to Livelihood, production system and micro-enterprises
Name of Villages
Activity to be Carried Out Unit Unit Cost
Total Cost (Rs. Lakhs)
Funds from
IWMP (Rs.
Lakhs)
Fund from Convergence (Rs. Lakhs)
Conver-gence
Scheme Beneficiaries
Lalp
ur
(Nir
mal
i)
Agriculture Development
Drip Irrigation 3 0.24 0.72 0.72 2.58 GGRC+
Farmers Ind.
Vermi Compost Unit 2 0.16 0.32 0.32 0 Ind.
Spray Pump 40 0.025 1.00 1.00 0 Ind.
Chaff Cutter 4 0.015 0.06 0.06 0 Ind.
Agro Center 1 2.00 2.00 2.00 0 SHG
Floriculture 1 0.24 0.24 0.24 0 Ind.
Dairy Development
Cattle Feed and Nutrition Store
1 2.00 2.00 2.00 SHG
Fodder Plantation 4 0.15 0.60 0.60 0 Ind.
Total 6.94 6.94 2.58 Ind.
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 134
Table no.39.8: Details of activities related to Livelihood, production system and micro-enterprises
Name of Villages
Activity to be Carried Out Unit Unit Cost
Total Cost (Rs.
Lakhs)
Funds from
IWMP (Rs.
Lakhs)
Fund from Convergence (Rs. Lakhs)
Conver-gence
Scheme Beneficiaries
Pat
hod
a
Agriculture Development
Crop Demonstration (Cotton, Tuwer)
2 0.15 0.3 0.30 0 Ind.
Drip Irrigation 4 0.24 0.96 0.96 3.44 GGRC+
Farmers Ind.
Vermi Compost Unit 4 0.16 0.64 0.64 0 Ind.
Spray Pump 55 0.025 1.38 1.38 0 Ind.
Chaff Cutter 55 0.015 0.83 0.83 0 Ind.
Floriculture 1 0.24 0.24 0.24 Ind.
Green House 1 2.00 2.00 2.00 SHG
Agro Center 1 2.00 2.00 2.00 0 SHG
Dairy Development
Animal Health Camp 2 0.24 0.48 0.48 0 All Village
Cattle Feed and Nutrition Store
1 2.00 2.00 2.00 SHG
Cattle Stand 3 0.09 0.27 0.27 0 All Village
Total 11.09 11.09 3.44 -
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 135
Table no.39.9: Details of activities related to Livelihood, production system and micro-enterprises
Name of Villages
Activity to be Carried Out Unit Unit Cost
Total Cost (Rs. Lakhs)
Funds from
IWMP (Rs. Lakhs)
Fund from Convergence (Rs. Lakhs)
Conver-gence
Scheme Beneficiaries
Suk
i
Agriculture Development
Drip Irrigation 1 0.24 0.24 0.24 0.86 GGRC+
Farmers Ind.
Spray Pump 19 0.025 0.475 0.48 0 Ind.
Chaff Cutter 5 0.015 0.075 0.075 0 Ind.
Vegetable Nursery 1 2.00 2.00 2.00 SHG
Total 2.79 2.79 0.86
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 136
Table no.39.10: Details of activities related to Livelihood, production system and micro-enterprises
Name of Villages
Activity to be Carried Out Unit Unit Cost
Total Cost (Rs. Lakhs)
Funds from
IWMP (Rs.
Lakhs)
Fund from Convergence (Rs. Lakhs)
Conver-gence
Scheme Beneficiaries
Sult
anp
ur
(Tai
yab
pu
ra)
Agriculture Development
Drip Irrigation 3 0.24 0.72 0.72 2.58 GGRC+
Farmers Ind.
Vermi Compost Unit 2 0.16 0.32 0.32 0 Ind.
Spray Pump 18 0.025 0.45 0.45 0 Ind.
Chaff Cutter 40 0.015 0.60 0.60 0 Ind.
Agro Center 1 2.00 2.00 2.00 0 SHG
Floriculture 1 0.24 0.24 0.24 0 Ind.
Dairy Development Ind.
Animal Health Camp 1 0.24 0.24 0.24 0 All Village
Cattle Stand 1 0.09 0.09 0.09 0 All Village
Poultry Farming 1 2.00 2.00 2.00 0 SHG
Fodder Plantation 1 0.15 0.15 0.15 0 Ind.
Total 6.81 6.81 2.58 Ind.
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 137
Table no.39.11: Details of activities related to Livelihood, production system and micro-enterprises
Name of Villages
Activity to be Carried Out Unit Unit Cost
Total Cost (Rs. Lakhs)
Funds from
IWMP (Rs.
Lakhs)
Fund from Convergence (Rs. Lakhs)
Conver-gence
Scheme Beneficiaries
Vya
s V
asan
a
Agriculture Development
Crop Demonstration (Castor) 1 0.24 0.24 0.24 0 Ind.
Drip Irrigation 1 0.24 0.24 0.24 0.86 GGRC+
Farmers Ind.
Vermi Compost Unit 10 0.16 1.60 1.60 0 Ind.
Spray Pump 70 0.025 1.75 1.75 0 Ind.
Chaff Cutter 13 0.015 0.195 0.195 0 Ind.
Horticulture Nursery 1 2.00 2.00 2.00 0 SHG
Vegetable Nursery 1 2.00 2.00 2.00 0 SHG
Floriculture 4 0.24 0.96 0.96 0 Ind.
Dairy Development Ind.
Animal Health Camp 1 0.24 0.24 0.24 0 All Village
Cattle Stand 2 0.09 0.18 0.18 0 All Village
Poultry Farming 1 2.00 2.00 2.00 0 SHG
Cattle Feed and Nutrition Store
1 2.00 2.00 2.00 0 SHG
Total 13.405 13.405 0.86
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 138
Table no.39.12: Details of activities related to Livelihood, production system and micro-enterprises
Name of Villages
Activity to be Carried Out Unit Unit Cost
Total Cost (Rs. Lakhs)
Funds from
IWMP (Rs.
Lakhs)
Fund from Convergence (Rs. Lakhs)
Conver-gence
Scheme Beneficiaries
Zan
da
Agriculture Development
Drip Irrigation 5 0.24 1.20 1.20 4.3 GGRC+
Farmers Ind.
Vermi Compost Unit 6 0.16 0.96 0.96 0
Spray Pump 68 0.025 1.70 1.70 0
Electrict Chaff Cutter 20 0.15 3.00 3.00 0
Vegetable Nursery 1 2.00 2.00 2.00 0 SHG
Agro Center 1 2 2.00 2.00 0 SHG
Dairy Development
Animal Health Camp 2 0.24 0.48 0.48 0 All Village
Cattle Feed and Nutrition Store
1 2.00 2.00 2.00 0 SHG
Total 13.34 13.34 4.3
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 139
Table no. 40.1: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas
S. No.
Names of Villages Name of activity
No. of SHGs
involved
Farmers (BPL/AL/LL
/MF/SF/Med.F/ LF AR)
Executing agency formed
UG/ SHG/
Others (pl. specify)
Details (Annexure and Page Number)
Average annual income from
activity per SHG
1 Aboch Agro Center 1 LL, APL, BPL, SF SHG
Cattle Feed and
Nutrition Store 1 LL, APL,BPL, SF SHG
TOTAL 2
Table no. 40.2: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas
S. No.
Names of Villages Name of activity
No. of SHGs
involved
Farmers (BPL/AL/LL
/MF/SF/Med.F/ LF AR)
Executing agency formed
UG/ SHG/
Others (pl. specify)
Details (Annexure and Page Number)
Average annual income from
activity per SHG
1
Bhungaliya
Agro Center 1 LL, APL, BPL, SF SHG
2 Cattle Feed and
Nutrition Store 1 LL, APL,BPL, SF SHG
3 Green House 1 LL, APL,BPL, SF SHG 4 Green House 1 LL, APL,BPL, SF SHG TOTAL 4
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 140
Table no. 40.3: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas
S. No.
Names of Villages Name of activity
No. of SHGs
involved
Farmers (BPL/AL/LL
/MF/SF/Med.F/ LF AR)
Executing agency formed
UG/ SHG/
Others (pl. specify)
Details (Annexure and Page Number)
Average annual income from
activity per SHG
1
Dandiyapur
Agro Center 1 LL, APL, BPL, SF SHG
2 Cattle Feed and
Nutrition Store 1 LL, APL,BPL, SF SHG
3 Green House 1 LL, APL,BPL, SF SHG 4 Green House 1 LL, APL,BPL, SF SHG TOTAL
Table no. 40.4: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas
S. No.
Names of Villages Name of activity
No. of SHGs
involved
Farmers (BPL/AL/LL
/MF/SF/Med.F/ LF AR)
Executing agency formed
UG/ SHG/
Others (pl. specify)
Details (Annexure and Page Number)
Average annual income from
activity per SHG
1 Khanpur Cattle Feed and
Nutrition Store 1 LL, APL,BPL, SF SHG
TOTAL 1
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 141
Table no. 40.5: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas
S. No.
Names of Villages Name of activity
No. of SHGs
involved
Farmers (BPL/AL/LL
/MF/SF/Med.F/ LF AR)
Executing agency formed
UG/ SHG/
Others (pl. specify)
Details (Annexure and Page Number)
Average annual income from
activity per SHG
1 Laduji Na Muvada Agro Center 1 LL, APL, BPL, SF SHG
TOTAL 1
Table no. 40.6: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas
S. No.
Names of Villages Name of activity
No. of SHGs
involved
Farmers (BPL/AL/LL
/MF/SF/Med.F/ LF AR)
Executing agency formed
UG/ SHG/
Others (pl. specify)
Details (Annexure and Page Number)
Average annual income from
activity per SHG
1
Lalpur Agro Center 1 LL, APL, BPL, SF SHG
2 Cattle Feed and
Nutrition Store 1 LL, APL,BPL, SF SHG
TOTAL 2
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 142
Table no. 40.7: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas
S. No.
Names of Villages Name of activity
No. of SHGs
involved
Farmers (BPL/AL/LL
/MF/SF/Med.F/ LF AR)
Executing agency formed
UG/ SHG/
Others (pl. specify)
Details (Annexure and Page Number)
Average annual income from
activity per SHG
1
Pathoda
Agro Center 1 LL, APL, BPL, SF SHG
2 Cattle Feed and
Nutrition Store 1 LL, APL,BPL, SF SHG
3 Green House 1 LL, APL,BPL, SF SHG TOTAL 3
Table no. 40.8: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas
S. No.
Names of Villages Name of activity
No. of SHGs
involved
Farmers (BPL/AL/LL
/MF/SF/Med.F/ LF AR)
Executing agency formed
UG/ SHG/
Others (pl. specify)
Details (Annexure and Page Number)
Average annual income from
activity per SHG
1 Suki Vegetable Nursery
1 LF, APL, SF SHG
TOTAL 1
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 143
Table no. 40.9: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas
S. No.
Names of Villages Name of activity
No. of SHGs
involved
Farmers (BPL/AL/LL
/MF/SF/Med.F/ LF AR)
Executing agency formed
UG/ SHG/
Others (pl. specify)
Details (Annexure and Page Number)
Average annual income from
activity per SHG
1 Sultanpur (Taiyabpura)
Agro Center 1 LL, APL, BPL, SF SHG
2 Poultry Farm 1 LL, APL,BPL, SHG
TOTAL 2
Table no. 40.11: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas
S. No.
Names of Villages Name of activity
No. of SHGs
involved
Farmers (BPL/AL/LL
/MF/SF/Med.F/ LF AR)
Executing agency formed
UG/ SHG/
Others (pl. specify)
Details (Annexure and Page Number)
Average annual income from
activity per SHG
1
Vyas Vasana
Horticulture Nursery
1 APL, SF, LF SHG
2 Vegetable Nursery
1 LL, APL,BPL,SF SHG
3 Cattle Feed and Nutrition Store
1 LL, APL,BPL,SF SHG
4 Poultry Farm 1 LL, APL,BPL,SF SHG TOTAL 4
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 144
Table no. 40.12: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas
S. No.
Names of Villages Name of activity
No. of SHGs
involved
Farmers (BPL/AL/LL
/MF/SF/Med.F/ LF AR)
Executing agency formed
UG/ SHG/
Others (pl. specify)
Details (Annexure and Page Number)
Average annual income from
activity per SHG
1
Zanda
Agro Cenret 1 LL, APL,BPL,SF SHG
2 Vegetable Nursery
1 LL, APL,BPL,SF SHG
3 Cattle Feed and Nutrition Store
1 LL, APL,BPL,SF SHG
TOTAL 3
Table no. 41: Linkages developed at Project level Sr. No. Project Name Name of activity Forward/Backward linkage Linkage with Outcome
1
IWM
P-1
2, V
agh
as Vermi Compost Unit
Forward: Use in vegetable and horticulture plantation Backward: Raw material at village level
Farmers group Improve soil health and increase productivity
2 Horticulture Nursary Forward: Pickle making Unit Backward: Vermicompost Unit
Local Markets Income will increase with food processing
3 Fodder Demonstration Local Area Farmers group Increase in income
4 Vegetable Nursary Forward: Good quality vegetable production Backward: Vermicompost Unit
Local Markets Income and Standard of living will be increased
5 Aloevera Plantation Local Area Local Markets Increase in income
6 Poltry Farm Local Area Local Markets Increase in income
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 145
Table no.42.1: Details of activities connected with vegetative cover in watershed works
S. No.
Name of
village
Name of structure/
work
Type of treatment Type of land Target Farmers (BPL/AL/LL
/MF/SF/LF
AR)
Executing agency formed
UG/ SHG/
Others
(pl.
specify)
Details (Annexure and Page Number) (i)
Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of
completion (mm/ yyyy)
1 Aboch
Horticulture with wire fencing
L C 1 1600 5.00 2013-14 UG
Regeneration
Agro-forestry
Fuel wood
Fodder
Afforastration
Pasture dev.
Nursery raising
Others (pl. specify)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 146
Table no.42.2: Details of activities connected with vegetative cover in watershed works
S. No.
Name of village
Name of structure/
work
Type of treatment Type of land Target Farmers (BPL/AL/LL
/MF/SF/LF
AR)
Executing agency formed
UG/ SHG/
Others
(pl.
specify)
Details (Annexure and Page Number) (i)
Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of
completion (mm/ yyyy)
2
Bh
un
gali
ya
Horticulture with wire fencing
L C 1 1600 5.09 2014-15 UG
Regeneration
Agro-forestry
Fuel wood
Fodder
Afforestation
Pasture dev.
Nursery raising
Others (pl. specify)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 147
Table no.42.3: Details of activities connected with vegetative cover in watershed works
S. No.
Name of
village
Name of structure/
work
Type of treatment Type of land Target Farmers (BPL/AL/LL
/MF/SF/LF
AR)
Executing agency formed
UG/ SHG/
Others
(pl.
specify)
Details (Annexure and Page Number) (i)
Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of
completion (mm/ yyyy)
3
Dan
diy
apu
r
Horticulture with wire fencing
L C 0.5 800 2.04 2014-15 UG
Regeneration
Agro-forestry
Fuel wood
Fodder
Afforestation
Pasture dev.
Nursery raising
Others (pl. specify)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 148
Table no.42.4: Details of activities connected with vegetative cover in watershed works
S. No.
Name of
village
Name of structure/
work
Type of treatment Type of land Target Farmers (BPL/AL/LL
/MF/SF/LF
AR)
Executing agency formed
UG/ SHG/
Others
(pl.
specify)
Details (Annexure and Page Number) (i)
Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of
completion (mm/ yyyy)
4
Kh
anp
ur
Horticulture with wire fencing
L C 0.5 800 2.04 2014-15 UG
Regeneration
Agro-forestry
Fuel wood
Fodder
Afforestation
Pasture dev.
Nursery raising
Others (pl. specify)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 149
Table no.42.5: Details of activities connected with vegetative cover in watershed works
S. No.
Name of
village
Name of structure/
work
Type of treatment Type of land Target Farmers (BPL/AL/LL
/MF/SF/LF
AR)
Executing agency formed
UG/ SHG/
Others
(pl.
specify)
Details (Annexure and Page Number) (i)
Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of
completion (mm/ yyyy)
5
Kot
wal
Na
Mu
vad
a
Horticulture with wire fencing
- - - -- - -- - - - -
Regeneration
Agro-forestry
Fuel wood
Fodder
Afforestation
Pasture dev.
Nursery raising
Others (pl. specify)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 150
Table no.42.6: Details of activities connected with vegetative cover in watershed works
S. No.
Name of
village
Name of structure/
work
Type of treatment Type of land Target Farmers (BPL/AL/LL
/MF/SF/LF
AR)
Executing agency formed
UG/ SHG/
Others
(pl.
specify)
Details (Annexure and Page Number) (i)
Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of
completion (mm/ yyyy)
6
Lad
uji
Na
Mu
vad
a
Horticulture with wire fencing
L C 0.5 800 2.50 2014-15 UG
Regeneration
Agro-forestry
Fuel wood
Fodder
Afforestation
Pasture dev.
Nursery raising
Others (pl. specify)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 151
Table no.42.7: Details of activities connected with vegetative cover in watershed works
S. No.
Name of
village
Name of structure/
work
Type of treatment Type of land Target Farmers (BPL/AL/LL
/MF/SF/LF
AR)
Executing agency formed
UG/ SHG/
Others
(pl.
specify)
Details (Annexure and Page Number) (i)
Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of
completion (mm/ yyyy)
7
Lalp
ur
(Nir
mal
i)
Horticulture with wire fencing
L C 0.5 800 4.46 2014-15 UG
Regeneration
Agro-forestry
Fuel wood
Fodder
Afforestation
Pasture dev.
Nursery raising
Others (pl. specify)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 152
Table no.42.8: Details of activities connected with vegetative cover in watershed works
S. No.
Name of
village
Name of structure/
work
Type of treatment Type of land Target Farmers (BPL/AL/LL
/MF/SF/LF
AR)
Executing agency formed
UG/ SHG/
Others
(pl.
specify)
Details (Annexure and Page Number) (i)
Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of
completion (mm/ yyyy)
8
Pat
hod
a
Horticulture with wire fencing
L C 1.5 2000 5.00 2014-15 UG
Regeneration
Agro-forestry
Fuel wood
Fodder
Afforestation
Pasture dev.
Nursery raising
Others (pl. specify)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 153
Table no.42.9: Details of activities connected with vegetative cover in watershed works
S. No.
Name of
village
Name of structure/
work
Type of treatment Type of land Target Farmers (BPL/AL/LL
/MF/SF/LF
AR)
Executing agency formed
UG/ SHG/
Others
(pl.
specify)
Details (Annexure and Page Number) (i)
Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of
completion (mm/ yyyy)
9 Suk
i
Horticulture with wire fencing
L C 1.0 1600 4.00 2014-15 UG
Regeneration
Agro-forestry
Fuel wood
Fodder
Afforestation
Pasture dev.
Nursery raising
Others (pl. specify)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 154
Table no.42.10: Details of activities connected with vegetative cover in watershed works
S. No.
Name of
village
Name of structure/
work
Type of treatment Type of land Target Farmers (BPL/AL/LL
/MF/SF/LF
AR)
Executing agency formed
UG/ SHG/
Others
(pl.
specify)
Details (Annexure and Page Number) (i)
Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of
completion (mm/ yyyy)
10
Sult
anp
ur
Horticulture with wire fencing
L C 1.00 1600 4.20 2014-15 UG
Regeneration
Agro-forestry
Fuel wood
Fodder
Afforestation
Pasture dev.
Nursery raising
Others (pl. specify)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 155
Table no.42.11: Details of activities connected with vegetative cover in watershed works
S. No.
Name of
village
Name of structure/
work
Type of treatment Type of land Target Farmers (BPL/AL/LL
/MF/SF/LF
AR)
Executing agency formed
UG/ SHG/
Others
(pl.
specify)
Details (Annexure and Page Number) (i)
Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of
completion (mm/ yyyy)
11
Vya
svas
ana
Horticulture with wire fencing
L C 1.00 1600 5.00 2014-15 UG
Regeneration
Agro-forestry
Fuel wood
Fodder
Afforestation
Pasture dev.
Nursery raising
Others (pl. specify)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 156
Table no.42.12: Details of activities connected with vegetative cover in watershed works
S. No.
Name of
village
Name of structure/
work
Type of treatment Type of land Target Farmers (BPL/AL/LL
/MF/SF/LF
AR)
Executing agency formed
UG/ SHG/
Others
(pl.
specify)
Details (Annexure and Page Number) (i)
Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of
completion (mm/ yyyy)
12
Zan
da
Horticulture with wire fencing
L C 1.00 1600 6.00 2014-15 UG
Regeneration
Agro-forestry
Fuel wood
Fodder
Afforestation
Pasture dev.
Nursery raising
Others (pl. specify)
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 157
Table no.42.13: Details of activities connected with vegetative cover in watershed works
S. No.
Name of
village
Name of structure/
work
Type of treatment Type of land Target Farmers (BPL/AL/LL
/MF/SF/LF
AR)
Executing agency formed
UG/ SHG/
Others
(pl.
specify)
Details (Annexure and Page Number) (i)
Ridge area (R)
(ii) Drainage
line (D)
(iii) Land dev. (L)
(i) Private
(ii) Community
(iii) Others
(pl. specify)
Area (ha)
No. of plants
Estimated cost
(Rs. in lakh)
Expected month & year of
completion (mm/ yyyy)
12
Vag
has
Horticulture with wire fencing
- - - - - - - - - - - - -
Regeneration - - - - - - - - - - - - -
Agro-forestry
- - - - - - - - - - - - -
Fuel wood - - - - - - - - - - - - -
Fodder - - - - - - - - - - - - -
Afforestation - - - - - - - - - - - - -
Pasture dev. - - - - - - - - - - - - -
Nursery raising
- - - - - - - - - - - - -
Others (pl. specify)
- - - - - - - - - - - - -
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 158
Table no.43: Details of activities in the CPRs in t he project areas
S. No.
Name(s) of the villages
CPR particulars Activity proposed
Units (Ha.)
Target
Target area under the activity (ha)
Estimated expenditure
(Rs. in Lakhs)
Expected no. of
beneficiaries
1 Aboch
To
tal
for
vill
ag
e
Afforastration 1.00 1.00 5.00
2 Bhungaliya Afforastration 1.00 1.00 5.09
3 Dandiyapur Afforastration 0.50 0.50 2.04
4 Khanpur Afforastration 1.00 1.00 5.20
5 Kotwalana na muvada
- - -
6 Ladujina muvada
Afforastration 0.50 0.50 2.50
7 Lalpur(Nirmali) Afforastration 1.00 1.00 4.46
8 Pathoda Afforastration 1.50 1.50 5.00
9 Suki Afforastration 1.00 1.00 4.00
10 Sulatanpur (Taiyabpura)
Afforastration 1.00 1.00 4.20
11 Vaghas - - - -
12 Vyas vasana Afforastration 1.00 1.00 5.00
13 Zanda Afforastration 1.50 1.50 6.00
Total for project 11.00 11.00 48.49
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 159
Table no. 44: Capacity Building Institution:
S. No. Name of the
Training Institute
Full Address with contact
no., website & e-mail
Type of Institute# Area (s) of specialization $
Accreditation details
Trainings
Reference Year
No. of trainings assigned
No. of trainees to be trained
1 Krushi Vigyan
Kendra
At. Po. -Dethali Ta. Matar,
Dist. Kheda
Research Institute
Agriculture/Horticulture/Animal Husbandry
GoI
2011-12 39 691
2 FES Anand NGO Livelihood Activities , Capacity
Building Society Reg.
Act
3 BISAG Gandhinagar Space
Application Remote Sensing GoG
4
Anand
Agriculture
University
Anand University Agriculture/Horticulture/Animal
Husbandry GoI
5 SPIPA Ahemedabad State govt.
Dept Water conservation/ Ground
water/ SMC GoG
# Central govt. Dept./ State govt. Dept./ Autonomous Body/ Research Institutes/ Universities/ Others (pl. specify) $ Capacity Building/ Agriculture/ Horticulture/ Animal Husbandry/ Pisciculture/ Remote Sensing/ Water conservation/ Ground water/ Forestry/
livelihoods/ entrepreneurship development/ others (pl. specify)
4.4 Capacity building
CCaappaacciittyy bbuuiillddiinngg iiss aa pprroocceessss ttoo ssttrreennggtthheenn tthhee aabbiilliittiieess ooff ppeeooppllee,, oorrggaanniizzaattiioonnss aanndd ssyysstteemmss ttoo mmaakkee eeffffeeccttiivvee aanndd eeffffiicciieenntt uussee ooff rreessoouurrcceess iinn
oorrddeerr ttoo mmaakkee aacchhiieevvee tthheeiirr oowwnn ggooaallss oonn aa ssuussttaaiinnaabbllee bbaassiiss”” ((GGeerrmmaann TTeecchhnniiccaall CCoorrppoorraattiioonn)).. TThhee ddeeffiinniittiioonn pprreettttyy mmuucchh ccaappttuurreess tthhee
eesssseennccee ooff ccaappaacciittyy bbuuiillddiinngg eexxeerrcciissee iinn aa hhoolliissttiicc wwaayy bbyy mmeennttiioonniinngg oorrggaanniizzaattiioonn aanndd ssyysstteemm aalloonngg wwiitthh ppeeooppllee.. FFrroomm aa lloonngg ttiimmee,, tthhee ffooccuuss
hhaass bbeeeenn oonn ppeeooppllee oonnllyy.. TThhiiss lleeaaddss ttoo aa ddiissttoorrtteedd aanndd ssuubbooppttiimmaall oouuttccoommee ooff tthhee wwhhoollee ccaappaacciittyy bbuuiillddiinngg eexxeerrcciissee.. NNoo wwoonnddeerr,, tthhee rreeaalliizzaattiioonn
hhaass ddaawwnneedd uuppoonn tthhee ppoolliiccyymmaakkeerrss aanndd tthheeyy hhaavvee ssttaarrtteedd ttoo eemmpphhaassiizzee uuppoonn tthhee hhoolliissttiicc aapppprrooaacchh rraatthheerr tthhaann aa ppiieecceemmeeaall oonnee..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 160
Table no. 45: Capacity Building plan:
S. No. District Project Stakeholders Total no. of persons
No. of persons to be trained
No. of training programmes
Estimated cost (Rs.)
1
Kheda
PIA/MDTs 4 4 11 7700
2 WDTs 4 4 11 7700
3 SHGs 220 0 6 110000
4 UGs 320 0 7 160000
5 WCs 143 26 4 71500
Total 691 34 39 356900
Table no.46: Information, Education and Communication Activities:
S. No. Activity Executing agency Estimated expenditure (Rs.) Outcome
(may quantify, wherever possible) 1 Street Plays
DWDU, Kheda-Nadiad
20000
Awareness for the importance of watershed project area
2 Video Shows 8000
3 Phamplets and Posters 6000
4 Banners and Holdings 8500
5 Tablo 5000
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 161
Chapter - 5 Budget
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 162
TThhee ffiirrsstt sstteepp iinn bbuuddggeettiinngg iiss ddiivviiddiinngg tthhee ccoosstt ooff tthhee pprroojjeecctt iinnttoo vvaarriioouuss ccoommppoonneenntt ss aass ddeettaaiilleedd iinn tthhee ccoommmmoonn gguuiiddeelliinneess aanndd ddoonnee
aaccccoorrddiinnggllyy iinn ttaabbllee nnoo.. 4477..11 IItt hheellppss uuss iinn ffuurrtthheerr iiddeennttiiffyyiinngg aaccttiivviittiieess uunnddeerr ddiiffffeerreenntt ccoommppoonneennttss aanndd aallllooccaattee aapppprroopprriiaattee ffuunnddss..
BUDGET
Table no. 47.1 : Budget at a glance for the Aboch village
No. Village Name Budget component % of Budget Cost requirement(Lac)
1 Aboch
Net Project Costs: 100 6492000
Administrative Costs 10 649200
Monitoring 1 64920
Evaluation 1 64920
Preparatory Phase:
Entry Point activity 4 259680
Institution and Capacity Building 5 324600
Detailed Project Report 1 64920
Watershed Works Phase:
Watershed Development Works 56 3635520
Livelihood activities for asset less 9 584280
Production systems and micro-enterprises 10 649200
Consolidation phase: 3 194760
TOTAL 6492000
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 163
Table no. 47.3 : Budget at a glance for the Bhungaliya village
No. Village Name Budget component % of Budget Cost requirement(Lac)
2 Bhungaliya
Net Project Costs: 100 9302400
Administrative Costs 10 930240
Monitoring 1 93024
Evaluation 1 93024
Preparatory Phase:
Entry Point activity 4 372096
Institution and Capacity Building 5 465120
Detailed Project Report 1 93024
Watershed Works Phase:
Watershed Development Works 56 5209344
Livelihood activities for asset less 9 837216
Production systems and micro-enterprises 10 930240
Consolidation phase: 3 279072
TOTAL 9302400
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 164
Table no. 47.3 : Budget at a glance for the Dandiyapura village
No. Village Name
Budget component % of Budget Cost requirement(Lac)
3 Dadiyapura
Net Project Costs: 100 2240400
Administrative Costs 10 224040
Monitoring 1 22404
Evaluation 1 22404
Preparatory Phase:
Entry Point activity 4 89616
Institution and Capacity Building 5 112020
Detailed Project Report 1 22404
Watershed Works Phase:
Watershed Development Works 56 1254624
Livelihood activities for asset less 9 201636
Production systems and micro-enterprises 10 224040
Consolidation phase: 3 67212
TOTAL 2240400
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 165
Table no. 47.4 : Budget at a glance for the Khanpur Village
No. Village Name Budget component % of Budget Cost requirement(Lac)
4 Khanpur
Net Project Costs: 100 1947600
Administrative Costs 10 194760
Monitoring 1 19476
Evaluation 1 19476
Preparatory Phase:
Entry Point activity 4 77904
Institution and Capacity Building 5 97380
Detailed Project Report 1 19476
Watershed Works Phase:
Watershed Development Works 56 1090656
Livelihood activities for asset less 9 175284
Production systems and micro-enterprises 10 194760
Consolidation phase: 3 58428
TOTAL 1947600
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 166
Table no. 47.5 : Budget at a glance for the Kotwal na Muvada village
No. Village Name Budget component % of Budget Cost
requirement(Lac)
5 Kotwal na
muvada
Net Project Costs: 100 948000
Administrative Costs 10 94800
Monitoring 1 9480
Evaluation 1 9480
Preparatory Phase:
Entry Point activity 4 37920
Institution and Capacity Building 5 47400
Detailed Project Report 1 9480
Watershed Works Phase:
Watershed Development Works 56 530880
Livelihood activities for asset less 9 85320
Production systems and micro-enterprises 10 94800
Consolidation phase: 3 28440
TOTAL 948000
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 167
Table no. 47.6 : Budget at a glance for the Laduji Na Muvada village
No. Village Name Budget component % of Budget Cost requirement(Lac)
6 Laduji na muvada
Net Project Costs: 100 1328400
Administrative Costs 10 132840
Monitoring 1 13284
Evaluation 1 13284
Preparatory Phase:
Entry Point activity 4 53136
Institution and Capacity Building 5 66420
Detailed Project Report 1 13284
Watershed Works Phase:
Watershed Development Works 56 743908
Livelihood activities for asset less 9 119556
Production systems and micro-enterprises 10 132840
Consolidation phase: 3 39852
TOTAL 1328400
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 168
Table no. 47.7 : Budget at a glance for the Lalpur Niramali r village
No. Village Name Budget component % of Budget Cost requirement(Lac)
7 Lalpur Niramali
Net Project Costs: 100 3654000
Administrative Costs 10 365400
Monitoring 1 36540
Evaluation 1 36540
Preparatory Phase:
Entry Point activity 4 146160
Institution and Capacity Building 5 182700
Detailed Project Report 1 36540
Watershed Works Phase:
Watershed Development Works 56 2046240
Livelihood activities for asset less 9 328860
Production systems and micro-enterprises 10 365400
Consolidation phase: 3 109620
TOTAL 3654000
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 169
Table no. 47.8 : Budget at a glance for the Pathoda village
No. Village Name
Budget component % of Budget Cost requirement(Lac)
8 Patuoda
Net Project Costs: 100 5833200
Administrative Costs 10 583320
Monitoring 1 58332
Evaluation 1 55332
Preparatory Phase:
Entry Point activity 4 233328
Institution and Capacity Building 5 291660
Detailed Project Report 1 58332
Watershed Works Phase:
Watershed Development Works 56 3266592
Livelihood activities for asset less 9 524988
Production systems and micro-enterprises 10 583320
Consolidation phase: 3 174996
TOTAL 5833200
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 170
Table no. 47.9 : Budget at a glance for the Suki Village
No. Village Name Budget component % of Budget Cost requirement(Lac)
9 Suki
Net Project Costs: 100 1468800
Administrative Costs 10 146880
Monitoring 1 14688
Evaluation 1 14688
Preparatory Phase:
Entry Point activity 4 58752
Institution and Capacity Building 5 73440
Detailed Project Report 1 14688
Watershed Works Phase:
Watershed Development Works 56 822528
Livelihood activities for asset less 9 132192
Production systems and micro-enterprises 10 146880
Consolidation phase: 3 44064
TOTAL 1468800
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 171
Table no. 47.10 : Budget at a glance for the Sultanpur village
No. Village Name Budget component % of Budget Cost
requirement(Lac)
10 Sultanpur
Net Project Costs: 100 3579600
Administrative Costs 10 357960
Monitoring 1 35796
Evaluation 1 35796
Preparatory Phase:
Entry Point activity 4 143184
Institution and Capacity Building 5 178980
Detailed Project Report 1 35796
Watershed Works Phase:
Watershed Development Works 56 2004576
Livelihood activities for asset less 9 322164
Production systems and micro-enterprises 10 357960
Consolidation phase: 3 107388
TOTAL 3579600
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 172
Table no. 47.11 : Budget at a glance for the Vaghas village
No. Village Name
Budget component % of Budget Cost
requirement(Lac)
11 Vaghas
Net Project Costs: 100 8203200
Administrative Costs 10 820320
Monitoring 1 82032
Evaluation 1 82032
Preparatory Phase:
Entry Point activity 4 328128
Institution and Capacity Building 5 410160
Detailed Project Report 1 82032
Watershed Works Phase:
Watershed Development Works 56 4593792
Livelihood activities for asset less 9 738288
Production systems and micro-enterprises 10 820320
Consolidation phase: 3 246096
TOTAL 8203200
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 173
Table no. 47.12 : Budget at a glance for the Vyas vasana village
No. Village Name Budget component % of Budget Cost
requirement(Lac)
12 Vyas vasana
Net Project Costs: 100 7057200
Administrative Costs 10 705720
Monitoring 1 70572
Evaluation 1 70572
Preparatory Phase:
Entry Point activity 4 282288
Institution and Capacity Building 5 352860
Detailed Project Report 1 705720
Watershed Works Phase:
Watershed Development Works 56 3952032
Livelihood activities for asset less 9 635148
Production systems and micro-enterprises 10 705720
Consolidation phase: 3 211716
TOTAL 7057200
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 174
Table no. 47.13 : Budget at a glance for the Zanda village
No. Village Name Budget component % of Budget Cost
requirement(Lac)
13 Zanda
Net Project Costs: 100 7021200
Administrative Costs 10 702120
Monitoring 1 70212
Evaluation 1 70212
Preparatory Phase:
Entry Point activity 4 280848
Institution and Capacity Building 5 351060
Detailed Project Report 1 702120
Watershed Works Phase:
Watershed Development Works 56 3931872
Livelihood activities for asset less 9 631908
Production systems and micro-enterprises 10 705720
Consolidation phase: 3 210636
TOTAL 7021200
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 175
Table no. 48: Village wise- component wise budget available under IWMP
Sl no Village
Activity
EPA
Inst
itu
tion
an
d C
B
DP
R
Wat
ersh
ed
dev
elop
men
t W
ork
Live
lih
ood
for
asse
t le
ss
Pro
du
ctio
n
syst
em a
nd
M
icro
ente
rpri
ses
Con
soli
dat
ion
Tot
al
1 Aboch 259680 324600 64920 3635520 584280 649200 194760 5712960
2 Bhungaliya 372096 465120 93024 5209344 837216 930240 279072 8186112
3 Dandiyapur 89616 112020 22404 1254624 201636 224040 67212 1971552
4 Khanpur 77904 97280 1947600 1090656 175284 194760 58428 3641912
5 Kotwalana na muvada 37920 47400 9480 530880 85320 94800 28440 834240
6 Ladujina muvada 53136 66420 13284 743904 119556 132840 39852 1168992
7 Lalpur(Nirmali) 146160 182700 36540 2046240 328860 365400 109620 3215520
8 Pathoda 233328 291660 58332 3266592 524988 583320 174996 5133216
9 Suki 58752 73440 14688 822528 132192 146880 44064 1292544
10 Sulatanpur (Taiyabpura) 143184 178980 35796 2004576 322164 257960 107388 3050048
11 Vaghas 328128 410160 82032 4593792 738228 820320 246096 7218756
12 Vyas vasana 282288 352860 70572 3952032 635146 705720 211716 6210334
13 Zanda 280848 351060 70212 3931872 631908 702120 210636 6178656
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 176
Table no. 49: Village wise gap in funds requirement
Sl No Village Total cost requirement
Total funds available under IWMP
Gap in funds requirement
1 Aboch 70.08 64.92 5.16
2 Bhungaliya 101.624 93.024 8.60
3 Dandiyapur 24.124 22.404 1.72
4 Khanpur 19.476 19.476 0
5 Kotwalana na muvada 10.34 9.48 0.86
6 Ladujina muvada 14.144 13.284 0.86
7 Lalpur(Nirmali) 39.12 36.54 2.58
8 Pathoda 61.772 58.332 3.44
9 Suki 15.548 14.688 0.86
10 Sulatanpur (Taiyabpura) 38.376 35.796 2.58
11 Vaghas 82.032 82.032 0
12 Vyas vasana 71.432 70.572 0.86
13 Zanda 74.512 70.212 4.3
Total 622.58 590.76 31.82
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 177
Table no.50: Details of Convergence of IWMP with other Schemes
S. No.
Village Phase/ Type
of work* Activity to be
carried out
Total cost requirement (Rs. in lakh)
Total funds available
under IWMP (Rs. in lakh)
Fund made available to
IWMP due to convergence (Rs. in lakh)
Scheme with which
convergence took place
Reference no. of
activity/ task/
structure in DPR
Level at which decision for convergence was
taken
1 Aboch Livelihood Drip Irrigation 70.08 64.92 5.16 GGRC P.I.A
2 Bhungaliya Livelihood Drip Irrigation 101.624 93.024 8.60 GGRC P.I.A
3 Dandiyapur Livelihood Drip Irrigation 24.124 22.404 1.72 GGRC P.I.A
4 Khanpur Livelihood Drip Irrigation 19.476 19.476 0 GGRC P.I.A
5 Kotwalana na muvada
Livelihood Drip Irrigation 10.34 9.48 0.86 GGRC P.I.A
6 Ladujina muvada
Livelihood Drip Irrigation 14.144 13.284 0.86 GGRC P.I.A
7 Lalpur(Nirmali) Livelihood Drip Irrigation 39.12 36.54 2.58 GGRC P.I.A
8 Pathoda Livelihood Drip Irrigation 61.772 58.332 3.44 GGRC P.I.A
9 Suki Livelihood Drip Irrigation 15.548 14.688 0.86 GGRC P.I.A
10 Sulatanpur (Taiyabpura)
Livelihood Drip Irrigation 38.376 35.796 2.58 GGRC P.I.A
11 Vaghas Livelihood Drip Irrigation 82.032 82.032 0 GGRC P.I.A
12 Vyas vasana Livelihood Drip Irrigation 71.432 70.572 0.86 GGRC P.I.A
13 Zanda Livelihood Drip Irrigation 74.512 70.212 4.3 GGRC P.I.A
TOTAL 622.58 590.76 31.82
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 178
Table no. 51: Public-Private Partnership in the IWMP projects
S. No. Name of Private Sector Partner
Agency
Type of agreement signed Financial contribution Partnership
Interventions Expected Outcomes
Comments a)MoU b)Contract
c) Any other (pl. specify)
IWMP Private sector
N.A
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 179
Chapter - 6 Expected Outcome
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 180
6.1 Expected Outcomes
6.1.1 Employment
EEmmppllooyymmeenntt iiss aa bbiigg pprroobblleemm iinn tthhee ((IIWWMMPP--1122)) VVaagghhaass WWaatteerrsshheedd PPrroojjeecctt.. MMaaiinn ooccccuuppaattiioonn ooff tthhee vviillllaaggeerrss iiss aaggrriiccuullttuurree,, aanniimmaall hhuussbbaannddrryy
aanndd ddaaiillyy wwaaggee llaabboouurr.. HHoowweevveerr,, dduuee ttoo uunndduullaattiinngg ssooiill,, ffaarrmmeerrss ttaakkee oonnllyy kkhhaarriiff ccrrooppss.. OOnnllyy ffeeww ffaarrmmeerrss ttaakkee rraabbii ccrrooppss.. LLaacckk ooff ffooddddeerr,, aanniimmaall
hhuussbbaannddrryy iiss vveerryy ddiiffffiiccuulltt iinn tthhee vviillllaaggeess.. SSoo ffaarrmmeerrss mmaaiinnllyy ddeeppeenndd oonn wwaaggee llaabboouurr aarroouunndd tthhee yyeeaarr..
Project will provide wage employment as well as self employment to the villagers. Wage employment would be created by engaging the people
in watershed development work like construction of check dam, farm bunding, nala plug, staggered contour trenches, Afforestation work. Self
employment would be created by providing different agriculture activities like nursery, vermi-compost, and in animal husbandry by providing
animals and fodder directly to the farmers. Project would provide indirectly self employment to the women through training activities of
catering, beauty parlour and waste ma se best
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 181
Table no. 52: Employment in Project area:
S. NO.
Names of Villages
Wage employment Self employment No. of mandays No. of beneficiaries No. of beneficiaries
SC ST Others Women Total SC ST Others Women Total SC ST Others Women Total
1 Aboch 6230 2731 32557 12158 41518 100 47 603 322 670
2 Bhungaliya 9947 4360 51983 19412 66290 160 75 963 513 1070
3 Dandiyapur 2923 1281 15275 5704 19479 47 22 283 151 314
4 Khanpur 1276 559 6668 2490 8503 21 10 123 66 137
5 Kotwalana na muvada
1172 514 6124 2287 7809 19 9 113 60 126
6 Ladujina muvada
2597 1138 13574 5069 17310 42 20 251 134 279
7 Lalpur(Nirmali) 4225 1852 22079 8245 28156 68 32 409 218 454
8 Pathoda 3655 1602 19102 7133 24360 59 28 354 189 393
9 Suki 2132 934 11142 4161 14208 34 16 206 110 229
10 Sulatanpur (Taiyabpura)
1488 652 7774 2903 9913 24 11 144 77 160
11 Vaghas 7434 3258 38851 14508 49544 120 56 719 384 799
12 Vyas vasana 4905 2150 25634 9573 32689 79 37 475 253 527
13 Zanda 7304 3201 38170 14254 48676 118 55 707 377 785
55289 24233 288932 107896 368454 892 416 5351 2854 5945
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 182
Table no. 53: Seasonal migration from Project area
Sl. No. Names of villages No. of persons migrating No. of days per year of migration
Pre-project Expected post project Pre-project Expected post project
1 Aboch 0 0
0 0
2 Bhungaliya 0 0
3 Dandiyapur 0 0
4 Khanpur 0 0
5 Kotwalna Muvada 0 0
6 Ladujina Muvada 0 0
7 Lalpur (Nirmali) 0 0
8 Pathoda 0 0
9 Suki 0 0
10 Sultanpur (Taiyabpur) 0 0
11 Vaghas 0 0
12 Vyas Vasna 0 0
13 Zanda 0 0
Total 0 0
6.1.2 Ground water table DDuuee ttoo tthhee uunndduullaattiinngg ssooiill,, ggrroouunndd wwaatteerr ttaabbllee iiss vveerryy llooww rraannggiinngg ffrroomm 99 –– 116600 mm.. AAfftteerr tthhee pprrooppeerr iimmpplleemmeennttaattiioonn ooff ssooiill aanndd wwaatteerr
ccoonnsseerrvvaattiioonn aaccttiivviittiieess,, ggrroouunndd wwaatteerr ttaabbllee wwoouulldd iinnccrreeaassee uuppttoo 66 –– 8800 mm..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 183
Table no. 54: Average ground water table depth in the project areas (in meters)
S. No. Names of Villages Sources Pre-Project level Expected Increase/decrease
(Post- Project)
1 Aboch
Open wells, Bore wells
9 mt,160 mt
6 mt, 80 mt
2 Bhungaliya 3 Dandiyapur 4 Khanpur 5 Kotwalna Muvada 6 Ladujina Muvada 7 Lalpur (Nirmali) 8 Pathoda 9 Suki 10 Sultanpur (Taiyabpur) 11 Vaghas 12 Vyas Vasna 13 Zanda
6.1.3 Drinking water PPeeooppllee uussee hhaannddppuummpp,, bboorree wweellll aanndd rriivveerr ffoorr ddrriinnkkiinngg ppuurrppoossee.. TThheessee ssttrruuccttuurreess pprroovviiddee oonnllyy 1122 mmoonntthh wwaatteerr ttoo tthhee vviillllaaggeerrss.. BBuutt iinn tthhee
ssuummmmeerr sseeaassoonn,, vviillllaaggeerrss ffaaccee aa lloott ooff pprroobblleemm.. WWaatteerr qquuaalliittyy iiss aallssoo nnoott ggoooodd..
AAfftteerr tthhee pprroojjeecctt,, vviillllaaggeerrss ccaann ggeett aallll oovveerr tthhee yyeeaarr ddrriinnkkiinngg wwaatteerr nneeaarrbbyy hhoouussee wwiitthh PPoottaabbllee qquuaalliittyy..
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 184
Table no. 55: Status of Drinking water
S. No.
Names of Villages Availability of drinking water
(no. of months in a year) Quality of drinking water
Comments Pre-project Expected Post project Pre-project Expected Post-project
1 Aboch 6
12 months Contaminated
Due to recharge of Ground Water, quality & quantity of potable water
will naturally improve
2 Bhungaliya 7 3 Dandiyapur 8 4 Khanpur 9 5 Kotwalna Muvada 6 6 Ladujina Muvada 7 7 Lalpur (Nirmali) 8 8 Pathoda 7 9 Suki 6
10 Sultanpur (Taiyabpur) 9 11 Vaghas 6 12 Vyas Vasna 7 13 Zanda
6
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 185
6.1.4 Crops AAllll aaggrriiccuullttuurree aaccttiivviittiieess aarree ssppeecciiaallllyy bbaasseedd oonn mmoonnssoooonn.. IInn tthhee ((IIWWMMPP--1122)) VVaagghhaass WWaatteerrsshheedd PPrroojjeecctt,, dduuee ttoo tthhee uunndduullaattiinngg llaanndd,, aaggrriiccuullttuurree
pprroodduuccttiivviittyy ooff tthhee ccrrooppss iiss vveerryy lleessss.. FFaarrmmeerrss ddoonn''tt uussee pprrooppeerr ffaarrmmiinngg ppaatttteerrnn iinn tthheeiirr ffiieelldd aallssoo.. TThheerree iiss nnoo iirrrriiggaattiioonn ffaacciilliittyy ffoorr tthhee
ccuullttiivvaattiioonn ooff tthhee ccrrooppss wwhhiicchh iiss ddiirreeccttllyy aaffffeecctteedd ooff tthhee ccrroopp yyiieelldd.. DDuuee ttoo tthhee eerroossiioonn ((gguullllyy aanndd rriillll)),, ffeerrttiilliittyy ooff tthhee llaanndd iiss llooww..
PPrroojjeecctt wwoouulldd iinnccrreeaassee tthhee pprroodduuccttiivviittyy ooff tthhee ccrrooppss bbyy pprroovviinngg pprrooppeerr iirrrriiggaattiioonn ffaacciilliittyy ttoo tthhee ffaarrmmeerrss aass wweellll aass tthhee ddiiffffeerreenntt ttrraaiinniinngg
pprrooggrraammmmeess ffoorr nneeww ffaarrmmiinngg tteecchhnnoollooggyy bbyy ccrroopp ddeemmoonnssttrraattiioonn aanndd ddiissttrriibbuuttiinngg hhyybbrriidd sseeeeddss ttoo tthhee ffaarrmmeerrss.. FFeerrttiilliittyy ooff tthhee llaanndd wwoouulldd
iinnccrreeaassee bbyy uussiinngg vveerrmmii--ccoommppoosstt aanndd pprrooppeerr ccrrooppppiinngg ppaatttteerrnn iinn tthhee llaanndd.. EErroossiioonn wwoouulldd bbee ddeeccrreeaasseedd bbyy ccoonnssttrruuccttiinngg ddiiffffeerreenntt ssooiill aanndd wwaatteerr
ccoonnsseerrvvaattiioonn mmeeaassuurreess..
Table no. 56:Crop area and yield in the project are a
Sr. No. Name of Project Name of crops
Pre-project Expected Post-project
Area (ha)
Average Yield (Qtl) per ha. Area (ha)
Average Yield per ha (qtl)
(IWMP-12) Vaghas
Kharif
Cereals 410.43 Area likely to increase of wheat, Gram, Pulse,
Cotton and Oil Seed Crops and other cash
crops
Rise@4 Percent per year for comtti. 5
years period expected
Paddy 481.27 2385
Bajri 470.46 1111
Sesamum 277.78 523
Cotton (irri) 577.99 457
Cotton (irri) 2104.17 224
Rabi/Summer
Wheat (Irri) 81.19 2454 Area likely to increase of wheat, Gram, Pulse,
Cotton and Oil Seed Crops and other cash
crops
Rise@4 Percent per year for comtti. 5
years period expected
Wheat (irri) 2104.17 441
Gram 43.59 403
Castor (irri.) 577.99 1359
Cumin 277.78 640
Other Pulse 37.54 546
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 186
HHoorrttiiccuullttuurree
TThheerree iiss nnoo aannyy hhoorrttiiccuullttuurraall ccrroopp ppllaannttaattiioonn iinn tthhee pprroojjeecctt aarreeaa dduuee ttoo nnoo aavvaaiillaabbiilliittyy ooff iirrrriiggaattiioonn ffaacciilliittiieess aanndd uunnssuuiittaabbllee cclliimmaattiicc ccoonnddiittiioonn..
WWiilldd aanniimmaall lliikkee wwiilldd ppiigg aanndd ootthheerr ccaattttllee aarree aallssoo aannootthheerr pprroobblleemmss ffoorr ppllaannttaattiioonn ooff hhoorrttiiccuullttuurree ccrroopp.. BBuutt ssttiillll wwee hhaavvee ccoonnvviinncceedd ppeeooppllee ffoorr
ppllaannttaattiioonn ooff ssoommee hhoorrttiiccuullttuurree ccrroopp lliikkee MMaannggoo,, PPoommeeggrraannaattee,, GGoooosseebbeerrrryy,, CChhiikkoooo,, GGuuaavvaa,, eettcc..
Table no. 57: Area under horticulture
S. No. Name of Village Existing area under horticulture (ha) Area under horticulture proposed to be
covered through IWMP 1 Aboch - -
2 Bhungaliya - -
3 Dandiyapur - -
4 Khanpur - -
5 Kotwalna Muvada - -
6 Ladujina Muvada - -
7 Lalpur (Nirmali) - -
8 Pathoda - -
9 Suki - -
10 Sultanpur (Taiyabpur) - -
11 Vaghas - -
12 Vyas Vasna - -
13 Zanda - -
TOTAL
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 187
Table no. 58: Forest/vegetative cover
S. No. Name of Village Existing area under tree cover (ha) Area under tree cover proposed (Ha.)
1 Aboch 6 1.00
2 Bhungaliya 3 1.00
3 Dandiyapur 2 0.50
4 Khanpur 12 1.00
5 Kotwalna Muvada - -
6 Ladujina Muvada 4 0.50
7 Lalpur (Nirmali) - 1.00
8 Pathoda - 1.50
9 Suki - 1.00
10 Sultanpur (Taiyabpur) 14 1.00
11 Vaghas - -
12 Vyas Vasna 8 1.00
13 Zanda 4 1.50
TOTAL 53 11.00
66..11..55 LLiivveessttoocckk
PPrroojjeecctt aarreeaa ccoovveerrss mmiillcchh aanniimmaall lliikkee ccooww,, bbuuffffaallooeess,, ggooaattss aanndd sshheeeepp.. DDiiffffeerreenntt aaccttiivviittiieess lliikkee pprroovviiddiinngg ggoooodd qquuaalliittyy ccoowwss aanndd bbuuffffaallooeess,,
ppoouullttrryy ffaarrmmiinngg,, pprroovviiddee ffooddddeerr bbyy eessttaabblliisshhmmeenntt ooff ffooddddeerr bbaannkk,, vveetteerriinnaarryy sseerrvviicceess eettcc..
IItt iiss eexxppeecctteedd tthhaatt tthhee ppoosstt pprroojjeecctt ppeerriioodd wwoouulldd sseeee aa ssuubbssttaannttiiaall iinnccrreeaassee iinn lliivveessttoocckk ppooppuullaattiioonn aanndd yyiieelldd ffrroomm tthheemm
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 188
Table no. 59: Details of livestock in the project areas (for fluids please mention in litres, for solids please mention in kgs. and income in Rs.)
S. No. Name of Village
Type of Animal Pre-Project Expected Post-project
Remarks No. Yield Income No. Yield Income
1 Aboch
Milch-animals 265 5.80 26.12 350 7.66 34.50
Draught Purpose animals 150 - 5.40 175 - 6.30
Animals for other purpose 20 15 0.65 50 35 1.50
S. No. Name of Village
Type of Animal Pre-Project Expected Post-project
Remarks No. Yield Income No. Yield Income
2 Bhungaliya
Milch-animals 325 7.12 28.47 375 8.21 32.85
Draught Purpose animals 165 - 5.94 195 - 7.02
Animals for other purpose 25 20 0.75 65 39 1.65
S. No. Name of Village
Type of Animal Pre-Project Expected Post-project
Remarks No. Yield Income No. Yield Income
3 Dandiyapur
Milch-animals 135 2.95 11.83 145 3.18 12.70
Draught Purpose animals 55 - 1.98 73 - 2.63
Animals for other purpose 9 12 0.35 15 25 0.45
S. No. Name of Village
Type of Animal Pre-Project Expected Post-project
Remarks No. Yield Income No. Yield Income
4 Khanpur
Milch-animals 138 3.02 12.08 145 3.18 12.70
Draught Purpose animals 50 - 1.80 58 - 2.08
Animals for other purpose 7 10 0.28 12 23 0.35
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 189
S. No. Name of Village
Type of Animal Pre-Project Expected Post-project
Remarks No. Yield Income No. Yield Income
5 Kotvad na munada
Milch-animals 65 2.80 6.04 70 1.55 6.35
Draught Purpose animals 75 - 2.70 80 - 3.15
Animals for other purpose 8 11 0.12 12 16 0.28
S. No. Name of Village
Type of Animal Pre-Project Expected Post-project
Remarks No. Yield Income No. Yield Income
6 Laduji na muvada
Milch-animals 55 1.20 4.82 75 1.64 6.57
Draught Purpose animals 35 - 1.26 50 - 1.80
Animals for other purpose 9 13 0.38 15 22 0.50
S. No. Name of Village
Type of Animal Pre-Project Expected Post-project
Remarks No. Yield Income No. Yield Income
7 Lalpur Nirmali
Milch-animals 165 3.6 12.03 210 4.80 18.26
Draught Purpose animals 75 - 2.70 95 - 3.42
Animals for other purpose 15 20 0.75 20 25 1.20
S. No. Name of Village Type of Animal
Pre-Project Expected Post-project Remarks
No. Yield Income No. Yield Income
8 Pathoda
Milch-animals 225 4.93 19.71 255 5.58 22.34
Draught Purpose animals 105 - 3.22 115 - 3.68
Animals for other purpose 25 35 1.00 35 40 1.25
S. No. Name of Village
Type of Animal Pre-Project Expected Post-project
Remarks No. Yield Income No. Yield Income
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 190
9 Suki
Milch-animals 55 1.20 4.82 75 1.64 6.57
Draught Purpose animals 35 - 1.26 50 - 1.80
Animals for other purpose 9 13 0.38 15 22 0.50
S. No. Name of Village
Type of Animal Pre-Project Expected Post-project
Remarks No. Yield Income No. Yield Income
10 Sultanpur
(Taiyab pura)
Milch-animals 165 3.6 12.03 210 4.80 18.26
Draught Purpose animals 75 - 2.70 95 - 3.42
Animals for other purpose 15 20 0.75 20 25 1.20
S. No. Name of Village Type of Animal
Pre-Project Expected Post-project Remarks
No. Yield Income No. Yield Income
11 vaghas
Milch-animals
Draught Purpose animals
Animals for other purpose
S. No. Name of Village
Type of Animal Pre-Project Expected Post-project
Remarks No. Yield Income No. Yield Income
12 Vyas vasna
Milch-animals 225 4.93 19.71 255 5.58 22.34
Draught Purpose animals 105 - 3.22 115 - 3.68
Animals for other purpose 25 35 1.00 35 40 1.25
S. No. Name of Village
Type of Animal Pre-Project Expected Post-project
Remarks No. Yield Income No. Yield Income
13 Zanda
Milch-animals 235 5.15 20.59 265 5.80 23.21
Draught Purpose animals 115 - 4.14 135 - 4.86
Animals for other purpose 35 45 1.25 40 50 1.50
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 191
Table no. 60: Backward-Forward linkages
S. No.
Project Type of Marketing Facility Pre-project (no.) During the project (no.) Post-project (no.)
1
IWMP-12,
Vaghas
Backward linkages
2 Seed certification
3 Seed supply system Yes Yes
4 Fertilizer supply system
5 Pesticide supply system
6 Credit institutions
7 Water supply Yes Yes
8 Extension services KVK KVK
9 Nurseries
10 Tools/machinery suppliers
11 Price Support system
12 Labour
13 Any other (please specify)
14 Forward linkages
15 Harvesting/threshing machinery
16 Storage (including cold storage)
17 Road network Yes Yes
18 Transport facilities Yes Yes
19 Markets / Mandis Collective Marketing
System Collective Marketing
System
20 Agro and other Industries
21 Milk and other collection centres
22 Labour
23 Any other (please specify) Vermi Compost Unit Vermi Compost Unit
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 192
Logical Framework Analysis
Objectives Expected outputs Proposed activities
Development Objective Improved and sustained management of natural resources in the watershed project
Immediate Objectives 1. District capable of appropriate management, monitoring and facilitation of community based natural resources management
• Overall land use zones for the watershed delineated into conservation, buffer and development zones based on village land use zones
• Sub-sector plans developed according to analysis and agreement on use of natural resources
• District staff trained in planning, management, monitoring and technical subjects
• District extension service functioning • IWMP plan updated
1.1.1 Review and delineate the catchment area into three overall zones through discussions with relevant villages and district staff. 1.2.1 Sub-sectors develop their annual plan, which supports the village development plans in line with the natural resources analysis. 1.2.2 Sub-sectors implement their annual work plans. 1.2.3 Follow-up on request from the district on designating the district protected area. 1.3.1 Identify training needs and conduct the training 1.4.1 Set-up the extension systems and assign adequate numbers of farming systems extension workers. 1.4.2Update IWM plan.
• Village land and forest allocation (LFA) completed for all villages
• Village action plans developed with prioritised activities
• Village requests submitted to district for assistance
2.1.1 Update LFA in villages and complete the LFA in the remaining villages 2.2.1 Conduct participatory rural appraisal (PRA) in all villages and draw-up village action plans 2.3.1 Assist villages in developing proposals
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 193
• Intra-village networks established to develop a sub-catchment plan
for village development activities 2.4.1 Assist villages in networking with each other
3. Improved enforcement and implementation of natural resources and environmental (NRE) legislation
• District staff trained in relevant NRE legislation
3.1.1 Access the legislation and conduct training workshops
4. Co-ordination and information exchange of NR activities among relevant stakeholders
4.1Coordination meetings held between relevant stakeholders 4.2MAF at the central level provides appropriate NR maps and information to the district level
4.1.1 District organizes regular meetings among the different stakeholders in relation to natural resources management 4.1.2Identify and discuss possible land use options that are agreeable to all partners 4.1.3Identify alternative income generating activities 4.2.1 District send request to MAF for maps and other NR information as appropriate.
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 194
Components Activities Outputs Effect Impact Village Institution Formation
§ Formation of Watershed Committee, User Group
§ One Watershed Committee each village
§ Project can be implemented and managed in a democratic and participatory way ensuring equity.
§ Unity and prosperity in the village management.
§ Number of User group depending on the coverage of particular intervention
§ People's Participation and positive perception towards the programme
Strengthening Village Institutions
§ Organise training and awareness programme for Village institutions
§ Awareness camps to be organised.
§ Quality of management of common resources improved.
§ Capacity building workshops and exposure visits User Group and Watershed Committee
§ trainings and exposure visits UGs and WCs to be held
§ Quality of distribution of benefits between people improved.
§ Facilitating and monitoring the functioning of UGs and WCs
§ Capacity building workshops to be organised
§ Increased awareness amongst women about village resources.
§ Strengthen linkages between UGs and WCs and Panchayat Institutions.
§ 1 Federations of UGs and WC to be formed.
§ Women participation enhanced in decision-making of GVCs.
§ Gender sensitisation of UGs and WCs to increase inclusiveness of samuh decision-making.
§ Involvement of youth and children in village development increased.
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 195
§ Sensitise village communities to involve children and youth in development.
Fund Management
§ Improve management and utilisation of UGs and WCs.
§ UGs and WCs operating bank account and managing resources on their own
§ Purpose, frequency and volume of use of the fund enhanced.
§ Prepare communities to explore other sources of income for UGs and WCs.
§ Volume of funds generated for UGs and WCs from other sources of income increased.
Ecological Restoration
§ Protection, treatment and regeneration of common and private lands
§ Common and private lands to be brought under new plantations and agro-horti-forestry like Neem, Ardusa, Nilgiri, prosopis, Banyan and Peepul
§ Fodder availability from common and private lands increased.
§ Better Ecological order in the area
§ Protection, treatment and regeneration of forest lands
§ Forest lands to be brought under new plantations and protection
§ Accessibility to common and forest lands increased with removal of encroachments and resolution of conflicts.
§ Increase in the proportion of households having more security of fodder
§ Plantation of fruits and forest species
§ Trainings, exposure visits and meetings to be organised for communities, village volunteers and staff
§ Reduction in drudgery of fodder and fuel collection, especially women
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 196
§ Impart trainings, conduct meetings and organise exposure visits for communities, village volunteers and staff to effectively plan, execute and monitor activities
§ Income generation intervention promoted
§ Identification and promotion of non-timber forest produce based income generation activities
Rainfed Area Development
§ Treatment of land through improved soil and moisture conservation practices on watershed basis
§ Land to be brought under improved soil moisture conservation practices
§ Improved productivity of treated land
§ Increase in proportion of households having more security of food
§ Promotion of good agricultural practices- horticulture, improved crop and vegetable
§ Good agricultural practices to be promoted
§ Increased availability of water in wells
§ Organic farming to be promoted
§ Increase in annual agriculture production
§ Increase in contribution of agricultural income to the household income
§ Fodder banks to be established
§ Farmers adopt organic farming practices
§ Promotion of organic farming practices
§ Agriculture based livelihood income generation activities to be promoted
§ Fodder security of farmers enhanced.
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 197
§ Formation of Fodder banks to increase fodder security and promote dairy development among communities
§ Water harvesting structures to be constructed
§ Increase availability of water for 9 to 12 months
§ Identification and promotion of agri-produce based income generation activities like grading, processing and packaging.
§ Drip Irrigation facilities to be distributed among farmers
§ Increased availability of water for livestock
§ Promotion of better Irrigation practices like drip irrigation
§ Approx 15000 person days of employment to be generated
§ Availability of irrigation water established
§ Impart trainings, conduct meetings and organise exposure visits of communities, village volunteers and staff to effectively plan, execute and monitor activities
§ Trainings, exposure visits and meetings to be organized for communities, village volunteers and staff
§ Farmers take two crops in a year
§ Increase in agricultural productivity of land
§ Availability of drinking water enhanced
Women’s Socio-political and economic empowerment
§ Formation & Strengthening of women’s SHG groups
§ Women’s SHG groups to be formed
§ Enhanced capacities of leaders of women's group in taking initiatives to solve problems at different levels.
§ Position of women in household, community, society (politically, socially and economically) as perceived by women and community at large
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 198
§ Capacity building of womenfolk § Federation of Women’s SHGs to be formed
§ Performance enhancement of SHGs in terms of participation, decision-making, leadership and fund management.
§ Capacity building of SHG leaders and accountants
§ Trainings to be conducted for preparation of woollen products from sheep and goats
§ Improved access to credit for livelihood purposes.
§ Equality & Equity in gender relations at home (decision making, expenditure, children’s education, health)
§ Linking SHGs with external financial institutions
§ Increased household income.
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 199
Chapter - 7 Quality and Sustainability Issues
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 200
7. Quality and Sustainability Issues
7.1 Plans for Monitoring and Evaluation
A web-based GIS system is being developed for monitoring and evaluating the in its project in its planning and implementation phases. The system would be
available on a public domain and can be accessed by all the stakeholders of the project. The system shows the entire state of Gujarat and all of those areas
selected over the next 18 years. Filtering allows the user to zoom on to one particular project. Details related to soil type, land use classification, inhabitation
etc., can be obtained village-wise. Furthermore, survey-number wise details related to ownership, irrigation source, yield etc., can also be accessed by the
user of the system. This system is being used for pooling up the details obtained from the DPR. In other words, the DPR is made available online in the form
of a database which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for
treatment etc., for further treatment and planning. The system would also show the satellite imageries of various years from the project inception stage to
the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The
system would serve as an aiding tool to the planner and evaluators for judging the efficacy of the project.
Yet another component of the Web-based GIS system is the Mobile based Monitoring & Evaluation System, which will help the ground staff alias WDTs
(Watershed Development Team) to transmit information from the ground level to the central server. Also, any higher-up official in charge of the project can
obtain information regarding the project area on their mobile phone by means of and SMS. The system works in the following manner. The WDT equipped
with a GPS instrument marks the latitude-longitude information of various treatment areas during DPR. The probable sites are then transferred on to the
central server. During the works phase, any progress in the treatment areas is reported to the server by means of an SMS by the WDT. Similarly, any nodal
officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent periods of time.
7.2 Plans for Project Management
The project management of any watershed programme is very important. It mainly depends upon the community organization and the village level
institution. In Felsani Project, watershed committee and various User Groups have been formulated for post operation and maintenance of assets created
during project period. Major emphasis will be on equity and sustainable benefit of the project even after implementation stage. A proper link-up will be built
during project period with various institutes and capacity building organization. They will act as a major kingpin during post implementation for scaling up
the successful experience during project.
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 201
7.3 Strengthening Forward and backward Linkages
A watershed programme is not a panacea for rainfed areas. Watershed activities alone cannot meet the objectives of augmenting production, increasing
income and conserving natural resources. The success lies on how strong backward (Input delivery system) and forward (post-harvest system) linkages
have been established. The backward linkages include credit delivery system, seed sector, labour markets, technology transfer mechanisms and other input
delivery systems. The forward linkages include access to output markets, transport facility; agro-processing, etc in some of the watershed, a strong linkage
of watershed programmes with various institutions yielded the desired outputs. The self-help groups, user groups and NGOs indeed strengthen backward
and forward linkages.
7.4 Watershed Development Fund
The major source of financial assistance after post implementation period is Watershed Development Fund. The contribution of it will comes mainly fund
the following.
Sr. No. Financial Details Percent
Contribution 1 Natural Resource Management
For General 10%
For SC/ST 5%
2 For intensive agriculture, Horticulture & Animal husbandry
For General 40%
For SC/ST 20%
7.5 User Charges Various user groups will be formed in village. These user groups will collect user according to the designated rules formed during the formation of user
group. These funds will be transferred to the WDF funds as per these formulated rules. The secretary of Watershed Committee (WC) shall maintain the
records.
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 202
Chapter - 8 MAPS
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 203
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 204
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 205
DETAILED PROJECT REPORT, IWMP-12 (Vaghas ),2011-12
District Watershed Development Unit, Nadiad Page 206