handumanan es i

3
School name: Handumanan Elementary School I T2T Validation Rank: Person interviewed: Theda F. Limbana Position of person interviewed: Principal IV Other attendees: Proposed T2T classroom: Grade 5 Inside shot of the classroom Window Door School grounds School Gymn Ground Particular Comment(s): Handumanan Elementary School is the biggest school in the division with its more than 3,800 pupils enrolled for that school year alone. There are 3 LED TV's which are purchased by section PTA officers, 2 in grade VI and 1 in grade V. Feeding programs are Criteria 1 School's openness and capacity to adapt to ICT-enabled instructions All of the teachers have mobile phones. Most teachers have mobile phone with camera and video feature. Most teachers are adept to mobile phone technology. The following are the trainings attended by the teachers: eClassroom Orientation (PanaBoard Manipulation). Those who attended the ICT training used the skills learned in: teaching pupils on basic computer operations, researching useful educational IMs and using them as motivation tool in class.

Upload: katrina-jean-dela-cruz

Post on 13-Aug-2015

53 views

Category:

Technology


1 download

TRANSCRIPT

School name: Handumanan Elementary School IT2T Validation Rank:Person interviewed: Theda F. LimbanaPosition of person interviewed: Principal IVOther attendees:

Proposed T2T classroom: Grade 5

Inside shot of the classroom Window Door

School grounds School Gymn Ground

Particular Comment(s):• Handumanan Elementary School is the biggest school in the division with its more than 3,800 pupilsenrolled for that school year alone. There are 3 LED TV's which are purchased by section PTA officers, 2 ingrade VI and 1 in grade V. Feeding programs are

Criteria 1 School's openness and capacity to adapt to ICT-enabled instructions• All of the teachers have mobile phones.• Most teachers have mobile phone with camera and video feature.• Most teachers are adept to mobile phone technology.• The following are the trainings attended by the teachers: eClassroom Orientation(PanaBoard Manipulation).• Those who attended the ICT training used the skills learned in: teaching pupils on basiccomputer operations, researching useful educational IMs and using them as motivation toolin class.

Criteria 2 Commitment of the school to support and sustain the project• The school provides a safe room and budget allotment for maintenance and repairs of theequipment.• The school keeps the equipment in the principal's office/Stock Room.• The school sustains their operational expense through: Secure funds from MOOE -Maintenance Operations and Others Expenditures, PTA Contribution, Solicitation from privateindividuals/institutions, Canteen Fund, and Organize fundraising events together with PTA.• The community supports and helps as project volunteers and fundraisers in school projectsand activities.• The projects fundraised and organized by the community are the following: BrigadaEskwela.

Criteria 3 School performance indicators• The school has a low bracket absenteeism rate of (4.0%). • The school's drop-out rate falls on average bracket of (8.5%).• The following interventions are employed to resolve issues on drop-out and absenteeism:Home Visitation and Dialogue with Parents.• The school's over-all mean percentage rating is 39.98%• The school's over-all mean percentage ratings are as follows: English (41.81%); Science(40.44%); and Math (37.68%) • The following are the factors that contributes to result performance in NationalAchievement Test: Remedial Classes, Learning action cell for teachers (LAC), Additionalassignments for students and Compilation of old NAT questions for students drill.• There are 48 Grade 5 students and 42 Grade 6 students as average class size in the school.• The school is a recipient of: E-package (educational DVD) and Child Inc..

Criteria 4 Accessibility to electrical power and Globe mobile phone signals• Electricity in the area is stable. • The GLOBE signal within the proposed T2T classroom is Strong (6-7 bars).• The Globe signal within the school ground is Strong (6-7 bars).

Criteria 5 School's ability to provide security• The proposed T2T classroom is a Grade 5.• The size of the proposed T2T classroom is 7 x 8 meters.• The following are present inside the proposed T2T classroom: 2 electrical socket(s), tablesand chairs are greater than or equal to average class size and blackboard or whiteboard.• In terms of security the school has the following: Proposed T2T Classroom: Windows are well built and with grills; Door is well built, withdoorlock, . School ground: There are security guard/s provided by school/LGU or maintenance serving assecurity personnel, barangay tanod/s provided by the Barangay, well-built school gate andfence around the school.• There is no case of theft recorded.• There were calamities experienced in school.

Criteria 6 External intervention support• The external interventions/support received by the school are the following:Local Government Unit: LGU provided funds to support the concretion of the schoolpathwalk .

Criteria 7 Submission of reports• The reports are sent to the DepEd office via hand carry.• The following are the communication equipment present in school: Computer, MobilePhone and Telephone.• Teachers have no difficulty in submitting reports.