RAB Meeting
2
• Control release of PCBs from Hangar 1 in accordancewith EE/CA (July 2008) and Action Memorandum(December 2008)
Demolition of interior structures
Removal of contaminated siding
Application of weather-resistant coating to steel frame
Project Objective
3
Continued Monitoring andProtection Measures
• Increased biological activity
• Increased storm water and groundsurface protection during rainy season
• Navy and NASA air monitoring datademonstrates control of air emissions
4
Increased Biological Activity & Mitigation
• No Burrowing Owls
• Discourage IncipientNest Building byRavens and HouseFinches
• Brandt’s CormorantRescue
5
Increased Storm Water Management
Protection of Grassy Areas withHeavy Plastic Sheeting
Runoff Pumped to Holding Tanksand Treatment System
6
RAB Tour – March 14, 2012
7
Permanent Roof Access
• Roof Ridge Access for FAA Beacon and Holiday Star
• Mock-up Display for Navy and NASA Engineers
8
Progress – January 23
9
Progress – April 26
10
Mansard Panel Removal Completed
11
Zone 6 – Siding Removal
12
Palo Alto Perspective
13
Schedule
• Fieldwork in zones 1 – 3
Nearly Complete
• Fieldwork in zones 4 – 6
Ongoing
• Complete mezzanine andtouch-ups, confirmationsampling and demobilize
September 2012
• Submit After ActionCompletion Report
Winter 2012
14