PRESENTED 12/07/2015 ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B 106 CONCRETE PRE·CAST CONCRETE AMENITIES The VIllage at Totem Lake CenterCal Pl'operties. LLC · AIIW11QY1th Architect WOOD COLORED ASPHALT HARDSCAPE MATERIAL .SUMMARY FINISH & SCHEDULE 49

Upload: others

Post on 24-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

PRESENTED 12/07/2015

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

APPENDIX B

106

CONCRETE

PRE·CAST CONCRETE

AMENITIES

The VIllage at Totem Lake CenterCal Pl'operties. LLC · Dewlo~l!'"

AIIW11QY1t h AMoc•Dte~ Architect L•~~>;mo:< lntqiTI!IhQ<i~l . In~ l.~nd~P9 Ar~h•tc<.t

WOOD

COLORED ASPHALT

HARDSCAPE MATERIAL .SUMMARY FINISH & SCHEDULE 49

Page 2: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

PRESENTED 12/07/2015 PREVIOUS

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

APPENDIX B

107

Design Guidelines

Village at Totem Lake

Project Goal: To completely transform an antiquated retail center at what has evolved Into a primary trade node In north Kirkland, along the 1-405 corridor, Into 11 signature mixed-use devel­opment.

Project Summary; The VIllage at Totem Lake will become a dynamic mixed-use project focused on expand­ed retail offerings, a new market, restaurants and cafes, entertainment and upmarket residential.

Program ObJectives: To re-establish the core or what has become the Totem Lake business district, with a semi-regional retail and mixed-use complex to create a vibrant, pedestrian-oriented vil­lage center. The redevelopment or The VIllage at Totem Lake will provide the Kirkland community with retail and restaurant offerings not presently represented in the city. It will also showcase a significant upmarket residential community that will benefit from the proximity to these new amenities and the nearby regional transit center and medical complex.

Project Phasing: In order to move this proJect along In a timely manner, phase one Is focused on the lower existing mall site, primarily driven by some strategic relocations needed to maintain cer­tain existing tenants. This essentially creates, what CenterCal believes would be a slight delay on starting a phase two, which is presently the site of the upper mall. This area is expected to be begin development almost In parallel to the phase one effort, but may take slightly longer to complete.

Development Plan: The rebuilt Village at Totem Lake envisions a high quality mixed use village with em­phasis on vibrant streetscapes, public spaces with amenities that tie together the retail, restaurants and cafes, residents as well as employees on site and the adJacent medical offices and hospital. Centercal will create stylish pedestrian oriented architecture using high quality materials and details Including brick, precast, stone, and cementuous siding integrated into a timeless combination of architecture. The building design will provide a variety or shapes and sizes that will Incorporate Individual tenant storefronts within a strong Centercal design standards and internal review process.

The Village at Totem Lake

Buildings A, B, K, L, and M Objectives Village at Totem Lake

BUILDINGS

1. Please focus in on building elevations and indicate specific materials in relationship to the elevations.

2. Please clearly indicate facade jogs or change in plane.

3. Please clearly indicate elevation direction and key buildings to a master key.

4. Please indicate final Whole Foods design.

5. Indicate mechanical screening for Whole Foods roof top equipment.

6. Indicate elevation heights on all elevations.

General Concepts/Concerns:

A. Compliance with Design Guidelines and Approved Conceptual Master Plan.

B. Need to start considering the "front" of the project at 120th.

CenterCal Properties, LLC Developer Antunovich Associates · Architect DESIGN GUIDELINES & ORB COMMENTS

Lifescapes International, Inc Landscape Architect

28

Page 3: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

PRESENTED 12/07/2015

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

APPENDIX B

108

The Village at Totem Lake Ceflt~l Pt~»e~t~e5o. LLC ~looeor

Antunovte., As~t•"5 A.~MIX1 BUILDING A - RENDERING 10 l.lf•~c.nPG" lntern.\tJOI'\41, n: Ulnd~O. ArC:MOC-1

Page 4: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

PRESENTED 12/07/2015

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

APPENDIX BAPPENDIX B

109

BUILDING A SOUTH ELEVA nON

PARTIAl FIRST FlOOR/SIDEWAlK PLAN

BUILDING MATERIALS

Stollt llllceo INIIIIIICI!IIMII ~ Bnc~ o.c..n~~ve llghl nmn. MaW and gina anapJ

ca..tatona­caatatone

The VIllage at Totem Lake CenterCI! I Propertie5, LLC · Developer

Antunovlch A$soclates · Architect Ufesc:apss International, Inc · Landscape Architect

BUILDING A -SOUTH ELEVATION

,..ill_, IMUiauw;tutt Paillltd IMUI AM lrmi!IIH 9iiN ·~ Scvo:co Pnrfln~ ..,.tal KfMnwall IJ!oyond Pnrllnlalwd .... tal apac•r PalniJod . ....Ulend c ..tor c.anop)'

PnrftnlaiMcl aluminum ooplng

11

Page 5: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

PRESENTED 12/07/2015

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

APPENDIX B

110

The Village at Totem Lake Ceflt~l Pt~»e~t~e5o. LLC ~looeor

Antunovte., As~t•"5 A.~MIX1 BUILDING A - RENDERING 12 l.lf•~c.nPG" lntern.\tJOI'\41, n: Ulnd~O. ArC:MOC-1

Page 6: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

PRESENTED 12/07/2015

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

APPENDIX B

111

BUILDING A EAST ELEVATION

PARTIAL FIRST FLOOR/SIDEWALK PLAN

BUILDING MATERIALS

The VIllage at Totem Lake CenterCI! I Propertie5, LLC · Developer

Antunovlch A$soclates · Architect Ufesc:apss International, Inc · Landscape Architect

' SCALE 1·20

BUILDING A - EAST ELEVATION 13

Page 7: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

PRESENTED 12/07/2015

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

APPENDIX B

112

The Village at Totem Lake Ceflt~l Pt~»e~t~e5o. LLC ~looeor

Antunovte., As~t•"5 A.~MIX1 BUILDING B- RENDERING 15

l.lf•~c.nPG" lntern.\tJOI'\41, n: Ulnd~O. ArC:MOC-1

Page 8: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

PRESENTED 12/07/2015

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

APPENDIX B

113

BUilDING B NORTHWEST ElEVATION

PARTIAL FIRST FLOOR/SIDEWALK PLAN

Stucco Cast Stone Stucco

BUILOING MATERIALS

The VIllage at Totem Lake CenterCI! I Propertie5, LLC · Developer

Antunovlch A$soclates · Architect Ufesc:apss International, Inc · Landscape Architect

; _ SCALE 1:20

Srucco

BUILDING B - NORTHWEST ELEVATION 16

Page 9: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

PRESENTED 12/07/2015

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

APPENDIX B

114

The Village at Totem Lake Ceflt~l Pt~»e~t~e5o. LLC ~looeor

Antunovte., As~t•"5 A.~MIX1 BUILDING B- RENDERING 17

l.lf•~c.nPG" lntern.\tJOI'\41, n: Ulnd~O. ArC:MOC-1

Page 10: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

PRESENTED 12/07/2015

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

APPENDIX B

115

Pnluhed•"-num c..t•-lldo.o eric~< noat.d;Loaa •-'ronl lrnulaaclglau •lolwlmr!t C..l •- lluda •11<1 •llh •tal•n• glan c-.., MellJ ~;AOQPJ 111.-t.J CMOp)' C..l-1>-. swc:co

' 1_, ___ ;;;:;::::;;;;;:;;;;,.-;;~=~~;;.::.:=;;e;;~~;;;;;;~e;;~ g=:::~:!;~;z:~~~ i"tR~L -!!iil

BUILDING B SOUTHWEST ELEVATION

PARTIAL FIRST FLOOR/SIDEWALK PLAN

BUILDING MATERIALS

Preflnlshed Metal

The VIllage at Totem Lake CenterCI! I Propertie5, LLC · Developer

Antunovlch A$soclates · Architect Ufesc:apss International, Inc · Landscape Architect

A lumU'!ul"'l Slorefront

BUILDING B -SOUTHWEST ELEVATION

'\ , SCALE 1:20

18

Page 11: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

PRESENTED 12/07/2015

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

APPENDIX B

116

The Village at Totem Lake Ceflt~l Pt~»e~t~e5o. LLC ~looeor

Antunovte., As~t•"5 A.~MIX1 BUILDING B- RENDERING 19

l.lf•~c.nPG" lntern.\tJOI'\41, n: Ulnd~O. ArC:MOC-1

Page 12: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

PRESENTED 12/07/2015

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

APPENDIX B

117

BUILDING B NORTHEAST ELEVATION

PARTIAL FIRST FLOOR/SIDEWALK PLAN

-

Stucco

BUILDING MATERIALS

The VIllage at Totem Lake CenterCI! I Propertie5, LLC · Developer

Antunovlch A$soclates · Architect Ufesc:apss International, Inc · Landscape Architect

Cast StOll*

l'rtt(Jftlaf\lld •lilmhurn 81'klo. lriaul•l8d ga. .. • ...,.front CMIPIM li!ltQI c:lftOIIY ""finished _..a~ ... Slucca

Stucco Prollnblhed Metal Panel

BUILDING B - NORTHEAST ELEVATION

'

· ' SCALE 1:20

Stone

20

Page 13: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

APPENDIX C:BUILDINGS A & B

BUILDING K

BUILDING M

LOADING DOCK FOR BUILDINGS A & B

118

Page 14: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

119

THEVI_ LAGE .AT TOTEM LAKE

Mlxed-Ure Development ICl rldall4!, - hlrl an

c..ru.c.J--W: --

SUBMITTAL DATE : 12/21/ 15 PRESENTATION DATE : 01 /04/ 16

DESIGN REVIEW BOARD SUBMIITAL

4

Page 15: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

120

n.lllllogo•T-..I.IIot Qt!WQj' ........ U.C • CIMIIM ~ .......... ...........

llillllollNf .......... II'IC ........ Nd~i~Mcl

City of Kirkland Design Board Review January 4, 2016

Meeting Objectives:

Obtain final design direction for: • BuildingA • Building B • BulldlngsK&M • Project Loading Environment • Existing Retail Facade Redesign (Ross, etc.)

Future meetings: • Phase II, Upper Site- Residential and Retail/Theatre • Building C

JANUARY 4,2015 MEETING OBJECTIVES 2

s

Page 16: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

121

8

Page 17: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

122

'lblt\11 .... --Ub c.-c.~....-.u.c . .........

~---- · --­"-"' ........ M , ~---

BUILDING A

ORB DIRECTION:

li.lrther devl!lop 1201h snetsape il!ld flcade work

RESPONSE: In Response to commei!IJ reaM!d at ltle last ORB meeting ltle Appllant has fine runed 1t1e elemlons to add more plilntl!rs,. ~nd his shown zdlllonal detalllng reg;~rdlng onopll!$. smlng ~~a~. and 1t1e loildlng IIIli.

4

7

Page 18: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

123

1M111111go•T-..I.IIIot QtMQj' ,.,..,.,..I.LC . CIMitOe' ~ ....................

~~W·...._..,..,..,..

BUILDING A- RENDERING s

8

Page 19: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

124

MATIAI. A liST FLIXlMUlEWAl.lPI.All

n.lllllogo•T-..I.IIot Qt!WQj' ........ U.C • CIMIIM ~ .......... ........... BUILDING A- EAST ELEVATION 6

llillllollNf .......... II'IC ........ Nd~i~Mcl

I

Page 20: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

125

llw\l ... n.nLIIe QIMQII,.....W: . ~ ~ ........ ......

._. ............. . '-*-"' ..... BUILOINGB

ORB DIRECTlON: For Buildings A 1111d B provide rnooe lntVrmlrtlon on unoples. parapets, and !tie pnlpiJ sed roof mndrllon.

RESPONSE:

.....,_, , fUNO.IIIWIHIIW --

Bui~!JS A and Bwlll hiM! deslglated mechlllllaiZIDIII!ll thirtwlll beii~Jr,~ropttobely saeened, parapets will hiM! proper 1'1!0.11'1'11 and canopies wll be provide near oontfnuous poutecllun fur the pedesb'liln •round the site.

10

7

Page 21: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

126

Th~ Wlag~ at Totem t.akt" ~Piopfl'l'""u,(~ ~o\\>0(141"' M~

I.JonCAfNIItli~II'IC ~~et'l

D

D _,._ ...

o-

-·--Lr

· ; -• . 1

. -'

r ., .. .. II ' ' • " !..·•

• • . . •

' •

l

• • ' ' ' '-'-·~ ~-·

r • • 1 ' If .: ..

·,

0

---

0 U•

r--~ • o(l

• II 'I

• _, .('

-' -,- r-·----'

li ij

----· __ ... ____ , __ .___ .: ' •

BUILDiNG A- MECHANICAL AND CANOPY PLAN

0

8

11

Page 22: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

127

Th~ Wlag~ at Totem take ~Piopfl'l'""u,(~ ~o\\>0(141"' M~

I.JonCAfNIItli~II'IC ~Mfl!et'l

0 0 0 0 0 0 • • •

~ -

®·

®·

®·

®· !

® • ." ..

BUILDiNG B- MECHANICAL AND CANOPY PLAN

• OACH.IEHJ 1

0 @ rl..f~ Dltv1&.611tl

DUICif ""II'O!Gl

::--

.· ----

9

12

Page 23: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

128

Tlwlllogo~LIIIoo C..CW .......... U£' ·~

~---- · ...... ..-........... ~,.,.,...

u

t"

;

. • f f

·~ ·

BUILDING B- CANOPY PLAN AND KEY

....

• ..

mJQMIIr1

_,.._ --

• ..

< •

"

13

10

Page 24: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

129

1\Jil.DINGI NOR'JMEAST~

P[tflnlthOG Htu!l P.;)nri Slone

n.lllllogo•T-..I.IIot Qt!WQj' ........ U.C • CIMIIM ~ .......... ........... BUILDING 8- NORTHEAST ELEVATION ,

llillllollNf .......... II'IC ........ Nd~i~Mcl

14

Page 25: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

130

n.lllllogo•T-..I.IIot Qt!WQj' ........ U.C • CIMIIM ~ .......... ........... LOADING DOCK

llillllollNf .......... II'IC ........ Nd~i~Mcl

ORB DIRECllON: Pleeose pf'Q\IIdedellr mtegyfot"tlle !cHiding dodt.-ld. l~ng clock doors.

RESPONSE: A combined CEiltr.lll..ollclng Dock ¥1411 be p!OV!cled within tile Cl!nla' of Building A and Building B aa::aslble fnlm 1201b Avenue. The I.Daclng Oockeree 111111 allltaln fvurb\lck doc: b. tl'll$h comPKtorJ ~nd d~.Wnll$tel:l; eledi!Clll t!'llllslormerl and oltll!f UUII'Iysef\00! elemenu.lhe Loading Ooc:keree WI be completely saeened from 120th Avenue by .a (SOft.x 201\.,) .aluminum cwemead door.

15

12

Page 26: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

131

The VIllage at Totem Lake Cente<Col Properties, U.C · DeYeloper

Antunovldl Assad.,.. • An:hltoct Lifescaptslntemationa~lnc • l.Jindsape:Architect:

LOADING DOCK 13

16

Page 27: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

132

llle'tlogo:otTo!an'"* ~,.,....uc·~ ...................... ......,

~~--·~ ...... LOADING DOCK· PERSPECilVE LOOKING SOUlll ON 120TH 1-4

17

Page 28: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

133

Th~ Wlag~ at Totem take ~Piopfl'l'""u,(~ ~o\\>0(141"' M~

I.JonCAfNIItli~II'IC ~Mfl!et'l

LOADING DOCK - PERSPECTIVE LOOKING NORTH ON 120TH 15

18

Page 29: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

134

TrltWIIIge.,_LIIIo ~~w: ·~

oWIN*II,_... . -~~ ... ~ ........ BUILDING K

ORB DIRECTlON: Plate c:Brly cie611! the detlgn lnll!mand IN1el1al pelet~e for Building K

RESPONSE:

Building ~ • mul~ rdlll building. is an eleg~~nt strvc;tun! wittlapplqlriate scale and ~uraii!!Cpl'ftSion. Till! entrances are l!lllphasll!l!d with a change In mall!rlif and eleval2d rod lines.

1&

16

Page 30: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

135

Th~ Wlag~ at Totem take ~Piopfl'l'""u,(~ ~A\>0(141"' M~

I.JonCAfNIItli~II'IC ~Mfl!et'l

BUILDING K- RENDERING

-' OACH.IEHJ 1 rl..f~ Dltv1&.611tl

DUICif ""II'O!Gl

20

17

Page 31: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

136

$1UCC02

n.lllllogo•T-..I.IIot Qt!WQj' ........ U.C . CIMIIM ~ .......... ........... BUILDING K- ELEVATIONS AND PLAN

llillllollNf .......... II'IC ........ Nd~i~Mcl

STANDING SEAM METAL CANOPY

CAIN AS AWNING

18

21

Page 32: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

137

rl::Ai'IVAS AWNING STUCCO 1

n.lllllogo•T-..I.IIot Qt!WQj' ........ U.C . CIMIIM ~ .......... ........... BUILDING K- ELEVATION

llillllollNf .......... II'IC ........ Nd~i~Mcl

LOWPRORLE STAI'IOING SEAl.! •ETAL ROOf

19

22

Page 33: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

138

• Integral COlor Concrete w/ Acid 30"X30" Sawcut Grid

.--------------10' Wide Multi Purpose Concrete SidewalkD

L----,=~-=----:c==--=-----==,;z.=----- Modular Pavers @ Pedestrian

The Village at Totem Lake centercal Properties, LLC Developer

Antunovich Associetes · Architect Lifescapes International. Inc · Landscape Architect

Crossings w/ Concrete Band 0

~AREA-,~- LANDSCAPE PLAN ENLARGEMENT "i'ntersection at 120th Avenue & Totem Lake Blvd

0 10 20 ~ NORTH ----...J--SCALE 1"•20' -0"

K&YMAP

20

23

Page 34: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

139

'lblt\11 .... -Ub c.-c.~....-.u.c . ......... ~---- · .......

"-"' ........ N , ~---

BUILDINGM

ORB DIRECTION:

Pla5e clurly dlfine 1M design Intent and ml111!rlal pa~letw for BuildingM

RESPONSE:

~· .....,. __ --

Building M. ; m~-tallnt nWI bulldfng.ls ;m elegant Slructure with ~pproprlate SIClll" .and ard!itl!dut'lll expoasion. Th" entrana:s ano em phi*"'<< with a d1an9" rn malll!rlal and elevalll!d rootlrnes.

24

21

Page 35: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

140

~VIII~~~ Totl!m takl! (~,_, ... I( -~ A\lotUI-" ,. IIM't

~ ... -- ... ~-... , BUILDING M - RENDERING 22

25

Page 36: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

141

BUILDING MATtRIALS

The Village at Totem Lake C.ntorCal l'>oportior, U.C • Dow!loper

---·Archiii!Ct ur.sc_.tn11!m.Uollli, Inc · Lands._ Archlllecl

BUILDING M- ELEVATIONS AND SITE PLAN

ATTACHMENT I FILE. NO. DRV11-0171C5

DESIGN RESPONSE

26

r,

23

Page 37: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

142

BUILDING MATtRIALS

CANVAS AWNING STUCCO 1 STANDI~G SEAM " .O.r.J<JIUV-

NORTHEAST ELEVATION -A

The Village at Totem Lake C.ntorCal l'>oportior, U.C • Dow!loper

---·Archiii!Ct ur.sc_.tn11!m.Uollli, Inc · Lands._ Archlllecl

BUILDING M- ELEVATIONS AND SITE PLAN

ATTACHMENT I FILE. NO. DRV11-0171C5

DESIGN RESPONSE

CAHVAS AWNING { SRtAK METAl

r,

24

27

Page 38: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015 UPDATED

APPENDIX C

143

The Village at Totem Lake centerC81 Properties, LLC • Developer

Antunovich Associates · Arch~ect Ufescapos International. Inc Landscape Arch~ect

L------Brass or Iron Medallion @ Bike Path.

FINISH MATERIALS

~AREA11- LANDSCAPE PLAN ENLARGEMENT \ iniaC.ie-Entry Drive SCALE 1" • 20'·0"

~. ~ NORTH --...... ----- 25

28

Page 39: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015

APPENDIX C

144

I

Project Information

NAME: The Village lit Totem Lilke ADDRESS: Kirldind, Wishingtm

CITY 1ST /ZIP: Klrldind, WishJngtm

COUNTY: KlngGoumy f Of Bl.GS: 8 (Phae I)

PRODUCTTYP£: Mbced·Ue Devi!Joprnent

SlTE AREA: 914,llli!l SF /21 ACRES (Phase J & Phae 10

PARKING STALLS: 1,300

RESIDENT1AL UNITS: 150 RETAIL GilA: 277 J»J

I CenterCilll Properties, U.C I The VlllagutTotem Likes 2 I

Page 40: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015

APPENDIX C

145

Project Description VlllageatT~m Lala!

Project Goal: To completely transform an antiquated retail centeratwhathasevol'ied Into a primary trade node In north Kirkland, along the 1-"105 corridor, into a signature mixed-use development

Project Summary; The VIllage atT~m Lala! will become a dynamic mbced-use project focused on expanded retail offerings, a new market, res­taulllnts and cafes, entertainment and upmarket residential.

Program ObJectM!s: To re-establish the core of what has become the Totem La lei! business district, with a semi-regional retail and mixed-use com­plex to create a viblllnt, pedestrian-oriented village ceiTtl!r. The redevelopment ofThe VIllage atTotem Lala! will provide the Kirkland community with retail and restaurant offerings not presently n~presentl!d in the city. It will alsoshowcasea signifiant upmarket residential community that will benefit from the proximity to these new amenities and the nearby regional transit center and medical complex.

Project Phasing: rn order to move this project along in a timely manner, phase one is focused on the rower existing mall site, primarily driven by some strategic relocations needed to maintain certain existing tl!nants. This essentially creates, what Centeteal believes would be aslight delay on starting a phase two, which is presently the site of the upper mall This area is expected to be begin development almost In parallel to the phase one effort, but may tala! slightly longer to complete.

Development Plan: The rebuilt VIllage at Totem Lala! envisions a high quality mbced use village with emphasis on vibrant streetscapes, public spaces with amenities that tie together the retail, restau111nts and cafes, residents as well as employees on site and the adjct­cent medical oflices and hospital. Centercal will create stylish pedestrian oriented architecture using high quality matl!rlals and details induding brick. precast. stone, and cementuous siding integrated into a timeless combination of architecture. The building design will provide a variety of shapes and sizes that wllllncorporatl! lndlvldualtl!nant storefronts within a strong Centercal design standards and Internal review process.

Major Design Considerations;

-creating a new village core for what has become the Totem Lakes business district, on the site of what had been traditionally the primary retail center In this part of north Kirkland. -Dewlap the property to It's fullest potential by mmblnlng a shop, live, work. and play environment. thus creating a vibrant new neighborhood. -The variety of uses complement both one another, and the community at large

New Tetail offerings to apture lost retail sales. A new upscale grocer Restaurants and cafes to expand the appeal of the new VIllage Entl!rtalnment options. Public gathering spaces, walkways and pedestrian zones thattietogetherthese attractions in a stylish village setting. New upscale residential units that create a distinct sense of neighborhood.

-The site is adjacent to both a regional transit station and a major medical center. -creation of distinct retail acldresses that can take advantage of both Its vistas from 124th Street. and the man! pedestrian-oriented internal slreetscapesand a reimagined 120th Slleet conidor. -Tala! advantage of the adJacent Totem La lei! park. and the bila! path that will transveBe the site from the transit centl!r and medical complex connecting to the Kirkland Cross Corridor.

I CenterCal Properties, LLC TheVillageatTotem Lakes

DRB Comments Village at Totem La lei!

Responses to ORB 9/21/15:

1. Totem Lake Blvd has a 1 O'bike/pedestrian lane requirement Rather than modify the lanes to accommodate the bike lanes we have agreed to lndudethlswlthin our prcperty along Totem La lei! Blvd within our landscaping. The city has request­ed a meandering path which we haw in our presentation. We have also looked at a straight solution which would provide the city requested separation from the street and also allow for trees on both sides of the path.

2. In the previous ORB a series of"qualitystatements"from CCP projects; we will bring a presentation ofCente<Cal proj-ects to the meeting to show the high level of product we aspire to on our projects.

3. There were discussion relative to tl!nant lmpi'IM!Illent/storefront design control. I will bring a sample Tenantotteria and Signage Criteria for ORB review. These are currently in process and will very much control the design, materials etc. in order to provide a consistency within the archltl!ctural theme of the prcject.

4. ORB requested the existing transit stop and connection to the Transit station be nOtl!d on the circulation plan along with the proposed bike paths. We also agreed to IIM!Stlgate a connection to properties on the north boundary of the site. Upon investigation the grade difference from our site to the other properties to the north are far too extreme. 30-60' differ­ences prohibit any connection. We are working with Evergreen Hospital on a pedestrian access from our site to their MOB parking structure. The pedestrian Wlllk bisecting the Ross parking lot moving west to east has been incorporated into our updated parking plan.

S. ORB requested we study the amenity spaces on the northwest comer of the site adjacent AutoZone to accommodatl! pedestrians. The sidewalk grade along the street and 6-12'retalnlng Wllll mala! a 10'Wlllkmst prohibitive and the node at the entrance does not work well for an amenity space.

6. ORB requested a series of source images and visuals ofanopiesfawning. kiosks, etc. These are incorporatl!d into the ORB presentation.

7. ORB requested Images of gall! proposal for the bldg. A&B service area. Design Ideas are Included In the presentation.

B. ORB requested a particular study of the residential west fa.;ade on bldg. C. We have addressed this with materials and the building design as tt moves forward.

9. Plant materials that were suggested during the last ORB have been tala!n Into consideration. Our Landscape Archi-tect will partidpate in the ORB meeting.

I

3 I

Page 41: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015

APPENDIX C

146

\ Site Survey Plan I

---- --~

-· --- I I I

- - £)CIS't"lll,i IILDG 'R) ~!~'MAN I - - VIWa::MimOIIt I

'!10-SETJ.ICIIS

I

~ : 4 I

Page 42: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015

APPENDIX C

147

Conceptual Renderings I

~

"' .g .. -o c: .. a: ;;;

" ~ c. .. v c: 0 u

I Cen1erCal Prt>penles. U.C I The VIllage at Totem Lake 5 I

Page 43: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015

APPENDIX C

148

Site Pedestrian Access Plan I ••• • • • access to uanslt centef •

c:: IQ

0: "' "' f;: u c( c::

"' ·s V'l QJ

" QJ a... QJ ... ·----· Vi

6 I ·----· • • • • ... I

Cen1erC.ll Pl'operun. U.C I TheVIII~eatTotem l..llle

Page 44: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015

APPENDIX C

149

L.andsape Master Plan I

Page 45: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015

APPENDIX C

150

Landscape Cross Section - 120th Street I

a I

Page 46: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015

APPENDIX C

151

Landscape Cross Section - 120th Street I

~

l A711~6S' 3

l !l "! !I

9 I

Page 47: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015

APPENDIX C

152

Landsa Cross Sections

DATE:

1W14121115

10-14-2015 PREFERRED OPTION SECTION A- 2-LANE PLUS PARKING

1--------- ....... --------1 1------ -------1--- .... ------1

••

ONE WAY OfF.STREET BIKEWAYS 121m-! AVE NE

NGI£UCIIONIII I LCOtCitQ tam IIddEII'

PRELIMINARY· FOR DISCUSSION ONLY

~TENW 'lnl._tatlan 1:11~ Harii\WOII '---...... 1.,._.1._...,...~ 11«102ftla..Uta¥U.IDIII Ol!atcl..,...

lftlletcnxtC.-.M --THE VILLAGE AT TOTEM LAKE .er

1 KIRKI..Atcl, WASHINGTON

120THAVENE ROADWAY DEVELOPMENT CONCEPT 3

I

,. I

Page 48: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015

APPENDIX C

153

Landscape Master Plan - Main Street Park I

11

Page 49: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015

APPENDIX C

154

Landscape I

I CenterCal Propertles, LlC I The Village at Totem Lake 12

Page 50: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015

APPENDIX C

155

L.andsape

--- j ., -

' ·.· ~

ittl.'er'~ .............. _,__ -·-·<P-• _...__ - -~ ~ --·~,, J i'·

' . jf~ .• • . f . • . y

~- . . ..;:~ ... ••

----

t~· .. -­..... _ _ .. __ _ --

,, ·"'

• . 0 --

--

~­---

I

I ---13

Page 51: HARDSCAPE MATERIAL .SUMMARY FINISH 49 · ATTACHMENT 1 FILE NO. DRV15-01765 APPLICANT DESIGN RESPONSE & FINAL PACKET APPENDIX B Design Guidelines Village at Totem Lake Project Goal:

ATTACHMENT 1 FILE NO. DRV15-01765

APPLICANT DESIGN RESPONSE & FINAL PACKET

PRESENTED 11/02/2015

APPENDIX C

156

Landscape I

.. I