G.Alexeev for Dubna group ITEP , April 28 , 2010 Muon System Status Report from Dubna. Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS, expected start of long strips r/o studies – May-June 2010 - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/1.jpg)
G.Alexeev for Dubna group ITEP, April 28, 2010
Muon System Status Report from Dubna Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS, expected start of long strips r/o studies – May-June 2010 * Range System prototype (degree of readiness) : - steel absorber /structure ~ 95% (Fe plates 100% ready -> to be welded) - MDT detectors ~ 50 % (all parts 100% ready, 10% of MDTs assembled) - strip boards, cables ~ few % (to be produced by summer 2010) - f/e electronics ~ few % (design 100% ready, mass production required) ( see report of A.Piskun)
Software : * Acceptance studies for DY and J/ muon pairs (see report of V.Rodionov)
![Page 2: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/2.jpg)
Full Scale prototype mechanically assembled and stored in COMPASS area (park position)
It is now being equipped with HV,LV, gas lines, strip boards, f/e electronics and tested before the start of COMPASS run
![Page 3: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/3.jpg)
F S prototype position
COMPASS MF2
Full Scale prototype position in COMPASS area.
The prototype should be fixedat this point inMay 2010
![Page 4: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/4.jpg)
Wiring of MDT detectors
![Page 5: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/5.jpg)
Wiring machine for MDT detectors
![Page 6: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/6.jpg)
Assembled MDTs (in black envelops) and profiles prepared for wiring
![Page 7: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/7.jpg)
VME crate 6U VME crate 6U
STRIP R/O digital
RW-TDC QTC–16QTC–16
ASum-96
AAlexander.NagaytWIRE R/O analog & digital
[email protected] ander.Nagaytsev
@cern.ch
ADB-32 (A-32)
A2DB-32
analog
digital
COMPASS CATCH
DAQ VME crate 9U
MWDB units
to DAQ crate
Hot link cables
Range System Prototype Read Out Scheme
![Page 8: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/8.jpg)
Polar angle distribution of DY photons.
Geometrical acceptance study of muon system in case of: full PANDA setup (material)
Pythia as event generator (40K DY events) + PandaRoot.Option: with/without magnetic field in Solenoid/Dipole.
![Page 9: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/9.jpg)
Plans for 2010:
* FS prototype : - finish full assembly (HV, LV, cabling, gas lines, f/e electronics etc) - start running (r/o test with long 2-4 m strips) in summer 2010 - study of wave impedance for strip r/o
* RS prototype : - finish production (300 MDTs, absorber structure, strip boards, cables etc) - produce and test f/e electronics (292 boards of different types) - move to CERN - assemble (at COMPASS) and test with cosmic (debugging) - start running in late autumn 2010 at PS (subject to available resources)
* Software development in PANDAroot :
- finish acceptance studies for muons (DY, J/ , D-mesons) with high statistics - track finding algorithms for muons in Range System (together with Torino/INFN group) - pattern recognition algorithms – muons vs hadrons (together with Torino/INFN group)
![Page 10: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/10.jpg)
Backup slides
![Page 11: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/11.jpg)
G10 fiberglass strip board (1cm wide strips) at CERN/COMPASS
![Page 12: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/12.jpg)
Strip R/O from RS Prototype
MDTs strip (1cm) board
Fe absorber plate A-32 preamp. card
![Page 13: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/13.jpg)
RS prototype absorber plates manufactured in Dubna
![Page 14: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/14.jpg)
RS prototype absorber structure/frame
![Page 15: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/15.jpg)
RS prototype assembly process (start)
![Page 16: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/16.jpg)
RS prototype assembly process (close to finish)
![Page 17: Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS,](https://reader035.vdocument.in/reader035/viewer/2022062804/56814930550346895db66e64/html5/thumbnails/17.jpg)
RS prototype assembly finished ( 60mm plates – black, 30mm plates – blue )