The project involves rebuilding approximately 17 miles of 138-kilo- volt transmission line connecting the Haviland and the North Delphos substations. The majority of the line will be rebuilt within the existing right-of-way with less than a mile rebuilt adjacent to the existing line. Existing lattice structures are being replaced with steel monopoles. The infrastructure, constructed in the 1920s, has reached an age where it needs to be replaced to better serve area customers. Upgrading the line modernizes equipment and increases reliability. Improvements also reduce power outages and speed recovery of service when outages do occur. The transmission line runs through Blue Creek and Latty townships in Paulding County, Hoaglin and Jackson townships in Van Wert County and Monterey and Jennings townships in Putnam County. WHAT PROJECT SCHEDULE WHY WHERE PROJECT ANNOUNCEMENT Fall 2016 SURVEYS Spring 2017 - Summer 2017 ENGINEERING Fall 2016 - Spring 2017 RIGHT-OF-WAY COMMUNICATIONS Spring 2017 - Fall 2018 FILE LETTER OF NOTIFICATION WITH OPSB* Fall 2017 OPSB* DECISION End 2017 CONSTRUCTION Spring 2018 - End 2018 PROJECT COMPLETE End 2018 Project schedule is subject to change. OPSB (Ohio Power Siting Board). Project schedule is subject to change. OPSB (Ohio Power Siting Board). 2016 2017 2018 2019 HAVILAND-NORTH DELPHOS 138KV TRANSMISSION LINE PROJECT AEP Ohio is upgrading the electric transmission grid in Paulding, Putnam and Van Wert counties in northwest Ohio. The Haviland-North Delphos 138kV Transmission Line Project upgrades the existing transmission line to improve the reliability of electricity to its customers. The project updates an aging infrastructure to improve its condition and address performance issues. * *

Upload: others

Post on 11-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Haviland-NorthDelphos FactSheet V5 · Haviland and the North Delphos substations. The majority of the line will be rebuilt within the existing right-of-way with less than a mile rebuilt

The project involves rebuilding approximately 17 miles of 138-kilo-volt transmission line connecting the Haviland and the North Delphos substations. The majority of the line will be rebuilt within the existing right-of-way with less than a mile rebuilt adjacent to the existing line. Existing lattice structures are being replaced with steel monopoles.

The infrastructure, constructed in the 1920s, has reached an age where it needs to be replaced to better serve area customers. Upgrading the line modernizes equipment and increases reliability. Improvements also reduce power outages and speed recovery of service when outages do occur.

The transmission line runs through Blue Creek and Latty townships in Paulding County, Hoaglin and Jackson townships in Van Wert County and Monterey and Jennings townships in Putnam County.

WHAT

PROJECT SCHEDULE

WHY WHERE

PROJECT ANNOUNCEMENTFall 2016

SURVEYSSpring 2017 - Summer 2017

ENGINEERINGFall 2016 - Spring 2017

RIGHT-OF-WAY COMMUNICATIONSSpring 2017 - Fall 2018

FILE LETTER OF NOTIFICATION WITH OPSB*Fall 2017

OPSB* DECISIONEnd 2017

CONSTRUCTIONSpring 2018 - End 2018

PROJECT COMPLETEEnd 2018

Project schedule is subject to change. OPSB (Ohio Power Siting Board). Project schedule is subject to change. OPSB (Ohio Power Siting Board).

2016 2017 2018 2019

HAVILAND-NORTH DELPHOS 138KV TRANSMISSION LINE PROJECT

AEP Ohio is upgrading the electric transmission grid in

Paulding, Putnam and Van Wert counties in northwest Ohio.

The Haviland-North Delphos 138kV Transmission Line

Project upgrades the existing transmission line to improve

the reliability of electricity to its customers. The project

updates an aging infrastructure to improve its condition and

address performance issues.

* *

Page 2: Haviland-NorthDelphos FactSheet V5 · Haviland and the North Delphos substations. The majority of the line will be rebuilt within the existing right-of-way with less than a mile rebuilt

SCOTTSCOTT

HAVILANDHAVILANDGROVER HILLGROVER HILL CLOVERDALECLOVERDALE

OTTOVILLEOTTOVILLE

VAN WERTVAN WERT

FORTJENNINGS

FORTJENNINGS

AEP OHIO VALUES YOUR INPUT ABOUT THIS PROJECT. PLEASE SEND COMMENTS AND QUESTIONS TO:

*Exact structure, height and right-of-way requirements may vary

9/22/20179/22/2017

New steel monopole structures will range between 120 to 130 feet in

height replacing existing lattice structures. Structures will be placed in

the existing right-of-way corridor, where possible.

TYPICAL STRUCTURES

AEP Ohioc/o Maggie Beggs8600 Smiths Mill RoadNew Albany, OH 43054

@ [email protected]

(380) 205-5178

AEPOhio.com/Haviland-NorthDelphos

HAVILAND - NORTH DELPHOS138 KV TRANSMISSION LINE PROJECT

SUBSTATIONS

TRANSMISSION LINE TO BE REBUILT

N

177

12

214

165

185

168

637

634

VAN WERT COUNTY

VAN

WER

T CO

UN

TY

PAU

LDIN

G C

OU

NTY

PAULDING COUNTY

PAU

LDIN

G C

OU

NTY

PUTN

AM

CO

UN

TY

PUTN

AM

CO

UN

TY

HAVILANDSUBSTATION

NORTH DELPHOSSUBSTATION