hazardous works - university of tasmania · web viewoverhead lines within 4 metres de-energised...

8
Australian Maritime College AMC RISK MANAGEMENT/WHS&E __________________________________________________________________________________________ ________________ Hazardous Works Permit & Risk Assessment When to complete- This form must be completed if the proposed work includes any of the following: Roof work or ceiling work Trenching or excavation work Crane operations Energy isolation (Gas, Water, Electricity) Part A: Work Details Permit Requestor: Requestor Phone No.: Date of Assessment: / / Description of Work: Equipment to be used: Part B: Examination To be completed by an authorised person. An authorised person can be an AMC project manager or principal contractor, contractor’s supervisor or sub contractor (for construction works). Roof work or ceiling work? Yes Complete checklist below No Go to next checklist Any work that requires access to the roof or ceiling and which may place people at risk through collapse, falling or contact with existing services. Safety Requirements Ye s No Risk Ratin g Risk Mitigation Actions Personal Protective Equipment to be used Issue date: 23/06/17 Issued by: D. Waldron Issue No: Three Page 1 of 8 Review: 06/19 IF PRINTED THIS DOCUMENT BECOMES UNCONTROLLED

Upload: others

Post on 04-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hazardous Works - University of Tasmania · Web viewOverhead lines within 4 metres de-energised Barricades placed around crane cab swing area Crane operator’s permit has been sighted

Australian Maritime College

AMC RISK MANAGEMENT/WHS&E __________________________________________________________________________________________________________

Hazardous Works Permit & Risk AssessmentWhen to complete-

This form must be completed if the proposed work includes any of the following:

Roof work or ceiling work

Trenching or excavation work

Crane operations

Energy isolation (Gas, Water, Electricity)

Part A: Work Details

Permit Requestor:

Requestor Phone No.: Date of Assessment: / /

Description of Work:

Equipment to be used:

Part B: ExaminationTo be completed by an authorised person. An authorised person can be an AMC project manager or principal contractor, contractor’s supervisor or sub contractor (for construction works).Roof work or ceiling work? Yes Complete checklist below No Go to next checklistAny work that requires access to the roof or ceiling and which may place people at risk through collapse, falling or contact with existing services.

Safety Requirements Yes NoRisk Rating

Risk Mitigation Actions

Personal Protective Equipment to be usedAdequate access and security for workers, equipment and materialsSafety harness or lifelines examined and secured to strong anchorageScaffolding or platforms about 4 metres have been erected and examined by a suitably qualified personArea sufficient for personnel, equipment and materials loadPersons working or passing below are adequately protected

Warning signs and barriers erected at ground level

Issue date: 23/06/17Issued by: D. Waldron

Issue No: ThreePage 1 of 5 Review: 06/19

IF PRINTED THIS DOCUMENT BECOMES

UNCONTROLLED

Page 2: Hazardous Works - University of Tasmania · Web viewOverhead lines within 4 metres de-energised Barricades placed around crane cab swing area Crane operator’s permit has been sighted

Australian Maritime College

AMC RISK MANAGEMENT/WHS&E __________________________________________________________________________________________________________

Hazardous Works Permit & Risk AssessmentTrenching and excavation work?

Yes Complete checklist below No Go to next checklist

Safety requirement Yes NoRisk Rating

Risk Mitigation Actions

Personal Protective Equipment to be used

If underground services are affected have specific instructions been issuedSoil erosion and sediment control measures have been identified for useAre banks over 1.5 metres sloped sufficiently and adequately provide a safe means of egressExcavations are barricaded and signed

Relevant certificates of competency for equipment operators have been sighted

Crane operation?

Yes Complete checklist below No Go to next checklist

Safety requirements Yes NoRisk Rating

Risk Mitigation Actions

Personal Protective Equipment to be used

Ground under crane is sufficient to support crane

All hoisting equipment inspected prior to use

Overhead lines within 4 metres de-energised

Barricades placed around crane cab swing area

Crane operator’s permit has been sighted and includes the name of the signal person (dogman)Personnel have received appropriate training

Clearance under crane operation area.

Issue date: 23/06/17Issued by: D. Waldron

Issue No: ThreePage 2 of 5 Review: 06/19

IF PRINTED THIS DOCUMENT BECOMES

UNCONTROLLED

Page 3: Hazardous Works - University of Tasmania · Web viewOverhead lines within 4 metres de-energised Barricades placed around crane cab swing area Crane operator’s permit has been sighted

Australian Maritime College

AMC RISK MANAGEMENT/WHS&E __________________________________________________________________________________________________________

Hazardous Works Permit & Risk AssessmentEnergy isolation? (Gas, Water and Electricity)

Yes Complete checklist below No Go to part C

Safety requirements Yes

NoRisk Rating

Risk Mitigation Actions

Personal Protective Equipment to be used

Lock out locks and tags installed to isolated valves or outletsFire protection equipment installed

If fire protection equipment or water is to be isolated, is a notice of impairment requiredArea barricaded and signed

Working on live electrical installations (must be in accordance with State legislative requirements)Ladders or scaffolds inspected and secure

Affected persons notified; that is, employees, customers or other contractors

Part C: AuthorisationTo be completed by an authorised person before work commences. The work as listed in this permit is authorised to proceed subject to all the necessary precautions as detailed in this permit being taken prior to work commencing and these procedures being maintained for the duration of the work

This permit is valid from: / / To: / /

Name: Signature:

Date: / / Time:

Part D: AcceptanceTo be completed by those performing the work

I have read this permit and understand the nature of the work and safety precautions to be taken

Signature: Date: / / Time:

Signature: Date: / / Time:

Signature: Date: / / Time:

Signature: Date: / / Time:

Hazardous Works Permit & Risk AssessmentIssue date: 23/06/17Issued by: D. Waldron

Issue No: ThreePage 3 of 5 Review: 06/19

IF PRINTED THIS DOCUMENT BECOMES

UNCONTROLLED

Page 4: Hazardous Works - University of Tasmania · Web viewOverhead lines within 4 metres de-energised Barricades placed around crane cab swing area Crane operator’s permit has been sighted

Australian Maritime College

AMC RISK MANAGEMENT/WHS&E __________________________________________________________________________________________________________

Part E: CompletionTo be completed by those performing the work

I certify that the job has been completed and made safeSignature: Date: / / Time:Signature: Date: / / Time:Signature: Date: / / Time:Signature: Date: / / Time:

Part F: Close out To be completed by the principal contractor

Name: Signature:Date: / / Time:

Site ManagerPermit returned and work completed

Name: Signature:Date: / / Time:

UTAS Risk Tools- Likelihood Scale

Hazardous Works Permit & Risk Assessment

Extract from the UTAS Table of Consequences

Issue date: 23/06/17Issued by: D. Waldron

Issue No: ThreePage 4 of 5 Review: 06/19

IF PRINTED THIS DOCUMENT BECOMES

UNCONTROLLED

Page 5: Hazardous Works - University of Tasmania · Web viewOverhead lines within 4 metres de-energised Barricades placed around crane cab swing area Crane operator’s permit has been sighted

Australian Maritime College

AMC RISK MANAGEMENT/WHS&E __________________________________________________________________________________________________________

Consequence DescriptorCatastrophic Loss of life, permanent disability or injury to multiple persons.Major Permanent disability or impairment to one or more persons.Moderate Hospitalisation required. Significant lost time and restricted or modified duties

required for longer than 1 month.Minor Medical Treatment Injury. Restricted or modification of duties for less than 1

month.Insignificant Injury report and/or first aid only.

Copies of this form are to be filed onsite or provided to the AMC Operations & Facilities Office and are to be retained for seven years.

Issue date: 23/06/17Issued by: D. Waldron

Issue No: ThreePage 5 of 5 Review: 06/19