health and safety executive 2013/14 plan of work neil stephens
TRANSCRIPT
Health and Safety Executive
2013/14 Plan of Work
Neil Stephens
Current Position
Originally final year of 3 year plan
Plan extended by 1 year to align with HSE Business plan – 2014/15 = final year
Priority sectors
Small Sites (30%) – 37% delivered
Refurbishment (25%) – 18%
Asbestos (20%) – 19%
Major Projects & Large Contractors
Local Priorities
2013/14 Updates
Priority sectors remain same
Small Sites (increase to 35%)
Refurbishment (25%)
Asbestos (20%)
Major Projects & Large Contractors
Local Priorities
Inspection initiative
• Currently in last week of this year’s
• Delivered over 2176 inspections so far*
• Promoting – no change message on hard hats
• Excellent regional media coverage
• 2013/14 will take place in September 2013
2013/14 New Field Projects
• Fragile Materials – Inspection by
CD– Inspection FOD– Estates
Excellence– Busy Builder
(type) Sheet– CSkills videos
– WWT SHADs– Ag SHADs– ORR– Research on
human factor causes
– Trade articles– Presentations
(toolbox talk)
2013/14 field projects……..
• Fireplace Installation– VO led project
• Tile Cutting (roof valley)– NRFC guidance
• Health Risks in paving & block work– Noise– Havs– Silica
• Asbestos Removal in Retail
• Temp de-mountable structures and timber frame construction - continues
Non - Field work examples
• Clients Standard (or Charter)
• Client Engagement on Nuclear Build/Estate
• H&S and BIM - guidance
• Lift installation and maintenance
• Dust partnership – Visualisations (Elvis)– On-tool extraction– Resolving Face fit testing
• COHME - revision