HELB Ltd. Engineering for energy infrastructures
Design, Production, Plant construction, Management and Maintenance, Site testing and commissioning
![Page 3: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/3.jpg)
Mission
We are an engineering team based on experience, excellence and partnership that provides solutions beyond expectations.
We are proud to make electricity available for next generations through our community and co-creation.
Vision
We will become a digital engineering company by 2025 through continuous creation of top experts.
We will be the first choice in the integration of advanced power systems through the implementation of new technologies and knowledge on the local and global market.
![Page 4: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/4.jpg)
Values
Cooperation / Communion / Partnership
Openness / Trust / Sincerity
Responsibility
Contribution / Productivity / Creativity
Learning / Flexibility / Adaptability
Love / Care about somebody and/or something
![Page 5: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/5.jpg)
Business segments
CUSTOM CABINET PRODUCTION
PLANT CONSTRUCTION ON ALL VOLTAGE LEVELS
SITE TESTING AND COMMISSIONING
ENGINEERING
OIL & GAS PRODUCTS AND SERVICES
MANAGEMENT & MAINTENANCE
0
20
40
60
80
100
120
140
2011 2013 2015 2017
Employees
Technicians
College educated
![Page 6: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/6.jpg)
Business activities
Design Production
Assembly Testing
Commissioning Maintenance
![Page 7: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/7.jpg)
ISO 9001, ISO 14001, OHSAS 18001, ISO/ TS 29001
SCC
120 PROFESSIONAL CERTIFICATES
Certificates
MORE THEN 250 PROFESSIONAL TRAININGS
![Page 8: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/8.jpg)
www.helb.hr
Production
![Page 9: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/9.jpg)
PRODUCTION OF CONTROL CUBICLES
DEVELOPMENT & PRODUCTION OF SPECIALISED ELECTRICAL
EQUIPMENT FOR THE OIL & GAS INDUSTRY
Products in general
![Page 10: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/10.jpg)
Production of LV control cubicles
DISTRIBUTION BOARDS FOR INDUSTRIAL PLANTS
CHANGE-OVER DISTRIBUTION BOARDS (NETWORK/ GENERATOR)
CONTROL CUBICLES FOR HV SWITCHGEARS
CONTROL CUBICLES FOR POWER TRANSFORMERS
CUBICLES FOR MEASURING/METERING
DISTRIBUTION BOARDS FOR DIFFERENT FACILITIES
![Page 11: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/11.jpg)
Protection and control cabinets
METERING / POWER QUALITY
CABINETS
PROTECTION AND CONTROL
CABINETS
![Page 12: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/12.jpg)
Remote control cabinets
production according to customer's wish:
dimensions, strength, anti-corrosive protection,
color, ...
![Page 13: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/13.jpg)
PLC cabinets
SIEMENS SIMATIC
![Page 14: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/14.jpg)
SPECIALLY DESIGNED AND ROBUST CABINET FOR EXTREME
CONDITIONS, ANTI-CONDENSATION PROTECTION
Transformer cabinets
![Page 15: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/15.jpg)
SPECIAL DESIGN, STAINLESS STEEL HOUSING
FOR EXPLOSIVE ATMOSPHERES
Oil and gas cabinets
![Page 16: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/16.jpg)
SYSTEMS FOR POWER SUPPLY AND CONTROL: VFD, SCR, MCC;
SERVICE LOOP (AUXILIARY & POWER)
Oil & gas industry
![Page 17: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/17.jpg)
DRILLING DATA ACQUISITION & LOGGING SYSTEM
TORSIONAL VIBRATIONS DAMPING SYSTEM
AUTOMATIC DRILLING SYSTEM
Oil & gas industry: automation systems
AM
3F~
1m
2m
1J
2J
Power converter 1
Current
controller
Rm1
mi1
Belt drive
1
Power converter 2
Current
controller
Rm2
mi2
SMPM
3F~
Programmable load for drillstring emulation
Industrial PC with aquisition
and control cards
sJ2
1c
d
s
1
)( 2fmi/1
i/1+
-
+
+
+-
1 m2PLC
Operator's panel
Input: motor
speed
Output: emulated
drillstring torqueInternally:
emulated
tool speedTool friction
![Page 18: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/18.jpg)
www.helb.hr
Services
![Page 19: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/19.jpg)
TURN KEY PROJECTS BY THE LEADING MANUFACTURERS
REFERENCES: ALBANIA, ARGENTINA, BANGLADESH, CROATIA,
IRAQ, UAE, UK, ...
Plant construction - HV
![Page 20: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/20.jpg)
INSTALLATION OF READY-MADE SWITCHGEARS & INSTALLATION
OF EQUIPMENT IN INDOOR OR OUTDOOR FACILITIES
INSTALLATION OF CABLE NETWORKS ON LV/MV/HV
Plant construction - MV
![Page 21: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/21.jpg)
CUSTOM TAILORED CABINETS AND ENERGY DISTRIBUTION SYSTEMS
FAST CONSTRUCTION AND RELIABLE OPERATION
Plant construction - LV
![Page 22: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/22.jpg)
DEPARTMENT WITH SPECIALISED ENGINEERS
BASIC & FUNCTIONAL TESTING
SPECIALISTIC & RELAY PROTECTION TESTING
Site testing & commissioning
![Page 23: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/23.jpg)
IMPROVING PROCESSES & DISTRIBUTION SYSTEMS THROUGH:
DESIGN, AUTOMATION AND DEVELOPMENT
Engineering
![Page 24: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/24.jpg)
www.helb.hr
Projects
![Page 25: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/25.jpg)
Iraq: new AIS 132/33/11kV SS
CLIENT: KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF
ELECTRICITY (MOE)
ERBIL GOVERNORATE: KOYA, REZAN, SHAQLAWA, SORAN,
QUSHTAPA
YEAR: 2013-2014
![Page 26: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/26.jpg)
Iraq: new AIS 132/33/11kV SS
ERECTION WORKS
500 t of steel structures; 10 km of MV cables
HV appliances in 44 132 kV bays
HV busbars: 30 km of ACSR conductors
175MV cubicles, 185LV control/protection/
meter. panels/AC&DC switchboard/SCADA/AVR
200 km of control & signal cables
9 power transfo. 132/33/11,5 kV, 63/50/40 MVA
![Page 27: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/27.jpg)
Iraq: new AIS 132/33/11kV SS
SITE TESTING & COMMISSIONING OF ALL EQUIPMENT/SYSTEMS
Functional testing
HV testing
Specialised testing on power transformers
Parametrisation and testing of protection
![Page 28: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/28.jpg)
Croatia: thermal power plant Zagreb
CLIENT: CROATIAN ELECTRICITY COMPANY HEP-PRODUCTION
LTD., BUILDING: BLOCK “L” 100 MWE/80 MWT
IMPORTANT NODE FOR 110 KV NETWORK FOR THE CITY OF
ZAGREB (1,000,000 INHABITANTS)
YEAR: 2009
ALL WORKS CONDUCTED WITHOUT POWER INTERRUPTIONS
![Page 29: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/29.jpg)
Croatia: thermal power plant Zagreb
RECONSTRUCTION OF 110 KV SWITCHGEAR
80 km of control & signal cables
57 t of steel structure
18 busbar disconnectors
55 current & 45 voltage metering transf.
52 surge arresters; 16 control cubicles
1500 m of HV 110 kV cable
2500 m of Al rope 625 mm2
![Page 30: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/30.jpg)
Croatia: thermal power plant Zagreb
RECONSTRUCTION OF LV & MV DISTRIBUTION BOARDS/SWITCHGEARS
54 bays of MV switchgear 6.3 kV
75 bays of LV switchgear 0.4 kV
307 electrical distribution boards for 0.4 kV
subdistribution
25 bays of DC auxiliary power supply system
20 power transformers (0.25 to 47 MVA)
![Page 31: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/31.jpg)
Croatian highways
CLIENT: HAC CROATIAN HIGHWAYS LTD.
KEY OBJECTS FOR TRANSMISSION & DISTRIBUTION
YEAR: 2003-2008
SS Oštarije, SS Andrijevci 110/35/10(20) kV
SS Bobovje 110/20 kV, SS Obrovac 35/10/20 kV
SS Sveti Rok, SS Mala Kapela 35/20 kV
![Page 32: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/32.jpg)
Croatian highways
RECONSTRUCTION OF 110 KV SWITCHGEAR
> 50 circuit-breakers
> 100 disconnectors with earthing blades
> 50 busbar disconnectors
> 150 current met. transf.
> 50 voltage met. transf.
> 150 surge arresters
> 100 control/protection/metering cubicles
![Page 33: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/33.jpg)
Croatian highways
RECONSTRUCTION OF LV & MV DISTRIBUTION BOARDS/SWITCHGEARS
> 120 bays of MV switchgear 10/20 kV
> 60 bays of LV switchgear 0.4 kV
> 24 bays of DC auxiliary power supply system
> 24 power transformers (0.25 to 40 MVA)
>100 enclosed busbars 2.500 A, 5.000 A
![Page 34: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/34.jpg)
Albania: main 220 kV SS
CLIENT: OST SHA ALBANIA -OPERATORI SISTEMIT
TRANSMETIMIT
MAIN SUBSTATIONS IN THE CAPITAL OF ALBANIA: TIRANA,
ELBASAN
YEAR: 2012
ALL WORKS CONDUCTED IN EXTREME WEATHER CONDITIONS
![Page 35: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/35.jpg)
Albania: main 220 kV switchyards
CLIENT: KESH SH.A. - KORPORATA ELEKTROENERGJITIKE
SHQIPTARE
MAIN SWITCHYARDS FOR HYDRO POWER PLANTS: FIERZA &
VAU DEJËS
YEAR: 2013
ALL WORKS CONDUCTED WITHOUT POWER INTERRUPTIONS
![Page 36: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/36.jpg)
Zagreb international airport
CLIENT: ZAGREB INTERNATIONAL AIRPORT
ZAGREB: THE CAPITAL OF CROATIA
YEAR: 1996-2014
CONSTRUCTION & RECONSTRUCTION OF SS & SWITCHYARDS
CHALLENGE: CONTINUOUS POWER SUPPLY
![Page 37: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/37.jpg)
Zagreb international airport
SCOPE OF WORKS
Transition of all switchyards from 10 to 20 kV
Construction of new substations 10(20)/0.4 kV – SS2, SS3, SS4 i SS7
Reconstruction of: 10(20)/0.4 kV switchyard-SS1 and automation of diesel generators
Performance measurement & protection 10(20)/0.4 kV – on all 7 SS
![Page 38: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/38.jpg)
Dubrovnik airport
CLIENT: DUBROVNIK AIRPORT
MEDITERANEAN TOURISTIC CENTAR
YEAR: 2016
RECONSTRUCTION OF SUBSTATION TS-1 10(20)/0,4 KV;
2X1000 KVA
ALL WORKS PERFORMED DURING THE HEIGHT OF THE SEASON
WITHOUT THE AIR TRAFFIC DISTURBANCE
![Page 39: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/39.jpg)
Ukraine: equipment for subarctic conditions
CLIENT: CROSCO, FOR UKRGASVYDOBUVANNYA (UGV) PJSC
YEAR: 2016 -2017
SCOPE OF WORKS: PREPARATION OF EMSCO 605:
Replacement of MCC connector and connecting board, drilling plant's cables and connectors, cooling units in PCR, complete lighting on the drill facility
Complete rig winterization
![Page 40: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/40.jpg)
Croatian oil industry: Jackup drilling rig Labin
CLIENT: CROSCO, INTEGRATED DRILLING & WELL SERVICES CO.
CROATIA: THE ADRIATIC SEA
YEAR: 2013
SCOPE OF WORKS:
Reconstruction, testing & commissioning of the
main power control station (generator
incomers, switchboard, main AC/DC drives)
![Page 41: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/41.jpg)
Italian oil industry: Jackup drilling rig KeyManhattan
CLIENT: TRANSOCEAN LTD.
ITALY: THE ADRIATIC SEA – JACK-UP DRILLING RIG “KEY
MANHATTAN”
YEAR: 2012
SCOPE OF WORKS:
Reconstruction of the AC power supply system
![Page 42: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/42.jpg)
Croatia: windpark Vrataruša 42 MW
CLIENT: VALALTA ROVINJ – GREENFIELD INVESTMENT
FIRST SIGNIFICANT CROATIAN WIND PARK CONNECTED TO 110
KV TRANSMISSION NETWORK
YEAR: 2008-2009
MAIN CONTRACTOR FOR ELECTRICAL INSTALLATION & ERECTION
WORKS
![Page 43: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/43.jpg)
Croatia: windpark Vrataruša 42 MW
SCOPE OF WORKS:
4 x 110 kV bays, 5 x 30 kV bays
Earthing of 14 wind masts
20 km of Cu rope 120 mm2
66 km of MV cable, 20 km of optical cable
DC system selectivity test
Earthing resistance, touch & step voltage, potential
transfer measurement
![Page 44: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/44.jpg)
Croatia: geothermal power plant
HELB CLIENT: SIEMENS CROATIA
INVESTOR: MB HOLDING, TURKEY
PRODUCT GROUP: SIEMENS SIVACON, NX PLUS, SIMATIC, SIPROTEC
‘VELIKA 1’ – CAPACITY 16.5 MWE
THE LARGEST GEOTHERMAL POWER PLANT IN CONTINENTAL
EUROPE
TECHNOLOGY - BINARY (ORC)
![Page 45: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/45.jpg)
LOCATIONS: BENI SUEF, NEW CAPITAL & BURULUSS
HELB CLIENT: SIEMENS AG, GS SCM C SG EFS FS
SCOPE OF WORK: SUPERVISION OF INSTALLATION OF POWER
TRANSFORMERS 485 MVA, 500 KV
Egypt: combined-cycle natural gaspower plants
![Page 46: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/46.jpg)
Oman: 220 kV substation
LOCATIONS: SOHAR, OMAN
HELB CLIENT: (SIEMENS) KONČAR POWER TRANSFORMERS
SCOPE OF WORK:
supervision of installation and testing of power transformers 500 MVA, 220 kV
![Page 47: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/47.jpg)
Croatia: thermal power plant Zagreb
CLIENT: SIEMENS CROATIA
LOCATIONS: EL-TO ZAGREB
SCOPE OF WORK: RECONSTRUCTION OF EL-TO ELECTRIC
POWER PLANT
PROJECT DURATION: 18 MONTHS
![Page 48: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/48.jpg)
Croatia: 7 biomass cogeneration plants
LOCATIONS: BE-TO CHP SISAK, OSIJEK, ĐAKOVO, SLAVONSKI
BROD, GLINA 1, GLINA 2, SAVA
NET ELECTRICAL OUTPUT: 1-5 MWE, HEAT: 3-15 MWT
SCOPE OF WORK: GENERAL CONSUMPTION OF BE-TO
![Page 49: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/49.jpg)
Uk: offshore wind park
CLIENT: DONG
HELB CLIENT: PROINTEGRIS FOR SIEMENS
LOCATION: BURBO BANK & WALNEY EXTENSION - ONSHORE / OFFSHORE PLANT 400, 220, 34 KV FOR WIND POWER
CONNECTION
SCOPE OF WORK: FUNCTIONAL TESTING
![Page 50: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/50.jpg)
Croatia: SS 110/10 (20) kV Zamet
2017-2018
INVESTOR: CROATIAN TRANSMISSION SYSTEM OPERATOR LTD.
CLIENT: SIEMENS CROATIA
INSTALLATION OF GIS 110 KV FOR INTERNAL INSTALLATION
![Page 51: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/51.jpg)
Croatia: SS 110/10 (20) kV Ploče
INVESTOR: CROATIAN TRANSMISSION SYSTEM OPERATOR LTD.
CLIENT: KONCAR - POWER PLANT AND ELECTRIC TRACTION
ENGINEERING INC.
SUPPLY AND INSTALLATION OF PRIMARY EQUIPMENT (GIS 110 KV) FOR INTERNAL INSTALLATION
YEAR: 2016
![Page 52: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/52.jpg)
Croatia: photovoltaic solar plant Biograd
CLIENT: MERIDIAN NEUE ENERGIEN GMBH, GERMANY
BIOGRAD: THE BIGGEST SOLAR PLANT IN THE REGION OF
DALMATIA
YEAR: 2013
THE INVESTOR’S INTERNAL QUALITY CONTROL UNDERLINES
EXTREMELY HIGH QUALITY CONSTRUCTION & TECHNICAL
PERFORMANCE
![Page 53: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/53.jpg)
Croatia: photovoltaic solar plant Biograd
DELIVERY & INSTALLATION ON A TURN-KEY BASIS
TESTING & COMMISSIONING
EQUIPMENT:
16 inverters: 6 REFUSOL 017K & 10 REFUSOL
020K
1,176 PV modules type TSM-255
Output power: 299.88 kW
Yearly production: 389,700 kWh
![Page 54: HELB Ltd. Engineering for energy infrastructuresP o we r c o n v e rte r 2 C u rre n t c o n tro lle r i 2 m m 2 R S MP M 3 F ~ P r o g r a m m a b l e l o a d f o r d r i l l s tr](https://reader036.vdocument.in/reader036/viewer/2022070923/5fbb3f5af126d0269f7fb6c8/html5/thumbnails/54.jpg)