high school site 80-h-sw-4
TRANSCRIPT
100% Design /Construction kick off Community Meeting
Please sign in on your mobile device: http://communitymeeting.ocps.net/
September 12, 2019
11
High School Site 80-H-SW-4
High School Site 80-H-SW-4Meeting AgendaSeptember 12, 2019, 6:00 PM
• Welcome – School Board Member: Pam Gould
• Introductions – Lauren Roth/ Facilities Communications
• Project Update – David Torbert, AIA, NCARBRichard Rodriguez-
• Questions and Answers
• Adjournment
1
Site Location 80-H-SW-4
2
Parkside
Sand Lake
Dr. Phillips Community Park
Villas of Grand
Cypress
S.AP
OPK
A VI
NEL
AND
ROAD
Lake Ruby
Lake Willis
Hilton Grand
Vacations
Jewish Community
Center
New Connector
Road (By County)
north
SEAWORLD
ORANGE COUNTY CONVENTION
CENTER
DR. PHILLIPS HS
FREEDOM HS
SITE 80NEW HIGH
SCHOOL
BEACHLINE
S.JO
HN Y
OU
NG
PAR
KWAY
STAT
E RO
AD 4
41
WIN
TER
GAR
DEN
VIN
ELAN
D RO
AD
Site Aerial 80-H-SW-4
3
Dr. Phillips Community
Park
Park Soleil
Lake Ruby
New Connector Road
(By County)
FENTON ROAD
High School Site 80-H-W-4
(+/-50 Acres)
north
Jewish Community
Center
Lake Willis
Sand Lake
S.AP
OPK
A VI
NEL
AND
ROAD
Site Plan 80-H-SW-4
4
Bus Loop &Staff Parking
north0’ 200’
StudentParking
Stadium Track
& Field
Courtyard
Practice Field
Baseball
Softball Practice Field
Tennis Basketball
Future Expansion
Retention
FRONT DOOR
Full Median Opening
Parent DropVisitorParking
Bus D
rop
Student Stations = 2,776
Parking = 777 spacesCar Stacking = up to 300 cars
On-site Bus Stacking = 60 buses
Bike Racks
ServiceFencing
Retention
Cafeteria3-Story Academics
Auditorium MusicAdmin.
Media Gym
Shadehouse & Greenhouse
Daryl Carter Parkway
Field House
Project Basis – OCPS Prototype High School 80-H-SW-4
5
OCPS PROTOTYPE HIGH SCHOOLSWindermere High SchoolOak Ridge High SchoolEvans High SchoolApopka High SchoolWest Orange High SchoolWekiva High SchoolOcoee High SchoolLake Nona High SchoolEast River High SchoolFreedom High SchoolTimber Creek High SchoolOlympia High School
Oak Ridge High School
Project Basis – OCPS Prototype High School 80-H-SW-4
6
UPGRADES INCLUDED PROTOTYPEEducational• 21st Century Collaborative Learning Hubs
Technology• Interactive Touchscreen Smart TV’s• WiFi access points throughout
Energy Efficiency• LED lighting campus wide (interior, exterior,
site and athletic fields)• High efficiency chillers and variable
pumping scheme• Low flow plumbing fixtures• Commissioning of MEP systems• ASHRAE 90.1 compliance for lighting and
power metering
Security• Full security access control and cameras for
the school• 2-way emergency radio system• Voice evacuation fire alarm system• Permanent generator and life safety lighting
Windermere High School
Building Program
15
AdministrationMedia CenterCafeteriaClassroom Buildings
• Classrooms• Science Labs• Computer Labs• CTE Labs
Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab
Gymnasium • Locker Rooms• Weight Room• Gymnastics/Dance• Wrestling
80-H-SW-4Students: 2,776Buildings: +/-350,000 Square Feet
Campus Program
CAFETERIA
MEDIA CENTER
Building Program
16
Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings
• Classrooms• Science Labs• Computer Labs• CTE Labs
Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab
Gymnasium • Locker Rooms • Weight Room• Gymnastics/Dance• Wrestling
80-H-SW-4Students: 2,776Buildings: +/-350,000 Square Feet
SCIENCE LAB
COMPUTER LAB
17
GYMNASIUM
AUDITORIUM
Building Program
Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings
• Classrooms• Science Labs• Computer Labs• CTE Labs
Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab
Gymnasium • Locker Rooms • Weight Room• Gymnastics/Dance• Wrestling
80-H-SW-4Students: 2,776Buildings: +/-350,000 Square Feet
Site Program
18
Cars and BusesStudent and Faculty parking
(+/-777 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)
80-H-SW-4Site: +/-50 Acres
STADIUM/TRACK & FIELD
GREENHOUSE
Site AmenitiesGreenhouse and Shade houseAthletics
• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions
• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts
Site Program
19
Site AmenitiesGreenhouse and Shade houseAthletics
• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions
• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts
Cars and BusesStudent and Faculty parking
(+/-777 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)
80-H-SW-4Site: +/-50 Acres
SOFTBALL
BASEBALL
Site Program
20
Site AmenitiesGreenhouse and Shade houseAthletics
• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions
• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts
Cars and BusesStudent and Faculty parking
(+/-777 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)
80-H-SW-4Site: +/-50 Acres
OUTDOOR BASKETBALL
TENNIS
Additional Features 80-H-SW-4
21
Safety & Security• Secure Courtyard Design• Single Secure Entry Point• Security System & Cameras• Card Reader Entrance Controls
Educational Technology• 70” Touch Screen “Smart” Monitors• Audio Enhancement• WiFi Connectivity
CLASSROOM TECHNOLOGY
SECURE ENTRY POINT
Audio Enhancement
System
70” Touchscreen
Wireless Access Point
Sustainability 80-H-SW-4
22
Building• 10% more energy efficient than ASHRAE
90.1 standard• High Efficiency Chillers (15% energy
reduction)• Light colored roof to reduce heat gain and
improves energy performance• Energy Efficient LED Lighting• Energy Star rated equipment• Water saving toilets, faucets, and fixtures• All classrooms have daylighting• Over 75% of ALL spaces have daylighting• Thermal efficient windows/glazing
Site• Native/low water plants – reduce water
consumption• Low Impact Design (LID) stormwater design
What to Expect
Work Hours*Monday – Saturday 6:00am –6:00pm* Early morning concrete pours will be necessary and will be in strict accordance with the Orange County noise ordinance
DeliveriesMonday – Friday 6:00am – 6:00pmAll construction deliveries to enter the jobsite from Fenton Rd.
• Import of over 350,000 CY of Fill = 22,000 trucks
• Concurrent Construction of Darryl Carter Parkway Extension
• No impact to the surrounding community
• Work alongside local law enforcement to ensure the safe driving along Apopka Vineland.
23
Planned Schedule
Main Campus Construction
June 2021
April2019
September2019
Move-In
August2021
Design, Permitting,and Bidding
EarlySitePackage
January2020
25