high school site 80-h-sw-4...aug 12, 2020 · 1 40% construction community meeting welcome! this...
TRANSCRIPT
1
40% Construction Community Meeting
Welcome! This meeting will begin shortly.
August 12, 2020
1
High School Site 80-H-SW-4
High School Site 80-H-SW-4Meeting AgendaAugust 12, 2020, 5:00 PM
• Welcome – School Board Member: Linda Kobert
• Introductions – Lauren Roth/ Facilities Communications
• School Naming: Principal Guy Swenson
• Project Update – David Torbert, AIA, NCARBFreddy Torres, PM
• Questions and Answers
• Adjournment3
Welcome Message from District 3 Board Member
Linda Kobert
Site 80-H-SW-4 4
Introductions by Senior manager, Facilities Communications
Lauren Roth
5Site 80-H-SW-4
Rezoning ProcessSchool Board Policy JC
Step 1 - Superintendent commences rezoningStep 2 - Calendar (Timeline) developedStep 3 - Calendar shared Step 4 - Research, data collection and meetings with internal stakeholders Step 5 - Community Meeting(s) September 2020Step 6 - Rule Development Workshop September 2020Step 7 - Public Hearing October 2020Step 8 - Storage of materials6
6 6Site 80-H-SW-4
School NamingPrincipal Guy Swenson
• Introduction
• Site 80-H-SW-4 web site: https://tinyurl.com/Site80HS
• School naming survey: https://forms.gle/tFbKABCxjoxyXAGx8
• Mascot,Colors
7Site 80-H-SW-4
Site Location 80-H-SW-4
8
Parkside
Sand Lake
Dr. Phillips Community Park
Villas of Grand
Cypress
S. A
POPK
A VI
NEL
AND
ROAD
Lake Ruby
Lake Willis
Hilton Grand
Vacations
Jewish Community
Center
New Connector
Road (By County)
north
SEAWORLD
ORANGE COUNTY CONVENTION
CENTER
DR. PHILLIPS HS
FREEDOM HS
SITE 80NEW HIGH
SCHOOL
BEACHLINE
S. JO
HN Y
OU
NG
PAR
KWAY
STAT
E RO
AD 4
41
WIN
TER
GAR
DEN
VIN
ELAN
D RO
AD
Site Aerial 80-H-SW-4
9
Dr. Phillips Community
Park
Park Soleil
Lake Ruby
New Connector Road
(By County)
FENTON ROAD
High School Site 80-H-W-4
(+/-50 Acres)
north
Jewish Community
Center
Lake Willis
Sand Lake
S. A
POPK
A VI
NEL
AND
ROAD
Site Plan 80-H-SW-4
10
Bus Loop &Staff Parking
north0’ 200’
StudentParking
Stadium Track
& Field
Courtyard
Practice Field
Baseball
Softball Practice Field
Tennis Basketball
Future Expansion
Retention
FRONT DOOR
Full Median Opening
Parent DropVisitorParking
Bus D
rop
Student Stations = 2,776
Parking = 777 spacesCar Stacking = up to 300 cars
On-site Bus Stacking = 60 buses
Bike Racks
ServiceFencing
Retention
Cafeteria3-Story Academics
Auditorium MusicAdmin.
Media Gym
Shadehouse & Greenhouse
Daryl Carter Parkway
Field House
Project Basis – OCPS Prototype High School 80-H-SW-4
11
OCPS PROTOTYPE HIGH SCHOOLSWindermere High SchoolOak Ridge High SchoolEvans High SchoolApopka High SchoolWest Orange High SchoolWekiva High SchoolOcoee High SchoolLake Nona High SchoolEast River High SchoolFreedom High SchoolTimber Creek High SchoolOlympia High School
Oak Ridge High School
Project Basis – OCPS Prototype High School 80-H-SW-4
12
UPGRADES INCLUDED PROTOTYPEEducational• 21st Century Collaborative Learning Hubs
Technology• Interactive Touchscreen Smart TV’s• WiFi access points throughout
Energy Efficiency• LED lighting campus wide (interior, exterior,
site and athletic fields)• High efficiency chillers and variable
pumping scheme• Low flow plumbing fixtures• Commissioning of MEP systems• ASHRAE 90.1 compliance for lighting and
power metering
Security• Full security access control and cameras for
the school• 2-way emergency radio system• Voice evacuation fire alarm system• Permanent generator and life safety lighting
Windermere High School
Renderings 80-H-SW-4
13
north
Renderings 80-H-SW-4
14
north
Renderings 80-H-SW-4
15
north
Renderings 80-H-SW-4
16
north
Campus Plan 80-H-SW-4
17
north
GYM
CLASSROOMS & LABS3-STORIES
SECURE COURTYARD
CAFETERIA
MEDIA
ADMIN
MUSICAUDITORIUM
LOCKER ROOMS
PARENT DROP OFF
BU
SD
RO
P O
FF
Building Program
18
Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings
• Classrooms• Science Labs• Computer Labs• CTE Labs
Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab
Gymnasium • Locker Rooms • Weight Room• Gymnastics/Dance• Wrestling
80-H-SW-4Students: 2,776Buildings: +/-350,000 Square Feet
CAFETERIA
MEDIA CENTER
Building Program
19
Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings
• Classrooms• Science Labs• Computer Labs• CTE Labs
Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab
Gymnasium • Locker Rooms • Weight Room• Gymnastics/Dance• Wrestling
80-H-SW-4Students: 2,776Buildings: +/-350,000 Square Feet
SCIENCE LAB
COMPUTER LAB
20
GYMNASIUM
AUDITORIUM
Building Program
Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings
• Classrooms• Science Labs• Computer Labs• CTE Labs
Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab
Gymnasium • Locker Rooms • Weight Room• Gymnastics/Dance• Wrestling
80-H-SW-4Students: 2,776Buildings: +/-350,000 Square Feet
Site Program
21
Cars and BusesStudent and Faculty parking
(+/-777 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)
80-H-SW-4Site: +/-50 Acres
STADIUM/TRACK & FIELD
GREENHOUSE
Site AmenitiesGreenhouse and Shade houseAthletics
• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions
• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts
Site Program
22
Site AmenitiesGreenhouse and Shade houseAthletics
• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions
• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts
Cars and BusesStudent and Faculty parking
(+/-777 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)
80-H-SW-4Site: +/-50 Acres
SOFTBALL
BASEBALL
Site Program
23
Site AmenitiesGreenhouse and Shade houseAthletics
• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions
• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts
Cars and BusesStudent and Faculty parking
(+/-777 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)
80-H-SW-4Site: +/-50 Acres
OUTDOOR BASKETBALL
TENNIS
Additional Features 80-H-SW-4
24
Safety & Security• Secure Courtyard Design• Single Secure Entry Point• Security System & Cameras• Card Reader Entrance Controls
Educational Technology• 70” Touch Screen “Smart” Monitors• Audio Enhancement• WiFi Connectivity
CLASSROOM TECHNOLOGY
SECURE ENTRY POINT
Audio Enhancement
System
70” Touchscreen
Wireless Access Point
Sustainability 80-H-SW-4
25
Building• 10% more energy efficient than ASHRAE
90.1 standard• High Efficiency Chillers (15% energy
reduction)• Light colored roof to reduce heat gain and
improves energy performance• Energy Efficient LED Lighting• Energy Star rated equipment• Water saving toilets, faucets, and fixtures• All classrooms have daylighting• Over 75% of ALL spaces have daylighting• Thermal efficient windows/glazing
Site• Native/low water plants – reduce water
consumption• Low Impact Design (LID) stormwater design
What to Expect
Work Hours*Monday – Saturday 6:00am –6:00pm* Early morning concrete pours will be necessary and will be in strict accordance with the Orange County noise ordinance
DeliveriesMonday – Friday 6:00am – 6:00pmAll construction deliveries to enter the jobsite from Fenton Rd.
• Import of over 350,000 CY of Fill = 22,000 trucks
• Concurrent Construction of Daryl Carter Parkway Extension
• No impact to the surrounding community
• Work alongside local law enforcement to ensure the safe driving along Apopka Vineland.
26
Site Logistic Plan
26
Planned Schedule
Main Campus ConstructionStructural
June 2021
April2019
September2019
Move-In
August2021
Design, Permitting,and Bidding
EarlySitePackage
January2020
28
August2020
Main Campus ConstructionFinishes
Construction Update and Milestones
28
Notice to Proceed (NTP) – Site was September 17, 2019.
Site clearing, import of fill was completed in December.
Tilt wall panels were completed in May.
Structural Steel Erection completed in July.
Roofing work is 95% complete.
Installation of deep storm drainage is ongoing.
Fireproofing of structural steel is ongoing.
Interior framing and finishes are ongoing.
Project remains on schedule for Substantial Completion in Summer 2021.
Orange County Public Schools Site 80-H-SW-4 High School
29
Orange County Public Schools Site 80-H-SW-4 High School
30
Orange County Public Schools Site 80-H-SW-4 High School
31
Orange County Public Schools Site 80-H-SW-4 High School
32
Orange County Public Schools Site 80-H-SW-4 High School
33
Orange County Public Schools Site 80-H-SW-4 High School
34
Forming of Slab on Grade
Pouring of Tilt Panels with a Boom Pump
Orange County Public Schools Site 80-H-SW-4 High School
35
Erection of Tilt Panels with 300 Ton Crawler Crane
Erection of Tilt Panels and Structural Steel
Orange County Public Schools Site 80-SW-4 High School
36
Preparation of Tilt Panels for Structural Steel Installation
Structural Steel for Second Floor Deck
Orange County Public Schools Site 80-H-SW-4 High School
37
Installation of Deep Storm Drainage Pipe and Structures
Roof Joist and Deck Installation
Orange County Public Schools Site 80-H-SW-4 High School
38
Pouring of Second Floor Slab
Installation of Roof Insulation and LWIC
Orange County Public Schools Site 80-H-SW-4 High School
39
Framing, MEP Hangers and Rough-in Ongoing
Exterior finishes ongoing
Orange County Public Schools Site 80-H-SW-4 High School
40
Questions & Answers
42