high street - consultation.eastsussex.gov.uk

1
The Centre Memorial SB Bank 8 El Sub Sta 57 40 1 77 83 59 PH 51 Plemont SP 2 58a 68 42 The Centre 3b Polegate Stat 6 6a 3 2 PO Foresters House 5 61 6 73a Sub Sta 29 1 1 to 8 Hall 54 58 16.0m 32 34 El Bank 47 58b New House 52 56a 2 73 56 LC 36 38 3a 1 5a 71a 71 1a El Sub Sta 72 12 Hall 87 Church 95 Millfields 1 4 9 2 1 Albert 1a 6 2a 91 4 93 Cottage Alberta 62 2 BUS STOP KEEP CLEAR KEEP CLEAR CLEAR KEEP STOP BUS Albert Place Public House Church Victoria Road Railway Level Crossing Brook Street Roy Martin Way Gilda Crescent High Street High Street High Street High Street B2247 Station Road B2247 Station Road CUT LINE CUT LINE Memorial SB El Sub Sta 57 51 SP Polegat Foresters House Garage 4a Def Def 1 to 4 7 St John 15 6 1 Court 9 The Hall 2 10 2 The Polegate Nursing Hom Manor Park El Sub Sta Exchange St 9 Medical 4 1 Telephone 8 5 10 Jubilee 3 45a 29 1 to 8 3 12 (PH) 16.0m Centre Court Horse and Groom 46 Bank 37 14 Ch 47 35 13 Tree 44 Elizabeth LC 2 47 11 BUS STOP KEEP KEEP CLEAR Black Path St Johns Road Church Road Old Drive Railway Level Crossing High Street High Street High Street High Street E'BN W'NK CLEAR KEEP CUT LINE CUT LINE General Arrangement Proposed Measures I Tingley 04/10/2021 C Kwok HGN-SCH122B-DR-ZH-0003 NTS P04 S2 I Tingley P01 04/10/2021 First issue IT CK IT S2 P02 08/10/2021 Minro updates to notes. IT CK IT S2 P03 13/10/2021 Minor text amendments to notes. IT CK IT S2 P04 22/10/2021 30mph Reference removed from key IT CK IT S2 CH2 Polegate High Street 3520000 Scale Project No. Drawn By Checked By Approved By Original Size A1 Date Drawing title Apprv'd Purpose of revision Rev Status Chck'd Project Rev. Date Status Revision Drawn EAST SUSSEX HIGHWAYS RINGMER DEPOT, THE BROYLE RINGMER, EAST SUSSEX, BN8 5NP Tel. 0345 60 80 193 www.eastsussexhighways.com Drawing number Volume Type Role Number Design Alt. Originator LEGEND - PROPOSED MEASURES NOTES 1. Background based on Ordnance Survey mapping supplemented with topographical survey. 2. DO NOT scale from this drawing. 3. Proposed measures to include:- · localised footway surface repairs / improvements. · improved dropped kerbing and provision of tactile paving at all crossing points. · replacement of pedestrian guardrailing with bollards. 4. A full version of this drawing can be viewed online at:- https://consultation.eastsussex.gov.uk/ economy-transport-environment/ polegate-high-street. Existing speed limit to remain. Existing 30mph speed limit reduced to 20mph. © Crown copyright and database rights Ordnance Survey 100019601 2021 BUS LAYBY IMPROVEMENTS BUS LAYBY IMPROVEMENTS AND REMOVAL OF 1 PARKING SPACE LEVEL CROSSING HIGH STREET HIGH STREET

Upload: others

Post on 18-Apr-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HIGH STREET - consultation.eastsussex.gov.uk

The C

entre

Mem

orial

SB

B

a

n

k

8

El S

ub S

ta

5

7

40

1

77

83

59

PH

5

1

P

le

m

o

n

t

SP

2

58a

68

42

The C

entre

3

b

Polegate S

tation

6

6

a

3

2

PO

Foresters H

ouse

5

61

6

73a

Sub S

ta

29

1

1 to 8

Hall

54

58

16.0m

32 3

4

El

Bank

4

7

58b

N

e

w

H

o

u

s

e

52

56a

2

73

56

LC

36

38

3

a

1

5

a

71a

71

1

a

E

l

S

u

b

S

t

a

72

1

2

Hall

87

Church

95

M

illf

ie

ld

s

1

4

9

20.7m

1

Albert

1

a

6

2

a

91

4

93

Cottage

Alberta

62

2

BU

S

ST

OP

KE

EP

CLE

AR

KE

EP

CLE

AR

CLE

AR

KE

EP

ST

OP

BU

S

Wo

rn

M

arkin

gs

Markings Worn

Markings Worn

EL

SC

IC

CL15.74

Be

nch

EL

BT

15

.7

9

Bench

WM

Corduroy

Corduroy

Steps

Concrete

RS

Be

nch

MH

CL 15.98

SV

LP

W

M

WM

Bench

R

S

G

V

W

M WM

TP

LP

WM

W

O

B

S

PB

LB

S

V

G 1

5.3

1

F

H

15

.4

2

G 1

5.1

8

P

MK

r

NP

CT

BT

15

.2

8

GV

NP

RS

FH

SV

KO

IC

CL 15.14

BT

15

.2

1SV

SV

SV

MH

CL 15.19

G 15.07

IC

CL 15.13

BT

15.11

L

P

WM

SC

RS

R

S

WM

IC

CL 15.19

K

O

EL

WM

W

M

IC

CL 15.27

G 15.13

BT

15

.2

0

W

M

RS

LP

P

P

WM

EP

Sta

y W

ire

NP

B

G 15.18

P

SV

EL

P

BT

15.12

IC

CL 15.66

B

T

15

.6

1

RS

B

W

M

P

MH

CL 15.31

SV

W

M

IC C

L 15.27

KO

WM

WM

BT

15

.3

9

GV

LP

WM

WM

T

L

TL

ICB

T

15

.5

6

WM

RS

DC

WM

WM

Ga

s

GV

WM

B

T

LP

W

M

G 15.09

SV

DC

W

Ms

BT

SV

S

V

G 15.01

KO

EL

WM

MH

CL 16.06

P

P

P

P

P

P

P

P

P

P

PW

M

WM

WM

IC

CL 16.22

RS

IC

CL 15.87

LP

EL

WM

WM

TLIC

TL

IC

TL

C

T

LB

W

M

P

P

RS

KO

WO

SV

KO

LP

Hatch

IC

CL

1

6.3

3

G 1

6.1

5

WM

IC

CL 16.09

GV

Bench

LB

W

M

RS

EL

B

T

17.70

W

O

WM

WM W

M

WM

WM

WM

W

M

SV

B

T

17

.2

7

W

M

RS

IC

CL 17.08

W

M

W

M

W

M

BT

17

.0

3

WM

WO

G 16.46

BT

16.54

WM

IC

CL 17.85

P

IC

CL 17.50

B

T

17.43

LP

Bench

IC

CL 17.47

W

M

D

C

GV

GV

RS

WM

s

WM

DC

RS

BS

MH

CL

1

6.4

4

FH

W

M

E

L

W

M

W

M

LP

P

P

P

P

RS

BT

18

.4

5

G 18.04

IC

CL 18.17

BT

18

.1

4

IC

CL 18.06

EL

WM

s

IC

CL 17.94

GV

BT

18

.4

8

G 18.22

SV S

V

BT

18.50

SV

W

O

PB

RSLP

NP

Sapling

IC

CL

1

9.6

9

KO

L

P

P

B

T

20.07

Maple

RS

RS

CT

CT

CT

FH

20.30

MK

r

EL

RS

WM

KO

CT

RS

B

TP

LPR

S

R

S

CT

CT

CT

BT

19.57

WM

WM

MH

CL 20.19

B

T

20

.3

3

RS

R

S

LP

WM

WM

N

P

B

T

20.28

FH

IC

CL 20.26

G 20.14

MK

r

Post

LP

WM

WM

SC

WM

TLIC

T

L

TL

IC

G 20.40

CT

CT

CT

EL

G

V

Mast

P

BT

20

.5

0

TL

TL

TL

IC

IC

CL 20.37

RS

DC

SV

W

O

SV

WO

W

M

RS

S

V

MH

CL 19.70

BT

20.06

M

H

CL 18.29

BT

18.09

MH

CL

1

5.8

4

MH

CL 15.14

M

H

CL 15.74

BT

15

.8

9

SV

GV

Corduroy

Corduroy

Shelter

B

Ta

ctile

Paving

Ta

ctile

P

avin

g

B

B

B

B

B

B

B

B

B

LT

B

LT

B

LT

B

h 7

.0

h 4.0

T

a

c

t

ile

P

a

v

in

g

LT

B

LT

B

T

a

c

t

ile

P

a

v

in

g

Shelter

K

e

rb

G

ra

nite

PA

L

h 1.60

G

ra

ss

Asp

ha

lt

K

erb

Granite

CL

F

h 1

.5

0

C

oncre

te

K

erb

D

C

Fence

Ch

an

ge

G

r

a

s

s

A

s

p

h

a

l

t

A

s

p

h

a

lt

C

o

r

d

u

r

o

y

Finger

G

r

a

s

s

B

a

r

r

ie

r

TL

B

a

r

r

ie

r

G

r

a

n

it

e

S

e

t

t

s

Gra

ss

Asp

ha

lt

Po

st

Finger

H

e

d

g

e

h

2

.

5

0

Gu

lly

Ke

rb

Gra

nite

Setts

Granite

Se

tts

Gra

nite

Setts

Asphalt

Po

st

Fin

ge

r

Grass

Barrier

Asphalt

R

/W

Paved

Corduroy

Corduroy

B

a

r

r

ie

r

Grass

(b

utto

n)

Step

Gra

ss

Gra

ss

Asphalt

Granite

Se

tts

G

r

a

s

s

A

s

p

h

a

lt

C

B

F

h

1

.

3

0

Albert P

lace

Concrete

Ke

rb

Asp

ha

lt

Granite

Kerb

Co

ncre

te

Kerb

Asp

ha

lt

Tactile

Paving

Tactile

Pa

vin

g

Asphalt

Asp

ha

lt

Barrier

Hedge h 1.80

Concrete Kerb

Hedge h 1.80

Po

st

Fin

ge

r

Granite Kerb

Concrete Kerb

CB

F

H 1

.0

0

Public H

ouse

Kerb

Granite

Tiled

Asphalt

Asphalt

Concrete Kerb

R/W

Asphalt

Asphalt

Concrete

Concrete

CC

TV

R/W

Asphalt

G

ra

s

s

Asphalt

Paved

C

o

n

c

r

e

t

e

C

o

n

c

r

e

t

e

Asphalt

Concrete

Concrete

Concrete

Concrete

Concrete

Asphalt

Blo

ck P

avin

g

Asphalt

A

s

p

h

a

lt

P

a

v

e

d

Asphalt

Concrete

Pa

ve

d

Asphalt

Concrete

Ke

rb

Granite

Ke

rb

Granite

Kerb

Asphalt

Paved

DC

Asphalt

Co

ncre

te

Gra

ss

Gra

ss

Concrete

Asphalt

Concrete

PA

L

h 1.40

C

BF

h 1.80

Grass

Asphalt

Granite Kerb

Asphalt

Paved

A

s

p

h

a

lt

CC

TV

Gra

nite

K

erb

Asp

ha

lt

Pa

ve

d

G 19.50

G 1

7.5

1

KO

P

M

H

CL 15.88

C

o

n

c

r

e

te

K

e

r

b

C

o

n

c

r

e

te

K

e

rb

C

o

n

c

r

e

t

e

K

e

r

b

C

o

n

c

r

e

t

e

K

e

r

b

Concrete

Kerb

LL

F

H 1

.8

0

Steps

Steps

Ra

mp

Church

Granite

Kerb

Granite

Kerb

G

r

a

n

i

t

e

K

e

r

b

C

o

n

c

r

e

te

K

e

r

b

Ch

an

ge

V

ic

to

r

ia

R

o

a

d

Granite

Change

Railw

ay Level C

rossing

P

a

r

k

e

d

O

v

e

r

G

r

a

n

ite

K

e

r

b

B

r

o

o

k

S

tr

e

e

t

Roy M

artin W

ay

Gilda C

rescent

Concrete

Granite

Granite

High Street

High Street

High Street

H

igh S

treet

B

2

2

4

7

S

t

a

t

io

n

R

o

a

d

B

2

2

4

7

S

t

a

t

i

o

n

R

o

a

d

CU

T LIN

E

CU

T LIN

E

M

e

m

o

r

i

a

l

S

B

E

l

S

u

b

S

t

a

5

7

5

1

S

P

P

o

l

e

g

a

t

e

S

t

a

t

i

o

n

F

o

r

e

s

t

e

r

s

H

o

u

s

e

G

a

r

a

g

e

4

a

D

e

f

D

e

f

1

t

o

4

7

S

t

J

o

h

n

'

s

15

6

1

C

o

u

r

t

9

T

h

e

OLD

DR

IVE

H

a

l

l

2

1

0

2

T

h

e

P

o

l

e

g

a

t

e

N

u

r

s

i

n

g

H

o

m

e

M

a

n

o

r

P

a

r

k

E

l

S

u

b

S

t

a

Exchange

S

t

G

e

o

r

g

e

'

s

9

M

e

d

i

c

a

l

4

1

Tele

phone

8

5

10

J

u

b

i

l

e

e

3

45a

2

9

1

t

o

8

3

12

(

P

H

)

1

6

.

0

m

C

e

n

t

r

e

C

ourt

H

o

r

s

e

a

n

d

G

r

o

o

m

46

B

a

n

k

3

7

1

4

C

h

u

r

c

h

4

7

3

5

1

3

T

r

e

e

4

4

Eliz

abeth

L

C

2

47

11

Road Markings Worn

B

U

S

STO

P

K

E

E

P

M

a

r

k

i

n

g

s

W

o

r

n

KE

EP

CLE

AR

M

H C

L

1

5

.

1

4

W

M

G

V

W

M

L

P

I

C

C

L

1

4

.

4

5

G

1

4

.

3

1

P

B

N

P

S

V

W

M

W

M

W

M

W

O

S

V

T

L

I

C

I

C

F

H 1

4

.

6

4

S

V

B

T 1

4

.

6

6

M

K

r

C

T

R

S

S

t

a

y

W

ir

e

T

P

I

C

C

L

1

4

.

5

9

K

O

C

L

1

4

.

7

5

S

V

W

O

Y

e

w

I

C

C

L

1

4

.

5

3

I

C

C

L

1

4

.

5

9

R

S

T

P

B

T

1

4

.

3

7

I

C

C

L

1

4

.

3

8

R

S

S

V

G

1

3

.

9

4

W

M

I

C

C

L

1

4

.

0

5 R

S

G

1

3

.

8

8

W

M

G

1

3

.

8

6

D

C

W

M

W

M

W

M

R

S

Bench

G

V

G

V

G

VG

V

G

V

G

V

V

P

C

T

C

T

L

P

G

V

I

C

C

L

1

3

.

9

8

C

T

B

T 1

3

.

6

2

M

H C

L

1

3

.

6

4

O

a

k

B

T 1

4

.

0

0

B

e

n

c

h

B

e

n

c

h

B

e

n

c

h

B

T 1

3

.

9

4

N

P

L

P

W

M

W

M

L

P

B

T 1

4

.

0

3

W

M

W

M

W

M

W

M

S

V

G

V

E

L R

S

B

T 1

4

.

3

9

L

P

I

C

C

L

1

4

.

4

1

B

T 1

4

.

3

0

G

1

4

.

3

0

B

T 1

4

.

5

9

G

1

4

.

4

0

R

S

W

M

B

T 1

4

.

3

3

L

B

W

M

B

e

n

c

h

W

M

s

W

M

W

M

B

e

n

c

h

W

M

s

I

C

C

L

1

4

.

9

6

W

M

E

L

S

C

I

C

C

L

1

5

.

7

4

B

e

n

c

h

L

P

S

C

W

M

W

M

s

G

V

L

B

B

e

n

c

h

W

M

s

W

M

G

1

4

.

9

7

G

1

4

.

6

8

W

M

I

C

C

L

1

4

.

7

5

W

M

G

1

4

.

7

7

W

M

I

C

C

L

1

4

.

8

3

L

P

P

P

P

M

H

C

L

1

5

.

1

3

E

L

R

S

R

S

L

P

B

T 1

5

.

7

9

B

e

n

c

h

W

M

M

H C

L

1

5

.

4

7

W

O

S

V

B

T 1

5

.

4

2

R

S

G

1

5

.

2

1

h

1

1

.

0

h

1

0

.

0

C

o

r

d

u

r

o

y

C

o

r

d

u

r

o

y

S

t

e

p

s

U

p

P

a

v

e

d

G

r

a

s

s

A

s

p

h

a

l

t

C

o

n

c

r

e

t

e

C

o

n

c

r

e

t

e

C

y

c

l

e

S

t

a

n

d

C

y

c

l

e

S

t

a

n

d

P

a

v

e

d

G

r

a

s

s

G

r

a

s

s

A

s

p

h

a

l

t

A

s

p

h

a

l

t

S

te

p

s

U

p

B

l

a

c

k

P

a

t

h

S

t

J

o

h

n

s

R

o

a

d

C

h

u

r

c

h

R

o

a

d

Old D

rive

F

/

B

F

/

B

R

S

B

e

n

c

h

M

H C

L

1

5

.

9

8

S

V

L

P

W

M

W

M

B

e

n

c

h

R

S

G

V

W

M

W

M

T

P

L

P

W

M

W

O

B

S

P

B

L

B

G

1

5

.

3

1

M

H C

L

1

5

.

7

4

B

T 1

5

.

8

9

S

V

G

V

C

o

r

d

u

r

o

y

C

o

r

d

u

r

o

y

S

h

e

lte

r

K

e

rb

G

ra

n

ite

K

erb

C

o

n

c

re

te

P

A

L

h

1

.

6

0

G

ra

ss

A

s

p

h

a

l

t

K

e

rb

G

ra

n

ite

C

L

F

h

1

.

5

0

C

o

n

c

re

te

K

e

rb

B

a

r

r

i

e

r

A

s

p

h

a

l

t

T

a

c

t

i

l

e

P

a

v

i

n

g

G

r

a

s

s

F

e

n

c

e

C

h

a

n

g

e

B

a

r

r

ie

r

T

a

c

t

i

l

e

P

a

v

i

n

g

A

s

p

h

a

l

t

A

s

p

h

a

lt

C

o

n

c

r

e

t

e

C

B

F

h

1

.8

0

P

a

v

e

d

A

s

p

h

a

l

t

Asphalt

C

o

n

c

C

o

n

c

r

e

t

e

C

o

n

c

r

e

t

e

Concrete Kerb

G

r

a

s

s

G

r

a

s

s

G

r

a

s

s

G

r

a

s

s

G

r

a

s

s

F

/

B

A

s

p

h

a

l

t

Asphalt

A

s

p

h

a

l

t

Granite Kerb

C

o

n

c

r

e

t

e

C

o

n

c

r

e

t

e

G

r

a

s

s G

r

a

s

s

G

r

a

s

s

A

s

p

h

a

l

t

G

r

a

s

s

K

O

C

o

n

c

r

e

t

e

K

e

r

b

G

r

a

s

s

G

r

a

s

s

G

r

a

s

s

G

r

a

n

it

e

K

e

r

b

H

e

d

g

e

h

1

.

2

0

Hedge h 1.20

Concrete

G

r

a

s

s

Asphalt

G

r

a

s

s

A

s

p

h

a

l

t

CB

F h 1.80

Concrete

Kerb

A

s

p

h

a

l

t

G

r

a

n

i

t

e

K

e

r

b

P

a

v

e

d

C

o

n

c

r

e

t

e

P

A

L

h

1

.

4

0

C

B

F

h

1

.

8

0

G

r

a

s

s

A

s

p

h

a

lt

G

r

a

n

ite

K

e

r

b

A

s

p

h

a

l

t

P

a

v

e

d

Asphalt

C

C

T

V

G

ra

n

ite

K

e

rb

A

s

p

h

a

l

t

P

a

v

e

d

M

H

M

H

C

L

1

5

.

8

8

C

L

1

5

.

5

9

M

H C

L

1

4

.

4

8

G

V

G

V

M

H C

L

1

4

.

0

8

G

V

K

O

G

V

M

H C

L

1

4

.

0

8

M

H C

L

1

4

.

5

5

P

S

i

g

n

a

l

L

o

o

p

T

r

a

f

f

i

c

S

i

g

n

a

l

L

o

o

p

T

r

a

f

f

i

c

R

a

i

l

w

a

y

L

e

v

e

l

C

r

o

s

s

i

n

g

IRF h 1.00 on W

all

P

a

v

e

d

C

o

n

c

B

T 1

4

.

7

6

H

igh S

treet

H

ig

h

S

tre

e

t

H

ig

h

S

tre

e

t

H

i

g

h

S

t

r

e

e

t

Concrete Kerb

K

O

Concrete

Kerb

E'BN

W'NK

CLE

AR

KE

EP

C

U

T

L

I

N

E

C

U

T

L

I

N

E

General Arrangement

Proposed Measures

I Tingley

04/10/2021

C Kwok

HGN-SCH122B-DR-ZH-0003

NTS

P04S2

I Tingley

P01 04/10/2021 First issue IT CK ITS2

P02 08/10/2021 Minro updates to notes. IT CK ITS2

P03 13/10/2021 Minor text amendments to notes. IT CK ITS2

P04 22/10/2021 30mph Reference removed from key IT CK ITS2

CH2

Polegate High Street

3520000

Scale

Project No.

Drawn By

Checked By

Approved By

Original Size

A1

Date

Drawing title

Apprv'dPurpose of revision

Rev Status Chck'd

Project

Rev. Date

Status Revision

Drawn

EAST SUSSEX HIGHWAYS

RINGMER DEPOT, THE BROYLE

RINGMER, EAST SUSSEX, BN8 5NP

Tel. 0345 60 80 193 www.eastsussexhighways.com

Drawing number

Volume Type Role NumberDesign Alt.

Originator

LEGEND - PROPOSED MEASURES

NOTES

1. Background based on Ordnance

Survey mapping supplemented

with topographical survey.

2. DO NOT scale from this drawing.

3. Proposed measures to include:-

· localised footway surface

repairs / improvements.

· improved dropped kerbing

and provision of tactile paving

at all crossing points.

· replacement of pedestrian

guardrailing with bollards.

4. A full version of this drawing can

be viewed online at:-

https://consultation.eastsussex.gov.uk/

economy-transport-environment/

polegate-high-street.

Existing speed limit to remain.

Existing 30mph speed limit reduced to

20mph.

© Crown copyright and database rights Ordnance Survey 1000196012021

BUS LAYBY

IMPROVEMENTS

BUS LAYBY IMPROVEMENTS

AND REMOVAL OF 1 PARKING

SPACE

LEVEL CROSSING

H

IG

H

S

T

R

E

E

T

HIGH STREET