highway projects (2040 rtp) · campo 2040 regional transportation plan. mpo id sponsor(s) county...
TRANSCRIPT
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
11-00001-00 TxDOT Bastrop US 290 1 Mile East of FM 696 8.864 Miles East of FM 696
Widen to a 4-lane divided. 2018 $50,303,707.00
11-00002-00 TxDOT Bastrop FM 2571 SH 304 SH 95 Full Depth, Level-up and seal coat. 2017 $1,441,999.00
11-00003-00 TxDOT Bastrop US 290 FM 2104 Lee County Line Widen to 4-Lane Divided 2018 $29,872,318.00
11-00004-00 TxDOT Bastrop SH 21 .668 Miles West of SH 95 .268 Miles West of SH 95
Construct Bridges, Main Lanes, and Frontage Roads.
2018 $24,838,838.00
11-00005-00 TxDOT Bastrop SH 21 1.187 MI W of SH 95 .668 MI W of SH 95 Construct Frontage Roads and Bridge. 2019 $37,660,345.76
11-00006-00 City of Smithville Bastrop SH 95 Smithville High School LP 230 at Fawcett Street Widen SH 95. 2019 $3,800,000.00
11-00007-00 Bastrop County Bastrop SH 21 SH 71 Caldwell County Line Construct MAD-4 or Super 2 2023 $5,646,000.00
11-00008-00 TxDOT Bastrop SH 71 west of Colorado River east of Loop 150 E Construct 4-lane freeway with 3-lane frontage roads
2015 $45,400,000.00
11-00009-00 Smithville Bastrop SH 95 Loop 230 Smithville High School Add continuous turn lane and sidewalks (both sides)
2015 $4,200,000.00
11-00010-00 Elgin Bastrop FM 1100 Travis County Line SH 95 Construct MAD-4 2040 $24,200,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
11-00011-00 City of Bastrop Bastrop Blakely Lane Extension Blakely Lane Jessica Place Plan alignment and construct extension of Blakely Lane east of Burleson Crossing to connect to Jessica Place in Riverside Grove between Hawthorne
2021 $1,200,000.00
11-00012-00 City of Bastrop Bastrop Hasler Boulevard Marie Street Hwy 304. Plan alignment and construct extension of Hasler Boulevard west of Marie Street to connect to Hwy 304 at Hunters Point Drive. Curb and gutter
2019 $2,900,000.00
11-00013-00 City of Bastrop Bastrop Mesquite Street Mesquite Street Reids Bend (CR 41) Re-construct Mesquite Street west to connect to Reids Bend (CR 41)
2025 $2,900,000.00
11-00014-00 Bastrop County Bastrop Arterial Street Improvement Program
. - $5,100,000.00
11-00015-00 City of Bastrop Bastrop Arterial Street Improvement Program
. - $25,900,000.00
11-00016-00 Smithville Bastrop Arterial Street Improvement Program
. - $4,600,000.00
11-00017-00 TxDOT Bastrop SH 71 Intersection at FM 1209 Construct overpass. 2024 $26,000,000.00
11-00018-00 TxDOT Bastrop SH 71 Intersection at Pope Bend Road
Construct overpass. 2024 $26,000,000.00
11-00019-00 TxDOT Bastrop FM 812 Travis County Line SH 21 Improve 2-lane roadway to MAD-4. 2025 $10,000,000.00
11-00020-00 TxDOT Bastrop SH 71 Intersection at Tucker Hill Lane
Construct overpass. 2021 $24,000,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
11-00021-00 Bastrop County Bastrop FM 1704 FM 969 TX 71 Extend FM 1704 south of FM 969 and connect to Colorado Dr. via a new bridge across the Colorado River; upgrade Colorado Dr. to an arterial
2040 $1,225,980.00
11-00022-00 Bastrop County/City of
Bastrop
Bastrop SH 304 SH 304 at Shiloh Rd. Lovers Lane 0.3 Miles South of SH 71
Construct new road connecting SH 304/ Shiloh Rd intersection with Lovers Lane via a new bridge across the Colorado River - includes a connection
2040 $8,400,000.00
11-00023-00 Bastrop County Bastop Old Lexington Road/ FM 3000
0.365 Miles West of Racoon Road
FM 696 Realign Old Lexington Rd. and upgrade to minor arterial; extend Old Lexington Rd. to FM 696 to the east
2040 $3,406,000.00
11-00024-00 Bastrop County Bastrop New Road 2.267 Miles East of Wolf Lane
SH 71 0.277 Miles West of SH 304
Construct a new arterial road connecting SH 71 to Pearce Lane/FM 535
2040 $9,111,000.00
11-00025-00 Bastrop County/City of
Bastrop
Bastrop Shiloh Rd SH 20 SH 304 Upgrade Shiloh Rd. to a collector from SH 20 to SH 304
2040 $1,382,000.00
11-00026-00 TxDOT Bastrop SH 21 Caldwell County Line SH 71 PROVIDE SUPER 2 PASSING LANES 2018 $4,656,528.00
11-00027-00 TxDOT Bastrop US 290 1.0 Miles East of FM 696 8.864 Miles East of FM 696
Reconstruct existing 4-Lane undivided roadway to a 4-Lanen divided roadway
2019 $44,456,558.53
11-00028-00 TxDOT Bastrop US 290 FM 2104 Lee C/L Reconstruct existing 4-Lane undivided roadway to a 4-Lanen divided roadway
2019 $29,000,875.67
11-00029-00 TxDOT Bastrop US 290 8.864 Miles East of FM 696 9.12 Miles East of FM 696
Reconstruct existing 4-Lane undivided roadway to a 4-Lanen divided roadway
2019 $2,119,101.19
11-00030-00 TxDOT Bastrop SH 71 At FM 1209 Construct 2-Lane Overpass 2021 $46,381,883.25
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
11-00031-00 TxDOT Bastrop SH 71 At Pope Bend Rd. Construct 2-Lane Overpass 2020 $33,293,974.25
11-00032-00 TxDOT Bastrop SH 71 Travis / Bastrop County Line
.65 Miles East of Tucker Hill Lane
Construct Overpass And Add 2 Lane One-Way Eastbound And Westbound Frontage Roads
2020 $24,535,803.38
11-00033-00 TxDOT Bastrop SH 21 1.187 Miles West of SH 95 0.668 Miles West of SH 95
Convert Existing 2-Lane 2-Way Frontage Roads To 2-Lane One-Way Frontage Roads Over Colorado River
2019 $30,179,771.11
11-00034-00 TxDOT Bastrop SH 21 0.668 Miles West of SH 95 0.268 Miles West of SH 95
Convert Existing 2-Lane Two-Way Frontage Roads To 2-Lane One Way Frontage Roads
2019 $17,475,675.12
11-00035-00 City of Bastrop Bastrop CS Bastrop State Park Chestnut Street at Loop 150
Construct Multi-Use Path 2020 $1,628,302.97
12-00000-00 City of Smithville Bastrop SL 230 SH 95 to Olive Street Bluebonnet Circle to Webb Street
ADA sidewalks. 2018 $591,093.00
12-00001-00 City of Bastrop Bastrop CS Bastrop State Park LP 150 at Chestnut Street Construct multi-use path. 2019 $1,450,000.00
21-00001-00 TxDOT Burnet US 281 RM 2147 East .466 Mi North of SH 71 Add Center Left Turn Lane and Shoulders
2018 $9,502,732.00
21-00002-00 Burnet County Burnet Arterial Street Improvement Program
. - $87,700,000.00
21-00003-00 City of Burnet Burnet Arterial Street Improvement Program
. - $11,800,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
21-00004-00 Marble Falls Burnet Arterial Street Improvement Program
. - $12,000,000.00
21-00005-00 TxDOT Burnet US 281 Intersection at SH 71 Reconstruct interchange. 2025 $55,000,000.00
31-00001-00 Hays County Caldwell SH 80 CR 266 .215 Mi E of CR 266 Install left turn lane 2019 $932,226.00
31-00002-00 Caldwell County Caldwell CS SH 142 Clear Fork Street Engineering for a 4-lane roadway. 2019 $200,000.00
31-00003-00 TxDOT Caldwell SH 80 SH 21 FM 1984 Complete gap in shoulder for bicycle travel.
2019 $5,400,000.00
31-00004-00 Caldwell Caldwell SH 21 Hays County Line SH 130 Widen to 4 lanes 2025 $12,500,000.00
31-00005-00 Caldwell Caldwell SH 80 FM 1979 SH 130 Widen to 4 lanes 2025 $55,900,000.00
31-00006-00 Caldwell Caldwell SH 80 County Line Road FM 1979 Widen to 6 lanes with raised median 2035 $100,400,000.00
31-00007-00 Caldwell Caldwell SH 142 SH 80 Yarrington Road Extension
Widen to 4 lanes 2025 $8,800,000.00
31-00008-00 Caldwell Caldwell SH 142 Yarrington Road Extension FM 150 Extension Widen to 4 lanes 2025 $40,300,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
31-00009-00 Caldwell Caldwell SH 142 FM 150 Extension SH 130 MAD 4 2025 $104,000,000.00
31-00010-00 Lockhart Caldwell FM 2001 Expansion / Silent Valley Rd
.14 Miles south of SH 142 Silent Valley Rd Northward extension of City Line Road from a point .14 miles south of SH 142 to intersect Silent Valley Road
2040 $1,200,000.00
31-00011-00 Lockhart Caldwell City Line Road Extend City Line Rd from Clear Fork St
FM 20 Construct new roadway 2035 $7,800,000.00
31-00012-00 Lockhart Caldwell City Line Road Extend City Line Rd south and southeast from FM 20 to and along MLK Jr Industrial Blvd
US 183 Construct new 4-lane arterial 2035 $5,600,000.00
31-00013-00 Lockhart Caldwell City Line Road SH 142 Clear Fork Rd Rehab and widen to 4 lanes 2035 $3,600,000.00
31-00014-00 Lockhart Caldwell CR 214 / Graham Road
Connect CR 215 US 183 via CR 214 Alternate to New Roadway 85 2035 $5,600,000.00
31-00015-00 Lockhart Caldwell E MLK Jr Industrial Blvd Extend E MLK Jr Industrial Blvd
FM1322 New MAU-4 2040 $2,200,000.00
31-00016-00 Lockhart Caldwell N Mockingbird Lane Extend Mockingbird Ln Silent Valley Rd. New MAU-4 2040 $10,800,000.00
31-00017-00 Lockhart Caldwell New Roadway 30 US 183 flood events Proposed alternative to FM 1322 2035 $11,700,000.00
31-00018-00 Lockhart Caldwell New Roadway 34 FM 1322 CR 203. Construct new roadway 2035 $3,800,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
31-00019-00 Lockhart Caldwell New Roadway 46 CR 215 CR 213/Robin Ranch Rd Construct new roadway 2035 $3,500,000.00
31-00020-00 Lockhart Caldwell New Roadway 47 CR 221 SH 130 at Plum Creek U-turn bridge
Construct new roadway 2035 $10,900,000.00
31-00021-00 Lockhart Caldwell San Jacinto Street FM 20 MLK Jr Industrial Blvd Construct new roadway 2035 $7,700,000.00
31-00023-00 Caldwell Caldwell Arterial Street Improvement Program
. - $8,900,000.00
31-00024-00 Lockhart Caldwell Arterial Street Improvement Program
. - $6,600,000.00
31-00025-00 TxDOT Caldwell SH 21 Hays County Line Bastrop County Line Provide super 2 passing lanes. 2022 $14,900,000.00
31-00026-00 TxDOT Caldwell SH 21 Hays County Line Bastrop County Line PROVIDE SUPER 2 PASSING LANES 2018 $4,889,356.00
31-00027-00 Caldwell County Caldwell VA Various In Caldwell County Set-Aside For Projects Caldwell County STPMM Set-Aside 2019 $2,554,036.58
31-00028-00 Hays County, TxDOT Caldwell FM 110 SH 80 SH 21 Construct Two Lanes And Shoulders 2019 $29,964,711.47
31-00030-00 Hays County, TxDOT Caldwell FM 110 Hays County Line SH 80 Construct Two Lanes And Shoulders 2019 $7,903,525.37
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
35-00001-00 Caldwell County Caldwell US 183 US 183 North of Luling US 183/SH 80 South of Luling
Alternatives analysis for relief route. 2017 $225,000.00
41-00001-00 Travis Travis IH 35 Yarrington Road RM 150 Mill, Seal, and TOM 2017 $1,811,693.00
41-00002-00 Hays County Hays IH 35 .741 Miles N. of Posey Road
Comal County Line Replace Bridges and Approaches 2020 $30,806,078.00
41-00003-00 TxDOT Hays IH 35 River Ridge Parkway FM 150 Mill, Seal, and Tom 2017 $1,403,384.00
41-00004-00 TxDOT Hays RM 967 .13 Mi N of Robert S Light .141 Mi S of Robert S Light
Add Left Turn Lane and Shoulders 2019 $567,464.00
41-00005-00 City of Wimberley/Hays
County
Hays RM 12 .13 Miles North of RM 3237
.12 Miles South of RM 3237
Engineering, design, and ROW purchase to add turn lanes and pedestrian crossing.
2019 $246,167.00
41-00006-00 Hays County Hays SH 80 .215 Mi W of CR 266 CR 266 Install left turn lane 2019 $932,226.00
41-00007-00 TxDOT Hays SH 21 .114 Mi West of FM 2001 Caldwell County Line Repair, Level-up, Widen and Overlay 2017 $5,387,294.00
41-00008-00 City of Wimberley/Hays
County
Hays RM 3237 RM 12 .22 Miles East of RM 12 Engineering, Design, and ROW purchase to add turn lanes and ped crossing
2019 $246,167.00
41-00009-00 City of San Marcos Hays CS LP 82 Commanche Street Intersection, signal, and bicycle and pedestrian improvements.
2017 $2,603,345.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00010-00 Hays County Hays Robert S Light RM 967 at Robert S. Light Blvd.
FM 1626 Construct new roadway 2019 $21,257,198.00
41-00011-00 Hays County Hays FM 2770 .955 Miles South of SL 4 1.414 Miles South of SL 4 Add left turn lane and shoulders. 2019 $1,138,023.00
41-00012-00 CTRMA/TxDOT Hays SH 45 Travis County Line FM 1626 Construction of a 4-lane tolled freeway (Project may be phased)
2017 $41,500,000.00
41-00013-00 Hays County Hays FM 2001 IH 35 SH 21 Widen to a 4-lane divided roadway by add two lanes and shoulders.
2017 $34,626,340.00
41-00014-00 TxDOT Hays SH 123 IH 35 DeZavalla Construct Sidewalks 2018 $815,000.00
41-00015-00 City of San Marcos Hays CS Hopkins Street from Moore Street
Bishop Street Reconstruct Hopkins Street from Bishop Street to Moore Street per the City's Complete Streets Policy.
2018 $3,050,000.00
41-00016-00 City of San Marcos Hays CS Hopkins Street from CM Allen Pkwy
Thorpe Road Design and construct multi-use bike/ped facility that connects existing Crosstown hike and bike trails to existing facility.
2020 $2,800,000.00
41-00017-00 City of Kyle Hays Dorman Lane At FM 1626 Feasibility study for proposed improvements at the intersection.
2017 $150,000.00
41-00018-00 TxDOT Hays IH-35 - Hays County SH 45 SE Posey Rd. IH-35 Improvement Projects 2020 $1,500,000,000.00
41-00019-00 Buda Hays IH-35 / OSR Connector Old San Antonio Rd IH-35 New 2-lane undivided 2018 $100,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00020-00 Hays Hays US 290 W Blanco County Line RM 165 MAD-4 2030 $25,900,000.00
41-00021-00 Hays Hays US 290 W RM 165 NF 2. MAD-4 2030 $25,900,000.00
41-00022-00 Hays Hays US 290 W RM 12 Nutty Brown Rd MAD-6 2035 $21,800,000.00
41-00023-00 San Marcos Hays Loop 82 LBJ Dr IH-35 (Two way) MAD-4 2035 $1,200,000.00
41-00024-00 San Marcos Hays Loop 82 (Phase 1) Guadalupe St/Grove St LBJ Dr (One way) MAD-4 2035 $200,000.00
41-00025-00 San Marcos Hays Loop 82 / Aquarena Springs Dr
IH-35 Sessom Dr. MAD-4 2035 $5,100,000.00
41-00026-00 San Marcos Hays Loop 82 / Guadalupe University Dr Grove St (One way SB) MAD-4 2035 $3,800,000.00
41-00027-00 San Marcos Hays Loop 82 / LBJ University Dr Grove St (One way NB) MAD-4 2035 $2,400,000.00
41-00028-00 San Marcos Hays Loop 82 / University Dr Sessom Dr Guadalupe St. MAD-4 2035 $2,000,000.00
41-00029-00 Hays Hays SH 21 Caldwell County Line CR 159 (Yarrington) MAD-6 2030 $40,400,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00030-00 Hays Hays SH 21 CR 159 (Yarrington) SH 80 MAD-6 2030 $32,200,000.00
41-00032-00 Hays Hays SH 80 SH 21 Caldwell County Line MAD-6 2030 $2,100,000.00
41-00033-00 San Marcos Hays SH 80 IH-35 SH 21. MAD-4 2035 $3,600,000.00
41-00034-00 San Marcos Hays SH 80 / E Hopkins Moore St Loop 82. MAD-4 2035 $1,200,000.00
41-00035-00 San Marcos Hays SH 80 / E Hopkins Loop 82 CM Allen. MAD-4 2035 $500,000.00
41-00036-00 San Marcos Hays SH 80 / E Hopkins CM Allen IH-35. MAD-4 2035 $3,800,000.00
41-00037-00 San Marcos Hays SH 80 / Old RR 12 RM 12/Wonder World Dr Holland St MAD-4 2035 $7,200,000.00
41-00038-00 San Marcos Hays SH 80 / Old RR 12 Holland St Lindsey. MAD-4 2035 $2,200,000.00
41-00039-00 San Marcos Hays SH 80 / Old RR 12 / Moore St
Lindsey Hopkins. MAD-4 2035 $700,000.00
41-00040-00 Hays Hays SH 80 at Old Bastrop Hwy (CR 266)
East of Old Bastrop Hwy (CR 266)
East of Old Bastrop Hwy (CR 266)
Construct center left-turn lanes 2016 $1,500,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00041-00 Hays Hays SH 123 Wonder World Dr Guadalupe County Line MAD-6 2025 $10,000,000.00
41-00042-00 San Marcos Hays SH 123 IH-35 FM 621. MAD-6 2025 $6,600,000.00
41-00043-00 San Marcos Hays SH 123 FM 621 Wonder World Dr MAD-6 2030 $700,000.00
41-00044-00 Hays Hays FM 110 E - Phase 1 Interim
IH-35 N SH 123. MAD-2 2015 $61,500,000.00
41-00045-00 Hays Hays FM 110 E - Phase 2 Ultimate
IH-35 N Turnersville Rd Extension (NF 1)
MAD-4 2030 $4,500,000.00
41-00046-00 Hays Hays FM 110 E - Phase 2 Ultimate
Turnersville Rd Extension (NF1)
SH 123 MAD-4 2030 $26,600,000.00
41-00047-00 Hays Hays FM 150 Extension / NF 17 (Kyle)
FM 150 Kyle Loop. MAD-4 2025 $10,400,000.00
41-00048-00 Hays Hays FM 150 W RM 12 RM 1826. MAD-4 2025 $5,700,000.00
41-00049-00 Hays Hays FM 150 W RM 1826 FM 3237. MAD-4 2025 $15,600,000.00
41-00050-00 Hays Hays FM 150 W FM 3237 Kyle Loop SW MAD-4 2025 $12,500,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00051-00 Hays Hays FM 150 W Kyle Loop SW FM 2770 MAD-4 2025 $3,100,000.00
41-00052-00 Kyle Hays FM 150 W / Center St Rebel Dr IH-35. MAD-2 2025 $11,000,000.00
41-00054-00 Hays Hays FM 165 US 290 Blanco County Line MAU-2 2030 $23,100,000.00
41-00055-00 Hays Hays FM 621 / Staples Rd SH 123 Guadalupe Line. MAU-2 2025 $14,800,000.00
41-00056-00 Hays Hays FM 967 FM 1626 Main St. MAD-2 2020 $13,800,000.00
41-00057-00 Hays Hays FM 967 FM 1826 FM 1626. MAU-4 2025 $17,400,000.00
41-00058-00 Hays Hays FM 967 / S. Loop 4 / S. Main St
Main St W Goforth. MAU-4 2020 $1,700,000.00
41-00059-00 Hays Hays FM 967 / S. Loop 4 / S. Main St
W Goforth IH-35. MAU-4 2020 $700,000.00
41-00060-00 Buda Hays FM 1626 0 FM 967 Widen to 4-lane divided 2013 $49,300,000.00
41-00061-00 Hays Hays FM 1626 FM 967 FM 2770. MAD-4 2015 $40,000,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00062-00 Hays Hays FM 1626 SH 45 SW IH-35. MAD-6 2030 $49,800,000.00
41-00063-00 Hays Hays FM 2439 / Hunter Rd Bishop RM 12/Wonder World Dr
MAD-2 2020 $3,600,000.00
41-00064-00 San Marcos Hays FM 2439 / Hunter Rd SH 80 Bishop. MNR-2 2020 $4,400,000.00
41-00065-00 Hays Hays FM 2439 / Hunter Rd Centerpoint Rd Comal County Line MAD-4 2025 $5,200,000.00
41-00066-00 Buda Hays FM 2770 FM 1626 Main St. Widen to 4-lane undivided 2024 $20,400,000.00
41-00067-00 Kyle Hays FM 2770 FM 1626 FM 150. MAD-4 2025 $20,500,000.00
41-00068-00 Hays Hays RM 12 FM 150 W Winters Mill Pkwy MAD-2 2025 $61,000,000.00
41-00069-00 Hays Hays RM 12 FM 3237 RM 32. MAD-2 2025 $24,500,000.00
41-00070-00 Hays Hays RM 12 Fitzhugh Rd FM 150 W MAD-4 2025 $5,800,000.00
41-00071-00 Hays Hays RM 12 FM 2439/Hunter Rd SH 123 MAD-6 2025 $4,500,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00072-00 Hays Hays RM 12 Winters Mill FM 3237. MAD-2; designate as BR 12 2025 $11,700,000.00
41-00073-00 Hays Hays RM 12 RM 32 Old RR 12/SH 80 PKWY-4 2025 $96,200,000.00
41-00074-00 Wimberley Hays RM 12 and FM 3237 Intersection Improvement
RM 12 - north and south of FM 3237 - FM 3237
east of RM 12 Engineering, design and right-of-way purchase to add turn lanes and pedestrian crossings
2016 $400,000.00
41-00075-00 Hays Hays RM 32 Comal County Line RM 12 MAD-2 2030 $25,900,000.00
41-00076-00 Buda Hays RM 967 Goforth Rd IH-35. Widen to 4-lane undivided 2017 $17,300,000.00
41-00077-00 Hays Hays RM 1826* SH 45 SW Nutty Brown Rd Improve to MAD-4 2025 $13,600,000.00
41-00078-00 Hays Hays RM 1826 Nutty Brown Darden Hill. MAD-4 2025 $5,800,000.00
41-00079-00 Hays Hays RM 1826 Darden Hill Rd FM 150 (W) MAD-4 2025 $5,800,000.00
41-00080-00 Hays Hays RM 2325 Blanco County Jacob's Well. MAD-2 2025 $39,600,000.00
41-00081-00 Hays Hays RM 2325 Jacob's Well Wimberley City Limits MAD-2 2025 $12,100,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00082-00 Hays Hays RM 3237 RM 12 Flite Acres Rd MAD-2 2025 $2,800,000.00
41-00083-00 Hays Hays RM 3237 Flite Acres Winters Mill. MAD-2 2025 $3,100,000.00
41-00084-00 Hays Hays RM 3237 Winters Mill FM 150. MAD-2 2025 $2,100,000.00
41-00085-00 Hays Hays Bebee Rd IH-35 SH 21 Improve to MAD-2 2025 $36,600,000.00
41-00086-00 Kyle Hays Bunton/Goforth Road IH-35 Frontage Road Lehman Road Construct 3-lane road with continuous left turn lane up to 900' west of Brandi Circle. From 900' west of Brandi Circle transition to existing 2-
2015 $5,000,000.00
41-00087-00 Kyle Hays Burleson Road Miller Street IH-35 Frontage at new connecting location
Construct 3-lane road with continuous left turn lane. Sidewalk along one side of the road.
2016 $8,800,000.00
41-00088-00 Buda Hays Cabela's Dr Main St Manchaca Springs Rd New 2-lane undivided 2024 $4,000,000.00
41-00089-00 Kyle Hays Center St Old Stagecoach FM 150. Widen to 4 lanes 2035 $7,900,000.00
41-00090-00 Hays Hays Centerpoint Rd RM 12 FM 2439. New MAD-4 2025 $14,500,000.00
41-00091-00 Hays Hays Centerpoint Rd / CR 234
IH-35 Old Bastrop Hwy. Improve to MAD-4 2025 $3,500,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00092-00 Hays Hays Centerpoint Rd / CR 234
FM 2439 IH-35. Improve to MAD-4, dedicate right-of-way for railroad overpass
2025 $2,900,000.00
41-00093-00 Hays Hays Centerpoint Rd / CR 234
Old Bastrop Beback Inn Rd MAD-4 2025 $2,700,000.00
41-00094-00 Hays Hays Craddock Ave / NF 8 N LBJ Dr. Lime Kiln/River Ridge MAU-4 2025 $9,800,000.00
41-00095-00 Buda Hays Dacy Ln Hillside Terrace Bebee Rd. MAU-4 2025 $11,400,000.00
41-00096-00 Hays Hays Dacy Ln / Goforth Rd Bebee IH-35. MAU-4 2025 $11,400,000.00
41-00097-00 Hays Hays Darden Hill Rd / CR 162
FM 150 FM 1826. Improve to MAD-2 2025 $24,800,000.00
41-00098-00 San Marcos Hays E River Ridge Pkwy IH-35 SH 21. MAD-4 2035 $16,800,000.00
41-00099-00 Hays Hays Elder Hill Rd / CR 170 RM 12 FM 150. Improve to MAU-2 2025 $7,800,000.00
41-00100-00 Hays Hays Fitzhugh Rd / CR 101 RM 12 Travis County Line Improve to MAU-4 2025 $5,500,000.00
41-00101-00 Buda Hays Garison Road Main St. Manchaca Springs Rd. Reconstruct/extend 2-lane undivided with sidewalks
2025 $6,500,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00102-00 Buda Hays Garlic Creek Dr (new N/S)
SH 45 RM 967. New 4-lane divided 2025 $26,800,000.00
41-00103-00 Kyle Hays Goforth Road Brent Boulevard Bunton Creek Road Construct 4-lane road. Sidewalk along one side of the road.
2016 $10,100,000.00
41-00104-00 Kyle Hays Goforth Road IH-35 Frontage Road Brent Boulevard Construct 3-lane road with continuous left turn lane. Sidewalk along one side of the road.
2016 $10,100,000.00
41-00105-00 Buda Hays Hillside Terrace IH-35 Old Goforth Rd.. Widen to 4-lane divided, add sidewalks
2020 $3,600,000.00
41-00106-00 Buda Hays Hillside Terrace Old Goforth Rd FM 2001 Widen to 4-lane divided, add sidewalks
2020 $6,400,000.00
41-00108-00 San Marcos Hays Hopkins Street Reconstruction
Moore Street Bishop Street. Reconstruct Hopkins Street from Moore Street to Bishop Street to the City's Complete Street policy. Reconstruct the street, multi-use path, sidewalks, curb
$9,000,000.00
41-00109-00 Hays Hays Jacobs Well Rd / NF 25
FM 2325 Wayside Dr. New MAU-2 2025 $13,800,000.00
41-00110-00 Hays Hays Kohlers Xing FM 2770 IH-35. New MAD-4 2025 $5,500,000.00
41-00111-00 Hays Hays Kyle Loop W NF 17 Old Stagecoach Rd MAD-4 2025 $15,500,000.00
41-00112-00 Hays Hays Kyle Loop W Old Stagecoach Rd IH-35. MAD-4 2025 $4,100,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00113-00 Hays Hays Kyle Loop W FM 1626 NF 17. MAD 5 2025 $10,000,000.00
41-00114-00 Kyle Hays Kyle Marketplace Frontage Road Reliever
North Burleson Street, east of the Union Pacific RR
City Lights Drive Construct 3-lane road. Sidewalk along one side of the road.
2016 $4,100,000.00
41-00115-00 Hays Hays Kyle Parkway IH-35 at FM 1626 SH 21 MAD-4 2030 $15,800,000.00
41-00116-00 Kyle Hays Lehman Road E RM 150 Goforth Road Construct 2-lane road with dedicated left turn lanes at cross streets and widen to 4 lanes at the Goforth Rd. intersection. Sidewalk along one side
2016 $8,300,000.00
41-00117-00 Buda Hays Main St Sequoyah St Sequoyah St. Traffic signal warrant and potential signal
2018 $100,000.00
41-00118-00 Buda Hays Main St IH-35 Turnersville Rd. New 4-lane divided 2020 $2,400,000.00
41-00119-00 Buda Hays Main St IH-35 Firecracker Dr. Widen to 6-lane divided 2025 $31,700,000.00
41-00120-00 Buda Hays Main St Cabela's Dr IH-35. Widen to 6-lane divided 2027 $1,200,000.00
41-00121-00 Buda Hays Manchaca Springs Rd RM 967 IH-35 at Turnersville New 4-lane divided 2025 $61,100,000.00
41-00122-00 Hays Hays Marketplace Ave FM 967 IH-35 at Burleson Rd New MAD-4 2025 $6,500,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00123-00 Hays Hays McCarty Ln / CR 233 FM 2439/Hunter Rd IH 35 Improve to MAD-4 2035 $2,300,000.00
41-00124-00 Hays Hays NF 2 (Dripping Springs) US 290 W US 290 Bypass MAU-4 2025 $8,300,000.00
41-00125-00 Hays Hays NF 6 (San Marcos) RM 12 FM 1102. New MAD-4 2025 $18,300,000.00
41-00126-00 Hays Hays NF 10 (Dripping Springs)
RM 12 US 290 SE Bypass MAU-4 2025 $3,000,000.00
41-00127-00 Hays Hays NF 12 (Driftwood) Elder Hill Rd FM 150 at RM 1826 New MAD-2 2025 $15,300,000.00
41-00128-00 Hays Hays NF 18 / Roger Hanks Ext.
US 290 W RM 12 New MAD-2 2025 $5,100,000.00
41-00129-00 Hays Hays Nutty Brown Rd / CR 163
US 290 RM 1826. Improve to MAD-4 2025 $8,600,000.00
41-00130-00 Buda Hays Old FM 2001 FM 2001 Old Goforth Rd. Reconstruct with TWLTL and sidewalks 2018 $1,800,000.00
41-00131-00 Kyle Hays Old Stagecoach Post Rd FM 150. MAU-2 2025 $13,700,000.00
41-00132-00 Hays Hays Posey Rd / CR 235 FM 2439 IH-35. Improve to MAD-4 2025 $1,500,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00133-00 Hays Hays Posey Rd / CR 235 IH-35 Old Bastrop Hwy. Improve to MAD-4 2025 $2,500,000.00
41-00134-00 Hays Hays Post Rd / CR 140 IH-35 Aquarena Springs Rd. Improve to MAU-4 2035 $17,400,000.00
41-00135-00 San Marcos Hays River Ridge Pkwy Lime Kiln Rd Post Rd MAU-2 2025 $10,200,000.00
41-00136-00 San Marcos Hays River Ridge Pkwy Post Rd IH-35. MAD-4 2025 $8,600,000.00
41-00137-00 San Marcos Hays River Road RR Overpass & Road
Wal-Mart Aquarena Springs Dr. Construct RR overpass to replace existing underpass and construct 4-lane section
2015 $14,000,000.00
41-00138-00 Buda Hays Robert Light Blvd FM 2770 Main St/FM 967 New 4-lane divided with railroad overpass
2015 $16,800,000.00
41-00139-00 Buda Hays Robert Light Blvd FM 1626 FM 2770. New 4-lane divided 2018 $27,100,000.00
41-00140-00 Hays Hays Robert S. Light Blvd. Phase 1 Interim
FM 1626 FM 967. Construct new MAD-2 with RR overpass 2020 $13,100,000.00
41-00141-00 Hays Hays Robert S. Light Blvd. Phase 2 Ultimate
FM 1626 FM 967. MAD-4 2025 $18,800,000.00
41-00142-00 Hays Hays Sawyer Ranch Rd / CR 164
US 290 Darden Hill Rd Improve to MAD-4 2025 $36,000,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00143-00 Hays Hays Shadow Creek Blvd Hillside Terrace Bebee Rd. New MAD-2 2035 $35,900,000.00
41-00144-00 Hays Hays Turnersville Rd Extension
SH 45 SE FM 2001 New MAD-4 2025 $11,300,000.00
41-00145-00 Hays Hays Turnersville Rd Extension
FM 2001 FM 110. MAD-6 2025 $15,500,000.00
41-00146-00 Hays Hays Windy Hill Rd IH-35 Turnersville Rd extension. Improve to MAD-2 2025 $24,100,000.00
41-00147-00 Hays Hays Winter's Mill Parkway RM 12 FM 3237. MAU-4 2025 $3,900,000.00
41-00148-00 Hays Hays Yarrington Rd / CR 159
FM 110 SH 21. Improve to MAD-4 2025 $7,900,000.00
41-00149-00 Buda Hays Arterial Street Improvement Program
. - $700,000.00
41-00150-00 Hays Hays Arterial Street Improvement Program
. - $13,600,000.00
41-00151-00 Kyle Hays Arterial Street Improvement Program
. - $23,700,000.00
41-00152-00 San Marcos Hays Arterial Street Improvement Program
. - $677,200,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00153-00 TxDOT Hays RM 150 IH 35 RM 150 at Arroyo Ranch Road
Realign Roadway (MAD-4) on new location.
2025 $200,000,000.00
41-00154-00 TxDOT Hays SH 21 Caldwell County Line SH 71 Provide super 2 passing lanes. 2022 $5,377,000.00
41-00155-00 TxDOT Hays SH 21 SH 80 Caldwell County Line Provide super 2 passing lanes. 2022 $185,900,000.00
41-00156-00 City of Kyle Hays Blanco-Nance Bridge Cypress Road Hillard Road Multi-lane span bridge with pedestrian/bike lane, starting at the elevated western Blanco River bank to a new road connecting to Hilliard
2025 $30,000,000.00
41-00157-00 TxDOT Hays IH 35 At SH 123 ADD SHLDS, AUX LNS, RAMP IMPRVMTS, PVMT REHAB, FRTG RD INTER SECT IMPROVMT, BIKE & PED IMPRVMTS
2018 $99,874,153.00
41-00158-00 TxDOT Hays SH 21 SH 80 Caldwell County Line PROVIDE SUPER 2 PASSING LANES 2018 $8,265,337.00
41-00161-00 TxDOT Hays IH 35 Loop 82 South of Loop 82 Reconstruct Ramps 2020 $2,011,599.37
41-00162-00 TxDOT Hays IH 35 South of SH 80 North of RM 12 Add Shlds, Aux Lns, Ramp Imprvmts, Pvmt Rehab, Frtg Rd Inter
2021 $96,504,925.13
41-00163-00 TxDOT, Hays County Hays RM 967 0.130 Miles North of Robert S Light
0.141 Miles South of Robert S Light
Add Left Turn Lane And Shoulders 2019 $709,752.08
41-00164-00 TxDOT Hays SH 123 IH 35 Dezavalla Dr Construct Sidewalks 2020 $87,677.85
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00165-00 TxDOT, Hays County Hays CR RM 967 at Robert S. Light Blvd.
FM 1626 Construct A Single-Lane Two Way Roadway And A Grade-Separated Crossing With The Union Pacific Railroad
2019 $18,763,724.78
41-00166-00 City of San Marcos Hays CS Moore Street Bishop Street Reconstuct Roadway With Multi-Use Path, Sidewalks, And Curb And Gutter
2019 $11,912,885.48
41-00167-00 City of San Marcos Hays CS CM Allen Parkway Thorpe Rd. Construct Multi-Use Bike/Ped. Facility 2020 $2,513,939.73
41-00168-00 City of San Marcos Hays VA Nine Intersections On_Guadalupe,
Hopkins, Gary & LBJ Streets
Downtown San Marcos Pedestrian Improvements
2019 $209,069.25
41-00169-00 City of San Marcos Hays VA East of Hopkins St. West of IH 35 SBFR San Marcos River Shared Use Path 2019 $2,739,313.89
41-00170-00 City of Dripping Springs
Hays CS US 290 Mighty Tiger Trl. Construct 6-foot sidewalk on Sportsplex Drive
2019 $440,129.42
41-00171-00 Hays County, TxDOT Hays FM 2001 IH 35 SH 21 Widen To 4-Lane Divided Roadway By Adding Two Lanes And Shoulders
2019 $48,410,281.76
41-00172-00 Hays County, TxDOT Hays FM 110 SH 21 800' East Of Ih 35 Nbfr Construct Two Lanes And Shoulders 2019 $28,562,480.00
41-00173-00 Hays County, TxDOT Hays FM 110 SH 123 CR 245 (Redwood Road) Construct Two Lanes And Shoulders 2019 $10,981,789.31
41-00174-00 Hays County, TxDOT Hays FM 110 FM 621 Caldwell County Line Construct Two Lanes And Shoulders 2019 $13,922,512.62
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
41-00175-00 Hays County, TxDOT Hays FM 110 CR 245 (Redwood Road) FM 621 Construct Two Lanes And Shoulders 2019 $3,894,057.82
42-00001-00 City of San Marcos Hays CS San Marcos Visitors Center Aquarena Spring Drive Reconstruct an existing pedestrian path into a shared use path to accommodate bicycles.
2017 $2,793,655.00
51-00001-01 CTRMA Travis SL 1 US 183 RM 2222 Add direct connectors with transitions 2019 $167,385,494.00
51-00001-02 TxDOT/CTRMA Travis US 183 N Williamson County Line SL 1 Widen from 3 to 4 general purposes lanes
2019 $69,262,963.00
51-00001-03 CTRMA Travis US 183 N Williamson County Line SL 1 Add two express lanes in each direction
2019 $135,639,969.00
51-00004-00 TxDOT Travis IH 35 At Wells Branch Pkwy Operational improvements-interchange 2020 $38,273,484.00
51-00005-00 TxDOT Travis IH 35 At Williams Drive Reconstruct interchange 2020 $61,853,480.00
51-00006-00 TxDOT Travis SH 71 At Ross Road & At Kellam Road
Construct overpass 2020 $64,034,594.00
51-00007-00 TxDOT Travis SH 130 US 290 SH 71 Add one lane in each direction 2018 $121,537,069.00
51-00008-00 TxDOT Travis SH 130 SH 45 US 290 Add one lane in each direction 2018 $90,576,967.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00009-00 TxDOT Travis SL 1 North of Slaughter South of LaCrosse Grade Separation of Main Lanes with 2 through-lanes in each direction.
2019 $77,897,229.00
51-00010-00 TxDOT Travis IH 35 South of Holly Street North of Oltorf Add CDs, Aux Lanes, ramp improvements, pavement rehab
2018 $204,605,169.00
51-00011-00 TxDOT Travis IH 35 At Parmer Lane Reconstruct intersection. 2018 $38,768,253.00
51-00012-00 TxDOT Travis IH 35 Rundberg Lane US 183 Add shoulders, auxiliary lanes, ramp improvements
2017 $187,176,718.00
51-00013-00 TxDOT Travis IH 35 US 183 US 290 East Operational Improvements to Ramps and Direct Connectors
2017 $86,798,275.00
51-00014-00 CTRMA/TxDOT Travis VA Various Locations in MPO Area
Operation of the Highway Emergency Response Operator (HERO) patrol service
2017 $5,750,000.00
51-00015-00 City of Elgin Travis VA Various Locations in the City of Elgin in Travis and Bastrop Counties
Construct Sidewalks 2017 $1,498,944.00
51-00016-00 City of Rollingwood Travis VA Various streets in Rollingwood
Add bike striping and construct walking trail
2017 $150,256.00
51-00017-00 City of Austin Travis CS North Lamar at Palmer Lane
US 183 Construct sidewalks 2017 $1,770,000.00
51-00018-00 City of Austin Travis CS East 7th Street East 4th Street Construct Sabine Street Pedestrian and Bicycle Promenade
2017 $3,370,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00019-00 City of Austin Travis CS 200' South of East 12th Street
MLK Station Widen trail, install new bridge, and improve crossing for bikes and pedestrians.
2017 $1,490,877.00
51-00020-00 City of Lago Vista Travis VA Bar K Ranch Road at FM 1431
Frontier Cove Construct sidewalks and traffic calming. 2019 $558,959.00
51-00021-00 City of Austin Travis VA Various Locations Install pedestrian safety devices citywide.
2017 $2,997,061.00
51-00022-00 Travis County Travis FM 969 FM 3177 FM 973 Widen FM 969, an existing 4-lane undivided arterial, to provide for a continuous left-turn lane, shoulders, and a sidewalk on one side of the
2019 $18,128,600.00
51-00022-01 Travis County Travis FM 969 FM 973 Hunters Bend Road Widen FM 969, an existing 2-lane undivided arterial, to provide for two additional travel lanes, a continuous left turn lane, shoulders, and a
2019 $10,917,185.00
51-00023-00 CTRMA/TxDOT Travis SH 45 Hays County Line Loop 1 Construction of a 4-lane tolled freeway (Project may be phased)
2017 $67,420,000.00
51-00024-00 CTRMA/TxDOT Travis US 183 At Colorado River Construct a bicycle and pedestrian path.
2018 $4,800,000.00
51-00025-00 CARTS Travis VA Travis-Hays County Purchase of 6 heavy duty 30-foot buses.
2018 $2,100,000.00
51-00026-00 TxDOT Travis FM 969 Tannehill Lane FM 3177/Decker Lane Pedestrian facility. 2018 $1,034,149.00
51-00027-00 Travis County Travis FM 1626 West of Brodie Lane FM 2304 Reconstruct to 4-lanes with continuous left turn lane.
2018 $12,223,300.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00028-00 TxDOT Travis FM 974 Samsung Blvd. .02 Miles East of Harris Ranch
Reconstruct Roadway 2018 $5,978,085.00
51-00029-00 Travis County Travis VA Various Locations Construct new sidewalk on both sides of Elroy Road within SH 130 right-of-way and a shared use path on FM 973 from Moores Bridge Road to
2019 $1,278,570.00
51-00030-00 City of Austin Travis CS Northern Walnut Creek Trail
West of Lamar Blvd. to IH 35
Construct bike/ped trail. 2019 $2,466,009.00
51-00031-00 Travis County Travis VA Proposed Wildhorse Connector
Travis County East Metro Park
Construct Shared Use Path. 2019 $3,176,784.00
51-00032-00 City of Pflugerville Travis Rowe Lane SH 130 Martin Lane Widen existing two-lane roadway to include turn lanes, additional shoulders, and drainage improvements.
2017 $0.00
51-00033-00 City of Pflugerville Travis Weiss Lane Cele Road Cameron Road Reconstruct from MUD2 to MAD4 from Cele Road to Wilbarger Creek. South of Wilbarger Creek will be improved MUD2.
2017 $542,000.00
51-00034-00 Travis County Travis FM 2304 FM 1626 Ravencroft Drive Construct four-lane, divided arterial with bicycle lanes and sidewalks.
2018 $12,000,000.00
51-00035-00 CTRMA Travis US 290 At SH 130 Develop and construct two tolled direct connectors at the US 290/SH 130 interchange
2018 $88,900,000.00
51-00035-01 TxDOT Travis US 290 At SH 130 Develop and construct one Central Texas Turnpike Systemdirect connector at the US 290/SH 130 Interchange
2018 $41,100,000.00
51-00036-00 TxDOT Travis IH-35 - Travis County SH 45 N SH 45 SE IH-35 Improvement Projects 2020 $1,940,000,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00037-00 CTRMA Travis US 183 N Loop 1 N RM 620 2 Express Lanes in each direction 2019 $225,700,000.00
51-00038-00 CTRMA Travis US 183 S US 290 Boggy Creek. Completion of environmental document, traffic and revenue studies, final engineering, ROW acquisition, utility relocation and construction for 6
2016 $332,300,000.00
51-00039-00 CTRMA Travis US 183 S Boggy Creek SH 71. Completion of environmental document, traffic and revenue studies, final engineering, ROW acquisition, utility relocation and construction for 6
2018 $319,700,000.00
51-00040-00 CTRMA Travis US 290 W West of RM 1826 Loop 1 Construct 6-lane tolled turnpike with frontage roads
2018 $529,000,000.00
51-00041-00 Travis Travis US 290 W RM 1826 Nutty Brown Rd Widen to MAD-6 2040 $17,500,000.00
51-00042-00 CTRMA Travis Loop 1 Cesar Chavez Slaughter. 2 Express Lanes in each direction - MoPac South
2020 $352,800,000.00
51-00043-00 CTRMA Travis SH 71 W Silvermine Dr. to US 290 Silvermine Dr. to US 290. Construct tolled lanes and frontage road
2018 $200,000,000.00
51-00044-00 Travis Travis FM 812 FM 973 N Maha Loop Rd Improve to MAD-4 2038 $28,000,000.00
51-00045-00 Travis Travis FM 812 Maha Loop Rd Travis County Line Widen to MAD-4 2040 $11,300,000.00
51-00046-00 Travis Travis FM 969 FM 3177 Hunters Bend. Improve to MAD-4 2017 $18,000,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00047-00 Travis Travis FM 969 Hunters Bend Webberville City Limit Improve to MAD-4 2038 $49,700,000.00
51-00048-00 Travis Travis FM 973 FM 973 Relocation SH 71 E Widen to MAD-4 2040 $61,200,000.00
51-00049-00 Travis Travis FM 973 SH 71 E FM 812 Widen to MAD-4 2040 $26,500,000.00
51-00050-00 Travis Travis FM 973 FM 812 US 183. Widen to MAD-4 2040 $16,200,000.00
51-00051-00 Travis Travis FM 973 Relocation US 290 FM 973. New MAD-4/Improve to MAD-4 2020 $20,500,000.00
51-00052-00 Travis Travis FM 973 to Blake Manor Rd. Connector
FM 973 Blake Manor Rd New MAD-4 2020 $12,000,000.00
51-00053-00 Travis Travis FM 1626 Manchaca Rd 0.2 miles south of Brodie Ln
Improve to MAD-4 2018 $12,200,000.00
51-00054-00 Travis Travis FM 1626 IH-35 Manchaca Road. Widen to MAD-4 2040 $15,300,000.00
51-00055-00 Travis Travis FM 3238 (Hamilton Pool Rd)
east side of Pedernales River
RM 12 Improve to MAD-2 2018 $23,100,000.00
51-00056-00 Travis Travis FM 3238 (Hamilton Pool Rd)
RM 12 SH 71 W Improve to MAD-2 2025 $40,000,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00057-00 Travis Travis RM 620 Anderson Mill Rd. SH 71 W Widen to MAD-6 2025 $52,000,000.00
51-00058-00 Travis Travis RM 620 Bypass 620 RR 2222. 3 lanes, 2-lane west, 1 east 2020 $8,000,000.00
51-00059-00 Travis Travis RM 1826 US 290 W Slaughter Lane Improve to MAD-4 2022 $7,900,000.00
51-00060-00 Travis Travis RM 1826* Slaughter Lane SH 45 SW Improve to MAD-4 2040 $17,200,000.00
51-00061-00 Travis Travis RM 2222 McNeil 620 Bypass. Widen to MAD-6 2020 $12,000,000.00
51-00062-00 Travis Travis RM 2244 Walsh Tarlton Redbud Trail. Widen to MAD-4 2020 $6,000,000.00
51-00063-00 Austin Travis Arterial A US 290 Samsung Blvd. New MAD-4, new alignment 2020 $25,500,000.00
51-00064-00 Travis Travis Arterial B FM 969 Harold Green Rd New 2-lane minor arterial 2022 $11,400,000.00
51-00065-00 Travis Travis Arterial C FM 969 Deaf Smith Blvd New 2-lane minor arterial 2022 $7,100,000.00
51-00066-00 Travis Travis Bee Creek Rd Highlands Blvd SH 71 Improve to MAD-4 2015 $9,500,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00067-00 Austin Travis Berkman Dr 51st St E Manor Rd New MND-2 and Widen to MND-2 2020 $2,900,000.00
51-00068-00 Travis Travis Blake-Manor Rd FM 973 Taylor Ln. Improve to MAD-4 2018 $13,800,000.00
51-00069-00 Travis Travis Blake-Manor Rd Taylor Ln Burleson-Manor Rd Improve to MAD-4 2030 $13,500,000.00
51-00070-00 Travis Travis Braker Ln FM 973 Taylor Ln New MAD-4 2018 $20,000,000.00
51-00071-00 Travis Travis Braker Ln FM 3177 SH 130 New MAD-4 2025 $36,000,000.00
51-00072-00 Travis Travis Braker Ln 1 mile east of Dessau Rd Harris Branch Pkwy New MAD-4 / Improve Blue Goose to MAD-4
2030 $20,800,000.00
51-00073-00 Travis Travis Braker Ln Taylor Ln Burleson-Manor Rd. New MAD-4 2030 $12,300,000.00
51-00074-00 Travis Travis Burleson-Manor Rd Blake-Manor Rd FM 969 Widen to 4 lanes 2038 $25,500,000.00
51-00075-00 Travis Travis Burleson-Manor Rd FM 969 SH 71 New 2-lane minor arterial undivided 2038 $53,200,000.00
51-00076-00 Travis Travis Cameron Rd Gregg-Manor Rd Gregg Ln. New MAD-4 / Improve to MAD-4 2017 $18,400,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00077-00 Travis Travis Cameron Rd Pflugerville East Rd Gregg-Manor Rd Widen to 4 lanes 2018 $17,600,000.00
51-00078-00 Austin Travis Congress Ave North Bluff Dr South Boggy Creek Improve to MAD-4 2019 $12,600,000.00
51-00079-00 Travis Travis CR 137 / Arterial A (Pflugerville)
CR 138 Rowe Ln. Widen to 4 lanes 2030 $9,700,000.00
51-00080-00 Travis Travis Deaf Smith Blvd Arterial C Northbound frontage of SH 130
New 2-lane minor arterial 2023 $9,500,000.00
51-00081-00 Travis Travis Decker Ln Williamson County Line Pecan St Widen to MAD-4 2040 $39,800,000.00
51-00082-00 Travis Travis Decker Ln Pecan St. Wells Branch Pkwy Widen to MAD-4 2040 $6,800,000.00
51-00083-00 Travis Travis Decker Ln Wells Branch Pkwy Gregg Manor Rd New MAD-4 and Widen to MAD-4 2040 $10,600,000.00
51-00084-00 Travis Travis Dessau Rd Northtown/Wells Branch FM 734. Widen to 6 lanes 2038 $30,800,000.00
51-00085-00 Travis Travis Dunlap Rd. FM 969 S Dunlap Road Improve to MAD-2 2023 $9,600,000.00
51-00086-00 Pflugerville Travis E Pflugerville Pkwy Colorado Sand Weiss Ln, SH 130 underpass
2 lane minor arterial undivided 2017 $7,300,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00087-00 Travis Travis Elroy Rd Ross Rd Fagerquist Rd. Improve to MAD-4 2017 $17,500,000.00
51-00088-00 Travis Travis Fagerquist Rd Elroy Rd Four Daughters Rd Improve to MAD-4 2030 $13,100,000.00
51-00089-00 Travis Travis Ferguson Ln Rundberg Ln Arterial A. New MAD-4 / Improve to MAD-4 2022 $16,800,000.00
51-00090-00 Travis Travis Fitzhugh Rd US 290 W County Line Improve to MAD-2 2030 $12,200,000.00
51-00091-00 Travis Travis Flint Rock Road City of Lakeway Jack Nicklaus Drive Widen to MAD-4 2016 $2,500,000.00
51-00092-00 Travis Travis Flint Rock Road Jack Nicklaus Drive Serene Hills Drive Expand roadway to meet county standards for MNR-2
2016 $5,100,000.00
51-00093-00 Travis Travis Four Daughters Road SH 71 E FM 812 New MAD-4 2030 $66,000,000.00
51-00094-00 Travis Travis Frate Barker Rd Brodie Ln Manchaca Rd. Widen to MAD-4 2020 $8,500,000.00
51-00095-00 Travis Travis Grand Ave Pkwy Greenlawn Blvd Bratton Lane. New MAD-4 / Improve to MAD-4 2030 $4,500,000.00
51-00096-00 Travis Travis Greenlawn Blvd IH-35 N Anderson Mill Rd New MAD-4 and widen to MAD-4 2040 $5,400,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00097-00 Travis Travis Gregg-Manor Rd SH 130 US 290 E New MAD-4 / improve to MAD-4 2030 $24,900,000.00
51-00098-00 Austin Travis Grove Blvd Montopolis Hogan Ave. New MAD-4 2019 $7,600,000.00
51-00099-00 Pflugerville Travis Heatherwilde Blvd / Wilke Ln
SH 45 Wilke Ln. MAD-4 2014 $8,300,000.00
51-00100-00 Travis Travis Hewitt Ln Frate Barker Rd FM 1626 Improve to MNR-4 2020 $5,500,000.00
51-00101-00 Travis Travis Hidden Lake Blvd Kelly Ln Pflugerville Rd. New MAD-4 2025 $18,100,000.00
51-00102-00 Travis Travis Hodde Ln Rowe Ln Cele Rd. Improve to MAD-4 2038 $18,700,000.00
51-00103-00 Travis Travis Howard Ln Cameron Rd SH 130. New MAD-4 2016 $19,000,000.00
51-00104-00 Austin Travis Howard Ln McNeil Rd Loop 1 N Improve to MAD-6 2030 $18,600,000.00
51-00105-00 Travis Travis Jake's Hill Rd Rowe Ln Kelly Ln. New MAD-4 2030 $15,700,000.00
51-00106-00 Travis Travis Jesse Bohls Rd Weiss Ln Cameron Rd. New MAD-4 / Improve to MAD-4 2023 $23,900,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00107-00 Pflugerville Travis Kelly Ln Moorlynch Ave Weiss Ln. Widen to 4-lane divided major arterial with bicycle and pedestrian accommodations
2015 $7,700,000.00
51-00108-00 Travis Travis Kelly Ln Weiss Lane FM 973. New MAD-4 and Widen to MAD-4 2040 $25,100,000.00
51-00109-00 Travis Travis Lohman Ford Rd FM 1431 Sylvester Ford Rd Widen to MAD-4 2040 $28,500,000.00
51-00110-00 Travis Travis Lohman Ford Rd Sylvester Ford Rd Point Venture Widen to MNR-4 2040 $16,600,000.00
51-00111-00 Travis Travis Maha Loop Rd SH 71 Pearce Ln (Phase 1) New MAD-2 2016 $15,000,000.00
51-00112-00 Travis Travis Maha Loop Rd SH 71 Pearce Ln (Phase 2) Improve to MAD-4 2025 $12,000,000.00
51-00113-00 Travis Travis Maha Loop Rd Pearce Ln FM 812. New MAD-4/Improve to MAD-4 2030 $37,600,000.00
51-00114-00 Travis Travis Maha Loop Rd FM 812 Slaughter Ln (Moore Rd) New MAD-4 and Widen to MAD-4 2040 $7,100,000.00
51-00115-00 Travis Travis Maha Loop Rd Slaughter Ln (Moore Rd) Maha Loop Rd New MAD-4 and Widen to MAD-4 2040 $15,100,000.00
51-00116-00 Travis Travis McKinney Falls Pkwy William Cannon Dr Slaughter Ln New MAD-4 and widen to MAD-4 2020 $5,900,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00117-00 Travis Travis McKinney Falls Pkwy (Palmer Rd)
SH 45 Turnersville Rd. Widen to MAD-4 2030 $4,000,000.00
51-00118-00 Austin Travis McNeil Dr US 183 Howard Ln. Widen to 6 lanes 2030 $29,300,000.00
51-00119-00 Austin Travis McNeil Rd 700' north of SH 45 McNeil Dr/Howard Ln Improve to MAD-6 2030 $26,100,000.00
51-00120-00 Travis Travis Melber Ln Kelly Ln Cameron Rd. New MAD-4 2038 $33,700,000.00
51-00121-00 Travis Travis Moore Rd (Slaughter) FM 973 Maha Loop Rd Improve to MAD-4 2030 $25,000,000.00
51-00122-00 Travis Travis Old Kimbro Rd US 290 E Littig Rd Improve to MAD-4 2021 $12,800,000.00
51-00123-00 Travis Travis Palmer Rd FM 1327 SH 45. Improve to MAD-4 2030 $5,200,000.00
51-00124-00 Travis Travis Parmer Lane US 290 E Braker. New MAD-4 2016 $14,700,000.00
51-00125-00 Travis Travis Parsons Rd Littig Rd Lockwood Rd. New MAD-4 / Improve to MAD-4 2021 $18,700,000.00
51-00126-00 Travis Travis Pearce Ln FM 973 Maha Loop Rd Improve to MAD-4 2024 $28,990,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00127-00 Travis Travis Pearce Ln Maha Loop Rd Wolf Ln Improve to MAD-4 2030 $28,880,000.00
51-00128-00 Pflugerville Travis Pflugerville East Rd (Pecan Street)
SH 130 Weiss Ln. MAD-2 2015 $4,600,000.00
51-00129-00 Travis Travis Pflugerville Rd Weiss Ln Cameron Rd. Widen to 4 lanes 2023 $3,200,000.00
51-00130-00 Austin Travis Pleasant Valley Rd Onion Creek Dr CR 105/Turnersville Rd New MAD-4 / Improve to MAD-4 2030 $46,700,000.00
51-00131-00 Austin Travis Pleasant Valley Rd Existing Pleasant Valley Rd SH 71 New MAD-4 2030 $4,000,000.00
51-00132-00 Travis Travis Puryear Rd 1 mile west of IH-35 IH-35 New MAD-6 2038 $10,500,000.00
51-00133-00 Travis Travis Reimers Peacock SH 71 Hamilton Pool Rd New 2-lane minor arterial undivided 2019 $10,000,000.00
51-00134-00 Travis Travis Ross Rd SH 71 Elroy Rd. Widen to 4 lanes 2038 $29,700,000.00
51-00135-00 Travis Travis Ross Rd Elroy Rd McAngus. New 2-lane minor arterial divided 2038 $5,500,000.00
51-00136-00 Pflugerville Travis Rowe Ln SH 130 CR 137. 2 lane minor arterial undivided 2017 $2,100,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00137-00 Travis Travis Rowe Ln City of Pflugerville Hodde Ln Widen to MAD-4 2040 $15,200,000.00
51-00138-00 Travis Travis Rowe Ln Hodde Ln Decker Ln. New MAD-4 and Widen to MAD-4 2040 $1,300,000.00
51-00139-00 Austin Travis Rundberg Ln FM 1325 Metric Blvd. New MAD-2 2021 $27,000,000.00
51-00140-00 Travis Travis Slaughter Ln Pleasant Valley Rd McKinney Falls Pkwy New MAD-4 2020 $16,100,000.00
51-00141-00 Travis Travis Slaughter Ln McKinney Falls Pkwy FM 973 New MAD-4 2030 $32,500,000.00
51-00142-00 Travis Travis Taylor Ln Lockwood Rd FM 969. Improve to MAD-4 2038 $39,200,000.00
51-00143-00 Travis Travis Thaxton Rd Slaughter Lane FM 1327. Improve to MAD-4 2025 $36,500,000.00
51-00144-00 Pflugerville Travis Weiss Lane Cele Road Kelly Ln. 2 lane minor arterial undivided 2017 $3,700,000.00
51-00145-00 Travis Travis Weiss Lane Cele Road Cameron Rd. New MAD-4 / Improve to MAD-4 2030 $36,700,000.00
51-00146-00 Travis Travis Wells Branch Pkwy Immanuel Cameron. New MAD-4 / Improve to MAD-4 2020 $10,000,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00147-00 Travis Travis Wells Branch Pkwy Cameron SH 130. New MAD-4 2023 $7,400,000.00
51-00148-00 Travis Travis Wells Branch Pkwy SH 130 Fuchs Grove Rd New MAD-4 2030 $17,800,000.00
51-00149-00 Austin Travis Westgate Blvd Cohoba Dr Cameron Loop. New MAD-4 2020 $4,000,000.00
51-00150-00 Travis Travis Wild Horse Connector FM 973 Parmer LN. New MAD-4 2019 $16,000,000.00
51-00151-00 Austin Travis William Cannon Dr Running Water Dr McKinney Falls Pkwy Improve to MAD-4 2018 $7,400,000.00
51-00152-00 Travis Travis William Cannon Dr McKinney Falls Pkwy US 183 S New MAD-4 2018 $9,500,000.00
51-00153-00 Austin Travis William Cannon Dr Pleasant Valley Rd .5 miles east Widen to MAD-6 2020 $8,600,000.00
51-00154-00 Travis Travis William Cannon Dr / FM 812
US 183 S FM 812 New MAD-4 2038 $15,800,000.00
51-00155-00 Austin Travis Arterial Street Improvement Program
. - $2,647,400,000.00
51-00156-00 Bee Cave Travis Arterial Street Improvement Program
. - $4,500,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00157-00 Lakeway Travis Arterial Street Improvement Program
. - $14,600,000.00
51-00158-00 Manor Travis Arterial Street Improvement Program
. - $7,900,000.00
51-00159-00 Pflugerville Travis Arterial Street Improvement Program
. - $216,400,000.00
51-00160-00 Travis Travis Arterial Street Improvement Program
. - $95,900,000.00
51-00161-00 Westlake Hills Travis Arterial Street Improvement Program
. - $20,500,000.00
51-00162-00 Travis County Travis FM 1625 McKenzie Road Intersection with 183 Realign Roadway and Relocate Highway Intersection.
2017 $1,000,000.00
51-00163-00 TxDOT Travis SH 130 SH 71 SH 45 SE Operational improvements. 2025 $10,000,000.00
51-00164-00 Travis County Travis SH 71 Intersection at Navarro Creek
Extend Westbound Left Turn Lane. 2017 $190,000.00
51-00165-00 TxDOT Travis SH 71 Ross Road Kellam Road Construct overpass. 2021 $64,000,000.00
51-00166-00 TxDOT Travis IH 35 Onion Creek Parkway SH 45 E Ramp Reversal 2019 $7,665,756.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00181-00 CARTS Travis Eastside Bus Plaza At 101 Shady Lane, Austin TX
Design and construction of Eastside Bus Plaza
2019 $5,000,000.00
51-00182-00 TxDOT Travis IH 35 Grand Ave Parkway SH 45N Reverse NB Ramps and Add Auxilary Lanes
2020 $8,867,049.82
51-00183-00 TxDOT Travis IH 35 At Wells Branch Pkwy Operational Improvements-Interchange 2020 $45,693,659.49
51-00184-00 TxDOT Travis IH 35 At Parmer Lane Reconstruct Intersection 2019 $30,371,592.40
51-00185-00 TxDOT Travis US 290 West of RM 1826 SL 1 Construct 6-Lane Turnpike With Frontage Roads_(Toll)
2022 $477,561,648.14
51-00186-00 TxDOT Travis SH 71 East of Riverside Dr. US 183 Construct Frontage Road And Ramp 2022 $3,741,188.94
51-00187-00 TxDOT, City of Austin
Travis SL 360 At Westlake Drive Grade Separate Intersection 2022 $66,804,217.60
51-00188-00 TxDOT, City of Austin
Travis SL 360 At Spicewood Springs Road Grade Separate Intersection 2022 $62,628,954.01
51-00189-00 TxDOT Travis US 183 Williamson County Line SL 1 Widen From 3 To 4 General Purpose Lanes
2019 $72,346,219.04
51-00190-00 CTRMA, TxDOT Travis US 183 Williamson County Line SL 1 Add 2 Express Lanes In Each Direction 2019 $141,678,012.28
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00191-00 TxDOT Travis SH 71 SH 71/US 183 Interchange Presidential Blvd. Construct Frontage Road, Ramps And Direct Connects
2021 $36,580,974.39
51-00192-00 TxDOT Travis US 183 0.46 Miles South of Thompson Ln
0.07 Miles SW of Airport Commerce Dr
Construct New Frontage Road 2021 $6,244,813.84
51-00193-00 TxDOT Travis SH 71 At Ross Road and Kellam Road
Construct 2-Lane Overpass 2020 $66,319,352.26
51-00194-00 TxDOT Travis SH 71 .85 Miles West ef Tucker Hill Lane
Travis / Bastrop County Line
Construct Overpass and Add 2 Lane One-Way Eastbounb And Westbound Frontage Roads
2021 $14,204,359.39
51-00195-00 TxDOT Travis SH 71 US 290 West Silvermine Dr Construct Tolled Lanes & Frontage Roads
2022 $14,071,077.99
51-00196-00 City of Austin Travis CS Northern Walnut Creek Trail Ph 2:
West of Lamar Blvd to IH 35
Const Bike/Ped Trail West Of Lamar To Ih 35
2019 $2,294,317.44
51-00197-00 Travis County Travis Blake Manor Road Proposed Wildhorse Connector
Travis County East Metro Park
Construct a new shared use path 2019 $3,176,784.00
51-00199-00 Travis County Travis FM 1625 0.22 Miles South of Mckenzie Road
US 183 & Mckenzie Rd. Intersection
Realign Roadway And Relocate Highway Intersection
2019 $1,383,452.31
51-00200-00 Travis County, TxDOT
Travis FM 1626 0.2 Miles South of Brodie Ln.
East of FM 2304 Reconstruct an existing 2-lane arterial to a 4‐lane arterial with a continuous left turn lane with 5 foot wide shoulders and 6 foot wide sidewalks
2020 $12,223,300.00
51-00201-00 TxDOT, City of Austin
Travis RM 2222 RM 620 Bonaventure Dr. Operational improvements and new 3 lane connector road (2 westbound lane and 1 eastbound lane)
2019 $13,867,798.46
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
51-00202-00 Travis County Travis FM 2304 Ravenscroft Drive FM 1626 Reconstruct an existing 2-lane divided arterial to a four‐lane divided arterial with bicycle lanes and sidewalks.
2019 $12,177,962.89
51-00203-00 CTRMA Travis SL 1 US 183 RM 2222 Add 1 Lane Direct Connectors With Transitions
2019 $174,836,696.00
61-00001-00 City of Cedar Park Williamson Bell Blvd. North of Cypress Creek Road
South of Cedar Park Drive
Realign 0.8 mile section of US 183 (Bell Boulevard) onto the Old Highway 183 alignment
2018 $20,000,000.00
61-00002-00 CTRMA/TxDOT Williamson 183A Phase III Hero Way SH 29 Construct 4-lane tolled expressway 2018 $179,000,000.00
61-00003-00 TxDOT/CTRMA Williamson US 183 N RM 620/SH 45 Travis County Line Widen from 3 to 4 general purposes lanes
2019 $69,262,963.00
61-00004-00 CTRMA Williamson US 183 N RM 620/SH 45 Travis County Line Add two express lanes in each direction
2019 $146,883,539.00
61-00005-00 TxDOT Williamson IH 35 At FM 3406 Bridge replacement and intersection improvements
2017 $21,046,790.00
61-00006-00 TxDOT Williamson IH 35 SH 45 Westinghouse Mill, Seal, and Inlay 2017 $7,555,651.00
61-00007-00 Williamson Williamson RM 620 Wyoming Springs Drive Deep Wood Drive Reconstruct existing 4-lane roadway to a 6-lane divided roadway
2017 $7,294,164.00
61-00008-00 City of Hutto Williamson CS Limmer Loop at FM 1660 Cottonwood Creek Elementary
Construct sidewalks. 2017 $841,928.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
61-00009-00 Williamson County Williamson CS Brushy Creek at Hairy Man Road
Creek Side Plaza Shared use path. 2018 $2,799,102.00
61-00010-00 City of Cedar Park Williamson CS 800' west of US 183 500' east of Parmer Lane Shared use path adjacent to roadway 2018 $466,115.00
61-00011-00 City of Cedar Park/TxDOT
Williamson RM 1431 Market Street Cottonwood Creek Trail Reconstruction of MAD-4 to MAD-6 arterial.
2017 $17,492,470.00
61-00012-00 Williamson County/TxDOT
Williamson FM 1660 CR 101 North of Hutto US 79 Interim 2-lane roadway on new alignment. MAD-4 at build-out.
2020 $18,319,901.00
61-00013-00 Williamson County/TxDOT
Williamson FM 1660 US 79 FM 3349 Interim 2-lane roadway on new alignment. MAD-4 at build-out.
2020 $15,452,681.00
61-00014-00 TxDOT Williamson RM 620 Cornerwood Drive Wyoming Springs Drive Mill, overlay and re-strip existing 4-lane divided roadway to a 6-lane divided.
2018 $2,600,000.00
61-00015-00 City of Georgetown Williamson CS 2nd Street Morrow Street Reconstruct the North and South Austin Avenue Bridges.
2019 $9,163,749.00
61-00016-00 Williamson County Williamson IH 35 At CR 305 Bridge replacement. 2017 $9,200,000.00
61-00017-00 Williamson County Williamson IH 35 At Ronald Reagan Blvd. Bridge replacement. 2017 $20,000,000.00
61-00018-00 Williamson County Williamson IH 35 Bud Stockton Loop FM 972 Convert existing northbound and southbound two-way frontage roads to two-lane one-way frontage roads and remove and replace existing
2017 $15,700,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
61-00019-00 Williamson County Williamson SW Bypass At RM 2243 Reconstruct intersection. 2017 $21,700,000.00
61-00020-00 Williamson County Williamson University Boulevard FM 1460 SH 130 Reconstructing the existing 2-lane to 4-lane divided.
2017 $11,700,000.00
61-00021-00 Williamson County Williamson SH 130 FM 685 US 79 New northbound two-lane frontage road.
2019 $7,300,000.00
61-00022-00 Williamson County Williamson SH 130 US 79 Limmer Loop New northbound frontage road and bridge.
2019 $2,612,000.00
61-00023-00 Williamson County Williamson SH 130 US 79 Limmer Loop New southbound two-lane frontage road.
2019 $3,200,000.00
61-00024-00 TxDOT Williamson IH-35 - Williamson County
SH 45 N SH 195 N IH-35 Improvement Projects 2020 $815,000,000.00
61-00025-00 Round Rock Williamson US 79 IH-35 A. W. Grimes Boulevard Reconstruct to a 6 lane divided roadway with sidewalks
2030 $14,400,000.00
61-00026-00 Williamson Williamson US 183 N FM 970 FM 3405. Widen from 4 lanes to 4 lanes with median (future frontage roads)
2018 $17,100,000.00
61-00027-00 Williamson Williamson US 183 N FM 3405 SH 29. Widen from 4 lanes to 4 lanes with median (future frontage roads)
2018 $40,900,000.00
61-00028-00 Williamson Williamson FM 734 / Parmer Ln RM 1431 Brushy Creek. Widen from 4 lanes with median to 6 lanes with median
2015 $14,400,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
61-00029-00 Williamson Williamson FM 734 / Parmer Ln Brushy Creek Spectrum Dr. Widen from 4 lanes with median to 6 lanes with median
2015 $4,000,000.00
61-00030-00 TxDOT Williamson FM 1660 SH 29 FM 3349 Widen from 2 lanes to 4 lanes with median
$82,300,000.00
61-00031-00 Williamson Williamson FM 3405 US 183 RM 2338. Widen from 2 lanes to 4 lanes 2015 $24,800,000.00
61-00032-00 Cedar Park Williamson RM 620 Pecan Park Blvd Anderson Mill Road Improve to MAD-6 2025 $25,000,000.00
61-00033-00 Williamson Williamson RM 1431 Sam Bass IH-35. Reconstruct and widen to 6 lane divided
2025 $39,800,000.00
61-00034-00 Cedar Park Williamson RM 1431 / Whitestone Blvd Reconstruction
and Widening
Cottonwood Creek Trail Market Street Reconstruct and widen to a six lane arterial roadway with a raised center median, turn lanes, wide outer lanes and shared use path. The project will
$12,900,000.00
61-00035-00 Round Rock Williamson A.W. Grimes Blvd Westinghouse Road University Boulevard. Reconstruct to a MAD-4 with sidewalks 2018 $6,700,000.00
61-00036-00 Georgetown Williamson Airport Dr IH-35 Berry Creek Drive. Improve to Principal Arterial Divided; upgrade from 2-lane to 4 DIV
2025 $33,300,000.00
61-00037-00 Round Rock Williamson Arterial A (Kenny Fort Blvd)
Joe DiMaggio Blvd 1000' S of US 79 Widen from 2 lanes with median to 6 lanes with median
2018 $2,900,000.00
61-00038-00 Round Rock Williamson Arterial L Chisholm Trail Road Mays Street Construct new MAD-4 with sidewalks and IH-35 crossing
2035 $26,200,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
61-00039-00 Leander Williamson Brushy Creek Trail Leander Station 183A trail. Trail/Pedestrian bridge -connects rail to trail
2016 $3,300,000.00
61-00040-00 Hutto Williamson Carl Stern Blvd FM 1660 Old FM 1660 Relo Construct 2-lane undivided collector 2025 $3,700,000.00
61-00041-00 Williamson Williamson Chandler Rd SH 130 FM 1660. Widen from 2 lanes with median to 6 lanes with median
2015 $15,300,000.00
61-00042-00 Round Rock Williamson CR 112 FM 1460 Kenney Fort Boulevard Reconstruct to a MAD-4 with sidewalks 2030 $9,000,000.00
61-00043-00 Hutto Williamson CR 119 CR 100 CR 164. Construct 4-lane minor arterial with a CTL
2022 $10,500,000.00
61-00044-00 Hutto Williamson CR 132 CR 134 FM 3349. Reconstruct from a 2-lane minor arterial to a 2-lane collector
2024 $3,500,000.00
61-00045-00 Hutto Williamson CR 164 CR 108 CR 119. Reconstruct from a 2-lane principal arterial undivided to a 2-lane minor arterial with a CTL
2030 $1,800,000.00
61-00046-00 Jarrell Williamson CR 237 Ronald Reagan Blvd CR 216 Reconstruct 2 lanes to 4 lanes with median
2015 $9,100,000.00
61-00047-00 Leander Williamson CR 273 / Mel Mathis Ave
CR 272 RM 2243 Widen from 2 lanes to 4 lanes $6,600,000.00
61-00048-00 Jarrell Williamson CR 313 Geode Ln CR 332 Reconstruct 2 lanes to 4 lanes with median
2015 $5,700,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
61-00049-00 Jarrell Williamson CR 332 CR 313 CR 313 – CR 3001. Reconstruct 2 lanes to 4 lanes with median
2015 $2,900,000.00
61-00050-00 Jarrell Williamson CR 332 FM 487 FM 487 – CR 313. Reconstruct 2 lanes to 4 lanes with median
2015 $6,300,000.00
61-00051-00 Round Rock Williamson Creek Bend Boulevard Sam Bass Road Brightwater Blvd Construct a new MAD-4 with sidewalks 2017 $10,800,000.00
61-00052-00 Round Rock Williamson Creek Bend Boulevard FM 1431 Old Settlers Blvd Construct a new MAD-4 with sidewalks 2035 $21,900,000.00
61-00053-00 Georgetown Williamson D.B. Wood Rd Oak Ridge Parkway SH 29 Improve to Principal Arterial Divided; upgrade from 2-lane to 4 DIV
2020 $19,900,000.00
61-00054-00 Williamson Williamson DB Wood Rd Williams Dr Cedar Breaks Rd Widen from 2 lanes to 4 lanes with median
2015 $8,400,000.00
61-00055-00 Round Rock Williamson Deepwood Drive Sam Bass Road RM 620 Construct new MAD-4 with sidewalks 2030 $14,400,000.00
61-00056-00 Round Rock Williamson Gattis School Road Greenlawn Boulevard A.W. Grimes. Reconstruct to a MAD-6 with sidewalks 2025 $11,800,000.00
61-00057-00 Round Rock Williamson Gattis School Road A.W. Grimes Deepwood Drive. Reconstruct to a MAD-6 with sidewalks 2025 $10,300,000.00
61-00058-00 Round Rock Williamson Gattis School Road Deepwood Drive Kenney Fort Boulevard Reconstruct to a MAD-6 with sidewalks 2030 $27,000,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
61-00059-00 Round Rock Williamson Gattis School Road Mays Street Greenlawn Boulevard. Reconstruct to a MAD-6 with sidewalks 2035 $32,800,000.00
61-00060-00 Round Rock Williamson Gattis School Road Kenney Fort Boulevard Red Bud Lane Reconstruct to a MAD-6 with sidewalks 2035 $26,200,000.00
61-00061-00 Georgetown Williamson Georgetown Inner Loop (Phase I)
IH-35 N IH-35 S. Widen from 2 lanes to 4 lanes with median
2015 $29,600,000.00
61-00062-00 Williamson Williamson Gupton Way Dr Park Street Brushy Creek. Widen to 4 lanes 2018 $4,400,000.00
61-00063-00 Leander Williamson Hero Way CR 270 Ronald Reagan Blvd Construct 4-lane minor arterial divided with sidewalks on both sides
2020 $8,500,000.00
61-00064-00 Austin Williamson Howard Ln SH 45/RM 620 McNeil Rd New MAD-6 2030 $22,700,000.00
61-00065-00 Round Rock Williamson Kenney Fort Boulevard Segment 2
Forest Creek Drive Gattis School Road Construct new MAD-6 with sidewalks and shared use path
2018 $8,400,000.00
61-00066-00 Round Rock Williamson Kenney Fort Boulevard Segment 3
Gattis School Road SH 45 Construct new MAD-6 with sidewalks and shared use path
2018 $8,400,000.00
61-00067-00 Round Rock Williamson Kenney Fort Boulevard Segment 4
Old Settlers Blvd Chandler Creek Drive Construct new MAD-4 with sidewalks and shared use path
2025 $9,600,000.00
61-00068-00 Round Rock Williamson Kenney Fort Boulevard Segment 5
CR 112 Old Settlers Blvd Construct new MAD-4 with sidewalks and shared use path
2025 $10,300,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
61-00069-00 Round Rock Williamson Kenney Fort Boulevard Segment 6
University Boulevard CR 112. Construct new MAD-4 with sidewalks and shared use path
2030 $12,600,000.00
61-00070-00 Austin Williamson Lyndhurst Lakeline Blvd SH 45/RM 620 New MND-4 2020 $4,600,000.00
61-00071-00 Round Rock Williamson Mays Street Westinghouse Road Teravista Drive. Construct new MAD-4 with sidewalks 2017 $8,600,000.00
61-00072-00 Williamson Williamson Mays Street University Boulevard Paloma Drive. Reconstruct/Construct new MAD-4 with sidewalks
2025 $22,200,000.00
61-00073-00 Georgetown Williamson Northwest Blvd Extension
Fontana Drive Spur 152 (Austin Ave) Construct new bridge over IH-35 - Principal Arterial Divided
2018 $10,000,000.00
61-00074-00 Leander Williamson Old 2243 Broad St Bagdad Rd. Construct 4-lane minor arterial undivided - engineering underway
2015 $5,800,000.00
61-00075-00 Leander Williamson Old 2243 Bagdad Rd Lakeline. Construct 4-lane minor arterial undivided - engineering underway
2017 $4,900,000.00
61-00076-00 Round Rock Williamson Old Settlers Boulevard Sam Bass Road Chisholm Trail Road Widen to a MAD-4 with sidewalks 2018 $4,400,000.00
61-00077-00 Austin Williamson Pearson Ranch Rd Avery Ranch Blvd SH 45/RM 620 New MAD-4 2020 $11,300,000.00
61-00078-00 Georgetown Williamson Rabbit Hill / Mays Street Ext
Terra Vista Parkway Westinghouse. Construct new principal arterial divided
2016 $8,300,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
61-00079-00 Round Rock Williamson Red Bud Lane CR 117 US 79. Reconstruct to a MAD-4 with sidewalks 2030 $18,000,000.00
61-00080-00 Round Rock Williamson Red Bud Lane US 79 Forest Creek Drive Reconstruct to a MAD-4 with sidewalks 2035 $17,500,000.00
61-00081-00 Round Rock Williamson Red Bud Lane Forest Creek Drive Gattis School Road Reconstruct to a MAD-4 with sidewalks 2035 $17,500,000.00
61-00082-00 Williamson Williamson Ronald Reagan Blvd at IH-35 Construct new 6-lane Overpass 2040 $23,200,000.00
61-00083-00 Round Rock Williamson Sam Bass Rd Old Settlers Blvd Creek Bend Blvd Widen to a MAD-2 with sidewalks 2030 $9,800,000.00
61-00084-00 Round Rock Williamson Sam Bass Rd Creek Bend Blvd Meadows Drive Widen to a MAD-2 with sidewalks 2030 $13,500,000.00
61-00085-00 Leander Williamson San Gabriel Blvd CR 270 Ronald Reagan Blvd Construct 4-lane minor arterial divided - original Williamson County alignment
2018 $41,100,000.00
61-00086-00 Leander Williamson San Gabriel Pkwy W Nameless/FM 2243 Bagdad Rd. Construct 4-lane road with median on a new location.
2014 $3,300,000.00
61-00087-00 Georgetown Williamson SE Inner Loop IH-35 Sam Houston. Improve to Principal Arterial Divided, widen to 4 lanes from 2 in Freeway ROW (Continuation of SW Bypass/Sam Houston)
2030 $3,300,000.00
61-00088-00 Williamson Williamson Shell Rd SH 195 Williams Dr. Widen from 2 lanes to 4 lanes with median
2014 $17,300,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
61-00089-00 Georgetown Williamson Southwest Bypass SH 29 RR 2243 (Leander Road) New Principal Arterial Divided - 2-lane construction in freeway ROW
2020 $22,100,000.00
61-00090-00 Round Rock Williamson University Boulevard IH-35 Sunrise Road. Reconstruct to a MAD-6 with sidewalks and shared use path
2017 $10,800,000.00
61-00091-00 Round Rock Williamson University Boulevard FM 1460 Kenney Fort Boulevard Reconstruct to a MAD-4 with sidewalks 2030 $18,000,000.00
61-00092-00 Round Rock Williamson University Boulevard Kenney Fort Boulevard CR 110 Reconstruct to a MAD-4 with sidewalks 2030 $12,600,000.00
61-00093-00 Round Rock Williamson University Boulevard Sunrise Road FM 1460. Reconstruct to a MAD-6 with sidewalks and shared use path
2035 $43,800,000.00
61-00094-00 Georgetown Williamson Westinghouse Road IH-35 FM 1460. Improve to Principal Arterial Divided, widen from 4 lanes to 6 lanes
2020 $23,100,000.00
61-00095-00 Georgetown Williamson Wolf Ranch Parkway SH 29 SW Bypass. Construct new collector undivided 2020 $4,200,000.00
61-00096-00 Round Rock Williamson Wyoming Springs Drive Sam Bass Road Brightwater. Construct new MAD-4 with sidewalks and shared use path
2035 $27,300,000.00
61-00097-00 Cedar Park Williamson Arterial Street Improvement Program
. - $169,800,000.00
61-00098-00 Georgetown Williamson Arterial Street Improvement Program
. - $2,000,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
61-00099-00 Hutto Williamson Arterial Street Improvement Program
. - $700,000.00
61-00100-00 Leander Williamson Arterial Street Improvement Program
. - $68,700,000.00
61-00101-00 Round Rock Williamson Arterial Street Improvement Program
. - $2,300,000.00
61-00102-00 Taylor Williamson Arterial Street Improvement Program
. - $89,700,000.00
61-00103-00 Williamson Williamson Arterial Street Improvement Program
. - $1,904,900,000.00
61-00104-00 TxDOT Williamson SH 130 IH 35 SH 45 Operational improvements. 2025 $82,000,000.00
61-00105-00 Williamson CR 104 - Phase 2 Ronald Rd SH 130. Extend the CR 104 improvements with a two-lane section with a center turn lane section to Ronald Lane and then a two-lane section with shoulders to SH
2015 $5,000,000.00
61-00106-00 Williamson CR 175 Extension - Phase 2B
RM 2243 CR 179. Reconstruction of a two-lane roadway to a four-lane divided section with a raised median.
2015 $10,000,000.00
61-00108-00 TxDOT, Williamson County
Williamson IH 35 At Theon Road (Ronald Reagan Blvd)
Replace Bridge Overpass And Tie-In Approaches
2019 $15,843,676.75
61-00109-00 TxDOT, Williamson County
Williamson IH 35 Corn Hill (Bud Stockton Lp) Undrpss
FM 972 Overpass Convert Existing 2-Lane NB and SB 2-Way Frontage Roads To 2-LN One-Way Frontage Roads And Replace Existing Ramps
2019 $13,782,378.46
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
61-00110-00 TxDOT Williamson IH 35 South of Lakeway Drive South of Williams Drive Add 3-Lane One-Way NB Frontage Road
2020 $41,699,815.94
61-00111-00 TxDOT Williamson IH 35 At Williams Dr Reconstruct Interchange 2020 $78,642,336.97
61-00112-00 Georgetown Williamson IH 35 At Northwest Blvd. Construct New Overpass Crossing IH 35 At Northwest Boulevard
2019 $2,979,768.65
61-00113-00 TxDOT Williamson IH 35 FM 3406 RM 1431 Widen NB Frontage Rd To 3 Lanes With Associated Paving, Grading, Drainage And Driveway Improvements
2019 $11,118,575.77
61-00114-00 TxDOT Williamson US 183 RM 620/SH 45 Travis County Line Widen From 3 To 4 General Purpose Lanes
2019 $72,346,219.04
61-00115-00 CTRMA, TxDOT Williamson US 183 SH 45/RM 620 Travis County Line Add 2 Express Lanes In Each Direction 2019 $144,478,012.28
61-00116-00 City of Cedar Park Williamson US 183 Cedar Park Dr South of Buttercup Creek Blvd
Realignment Of Existing Us 183 To Old Hwy 183. Old 183 To Be Widened And Realigned Include Relocation
2019 $15,352,849.75
61-00117-00 City of Liberty Hill Williamson SL 332 SH 29 CR 279 Liberty Hill Downtown Bike/Ped Loop 2019 $1,645,868.05
61-00118-00 TxDOT Williamson US 79 IH 35 East of FM 1460 Add One Lane In Each Direction 2022 $38,074,706.25
61-00119-00 TxDOT, City of Round Rock
Williamson RM 620 Deepwood Drive IH 35 (Dot No. 439705H) Construct New 4-Ln Overpass At Georgetown Rr And Lake Creek With Roundabout And Collector Roads
2019 $40,940,473.16
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
61-00120-00 City of Cedar Park Williamson VA 800' West of US 183 500' East of Parmer Lane Shared Use Path: Adjacent To Roadway
2019 $490,560.76
61-00121-00 Williamson County Williamson VA Heritage Trail at Creekside Plaza
1.1 Miles NW Along Brushy Creek
Construct 10-Ft Wide Shared Use Path In Round Rock With Pedestrian Bridge
2019 $1,701,515.86
61-00122-00 CTRMA Williamson 183A Hero Way North of SH 29 Construct 4-Lane Tolled Expressway 2020 $185,868,309.11
61-00123-00 Williamson County, TxDOT
Williamson FM 1660 Cr 101 North of Hutto US 79 Upgrade Roadway From 2 Ln Undivided To A 4 Ln Undivided
2020 $16,953,989.59
61-00124-00 Williamson County, TxDOT
Williamson FM 1660 US 79 FM 3349 Construct New Location Roadway 2020 $15,556,056.47
61-00125-00 City of Georgetown Williamson FM 971 SS 158 (Austin Avenue) Gann Street/River Haven Drive
Upgrade From 2 Lane To 4 Lane Urban Section
2020 $4,075,570.73
61-00126-00 TxDOT, City of Austin
Williamson FM 734 RM 1431 SH 45 Upgrade From 4 Lanes To 6 Lanes 2022 $62,127,197.87
71-00001-00 CTRMA Hays / Travis SH 45 SW Loop 1 S FM 1626 Construction of a 4-lane tolled freeway (Project may be phased; shared use path where feasible
2015 $108,100,000.00
71-00002-00 Hays Hays / Travis RM 12 FM 3238 Fitzhugh Rd. MAD-2 2025 $11,600,000.00
71-00003-00 Elgin Travis / Bastrop
Arterial Street Improvement Program
. - $4,500,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
71-00004-00 Hays Travis / Hays SH 45 SW-E FM 1626 IH-35 S. Environmental and preliminary engineering analysis for a new freeway (Design only)
2025 $2,900,000.00
71-00005-00 Cedar Park Travis / Williamson
Anderson Mill Rd Zeppelin Drive Cypress Creek Rd Widen to MAD-4 2025 $6,000,000.00
71-00006-00 Cedar Park Travis / Williamson
Anderson Mill Rd RM 1431 Lime Creek Rd Improve roadway to MAD-4 2025 $15,000,000.00
71-00007-00 Austin Travis / Williamson
Anderson Mill Rd Loop 1 Grand Ave Pkwy New MAD-4 2031 $15,200,000.00
71-00008-00 TxDOT Hays, Caldwell
SH 80 SH 21 FM 1984 Complete Gap In Shoulder For Bicycle Travel
2020 $6,262,703.77
BUC12RD Burnet County Burnet SH 29 RM 243 North Williamson County Line Reconstruct to four 11-foot lanes, 12-foot continuous turn lane and 5-foot shoulders
2021 $5,184,000.00
BUC14RD Burnet County Burnet US 281 SH 71 Blanco County Line Reconstruct to four 12-foot lanes, 14-foot continuous turn lane and 10-foot shoulders
2021 $5,616,000.00
BUC18RD Burnet County Burnet US 281 Nature Heights Drive Lantana Drive Curb and gutter, sidewalks and shoulders
2021 $1,080,000.00
BUC1RD Burnet County Burnet Wirtz Dam Road RM 1431 RM 2147 Bridge and approaches 2019 $2,981,250.00
BUC20RD Burnet County Burnet SH 71 Spur 191 Blanco County Line Reconstruct to four 12-foot lanes, 14-foot continuous turn lane and 10-foot shoulders
2021 $9,720,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
CAMPO(1)ST CAMPO FM 1626/RM 957 Intersection
Land use and transportation nodal analysis
2021 $200,000.00
CAMPO(2)ST CAMPO Garlic Creek Parkway Corridor and connectivity analysis 2021 $350,000.00
CAMPO(3)ST CAMPO Bergstrom Spur Feasibility analysis of an abandoned rail corridor
2021 $350,000.00
CAMPO(4)ST CAMPO US 290/RM 12 & Mercer District
Land use, corridor and node analysis 2022 $450,000.00
CAMPO(5)ST CAMPO Regional Transportation
Demand Management Study
Development of regional TDM strategies
2019 $360,000.00
CAMPO(6)ST CAMPO San Marcos - Southwestern Hays Subregional Study
Land use, corridor and node analysis 2022 $1,000,000.00
CARTS (1) Transit
CARTS Eastside Bus Plaza Shady at E. Cesar Chavez Construction of a bus plaza and passenger terminal
2019 $5,000,000.00
CC1RD Caldwell County Caldwell FM 150/Yarrington Road
SH 21 (Hays) SH 130 (Caldwell) 7-mile extension of FM 150, 10-mile extension of Yarrington road
2019 $121,933,935.00
City of Austin (1) ITS
City of Austin Travis Vehicle Detection Procure and install vehicle detection at 400 signalized intersections
2019 $11,200,000.00
City of Austin (3) ITS
City of Austin Travis Traffic Monitoring System
Expand the Traffic Monitoring System including 275 CCTV cameras and video management system
2019 $1,400,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
City of Austin (4) ITS
City of Austin Travis Emergency/Transit Vehicle Signal Priority
Enhance the Advanced Transportation Management System (ATMS)
2019 $7,280,000.00
City of Kyle (1) Other
City of Kyle Hays Center Street Rail Siding Project
Burleson Street Kohlers Crossing Center Street Rail Siding Relocation 2020 $15,209,034.00
CMTA1RD Capital Metro Travis North Lamar/Airport Blvd
Airport Blvd N. Lamar Grade seperation of Metrorail Red Line and N. Lamar Blvd.
2019 $5,872,181.58
COA13RD City of Austin Travis William Cannon Running Water Drive McKinney Falls Pkwy Convert existing two-lane to four-lane divided roadway with shared use path and intersection improvements
2019 $21,364,000.00
COA14RD City of Austin Travis West Rundberg Lane Burnet Road Metric Blvd. Extend current roadway as a four-lane major divided arterial with sidewalks, bike lanes, and new signalized intersection
2019 $10,592,884.00
COA3AT City of Austin Travis Violet Crown Trail North
Home Depot Boulevard MoPac Expressway and William Cannon Drive
1.2 mile 12-foot wide natural composite trail
2019 $2,600,000.00
COA5AT City of Austin Travis Austin to Manor Phase II Urban Trail
Decker and Lindell Lane Ben E. Fisher Park 12-foot concrete trail from Lindell Ln to Manor, Texas (approximately 2.9 miles)
2019 $7,800,000.00
COA5RD City of Austin Travis Lakeline Blvd Lyndhurst Blvd Parmer Lane Add two additional travel lanes and uprgrade bicycle facilities and sidewalks
2019 $23,100,000.00
COA7AT City of Austin Travis Pedestrian Safety and Transit Connections
Project
Construct 10 pedestrian hybrid beacons
2019 $1,668,000.00
COA7RD City of Austin Travis Slaughter Lane N. Mopac Expressway Brodie Lane Convert existing four-lane to six-lane divided roadway with shared use path and intersection improvements
2019 $22,875,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
COA8RD City of Austin Travis Braker Lane Dawes Place Samsung Blvd. Extend roadway as a four-lane divided roadway with bicycle and pedestrian facilities
2020 $19,800,000.00
COB1AT City of Bastrop Bastop Loop 150/SH 71/Water St/Main St
Old Austin Highway Walnut Street Complete 1.8 mile 'River Loop' shared-use path
2019 $664,000.00
COB2RD City of Buda Hays RM 967 (Main St.) Austin St. China/Ash St Intersection improvements 2019 $1,730,000.00
COBU1AT City of Buda Hays FM 2001 Overpass Road/FM 2001 FM 119/Old Goforth Road
Construct a 10’ wide multi-use path for pedestrian and bicycle traffic along the east side of FM 2001 and Overpass Road
2020 $500,000.00
COCP1AT City of Cedar Park Williamson Brushy Creek North Fork Trail
Parmer Lane Brush Creek Road Construct 3-mile shared-use path along Brushy Creek North Fork
2021 $4,152,510.00
COCP1RD City of Cedar Park Williamson New Hope Dr. Ronald Reagan Blvd. CR 175/Sam Bass Rd. Widen and extend as a new four-lane divided roadway with bicycle and pedestrian facilities
2020 $20,778,100.00
COG2RD City of Georgetown Williamson RM 2243 (Leander Rd) Norwood Drive SW Bypass Upgrade to a four-lane divided with new traffic signals and pedestrian improvements
2021 $9,583,000.00
COG3RD City of Georgetown Williamson Williams Drive Access Management 2019 $730,000.00
COL1AT City of Leander Williamson S. West Drive Sidewalk Horseshoe Dr. Lion Dr Construct .23 mile sidewalk on S West Drive
2019 $244,610.00
CORR1RD City of Round Rock Williamson University Boulevard A.W. Grimes (FM 1460) Co. Rd. 110 Reconstruct two-lane facility with shoulders to four-lane divided roadway with left-turn lanes
2019 $11,900,000.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
CORR2RD City of Round Rock Williamson Kenney Fort Blvd, Seg. 2. 3
Forest Creek Drive SH 45 North Construction of a limited access six-lane divided major arterial with shared use path
2019 $27,430,180.00
CORR3RD City of Round Rock Williamson Gattis School Road, Seg. 6
Sonoma Trail Red Bud Lane Widen from four to six-lanes including intersection improvements, raised median and turn-lanes
2020 $22,120,000.00
HC1RD Hays County Hays Lime Kiln Road Post Road Hilliard Road Realignment and intersection improvements
2019 $5,786,000.00
HC2RD Hays County Hays RM 967 FM 1626 Oak Forest Drive Widen roadway with center turn lane 2019 $5,824,000.00
HC4RD Hays County Hays US 290 Intersection at Trautwein Rd.
Intersection improvements 2019 $1,508,000.00
HC5RD Hays County Hays FM 110 East of SH 123 East of I-35 at Yarrington Construct two-lane roadway 2019 $118,380,000.00
HC6RD Hays County Hays FM 110 Intersection at SH 123 Grade seperated overpass 2019 $7,279,000.00
HC7RD Hays County Hays FM 621 De Zavala Drive CR 266/ Old Bastrop Hwy
Widen roadway with center turn lane 2019 $5,144,000.00
HC8RD Hays County Hays FM 2001 Sun Bright Blvd. FM 2001 Upgrade to a four-lane divided with new traffic signals and pedestrian improvements
2019 $8,818,000.00
TC1RD Travis County Travis Braker Lane North Samsung Blvd. Harris Branch Parkway Widen current and extend roadway as a four-lane divided roadway with bicycle and pedestrian facilities
2020 $22,715,790.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
TC2RD Travis County Travis Pearce Lane Kellam Road Travis/Bastrop County Line
Widen existing two-lane facility to a four-lane divided arterial with bike lanes and sidewalks
2022 $25,520,000.00
TC5RD Travis County Travis RM 1826 US 290 West Travis County Line Improve current facility to a four-lane divided arterial with bicycle and pedestrian facilities
2019 $49,240,000.00
TC6RD Travis County Travis FM 1626 West of Brodie Lane Manchaca Rd. (FM 2304) Reconstruct an existing 2-lane arterial to a 4‐lane arterial with a continuous left turn lane with 5 foot wide shoulders and 6 foot wide sidewalks
2019 $16,812,400.00
TxD11RD TxDOT Williamson FM 734 RM 1431 SH 45 Upgrade to a six-lane divided roadway
2022 $62,430,286.00
TxD16RD TxDOT Travis RM 620 SH 71 Aria Dr/Cavalier Dr. Upgrade existing four-lane roadway to a six-lane divided roadway
2022 $37,039,200.00
TxD17RD TxDOT Travis RM 620 Aria Dr/Cavalier Dr. Oak Grove Blvd. Upgrade existing four-lane roadway to a six-lane divided roadway
2022 $60,827,900.00
TxD6RD TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane
2021 $8,985,397.00
TxDOT (1) ITS TxDOT HERO Program Expansion
Continue and expand the HERO Program
2019 $30,576,704.00
TxDOT (2) ITS TxDOT Loop 360 Loop 1 (MoPac) SH 71 ITS Deployment 2020 $8,274,044.00
TxDOT (3) ITS TxDOT RM 620/SH 71 US 183 US 290 ITS Deployment 2019 $15,581,173.00
CAMPO 2040 Regional Transportation Plan
MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost
Roadway Projects
TxDOT (4) ITS TxDOT RM 2222 Loop 360 I-35 ITS Deployment 2019 $5,809,800.00
TxDOT (5) ITS TxDOT SH 71 SH 130 Norwood Lane ITS Deployment 2019 $1,223,200.00
TxDOT (7) ITS TxDOT FM 734 (Parmer) SH 45-N US 290-E ITS Deployment 2019 $9,144,100.00
WC6RD Williamson County Williamson RM 2243 183A IH 35 New location roadway 2019 $158,300,000.00
CAMPO 2040 Regional Transportation Plan