HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement 312453

Upload: brooke-davis

Post on 18-Jan-2016

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

HiRadMat –Users Meeting

6/2/2015

Adrian Fabich

EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement 312453

Page 2: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 2

HiRadMat remainder

HRM-TB 2. Feb. 2015

• HRMT 10 – WTHIMBLE– Preparing for PIE

• HRMT 14 – LCMAT– Exp. Cubicle hosted in build 954– Mobile table 02 to be recuperated– Use again for HRMT23

• HRMT 09 – LCOL– Exp. Cubicle hosted in build 954– Mobile table 02 to be recuperated, to be returned to HRM

• HRMT 12 – LPROT– Hosted in TNC – cool-down– Recuperated “today” – EDMS 1471655– Table 04 returned to HiRadMat

• WANF blocks– Disposal scheduled January 2016– Preparations to be discussed with DGS/RP now

Page 3: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 3

Feed-throughs - status• Infrastructure installation removed

– (water cooled) cabling– Water piping– Cable trays

• Drilling w7-8, completed until 19th Feb. 2015• Cabling between TNC and TT61

– NE48 x 6– Additional star point in TT61– Electricity available– ? Specifications of the transparent feed-through window?– Additional users’ needs?

• submit to [email protected] for optimisation

6/2/2015

Page 4: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 4

Demin. water

• Nous avons 35kW de puissance de refroidissement disponible au niveau des tables avec un débit max de 3m3/h à 27°C.

• Nous pouvons avoir une pression max à l’entrée de la table à 9 bars.

6/2/2015

Page 5: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 5

HiRadMat beam times in 2014/2015

6/2/2015

• 15 proposals received– including 2 parasitic experiments

– HiRadMat Scientific And Technical Committee• 9 proposals fully approved• Proposals received most recently will be reviewed in the coming months

Accumulated SPS cycle time • 2012: 48 hours• 2014: 8 hours (estimate)• 2015: 75 hours (estimate)

BLMTPSG4GlassyC windowsBPM diamondBerrylium samplesSupra sextupoleCollimator jawsRotating collimatorAD targetUA9 crystalMicrophoneHigh power targetFiber BLMTDICollimator materials

Page 6: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 6

Proposals

6/2/2015

proposal # name index HRM-SB HRM-TBproposed beam time

1401 BLM2 19 Jan-151402 TPSG4 25 Aug-151403 GlassyC 15.12 May-151404 dBM 17 Dec-141405 BeGrid 24 Nov-151406 SextSC Jan-161407 Jaws 23 Jul-151408 RotColl 21 Sep-151409 RodTarg Apr-151410 CRY2 Nov-151411 MicOpt 20 Feb-151412 PTarg 22 Jun-15

fiber BLM Mar-151420 TDI 15.12 Oct-151421 MultiMat Feb-16

Page 7: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 76/2/2015

• 7 HRM slots• Every 4-5 weeks

Page 8: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 8

Scheduling

6/2/2015

Slots every 4-5 weeks– limited by RP aspects– HRM personnel resources

• Overall interest being scheduled end 2015– Highest intensities available– Readiness of experimental HW

Page 9: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 9

Assigned beam slots

6/2/2015

confirmed

Page 10: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 10HRM-TB 2. Feb. 2015

Page 11: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 11

Users’ BPM

6/2/2015

• Requested so far by– proposal 1409 – RodTarg– HRMT24 – BeGrid– proposal 1420 TCDI/TDI– Proposal 1410 - UA9

Name of Exp. Name of Exp.2 Name of Exp.3 Name of Exp.4HRMT27 HRMT24 TCDI/TDI (proposal 1420) UA9 (proposal 1410)

Beam intensity (N of Protons) 1E11 (min) - 2E12 (max) (total=3E13) 1.22E13 (min) - 4.9E13 (max) (total 2E14) 5E9 (min) - 3.46E13 (max) (total=4E14) 1E9 (min) - 4.9E13 (max) (total=5E14)Expected resolution (microns) 150 50/100 100 100Typical Beam size (mm^2) 1.5x1.5 0.3x0.3 0.31x0.31 0.5x0.5Comments 0.9 us pulse length Min. pulse intensity: 1 bunch for alignment Min. pulse intensity: 1 bunch for alignment

36 number of bunches Max. pulse intensity: 288 bunches Max. pulse intensity: 288 bunches

bunch intensity as low as 8.3E9 p/bunch Max. pulse intensity depends on availability of high-intensity bunches (4.9E13 assumes bunches a la 1.7E11)

min pulse intensity: 1 bunch

Page 12: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 12

BPM requirements

6/2/2015

• ABSOLUTE beam position ~0.1 mm– wrt to experimental setup (metrology)– As close as possible to the experimental setup – just upstream– Integrated in an (typical) experimental setup – on the mobile table

• ONLINE• Single bunch resolution

In the full range of the beam parameter space• 1-288 bunches/pulse• 1010-1011 ppb

• Provision/maintenance by BE/BI based on standard equipment/procedures

• Available by August 2015 for commissioning

Write-up to be discussed in week Requirements will be presented to BI techn. Board on 19th Feb.