Indianapolis Factory and QRCHorizontal Pump Products - Price Adders
Pump Series Driver Models Included
(Factory Approval Required)
< 2Weeks
<= 2Weeks
<= 3Weeks
<= 4Weeks
<= 5Weeks
<= 6Weeks
<= 7Weeks
<= 8Weeks
A All All NA NA NA NA NA NA NA NA
AE Electric Motor
3AE9, 3AE9G, 4AE10, 4AE10G, 4AE11, 4AE11G, 4AE12, 5AE8, 5AE8N, 5AE11, 5AE11G, 5AE12, 6AE12, 6AE14, 6AE14G, 6AE14N, 6AE16, 6AE16G, 6AE16N, 8AE15, 8AE15G, 8AE17, 8AE17A, 8AE17Q, 8AE17W, 8AE20, 8AE20G
$1000 Min NA NA $0 $0 $0 $0 $0
AE Engine
3AE9, 3AE9G, 4AE10, 4AE10G, 4AE11, 4AE11G, 4AE12, 5AE8, 5AE8N, 5AE11, 5AE11G, 5AE12, 6AE12, 6AE14, 6AE14G, 6AE14N, 6AE16, 6AE16G, 6AE16N, 8AE15, 8AE15G, 8AE17, 8AE17A, 8AE17Q, 8AE17W, 8AE20, 8AE20G
NA NA $750 NA $0 $0 $0 $0
AE All All other models not listed above $1000 Min NA NA NA $350 $350 $350 $350
AEF"Quick Ship Program" Electric Motor
3AEF9, 4AEF10, 4AEF10G, 4AEF12, 5AEF8N, 5AEF11G, 6AEF10, 6AEF12, 6AEF14, 6AEF14Q, 6AEF16
$1000 Min $500 NA NA NA NA NA NA
AEF"Quick Ship Program" Engine
3AEF9, 4AEF10, 4AEF10G, 4AEF12, 5AEF8N, 5AEF11, 6AEF10, 6AEF12, 6AEF14, 6AEF14Q, 6AEF16
NA NA $750 NA NA NA NA NA
AEF"Fire Pump Express" Electric Motor
3AEF9, 3AEF9G, 4AEF10, 4AEF10G, 4AEF11G, 4AEF12, 5AEF8, 5AEF8N, 5AEF11G, 5AEF12, 6AEF10, 6AEF12, 6AEF14, 6AEF14G, 6AEF14Q, 6AEF16, 6AEF16N, 8AEF15, 8AEF15G, 8AEF17Q, 8AEF17W, 8AEF20, 8AEF20G
$1000 Min NA NA $0 NA NA NA NA
AEF"Fire Pump Express" Engine
3AEF9, 3AEF9G, 4AEF10, 4AEF10G, 4AEF11, 4AEF12, 5AEF8, 5AEF8N, 5AEF11, 5AEF11G, 6AEF10, 6AEF14, 6AEF14G, 6AEF14Q, 6AEF16, 6AEF16N, 8AEF15 8AEF15A, 8AEF15G, 8AEF17A, 8AEF17Q, 8AEF17W, 8AEF20, 8AEF20G
NA NA $750 NA NA NA NA NA
AEF All All other models not listed in the Quick Ship or the Fire Pump Express Program $1000 Min $1000 Min $1000 Min $1000 Min $1000 Min $1000 Min NA NA
AF All All NA NA NA NA NA NA NA NA
BT None All $500 $350 $350 $350 $0 $0 $0 $0
TU All All NA NA NA NA NA NA NA NA
TUT All All NA NA NA NA NA NA NA NA
TUF All All NA NA NA NA NA NA NA NA
TUTF All All NA NA NA NA NA NA NA NA
UNF All All NA NA NA NA NA NA NA NA
Note:- Quick Ship and 3 week deliveries require factory approval prior to lead time commitment- Pump premium adders (dollars) reflects per pump- Customer's order quantity needs to be considered prior to authorization- No concessions will apply without an authorized concession number (Quick Ship Orders do not qualify for concession)- Controllers ship separate and direct for expedited orders- Special Export Conditions - Add 5% for commercial export boxing - Orders must be accompanied by an irrevocable Letter of Credit, confirmed by a bank in the USA and for a sufficient period of time to cover production time plus 30 days.
2 of 12
Indianapolis FactoryHorizontal Part Products - Lead Time and Price Adders
Horizontal Commodities On Shelf?
PublishedLead Time
(Weeks)
Rcv'dBefore11:45
Same Day
Rcv'd After11:45
Same Day
2-4Working
Days
> 5Working
Days
Impellers Trimmed and Balanced Yes 1 $100 RTF ($100 Min.) $50 $0
Impellers Trimmed and Balanced No RTF N/A N/A N/A $0
Repair Kits Yes 1 $0 $0 $0 $0
Repair Kits No RTF $75 RTF ($100 Min.) $50 $0
All Other Parts Yes 1 $0 $0 $0 $0
All Other Parts No RTF N/A N/A N/A $0
Note:- Parts availability on "RTF" must be confirmed with factory prior to lead time commitment- Customer's order quantity needs to be considered prior to authorization- If Customer needs less than Published Lead Time, please note on purchase order- Same Day shipments must be received prior to 11:45am
HOW TO ADD EXPEDITE TO SPEED ORDER- If your part on the order qualifies for an expedite adder, you will need to "Add Part Not Found inand add the amount(s) to your total order.
3 of 12
Product Lead TimesPumpType Model Sizes Material Configuration
ShippingSchedule
A
10A22B12A16D12A19G12A20B12A22B14A20C14A20G14A20N14A22C14A22G14A24C16A18B16A20B18A22C18A22G18A22N20A25B20A2824A28B
Cast Iron Bronze Fitted
Packed Bare Pumpor Mounted with Factory Choice
Motor or Engine, Base, and Guard
18 Weeks
10A20B12A20B16A18B18A22C18A22G18A22N24A28B
Cast Iron Bronze Fitted
(BOTTOM SUCTION) Packed Bare Pump
or Mounted with Factory Choice
Motor or Engine, Base, and Guard
18 Weeks
Options for A Pumps Adder to StandardLead Time (Week)
1) Non-Witness Hydrostatic Testing 02) Witness Hydrostatic Testing 23) Non-Witness Running Performance Testing 14) Witness Running Performance Testing 25) Export Boxing 16) Non Standard Configuration RTF
- Subject to Change Without Notice -
4 of 12
Product Lead TimesPumpType Model Sizes Material Configuration
ShippingSchedule
AF 12AF19G Cast Iron Bronze Fitted
PumpMounted with Factory
Choice Motor or Engine, Base, and
Guard
16 Weeks
Options for AF Pumps Adder to StandardLead Time (Week)
1) Non-Witness Hydrostatic Testing 02) Witness Hydrostatic Testing 23) Non-Witness Running Performance Testing 14) Witness Running Performance Testing 25) Export Boxing 16) Non Standard Configuration RTF
- Subject to Change Without Notice -
5 of 12
Product Lead TimesPumpType Model Sizes Material Configuration
ShippingSchedule
3AE9, 3AE9G4AE10, 4AE10G4AE11, 4AE11G4AE12, 5AE85AE8N, 5AE115AE11G, 5AE126AE12, 6AE146AE14G, 6AE14N6AE16, 6AE16G6AE16N, 8AE158AE15G, 8AE178AE17A, 8AE17Q8AE17W, 8AE208AE20G
Cast IronBronze Fitted
Bare Pump or Mountedwith Electric Motor, Base,
and Guard(Factory Approval
Required)
4 Weeks
AE
2AE11, 3AE93AE9G, 3AE143AE14G, 4AE104AE10G, 4AE114AE11G, 4AE125AE8, 5AE8N5AE11, 5AE11G5AE12, 5AE145AE14G, 5AE14N6AE11 , 6AE126AE14, 6AE14G6AE14N, 6AE16 Cast Iron
Packed/Sealed Bare Pump
or Mounted withFactory Choice Motor,
Base, and Guard
8 Weeks
6AE16G, 6AE16N6AE16V, 6AE188AE12, 8AE138AE15, 8AE15G8AE17, 8AE17A8AE17N, 8AE17Q8AE17V, 8AE17W8AE20, 8AE20G10AE12, 10AE1410AE14A, 10AE14G10AE14J, 10AE1610AE20
Bronze Fitted
Bare Pump or Mountedwith Engine ,
Base, and Guard(Factory Approval
Required)
RTF
Most Common Options for AE Pumps Adder to Standard Lead Time (Week)
Adder to ExpressLead Time (Week)
1) 11-13% Cr. Stainless Steel Casing rings 2 NA2) 11-13% Cr. Stainless Steel Shaft 2 NA3) 11-13% Cr. Stainless Steel Shaft Sleeves 2 NA4) Export Boxing 1 15) Double Extended Shaft 2 NA6) Double Row Outboard Thrust Bearing 2 NA7) 316 Stainless Steel Casing rings 6 68) 316 Stainless Steel Shaft Sleeves 6 69) 316 Stainless Steel Shaft 6 610) Non-Witness Hydrostatic Testing 0 011) Witness Hydrostatic Testing 2 212) Non-Witness Running Performance Testing 1 113) Witness Running Performance Testing 2 214) Non Standard Configuration RTF RTF15) See RAPID For Other Options
- Subject to Change Without Notice -
6 of 12
Product Lead TimesPumpType Model Sizes Material Configuration
ShippingSchedule
3AEF9, 4AEF104AEF10G, 4AEF125AEF8N, 5AEF11G Cast Iron
"Quick Ship Program"with Electric Motor, Base, and Guard
(Factory Approval Required)
2 Weeks($500 Adder)
6AEF10, 6AEF126AEF14, 6AEF14G6AEF14Q, 6AEF16
Bronze Fitted "Quick Ship Program"with Engine,
Base, and Guard(Factory Approval Required)
3 Weeks($750 Adder)
3AEF9, 3AEF9G4AEF10, 4AEF10G4AEF11G, 4AEF125AEF8, 5AEF8N5AEF11G, 5AEF126AEF10, 6AEF126AEF14, 6AEF14G6AEF14Q, 6AEF166AEF16N, 8AEF158AEF15G, 8AEF17Q8AEF17W, 8AEF208AEF20G
Cast IronBronze Fitted
"Express Program"with Electric Motor ,
Base, and Guard(Factory Approval Required)
4 Weeks
AEF
3AEF9, 3AEF9G4AEF10, 4AEF10G4AEF11, 4AEF125AEF8, 5AEF8N5AEF11, 5AEF11G6AEF10, 6AEF146AEF14G, 6AEF14Q6AEF16, 6AEF16N8AEF15, 8AEF15A8AEF15G, 8AEF17A8AEF17Q, 8AEF17W8AEF20, 8AEF20G
Cast IronBronze Fitted
"Express Program"with Engine ,
Base, and Guard(Factory Approval Required)
5 Weeks
3AEF9, 3AEF9G4AEF10, 4AEF10G4AEF11, 4AEF11G 4AEF12, 5AEF8 5AEF8G, 5AEF8N 5AEF11, 5AEF11G 5AEF12, 5AEF14 5AEF14N, 6AEF10 6AEF12, 6AEF14 Cast Iron
Pump Mounted with Factory Choice Motor,
Base, and Guard8 Weeks
6AEF14G, 6AEF14Q6AEF16, 6AEF16G6AEF16N, 6AEF188AEF13, 8AEF158AEF15A, 8AEF15G8AEF17A, 8AEF17Q8AEF17W, 8AEF208AEF20G, 10AEF1610AEF20
Bronze Fitted
Pump Mounted with Factory Choice Engine,
Base, and Guard10 Weeks
Options for AEF Pumps
SEE DOCUMENTS FOR DETAILS OF THE QUICK SHIP AND EXPRESS PROGRAMS
- Subject to Change Without Notice -
7 of 12
Product Lead TimesPumpType Model Sizes Material Configuration
ShippingSchedule
2BT113BT93BT9G4BT10
Quick Ship(Factory Approval
Required)2 Weeks
4BT10G4BT114BT11G4BT12
ExpeditedLead Times
(Factory ApprovalRequired)
2 - 4 Weeks
BT 6BT116BT146BT14G8BT128BT15
Cast IronBronze Fitted
Sealed Bare Pump, Base, and Guard 4 Weeks
8BT15G10BT1210BT14A10BT14J
Sealed Pump with Factory Choice Motor,
Base, and Guard5 Weeks
Options for BT Pumps Adder to StandardLead Time (Week)
1) Optional Mating Ring Material 12) Motors. The longest lead time applies. Refer to Sect 10003) Non-Witness Running Performance Testing 14) Performance Test Witnessed 25) Export Boxing 16) Non-Standard Configuration RTF
- Subject to Change Without Notice -
8 of 12
Product Lead TimesPumpType Model Sizes Material Configuration
ShippingSchedule
TU
1.5TU7A22TU8A22TU10A22TU10G22TU12A23TU10A23TU13A23TU13G23TU13.5A23TU13.5G24TU10A24TU11A24TU14A24TU14G25TU15A25TU13B26TU16C26TU16G28TU16A28TU16G2
Cast Iron Bronze Fitted
Packed/Sealed Bare Pump or Mounted with
Factory ChoiceMotor or Engine, Base,
and Guard
14 Weeks
10TU22C Cast Iron Bronze Fitted
Packed/Sealed Bare Pump or Mounted with
Factory ChoiceMotor or Engine, Base,
and Guard
18 Weeks
Options for TU Pumps Adder to StandardLead Time (Week)
1) 303 or 416 Stainless Steel shaft or shaft sleeves 22) Bronze impeller rings, Oil lubricated bearings, SS Packing 23) All Iron construction 64) Fabricated Steel drip rim base 15) Non-Witness Running Performance Testing 16) Performance Test Witnessed 27) Export Boxing 18) Non-Standard Configuration RTF9) Stock Factory Choice Electric Motors Refer to Sect. 1010
- Subject to Change Without Notice -
9 of 12
Product Lead TimesPumpType Model Sizes Material Configuration
ShippingSchedule
TUT
1.5TUT7A (Not Incld. 3&4 Stage)2TUT8A43TUT13A3TUT13G33TUT9A44TUT14A34TUT14G35TUT16C35TUT16G35TUT16N3
Cast Iron Bronze Fitted
Packed/Sealed Bare Pump or Mounted with
Factory ChoiceMotor or Engine, Base,
and Guard
14 Weeks
1.5TUT7A3 with3 or 4 stage,1.5TUT7A4 with3 or 4 stage,4TUT10A44TUT10G4
Cast Iron Bronze Fitted
Packed/Sealed Bare Pump or Mounted with
Factory ChoiceMotor or Engine, Base,
and Guard
18 Weeks
2TUT9A5 - 5 Stage Cast Iron Bronze Fitted
Refer toFactory 24 Weeks
Options for TUT Pumps Adder to StandardLead Time (Week)
1) 303 or 416 Stainless Steel shaft or shaft sleeves 22) Bronze impeller rings, Oil lubricated bearings, SS Packing 23) All Iron construction 64) Fabricated Steel drip rim base 15) Non-Witness Running Performance Testing 16) Performance Test Witnessed 27) Export Boxing 18) Non-Standard Configuration RTF9) Stock Factory Choice Electric Motors Refer to Sect. 1010
- Subject to Change Without Notice -
10 of 12
Product Lead TimesPumpType Model Sizes Material Configuration
ShippingSchedule
TUF
4TUF54TUF115TUF75TUF13B6TUF10B8TUF15
Cast Iron Bronze Fitted
PumpMounted with Factory
Choice Motor or Engine, Base, and Guard
14 Weeks
TUTF 4TUTF145TUTF16B
Cast Iron Bronze Fitted
PumpMounted with Factory
Choice Motor or Engine, Base, and Guard
14 Weeks
8TUTF15 Cast Iron Bronze Fitted
PumpMounted with Factory
Choice Motor or Engine, Base, and Guard
18 Weeks
Options for TUF & TUTF Pumps Adder to StandardLead Time (Week)
1) Fabricated Steel drip rim base 12) Non-Witness Running Performance Testing 13) Performance Test Witnessed 24) Export Boxing 15) Non-Standard Configuration RTF6) Stock Factory Choice Electric Motors Refer to Sect. 1010
- Subject to Change Without Notice -
11 of 12
Product Lead TimesPumpType Model Sizes Material Configuration
ShippingSchedule
UNF
2.5UNF82UNF103UNF113UNF73UNF85UNF116UNF12
Cast Iron Bronze Fitted
PumpMounted with Factory
Choice Motor or Engine, Base, and Guard
16 Weeks
Options for UNF Pumps Adder to StandardLead Time (Week)
1) Non-Witness Hydrostatic Testing 02) Witness Hydrostatic Testing 23) Non-Witness Running Performance Testing 14) Witness Running Performance Testing 25) Export Boxing 16) Non Standard Configuration RTF