Horizontal Products Lead Times and Price Adders (Effective 9/15/04)

Upload: vokhuong

Post on 29-Mar-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Horizontal Products

Lead Timesand

Price Adders

(Effective 9/15/04)

Indianapolis Factory and QRCHorizontal Pump Products - Price Adders

Pump Series Driver Models Included

(Factory Approval Required)

< 2Weeks

<= 2Weeks

<= 3Weeks

<= 4Weeks

<= 5Weeks

<= 6Weeks

<= 7Weeks

<= 8Weeks

A All All NA NA NA NA NA NA NA NA

AE Electric Motor

3AE9, 3AE9G, 4AE10, 4AE10G, 4AE11, 4AE11G, 4AE12, 5AE8, 5AE8N, 5AE11, 5AE11G, 5AE12, 6AE12, 6AE14, 6AE14G, 6AE14N, 6AE16, 6AE16G, 6AE16N, 8AE15, 8AE15G, 8AE17, 8AE17A, 8AE17Q, 8AE17W, 8AE20, 8AE20G

$1000 Min NA NA $0 $0 $0 $0 $0

AE Engine

3AE9, 3AE9G, 4AE10, 4AE10G, 4AE11, 4AE11G, 4AE12, 5AE8, 5AE8N, 5AE11, 5AE11G, 5AE12, 6AE12, 6AE14, 6AE14G, 6AE14N, 6AE16, 6AE16G, 6AE16N, 8AE15, 8AE15G, 8AE17, 8AE17A, 8AE17Q, 8AE17W, 8AE20, 8AE20G

NA NA $750 NA $0 $0 $0 $0

AE All All other models not listed above $1000 Min NA NA NA $350 $350 $350 $350

AEF"Quick Ship Program" Electric Motor

3AEF9, 4AEF10, 4AEF10G, 4AEF12, 5AEF8N, 5AEF11G, 6AEF10, 6AEF12, 6AEF14, 6AEF14Q, 6AEF16

$1000 Min $500 NA NA NA NA NA NA

AEF"Quick Ship Program" Engine

3AEF9, 4AEF10, 4AEF10G, 4AEF12, 5AEF8N, 5AEF11, 6AEF10, 6AEF12, 6AEF14, 6AEF14Q, 6AEF16

NA NA $750 NA NA NA NA NA

AEF"Fire Pump Express" Electric Motor

3AEF9, 3AEF9G, 4AEF10, 4AEF10G, 4AEF11G, 4AEF12, 5AEF8, 5AEF8N, 5AEF11G, 5AEF12, 6AEF10, 6AEF12, 6AEF14, 6AEF14G, 6AEF14Q, 6AEF16, 6AEF16N, 8AEF15, 8AEF15G, 8AEF17Q, 8AEF17W, 8AEF20, 8AEF20G

$1000 Min NA NA $0 NA NA NA NA

AEF"Fire Pump Express" Engine

3AEF9, 3AEF9G, 4AEF10, 4AEF10G, 4AEF11, 4AEF12, 5AEF8, 5AEF8N, 5AEF11, 5AEF11G, 6AEF10, 6AEF14, 6AEF14G, 6AEF14Q, 6AEF16, 6AEF16N, 8AEF15 8AEF15A, 8AEF15G, 8AEF17A, 8AEF17Q, 8AEF17W, 8AEF20, 8AEF20G

NA NA $750 NA NA NA NA NA

AEF All All other models not listed in the Quick Ship or the Fire Pump Express Program $1000 Min $1000 Min $1000 Min $1000 Min $1000 Min $1000 Min NA NA

AF All All NA NA NA NA NA NA NA NA

BT None All $500 $350 $350 $350 $0 $0 $0 $0

TU All All NA NA NA NA NA NA NA NA

TUT All All NA NA NA NA NA NA NA NA

TUF All All NA NA NA NA NA NA NA NA

TUTF All All NA NA NA NA NA NA NA NA

UNF All All NA NA NA NA NA NA NA NA

Note:- Quick Ship and 3 week deliveries require factory approval prior to lead time commitment- Pump premium adders (dollars) reflects per pump- Customer's order quantity needs to be considered prior to authorization- No concessions will apply without an authorized concession number (Quick Ship Orders do not qualify for concession)- Controllers ship separate and direct for expedited orders- Special Export Conditions - Add 5% for commercial export boxing - Orders must be accompanied by an irrevocable Letter of Credit, confirmed by a bank in the USA and for a sufficient period of time to cover production time plus 30 days.

2 of 12

Indianapolis FactoryHorizontal Part Products - Lead Time and Price Adders

Horizontal Commodities On Shelf?

PublishedLead Time

(Weeks)

Rcv'dBefore11:45

Same Day

Rcv'd After11:45

Same Day

2-4Working

Days

> 5Working

Days

Impellers Trimmed and Balanced Yes 1 $100 RTF ($100 Min.) $50 $0

Impellers Trimmed and Balanced No RTF N/A N/A N/A $0

Repair Kits Yes 1 $0 $0 $0 $0

Repair Kits No RTF $75 RTF ($100 Min.) $50 $0

All Other Parts Yes 1 $0 $0 $0 $0

All Other Parts No RTF N/A N/A N/A $0

Note:- Parts availability on "RTF" must be confirmed with factory prior to lead time commitment- Customer's order quantity needs to be considered prior to authorization- If Customer needs less than Published Lead Time, please note on purchase order- Same Day shipments must be received prior to 11:45am

HOW TO ADD EXPEDITE TO SPEED ORDER- If your part on the order qualifies for an expedite adder, you will need to "Add Part Not Found inand add the amount(s) to your total order.

3 of 12

Product Lead TimesPumpType Model Sizes Material Configuration

ShippingSchedule

A

10A22B12A16D12A19G12A20B12A22B14A20C14A20G14A20N14A22C14A22G14A24C16A18B16A20B18A22C18A22G18A22N20A25B20A2824A28B

Cast Iron Bronze Fitted

Packed Bare Pumpor Mounted with Factory Choice

Motor or Engine, Base, and Guard

18 Weeks

10A20B12A20B16A18B18A22C18A22G18A22N24A28B

Cast Iron Bronze Fitted

(BOTTOM SUCTION) Packed Bare Pump

or Mounted with Factory Choice

Motor or Engine, Base, and Guard

18 Weeks

Options for A Pumps Adder to StandardLead Time (Week)

1) Non-Witness Hydrostatic Testing 02) Witness Hydrostatic Testing 23) Non-Witness Running Performance Testing 14) Witness Running Performance Testing 25) Export Boxing 16) Non Standard Configuration RTF

- Subject to Change Without Notice -

4 of 12

Product Lead TimesPumpType Model Sizes Material Configuration

ShippingSchedule

AF 12AF19G Cast Iron Bronze Fitted

PumpMounted with Factory

Choice Motor or Engine, Base, and

Guard

16 Weeks

Options for AF Pumps Adder to StandardLead Time (Week)

1) Non-Witness Hydrostatic Testing 02) Witness Hydrostatic Testing 23) Non-Witness Running Performance Testing 14) Witness Running Performance Testing 25) Export Boxing 16) Non Standard Configuration RTF

- Subject to Change Without Notice -

5 of 12

Product Lead TimesPumpType Model Sizes Material Configuration

ShippingSchedule

3AE9, 3AE9G4AE10, 4AE10G4AE11, 4AE11G4AE12, 5AE85AE8N, 5AE115AE11G, 5AE126AE12, 6AE146AE14G, 6AE14N6AE16, 6AE16G6AE16N, 8AE158AE15G, 8AE178AE17A, 8AE17Q8AE17W, 8AE208AE20G

Cast IronBronze Fitted

Bare Pump or Mountedwith Electric Motor, Base,

and Guard(Factory Approval

Required)

4 Weeks

AE

2AE11, 3AE93AE9G, 3AE143AE14G, 4AE104AE10G, 4AE114AE11G, 4AE125AE8, 5AE8N5AE11, 5AE11G5AE12, 5AE145AE14G, 5AE14N6AE11 , 6AE126AE14, 6AE14G6AE14N, 6AE16 Cast Iron

Packed/Sealed Bare Pump

or Mounted withFactory Choice Motor,

Base, and Guard

8 Weeks

6AE16G, 6AE16N6AE16V, 6AE188AE12, 8AE138AE15, 8AE15G8AE17, 8AE17A8AE17N, 8AE17Q8AE17V, 8AE17W8AE20, 8AE20G10AE12, 10AE1410AE14A, 10AE14G10AE14J, 10AE1610AE20

Bronze Fitted

Bare Pump or Mountedwith Engine ,

Base, and Guard(Factory Approval

Required)

RTF

Most Common Options for AE Pumps Adder to Standard Lead Time (Week)

Adder to ExpressLead Time (Week)

1) 11-13% Cr. Stainless Steel Casing rings 2 NA2) 11-13% Cr. Stainless Steel Shaft 2 NA3) 11-13% Cr. Stainless Steel Shaft Sleeves 2 NA4) Export Boxing 1 15) Double Extended Shaft 2 NA6) Double Row Outboard Thrust Bearing 2 NA7) 316 Stainless Steel Casing rings 6 68) 316 Stainless Steel Shaft Sleeves 6 69) 316 Stainless Steel Shaft 6 610) Non-Witness Hydrostatic Testing 0 011) Witness Hydrostatic Testing 2 212) Non-Witness Running Performance Testing 1 113) Witness Running Performance Testing 2 214) Non Standard Configuration RTF RTF15) See RAPID For Other Options

- Subject to Change Without Notice -

6 of 12

Product Lead TimesPumpType Model Sizes Material Configuration

ShippingSchedule

3AEF9, 4AEF104AEF10G, 4AEF125AEF8N, 5AEF11G Cast Iron

"Quick Ship Program"with Electric Motor, Base, and Guard

(Factory Approval Required)

2 Weeks($500 Adder)

6AEF10, 6AEF126AEF14, 6AEF14G6AEF14Q, 6AEF16

Bronze Fitted "Quick Ship Program"with Engine,

Base, and Guard(Factory Approval Required)

3 Weeks($750 Adder)

3AEF9, 3AEF9G4AEF10, 4AEF10G4AEF11G, 4AEF125AEF8, 5AEF8N5AEF11G, 5AEF126AEF10, 6AEF126AEF14, 6AEF14G6AEF14Q, 6AEF166AEF16N, 8AEF158AEF15G, 8AEF17Q8AEF17W, 8AEF208AEF20G

Cast IronBronze Fitted

"Express Program"with Electric Motor ,

Base, and Guard(Factory Approval Required)

4 Weeks

AEF

3AEF9, 3AEF9G4AEF10, 4AEF10G4AEF11, 4AEF125AEF8, 5AEF8N5AEF11, 5AEF11G6AEF10, 6AEF146AEF14G, 6AEF14Q6AEF16, 6AEF16N8AEF15, 8AEF15A8AEF15G, 8AEF17A8AEF17Q, 8AEF17W8AEF20, 8AEF20G

Cast IronBronze Fitted

"Express Program"with Engine ,

Base, and Guard(Factory Approval Required)

5 Weeks

3AEF9, 3AEF9G4AEF10, 4AEF10G4AEF11, 4AEF11G 4AEF12, 5AEF8 5AEF8G, 5AEF8N 5AEF11, 5AEF11G 5AEF12, 5AEF14 5AEF14N, 6AEF10 6AEF12, 6AEF14 Cast Iron

Pump Mounted with Factory Choice Motor,

Base, and Guard8 Weeks

6AEF14G, 6AEF14Q6AEF16, 6AEF16G6AEF16N, 6AEF188AEF13, 8AEF158AEF15A, 8AEF15G8AEF17A, 8AEF17Q8AEF17W, 8AEF208AEF20G, 10AEF1610AEF20

Bronze Fitted

Pump Mounted with Factory Choice Engine,

Base, and Guard10 Weeks

Options for AEF Pumps

SEE DOCUMENTS FOR DETAILS OF THE QUICK SHIP AND EXPRESS PROGRAMS

- Subject to Change Without Notice -

7 of 12

Product Lead TimesPumpType Model Sizes Material Configuration

ShippingSchedule

2BT113BT93BT9G4BT10

Quick Ship(Factory Approval

Required)2 Weeks

4BT10G4BT114BT11G4BT12

ExpeditedLead Times

(Factory ApprovalRequired)

2 - 4 Weeks

BT 6BT116BT146BT14G8BT128BT15

Cast IronBronze Fitted

Sealed Bare Pump, Base, and Guard 4 Weeks

8BT15G10BT1210BT14A10BT14J

Sealed Pump with Factory Choice Motor,

Base, and Guard5 Weeks

Options for BT Pumps Adder to StandardLead Time (Week)

1) Optional Mating Ring Material 12) Motors. The longest lead time applies. Refer to Sect 10003) Non-Witness Running Performance Testing 14) Performance Test Witnessed 25) Export Boxing 16) Non-Standard Configuration RTF

- Subject to Change Without Notice -

8 of 12

Product Lead TimesPumpType Model Sizes Material Configuration

ShippingSchedule

TU

1.5TU7A22TU8A22TU10A22TU10G22TU12A23TU10A23TU13A23TU13G23TU13.5A23TU13.5G24TU10A24TU11A24TU14A24TU14G25TU15A25TU13B26TU16C26TU16G28TU16A28TU16G2

Cast Iron Bronze Fitted

Packed/Sealed Bare Pump or Mounted with

Factory ChoiceMotor or Engine, Base,

and Guard

14 Weeks

10TU22C Cast Iron Bronze Fitted

Packed/Sealed Bare Pump or Mounted with

Factory ChoiceMotor or Engine, Base,

and Guard

18 Weeks

Options for TU Pumps Adder to StandardLead Time (Week)

1) 303 or 416 Stainless Steel shaft or shaft sleeves 22) Bronze impeller rings, Oil lubricated bearings, SS Packing 23) All Iron construction 64) Fabricated Steel drip rim base 15) Non-Witness Running Performance Testing 16) Performance Test Witnessed 27) Export Boxing 18) Non-Standard Configuration RTF9) Stock Factory Choice Electric Motors Refer to Sect. 1010

- Subject to Change Without Notice -

9 of 12

Product Lead TimesPumpType Model Sizes Material Configuration

ShippingSchedule

TUT

1.5TUT7A (Not Incld. 3&4 Stage)2TUT8A43TUT13A3TUT13G33TUT9A44TUT14A34TUT14G35TUT16C35TUT16G35TUT16N3

Cast Iron Bronze Fitted

Packed/Sealed Bare Pump or Mounted with

Factory ChoiceMotor or Engine, Base,

and Guard

14 Weeks

1.5TUT7A3 with3 or 4 stage,1.5TUT7A4 with3 or 4 stage,4TUT10A44TUT10G4

Cast Iron Bronze Fitted

Packed/Sealed Bare Pump or Mounted with

Factory ChoiceMotor or Engine, Base,

and Guard

18 Weeks

2TUT9A5 - 5 Stage Cast Iron Bronze Fitted

Refer toFactory 24 Weeks

Options for TUT Pumps Adder to StandardLead Time (Week)

1) 303 or 416 Stainless Steel shaft or shaft sleeves 22) Bronze impeller rings, Oil lubricated bearings, SS Packing 23) All Iron construction 64) Fabricated Steel drip rim base 15) Non-Witness Running Performance Testing 16) Performance Test Witnessed 27) Export Boxing 18) Non-Standard Configuration RTF9) Stock Factory Choice Electric Motors Refer to Sect. 1010

- Subject to Change Without Notice -

10 of 12

Product Lead TimesPumpType Model Sizes Material Configuration

ShippingSchedule

TUF

4TUF54TUF115TUF75TUF13B6TUF10B8TUF15

Cast Iron Bronze Fitted

PumpMounted with Factory

Choice Motor or Engine, Base, and Guard

14 Weeks

TUTF 4TUTF145TUTF16B

Cast Iron Bronze Fitted

PumpMounted with Factory

Choice Motor or Engine, Base, and Guard

14 Weeks

8TUTF15 Cast Iron Bronze Fitted

PumpMounted with Factory

Choice Motor or Engine, Base, and Guard

18 Weeks

Options for TUF & TUTF Pumps Adder to StandardLead Time (Week)

1) Fabricated Steel drip rim base 12) Non-Witness Running Performance Testing 13) Performance Test Witnessed 24) Export Boxing 15) Non-Standard Configuration RTF6) Stock Factory Choice Electric Motors Refer to Sect. 1010

- Subject to Change Without Notice -

11 of 12

Product Lead TimesPumpType Model Sizes Material Configuration

ShippingSchedule

UNF

2.5UNF82UNF103UNF113UNF73UNF85UNF116UNF12

Cast Iron Bronze Fitted

PumpMounted with Factory

Choice Motor or Engine, Base, and Guard

16 Weeks

Options for UNF Pumps Adder to StandardLead Time (Week)

1) Non-Witness Hydrostatic Testing 02) Witness Hydrostatic Testing 23) Non-Witness Running Performance Testing 14) Witness Running Performance Testing 25) Export Boxing 16) Non Standard Configuration RTF

- Subject to Change Without Notice -