45
Hot Mix Gone Wild Ernie De La Garza, P.E. Corpus Christi District

Upload: others

Post on 26-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Hot Mix Gone Wild Ernie De La Garza, P.E. Corpus Christi District

Page 2: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Project Facts District: 16 County: Kleberg Project: STP 2010(828) Control: 0102-06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County Line to US 77 Cost: $2,420,230.18 Let Date: April 2010 ADT: 10238, % TRK ADT 16%, ESAL 4 MIL

Page 3: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Location Map

Page 4: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Typical Sections

Page 5: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Typical Sections

Page 6: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Typical Sections

Page 7: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Develop Approach Step 1: Drive to project and take photos Step 2: Gather information and ask questions Step 3: Test to verify Step 4: Conclusion / Solutions Step 5: Lessons Learned

Page 8: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Step 1: Drive to project and take photos During Construction

After Construction (Project Accepted 2/11)

Page 9: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

During Construction

Page 10: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

During Construction

Page 11: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

During Construction

Page 12: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

During Construction

Page 13: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

During Construction

Page 14: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

During Construction

Page 15: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

During Construction

Page 16: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

After Construction

Page 17: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

After Construction

Page 18: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

After Construction

Page 19: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

After Construction

Page 20: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

After Construction

Page 21: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Step 2: Gather information and ask questions Material Hot mix production data Hot mix placement data Personnel Contractor / Inspector / Area Engineer /

Maintenance Forces Get the Story

Page 22: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Hot Mix Production/Placement Data

Type "D" CA - Martin Marietta Limestone Beckmann

FA - Wrights Material Sand FM 3088 RAP -1/2" Fractionated

Asphalt - PG 64-22S NuStar Asphalt Content: Contr= 5.2% Txdot= 5.1%

Sieve #8: Contr= 37.5% Txdot= 37.2% Sieve #200: Contr= 6.1% Txdot= 6.4%

Density: Contr= 97.1% Txdot= 97.0% Ga: Contr= 2.340 Txdot= 2.338 Rice Gravity: Contr= 2.409 Txdot= 2.409

Air Voids: 7.2%

Page 23: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Hot Mix Production/Placement Data Segregation profile 17 lots (avg. 136.3, avg.

high to low 2.4, avg. to low 1.2 pcf) Joint density avg. confined diff. -2.0, avg.

unconfined diff. -2.4 Thermal profile avg. temp diff. 7 degrees F

Page 24: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Personnel Contractor Area Office Maintenance Office CST Division

Page 25: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Get the story and ask questions

Page 26: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Step 3: Test to verify story Core

GPR

FWD / LAB

Page 27: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Core that Bonded

Page 28: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Core After Failure

Page 29: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Core After Failure

Page 30: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

GPR

K1, Inside lane only

RM540 RM542

Riviera SH 285 East Bound

Extra depth? Maybe not milled? Maybe extra layer in Original structure?

Cold Mix + overlay?

Page 31: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

FWD / LAB Subgrade (Sandy/Clay) Sta. 151+00

Classification 3.6 Subgrade (Sandy/Clay) Sta. 396+00

Classification 4.1 Subgrade (Sandy/Clay) Sta. 500+00

Classification 3.7

Page 32: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

FWD / LAB

Page 33: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Step 4: Conclusion /Solutions Short Term Solution

Long Term Solutions

Page 34: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Short Term Solution

Page 35: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Short Term Solution

Page 36: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Short Term Solution

Page 37: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Short Term Solution

Page 38: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

ID Repair Sections

Page 39: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

ID Repair Sections

Page 40: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Good Patch

Page 41: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Good Crews (Kleberg Maintenance is #1)

Page 42: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Cannot Keep Up!

Page 43: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Long Term Solution? Evaluate how patches are holding up to see if

a mill and overlay will work Possibly consider reconstruction for a

majority of the project if underlying layers do not hold up

HIR maybe?

Page 44: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Step 5: Lessons Learned Preliminary evaluation is critical

IDP- Inform inspectors

Production Adjustments- Use all of your lab

tools

Page 45: Hot Mix Gone Wild · 2017-01-04 · District: 16 County: Kleberg Project: STP 2010(828) Control: 0102- 06-029 Length: 12.068 Miles Type: Overlay Roadway Limits: From Brooks County

Questions Ernesto De La Garza, P.E. Corpus Christi District Lab [email protected]