HECTOR F. RUEDA, MBA-PROJECT MANAGER New York New York11206 & Hialeah, FL33012 [email protected] (305) 767-8643 - (786) 238-1975 Hotel and hospitalities industries /Improve project outcomes by nearly 35 percent. Standard lodging facility must meet Golden Eagle Standards. Bedrooms will have a bed for an occupant that contains a pillow, two sheets, firm mattress, mattress pad or cover, blankets, spread, wall to wall carpeting (desired) or other floor covering, a wall switch near the entrance door for a least one lamp, incandescent table or wall mounted lights for each bed, color TV, closet or hangar space, smoke detectors, individual thermostats, telephone, note pad with pen, bathrooms with vanity, mirror, light with grounded electrical outlet, and exhaust fan/privacy outside window. Rooms shall be constructed and finished to provide good light and sound attenuation. All piping and wiring must be enclosed. All finishes (walls and ceiling) should be free from damage, scars, marks, dirt, and dust. Vents and surrounding finishes must be free of dirt and dust. Ceilings and wall shall be finished in paint or wall covering. All floors in living and sleeping areas shall have a clean, serviceable covering. All windows shall be provided drapes with blackout lining, shades, or blinds. If only drapes are provided, they must screen out light. Sufficient electrical outlets shall be available. All electrical cords, bulbs, lights, and switches shall be operational and free from defects. All entrance doors to rooms shall have interior security locks, either deadbolt or double locking locks. All doors shall be free from holes, dents, or other physical defects. Smoke and fire protection systems must be installed and meet federal, state, or local fire codes. Bathrooms must be constructed to provide convenient sanitary facilities. Wash basin and shower tub areas shall have a vanity table, a large lighted mirror, stopper devices, soap dishes, towel bars/hooks, and grounded electrical outlets conveniently located for use of electrical razors, hair dryers etc. Loose, missing, or badly worn/damaged wall tiles, floor tiles, fixtures or accessories are unacceptable. The fixtures controlling the flow of water must not be cracked or leaking and shall operate properly to maintain a constant, adequate flow and temperature without sudden surges of temperature changes. Bathrooms must have a working exhaust fan or an exterior window that can be opened, which must

Upload: hector-rueda

Post on 30-Jul-2015

30 views

Category:

Business


1 download

TRANSCRIPT

Page 1: Hotel Project Manager Request for services

HECTOR F. RUEDA, MBA-PROJECT MANAGER

New York New York11206 & Hialeah, FL33012 [email protected] (305) 767-8643 -

(786) 238-1975 Hotel and hospitalities industries /Improve project outcomes by nearly 35 percent.

Standard lodging facility must meet Golden Eagle Standards. Bedrooms will have a bed for an

occupant that contains a pillow, two sheets, firm mattress, mattress pad or cover, blankets, spread,

wall to wall carpeting (desired) or other floor covering, a wall switch near the entrance door for a

least one lamp, incandescent table or wall mounted lights for each bed, color TV, closet or hangar

space, smoke detectors, individual thermostats, telephone, note pad with pen, bathrooms with

vanity, mirror, light with grounded electrical outlet, and exhaust fan/privacy outside window. Rooms

shall be constructed and finished to provide good light and sound attenuation. All piping and wiring

must be enclosed. All finishes (walls and ceiling) should be free from damage, scars, marks, dirt,

and dust. Vents and surrounding finishes must be free of dirt and dust. Ceilings and wall shall be

finished in paint or wall covering. All floors in living and sleeping areas shall have a clean,

serviceable covering. All windows shall be provided drapes with blackout lining, shades, or blinds. If

only drapes are provided, they must screen out light. Sufficient electrical outlets shall be available.

All electrical cords, bulbs, lights, and switches shall be operational and free from defects. All

entrance doors to rooms shall have interior security locks, either deadbolt or double locking locks.

All doors shall be free from holes, dents, or other physical defects. Smoke and fire protection

systems must be installed and meet federal, state, or local fire codes. Bathrooms must be

constructed to provide convenient sanitary facilities. Wash basin and shower tub areas shall have a

vanity table, a large lighted mirror, stopper devices, soap dishes, towel bars/hooks, and grounded

electrical outlets conveniently located for use of electrical razors, hair dryers etc. Loose, missing, or

badly worn/damaged wall tiles, floor tiles, fixtures or accessories are unacceptable. The fixtures

controlling the flow of water must not be cracked or leaking and shall operate properly to maintain a

constant, adequate flow and temperature without sudden surges of temperature changes.

Bathrooms must have a working exhaust fan or an exterior window that can be opened, which must

Page 2: Hotel Project Manager Request for services

be of frosted glass or curtained to provide privacy. The shower or shower/tub combination shall

have shower doors or curtains.

This proposal attempt to confident to solving customer problem as a reasonable cost in order to

implement the proposal as a result thus is eliminating the subsequent competitive proposal

process. Whether the goal is winning the opportunities to perform the project shall maintain the

reservation list reflecting dates, length of stay, and collect the occupant’s signature during check-

in or check out. This will be returned to the Contracting Officer’s Representative (COR) for

certification/verification of performance. Contractor interested in submitting a realistic

evaluation in order to being selected as the winning. We aware that Extension of capabilities

will provide the best value for the project and would the proposed project provide the contractor

with an opportunity to extend and enhance its capabilities

This Proposed approach or solution must be In Response a specific proposed solution for, a

Blanket Purchase agreement RFP to reconfigure a large office to accommodate 10 percent more

people. A problem may require that an analysis and development task be conducted as part of the

proposed lodging facility performance project before a specific solution can be described in

detail. In such cases, contractor’s