hotel project manager request for services
TRANSCRIPT
HECTOR F. RUEDA, MBA-PROJECT MANAGER
New York New York11206 & Hialeah, FL33012 [email protected] (305) 767-8643 -
(786) 238-1975 Hotel and hospitalities industries /Improve project outcomes by nearly 35 percent.
Standard lodging facility must meet Golden Eagle Standards. Bedrooms will have a bed for an
occupant that contains a pillow, two sheets, firm mattress, mattress pad or cover, blankets, spread,
wall to wall carpeting (desired) or other floor covering, a wall switch near the entrance door for a
least one lamp, incandescent table or wall mounted lights for each bed, color TV, closet or hangar
space, smoke detectors, individual thermostats, telephone, note pad with pen, bathrooms with
vanity, mirror, light with grounded electrical outlet, and exhaust fan/privacy outside window. Rooms
shall be constructed and finished to provide good light and sound attenuation. All piping and wiring
must be enclosed. All finishes (walls and ceiling) should be free from damage, scars, marks, dirt,
and dust. Vents and surrounding finishes must be free of dirt and dust. Ceilings and wall shall be
finished in paint or wall covering. All floors in living and sleeping areas shall have a clean,
serviceable covering. All windows shall be provided drapes with blackout lining, shades, or blinds. If
only drapes are provided, they must screen out light. Sufficient electrical outlets shall be available.
All electrical cords, bulbs, lights, and switches shall be operational and free from defects. All
entrance doors to rooms shall have interior security locks, either deadbolt or double locking locks.
All doors shall be free from holes, dents, or other physical defects. Smoke and fire protection
systems must be installed and meet federal, state, or local fire codes. Bathrooms must be
constructed to provide convenient sanitary facilities. Wash basin and shower tub areas shall have a
vanity table, a large lighted mirror, stopper devices, soap dishes, towel bars/hooks, and grounded
electrical outlets conveniently located for use of electrical razors, hair dryers etc. Loose, missing, or
badly worn/damaged wall tiles, floor tiles, fixtures or accessories are unacceptable. The fixtures
controlling the flow of water must not be cracked or leaking and shall operate properly to maintain a
constant, adequate flow and temperature without sudden surges of temperature changes.
Bathrooms must have a working exhaust fan or an exterior window that can be opened, which must
be of frosted glass or curtained to provide privacy. The shower or shower/tub combination shall
have shower doors or curtains.
This proposal attempt to confident to solving customer problem as a reasonable cost in order to
implement the proposal as a result thus is eliminating the subsequent competitive proposal
process. Whether the goal is winning the opportunities to perform the project shall maintain the
reservation list reflecting dates, length of stay, and collect the occupant’s signature during check-
in or check out. This will be returned to the Contracting Officer’s Representative (COR) for
certification/verification of performance. Contractor interested in submitting a realistic
evaluation in order to being selected as the winning. We aware that Extension of capabilities
will provide the best value for the project and would the proposed project provide the contractor
with an opportunity to extend and enhance its capabilities
This Proposed approach or solution must be In Response a specific proposed solution for, a
Blanket Purchase agreement RFP to reconfigure a large office to accommodate 10 percent more
people. A problem may require that an analysis and development task be conducted as part of the
proposed lodging facility performance project before a specific solution can be described in
detail. In such cases, contractor’s