HS2 – Ecclesfield Parish Council – 19 November
2013Rachael Blake and David Orr-EwingHS2 Ltd
![Page 2: HS2 – Ecclesfield Parish Council – 19 November 2013 Rachael Blake and David Orr-Ewing HS2 Ltd](https://reader033.vdocument.in/reader033/viewer/2022060106/551bc8f2550346af588b4fe4/html5/thumbnails/2.jpg)
2
Overview of presentation
• The need for HS2• The benefits HS2 will bring• The proposed line of route• The consultation process• Questions
![Page 3: HS2 – Ecclesfield Parish Council – 19 November 2013 Rachael Blake and David Orr-Ewing HS2 Ltd](https://reader033.vdocument.in/reader033/viewer/2022060106/551bc8f2550346af588b4fe4/html5/thumbnails/3.jpg)
The Need
• Demand for long distance rail travel has doubled to 125 million a year in the past 15 years
• Network Rail has said by the mid-2020’s the West Coast Main Line will be full
• 2030 on commuter services into London there will be 10 passengers standing for every 10 with seats
• The position is no better in Leeds, Manchester or Birmingham with 7 people standing for every seat.
![Page 4: HS2 – Ecclesfield Parish Council – 19 November 2013 Rachael Blake and David Orr-Ewing HS2 Ltd](https://reader033.vdocument.in/reader033/viewer/2022060106/551bc8f2550346af588b4fe4/html5/thumbnails/4.jpg)
The Need
The development of digital technology is stimulating demand“People need to be with people, it is at the root of human existence. We live in a real - not virtual - world, and connectivity is essential to us.”
Stephen GleaveChairman IBI Taylor Young
![Page 5: HS2 – Ecclesfield Parish Council – 19 November 2013 Rachael Blake and David Orr-Ewing HS2 Ltd](https://reader033.vdocument.in/reader033/viewer/2022060106/551bc8f2550346af588b4fe4/html5/thumbnails/5.jpg)
The HS2 Network
• A dedicated high speed network with a maximum design speed up to 400kph
• Trains up to 400m long, carrying up to 1100 passengers
• Some trains run onto “classic” network to serve ECML / WCML destinations directly
• A direct link onto HS1 towards Kent and the continent
• Sustainability an integral part of the design development process
![Page 6: HS2 – Ecclesfield Parish Council – 19 November 2013 Rachael Blake and David Orr-Ewing HS2 Ltd](https://reader033.vdocument.in/reader033/viewer/2022060106/551bc8f2550346af588b4fe4/html5/thumbnails/6.jpg)
The HS2 Network
![Page 7: HS2 – Ecclesfield Parish Council – 19 November 2013 Rachael Blake and David Orr-Ewing HS2 Ltd](https://reader033.vdocument.in/reader033/viewer/2022060106/551bc8f2550346af588b4fe4/html5/thumbnails/7.jpg)
7
South Yorkshire Connections
![Page 8: HS2 – Ecclesfield Parish Council – 19 November 2013 Rachael Blake and David Orr-Ewing HS2 Ltd](https://reader033.vdocument.in/reader033/viewer/2022060106/551bc8f2550346af588b4fe4/html5/thumbnails/8.jpg)
Regional Economic Impacts - KPMG
• Increased rail capacity, with faster and more reliable connectivity, will contribute to the economy right across the UK.
• Brings net benefits to the country of many times the scheme’s cost
• Could potentially generate annual productivity gains for the British economy of up to £15bn in 2037 – and the regions will be the biggest winners:
• Leeds City Region - c£1bn per year in 2037 including Wakefield between £75.47m and £114m
• South Yorkshire - £o.5bn and £0.9bn in 2037.• York: c£110m• North Yorkshire between £162m and £229m
8
![Page 9: HS2 – Ecclesfield Parish Council – 19 November 2013 Rachael Blake and David Orr-Ewing HS2 Ltd](https://reader033.vdocument.in/reader033/viewer/2022060106/551bc8f2550346af588b4fe4/html5/thumbnails/9.jpg)
9
Protecting people and the environment
![Page 10: HS2 – Ecclesfield Parish Council – 19 November 2013 Rachael Blake and David Orr-Ewing HS2 Ltd](https://reader033.vdocument.in/reader033/viewer/2022060106/551bc8f2550346af588b4fe4/html5/thumbnails/10.jpg)
10
The Proposed Route
• North of Meadowhall the route would follow the M1 for a short distance
• The route leaves the transport corridor at Chapeltown to head towards the East of Barnsley
• Before Chapeltown, the route would need to climb 70m over a distance of two miles before passing below the M1
![Page 11: HS2 – Ecclesfield Parish Council – 19 November 2013 Rachael Blake and David Orr-Ewing HS2 Ltd](https://reader033.vdocument.in/reader033/viewer/2022060106/551bc8f2550346af588b4fe4/html5/thumbnails/11.jpg)
11
Consultation
• Runs from 17th July 2013 to 31st January 2014• Seeking views on:
• Proposed route between the West Midlands and Leeds
• Proposed stations• The Appraisal of Sustainability• Using freed-up capacity on the existing “classic”
network• Introduction of other utilities along the network.
• Respond:• Online through www.hs2.org.uk• Email [email protected]• Freepost address for posting responses
![Page 12: HS2 – Ecclesfield Parish Council – 19 November 2013 Rachael Blake and David Orr-Ewing HS2 Ltd](https://reader033.vdocument.in/reader033/viewer/2022060106/551bc8f2550346af588b4fe4/html5/thumbnails/12.jpg)
TimelineDate Milestone
2013 • Consultation on preferred route, stations and depots for Phase Two launches
• Safeguarding Consultation for Phase One
Nov 2013
• Hybrid Bill for Phase One submitted to Parliament
End of 2014
• Government’s announcement of final decision on the chose route, station and depots for Phase Two
• Hybrid Bill process for Phase One continues
2015 • Commence engineering design, environmental impact assessment and preparation of Hybrid Bill for Phase Two
• Target date for Royal Assent to Hybrid Bill for Phase One, containing legal powers to construct Phase One
Next Parliament
• Deposit Hybrid Bill for Phase Two
2016/2017
• Construction on Phase One commences
2026 • Phase One opens to passengers
2033 • Phase Two opens to passengers
![Page 13: HS2 – Ecclesfield Parish Council – 19 November 2013 Rachael Blake and David Orr-Ewing HS2 Ltd](https://reader033.vdocument.in/reader033/viewer/2022060106/551bc8f2550346af588b4fe4/html5/thumbnails/13.jpg)
Questions and comments
• Rachael Blake and David Orr-Ewing Stakeholder and Community Engagement Team • [email protected]
• CALL: General enquiries on 020 7944 4908
• EMAIL: [email protected] • WRITE TO: High Speed Two (HS2) Limited,
2nd Floor, Eland House, Bressenden Place,London, SW1E 5DU