hsc construction map - usc facilities management...

1
Alca South Zonal Ave Ricardo St e St Tremont St Murchison St San Pablo St A Lancaster Ave Charlotte St Biggy St St Norfolk St Verde St Lambie St N North Main St Soto St Playground St Mark St Hospital Pl Clement St Ave Unnamed Alley 2 e Neve Ln N Henry St N Johnston St St go St N Cummings St Marengo St N Soto St Eastlake Ave N Mission Rd Pomeroy Ave Alhambra Ave N Soto St Norfolk St Zonal Ave N State St N Main St Valley Blvd GNH 603 SST 333 UHP 642 CSC 247 UNH 640 CHP 255 OPD 619 NTT 17 ZNI 282 SBA 329 SSB 235 EDM 96 HSP 190 HCT 287 DEI 610 DOH 609 NOR 81 GRH 612 BCC 266 CSA 249 SRH 147 KAM 70 NRT 288 IRD 631 CSB 183 MOL 618 HMR 22 PSC 71 NML 69 TRC 643 HCC 269 GLB 611 MCH 108.1 PMB 170 PHH 620 BMT 68 CCC 12 RMR 67 MMR 108 MCA 108.6 TOW 622 CRL 608 LRB 617 EVH 406 LRA 660 HSV 403 CLB 615 PST 238 CPT 278 ¬ « 1 ¬ « 2 ¬ « 5 ¬ « 3 ¬ « 4 ¬ « 6 ¬ « 6 ¬ « 2 ¬ « 4 ¬ « 3 ¬ « 1 ¬ « 5 Parking Lot SSP Parking Lot 71 Eastlake Lot Clinical Sciences Lot (P2) Norfolk Lot (P8) Parking Lot 70 LOT P4 San Pablo Parking Lot (P11) Edmondson Lot LOT P6 MRI Lot ¬ « 29 ¬ « 30 ¬ « 5 ¬ « 4 ¬ « 2 ¬ « 3 ¬ « 24 ¬ « 11 ¬ « 1 ¬ « 9 ¬ « 12 ¬ « 25 ¬ « 26 ¬ « 27 ¬ « 28 ¬ « 10 ¬ « 6 ¬ « 7 ¬ « 8 ¬ « 16 ¬ « 18 ¬ « 15 ¬ « 17 ¬ « 19 ¬ « 32 ¬ « 33 ¬ « 31 ¬ « 13 ¬ « 14 ¬ « 20 ¬ « 21 ¬ « 23 ¬ « 22 University of Southern California HSC Construction Map Path: K:\Active Projects\GIS2\Maps\Theme_Maps\Construction\Winter_2013\HSC_Construction_W2013_11x17_NEW.mxd Date Saved: 6/19/2013 9:35:30 AM Visit www.usc.edu/fms for the latest Map Capital Construction Development Facilities Management Services University of Southern California CONSTRUCTION PROJECTS CAPITAL CONSTRUCTION DEVELOPMENT PLANNED SITE CONSTRAINTS CAPITAL CONSTRUCTION DEVELOPMENT PROJECTS FACILITIES MANAGEMENT SERVICES MAINTENANCE PROJECTS UTILITIES PROJECTS ITS PROJECTS CURRENT SITE CONSTRAINTS MAINTENANCE PROJECTS 1 NTT BURNER BOILER RETOFIT 12/5/2012 5/13/2013 Dan Hearon (213) 740 5711 2 NOR BURNER BOILER RETOFIT 12/5/2012 5/13/2013 Dan Hearon (213) 740 5711 3 HMR BURNER BOILER RETOFIT 12/5/2012 5/13/2013 Dan Hearon (213) 740 5711 4 NTT NTT GENERATOR REPLACEMENT <null> <null> Jennifer Schlesinger (213) 821 7944 5 MMR DFM HSC HMR BOILER BURNER REPLACEMENT 12/17/2012 6/28/2013 Dan Hearon (213) 740 5711 6 UNH REPLACEMENT OF THREE BOILERS 3/17/2013 9/7/2013 Dan Hearon (213) 740 5711 NO BLD CODE PROJECT DESCRIPTION START DATE END DATE PROJ MANAGER CONTACT UTILITY PROJECTS 1 ALCAZAR ST WATER LINE RELOCATION CONSTRUCTION 10/1/2012 4/30/2013 Jay Fischer (213) 740 3554 2 ALCAZAR ST ELECTRICAL DUCTBANK CONSTRUCTION 12/1/2012 10/30/2013 Jay Fischer (213) 740 3554 3 SOTO ST DWP/TELECOMM CABLING INSTALLATION 11/1/2012 1/31/2013 Jay Fischer (213) 740 3554 4 <null> NTT GENERATOR REPLACEMENT 5/1/2013 1/1/2014 Kelvin Khor (213) 821 6454 5 <null> CSC EMERGENCY SYSTEM UPGRADE 10/1/2014 <null> Kelvin Khor (213) 821 6454 NO SITE PROJ DESCRIPTION START DATE END DATE PROJ MANAGER CONTACT BANK EXPANSION Henderson 26 UNH PR028928 CONSTRUCT A THIRD CATH LAB BY REMODELING EXISTING PATIENT HOLDING AREA 10/8/2013 12/6/2013 Aaron Henderson (323) 442 1546 27 UNH PR029343 REPLACE AN EXISTING MRI & CONTROL ROOM W/ NEW EQUIPMENT 8/26/2013 1/31/2014 Aaron Henderson (323) 442 1546 28 UNH PR022084 MEDICARE AIR AND VACUUM UPGRADE; EQUIPMENT UPGRADE 9/4/2012 5/31/2013 Rick Sendele (323) 442 3738 29 UNH PR022909 HOSPITAL FIRE ALAM UPGRADE 12/19/2011 9/27/2013 Rick Sendele (323) 442 3738 30 UNH PR032981 REPLACE EXISTING BOILER PLANT 3/17/2013 9/7/2013 Dan Hearon (213) 740 5761 31 ZNI PR028672 CONVERT EXISTING LAB SPACE INTO A LEVEL 3 BIO-SAFETY LABORATORY 12/10/2012 7/31/2013 LaDrena Dansby (323) 442 1544 32 ZNI USC0000200 ZNI B183: NMR LAB REMODEL 5/17/2013 8/14/2013 Owen Dy (323) 442 2070 33 ZNI USC0000240 ZNI/312: PROPOSED LAB REMODEL (LASER ROOM) 7/1/2013 10/7/2013 Owen Dy (323) 442 2070 1 BCC USC0000236 BCC 5 NEW OFFICES AND 2 EQUIPMENT ROOMS 10/1/2013 11/29/2013 LaDrena Dansby (323) 442 1544 2 CHP USC0000129 CHP BIOKINESIOLOGY & PHYSICAL THERAPY REMODEL 6/3/2013 9/30/2013 Aaron Henderson (323) 442 1546 3 CHP USC0000092 CHP OT CLASSROOM RENOVATION - PHASE II 5/13/2013 6/17/2013 Shelly Wong (213) 821 7900 4 CSC PR026895 CSC CYCLOTRON REPLACEMENT AND WET LABORTORY RENOVATION <null> 7/12/2013 LaDrena Dansby (323) 442 1544 5 CSC PR025386 CSC FIRST FLOOR FIRE SPRINKLER MANDATED UPGRADES 2/21/2013 10/18/2013 Rick Sendele (323) 442 3738 6 DEI <null> DEI CHILLER PLANT 4/1/2013 7/9/2013 Dan Hearon (213) 740 5761 7 DEI <null> DEI SWITCHGEAR REPLACEMENT 6/24/2013 7/19/2013 Dan Hearon (213) 740 5761 8 DEI PR029874 DEI BUILDING IMPROVEMENTS 4/17/2013 8/2/2013 Mark M, Robert S (323) 442 3721 9 HCC III <null> NEW MEDICAL OFFICE BUILDINGS 8/7/2013 5/5/2015 Maria Morgan (323) 442 3721 10 HCT USC000097 CONSTRUCTION OF A NEW CT SCAN ROOM 5/13/2013 8/9/2013 Dan Packer (213) 740 1923 11 HCT USC0000097 TOSHIBA CT SCAN ROOM 5/6/2013 7/19/2013 Dan Packer (213) 740 1923 12 HMR USC0000296 HMR 5TH FLOOR DATA CLOSET 4/15/2013 6/28/2013 Aaron Henderson (323) 442 1546 13 KAM PR027331 FRP STRUCTURAL RENOVATION 5/14/2013 8/23/2013 Susan Carr (213) 740 8224 14 MCH USC0000268 BASEMENT RESEARCH ADVANCEMENT REMODEL 8/19/2013 9/20/2013 Aaron Henderson (323) 442 1546 15 NOR USC0000147 NORRIS HOSPITAL OSHPD SB 1953 SEISMIC COMPLIANCE 11/5/2012 12/31/2013 LaDrena Dansby (323) 442 1544 16 NOR USC000126 RED ONC LINEAR ACCELERATOR REPLACEMENT 5/25/2013 9/30/2013 Kelly Estes (323) 442 3718 17 NOR USC0000312 NOR (NCH): DATA CLOSET COOLING SYSTEM 4/29/2013 5/31/2013 Aaron Henderson (323) 442 1546 18 NOR PR018111 NOR & UNH OSHPD COMPLIANCE PROJECT 11/5/2012 12/31/2013 LaDrena Dansby (323) 442 1544 19 NTT USC0000096 NTT 6428A: OFFICE CONVER. TO LAB (TISSUE CULTURE RM.) 6/5/2013 7/31/2013 Owen Dy (323) 442 2070 20 PSC USC0000217 PSC 108/112: AUDITORIUM EXPANSION PROJECT 5/20/2013 8/30/2013 Owen Dy (323) 442 2070 21 PSC USC0000276 PSC 402: LAB REMODEL (TISSUE CULTURE RM.) 4/30/2013 7/31/2013 Owen Dy (323) 442 2070 22 RMR USC0000003 PHASE II SEISMIC INVESTIGATION 5/27/2013 12/1/2014 Shelly Wong (213) 821 7900 23 RMR USC0000294 RMR RAULSTION RENOVATION/SEISMIC UPGRADE 9/23/2013 12/1/2014 Shelly Wong (213) 821 7900 24 SSB USC0000273 SEEDS CAFE KITCHEN EQUIPMENT 6/17/2013 7/31/2013 Ellen Garrett <null> 25 UNH PR028929 UNH 2ND FLOOR BLOOD BANK EXPANSION 7/15/2013 1/18/2014 Aaron Henderson (323) 442 1546 NO BLD CODE PROJ NO PROJ DESCRIPTION START DATE END DATE PROJECT MAN CONTACT

Upload: vandang

Post on 29-Mar-2019

217 views

Category:

Documents


0 download

TRANSCRIPT

Alcazar St

Southern Pacific RR

Zonal Ave

Ricard

o St

N Stat

e St

Tremo

nt St

Murch

ison S

t

San P

ablo

St

Alta S

t

Lancaster Ave

Charlotte St

Biggy St

Lord

St

Norfolk St

Verde St

Lambie St

N North Main St

Soto

St

Playg

round

St

Mark

St

Hospital Pl

Cleme

nt St

Kingst

on Av

e

Unna

med A

lley 2

de Ne

ve Ln

N Henry St

N Jo

hnsto

n St

Ricardo

St

N Chic

ago S

t

N Cum

mings

St

Marengo St

N Soto

St

Eastlake Ave

N Mission Rd

Pomeroy Ave

Alhambra Ave

N Soto

St

Cornw

ell St

Darwin Ave

Norfolk St

Zonal Ave

N State St

N Main St Valley Blvd

GNH 603

SST 333

UHP 642 CSC247

UNH 640

CHP 255

OPD 619

NTT 17

ZNI 282

SBA 329

SSB 235

EDM 96

HSP 190

COR

HCT 287

DEI 610

DOH 609

NOR81

GRH 612

BCC 266

CSA 249

SRH 147

KAM70

NRT 288

IRD 631

CSB 183

MOL 618

HMR 22PSC 71

NML 69

TRC 643HCC 269

GLB 611

MCH 108.1

PMB 170

PHH 620

BMT 68

CCC 12

RMR 67

MMR 108

MCA 108.6

TOW 622CRL 608

LRB 617

EVH 406

LRA 660

HSV 403

CLB 615

PST 238CPT 278

¬«1 ¬«2

¬«5

¬«3¬«4

¬«6

¬«6

¬«2¬«4

¬«3

¬«1

¬«5

Parking LotSSP

Parking Lot71

EastlakeLot

Clinical Sciences Lot (P2)

NorfolkLot (P8)Parking

Lot 70

LOT P4

San Pablo Parking Lot (P11)

EdmondsonLot

LOTP6

MRILot

¬«29

¬«30¬«5

¬«4¬«2¬«3

¬«24

¬«11

¬«1

¬«9

¬«12

¬«25

¬«26¬«27¬«28

¬«10

¬«6¬«7

¬«8¬«16

¬«18

¬«15

¬«17

¬«19

¬«32¬«33 ¬«31

¬«13

¬«14¬«20¬«21

¬«23¬«22

University of Southern CaliforniaHSC Construction MapPath: K:\Active Projects\GIS2\Maps\Theme_Maps\Construction\Winter_2013\HSC_Construction_W2013_11x17_NEW.mxdDate Saved: 6/19/2013 9:35:30 AM Visit www.usc.edu/fms for the latest Map

Capital Construction DevelopmentFacilities Management Services

University of Southern CaliforniaCONSTRUCTION PROJECTS

CAPITAL CONSTRUCTION DEVELOPMENT

PLANNED SITE CONSTRAINTS

CAPITAL CONSTRUCTION DEVELOPMENT PROJECTS

FACILITIES MANAGEMENT SERVICES MAINTENANCE PROJECTS

UTILITIES PROJECTS

ITS PROJECTS

CURRENT SITE CONSTRAINTS

MAINTENANCE PROJECTS1 NTT BURNER BOILER RETOFIT 12/5/2012 5/13/2013 Dan Hearon (213) 740 57112 NOR BURNER BOILER RETOFIT 12/5/2012 5/13/2013 Dan Hearon (213) 740 57113 HMR BURNER BOILER RETOFIT 12/5/2012 5/13/2013 Dan Hearon (213) 740 57114 NTT NTT GENERATOR

REPLACEMENT<null> <null> Jennifer Schlesinger (213) 821 7944

5 MMR DFM HSC HMR BOILER BURNER REPLACEMENT

12/17/2012 6/28/2013 Dan Hearon (213) 740 5711

6 UNH REPLACEMENT OF THREE BOILERS

3/17/2013 9/7/2013 Dan Hearon (213) 740 5711

NO BLD CODE PROJECT DESCRIPTION START DATE END DATE PROJ MANAGER CONTACT

UTILITY PROJECTS1 ALCAZAR ST WATER LINE RELOCATION CONSTRUCTION 10/1/2012 4/30/2013 Jay Fischer (213) 740 35542 ALCAZAR ST ELECTRICAL DUCTBANK CONSTRUCTION 12/1/2012 10/30/2013 Jay Fischer (213) 740 35543 SOTO ST DWP/TELECOMM CABLING INSTALLATION 11/1/2012 1/31/2013 Jay Fischer (213) 740 35544 <null> NTT GENERATOR REPLACEMENT 5/1/2013 1/1/2014 Kelvin Khor (213) 821 64545 <null> CSC EMERGENCY SYSTEM UPGRADE 10/1/2014 <null> Kelvin Khor (213) 821 6454

NO SITE PROJ DESCRIPTION START DATE END DATE PROJ MANAGER CONTACT

BANK EXPANSION Henderson26 UNH PR028928 CONSTRUCT A THIRD CATH

LAB BY REMODELING EXISTING PATIENT HOLDING AREA

10/8/2013 12/6/2013 Aaron Henderson

(323) 442 1546

27 UNH PR029343 REPLACE AN EXISTING MRI & CONTROL ROOM W/ NEW EQUIPMENT

8/26/2013 1/31/2014 Aaron Henderson

(323) 442 1546

28 UNH PR022084 MEDICARE AIR AND VACUUM UPGRADE; EQUIPMENT UPGRADE

9/4/2012 5/31/2013 Rick Sendele (323) 442 3738

29 UNH PR022909 HOSPITAL FIRE ALAM UPGRADE

12/19/2011 9/27/2013 Rick Sendele (323) 442 3738

30 UNH PR032981 REPLACE EXISTING BOILER PLANT

3/17/2013 9/7/2013 Dan Hearon (213) 740 5761

31 ZNI PR028672 CONVERT EXISTING LAB SPACE INTO A LEVEL 3 BIO-SAFETY LABORATORY

12/10/2012 7/31/2013 LaDrena Dansby

(323) 442 1544

32 ZNI USC0000200 ZNI B183: NMR LAB REMODEL 5/17/2013 8/14/2013 Owen Dy (323) 442 2070

33 ZNI USC0000240 ZNI/312: PROPOSED LAB REMODEL (LASER ROOM)

7/1/2013 10/7/2013 Owen Dy (323) 442 2070

NO BLD CODE PROJ NO PROJ DESCRIPTION START DATE END DATE PROJECT MAN CONTACT

1 BCC USC0000236 BCC 5 NEW OFFICES AND 2 EQUIPMENT ROOMS

10/1/2013 11/29/2013 LaDrena Dansby

(323) 442 1544

2 CHP USC0000129 CHP BIOKINESIOLOGY & PHYSICAL THERAPY REMODEL

6/3/2013 9/30/2013 Aaron Henderson

(323) 442 1546

3 CHP USC0000092 CHP OT CLASSROOM RENOVATION - PHASE II

5/13/2013 6/17/2013 Shelly Wong (213) 821 7900

4 CSC PR026895 CSC CYCLOTRON REPLACEMENT AND WET LABORTORY RENOVATION

<null> 7/12/2013 LaDrena Dansby

(323) 442 1544

5 CSC PR025386 CSC FIRST FLOOR FIRE SPRINKLER MANDATED UPGRADES

2/21/2013 10/18/2013 Rick Sendele (323) 442 3738

6 DEI <null> DEI CHILLER PLANT 4/1/2013 7/9/2013 Dan Hearon (213) 740 5761

7 DEI <null> DEI SWITCHGEAR REPLACEMENT

6/24/2013 7/19/2013 Dan Hearon (213) 740 5761

8 DEI PR029874 DEI BUILDING IMPROVEMENTS

4/17/2013 8/2/2013 Mark M, Robert S

(323) 442 3721

9 HCC III <null> NEW MEDICAL OFFICE BUILDINGS

8/7/2013 5/5/2015 Maria Morgan (323) 442 3721

10 HCT USC000097 CONSTRUCTION OF A NEW CT SCAN ROOM

5/13/2013 8/9/2013 Dan Packer (213) 740 1923

11 HCT USC0000097 TOSHIBA CT SCAN ROOM 5/6/2013 7/19/2013 Dan Packer (213) 740 1923

12 HMR USC0000296 HMR 5TH FLOOR DATA CLOSET

4/15/2013 6/28/2013 Aaron Henderson

(323) 442 1546

13 KAM PR027331 FRP STRUCTURAL RENOVATION

5/14/2013 8/23/2013 Susan Carr (213) 740 8224

14 MCH USC0000268 BASEMENT RESEARCH ADVANCEMENT REMODEL

8/19/2013 9/20/2013 Aaron Henderson

(323) 442 1546

15 NOR USC0000147 NORRIS HOSPITAL OSHPD SB 1953 SEISMIC COMPLIANCE

11/5/2012 12/31/2013 LaDrena Dansby

(323) 442 1544

16 NOR USC000126 RED ONC LINEAR ACCELERATOR REPLACEMENT

5/25/2013 9/30/2013 Kelly Estes (323) 442 3718

17 NOR USC0000312 NOR (NCH): DATA CLOSET COOLING SYSTEM

4/29/2013 5/31/2013 Aaron Henderson

(323) 442 1546

18 NOR PR018111 NOR & UNH OSHPD COMPLIANCE PROJECT

11/5/2012 12/31/2013 LaDrena Dansby

(323) 442 1544

19 NTT USC0000096 NTT 6428A: OFFICE CONVER. TO LAB (TISSUE CULTURE RM.)

6/5/2013 7/31/2013 Owen Dy (323) 442 2070

20 PSC USC0000217 PSC 108/112: AUDITORIUM EXPANSION PROJECT

5/20/2013 8/30/2013 Owen Dy (323) 442 2070

21 PSC USC0000276 PSC 402: LAB REMODEL (TISSUE CULTURE RM.)

4/30/2013 7/31/2013 Owen Dy (323) 442 2070

22 RMR USC0000003 PHASE II SEISMIC INVESTIGATION

5/27/2013 12/1/2014 Shelly Wong (213) 821 7900

23 RMR USC0000294 RMR RAULSTION RENOVATION/SEISMIC UPGRADE

9/23/2013 12/1/2014 Shelly Wong (213) 821 7900

24 SSB USC0000273 SEEDS CAFE KITCHEN EQUIPMENT

6/17/2013 7/31/2013 Ellen Garrett <null>

25 UNH PR028929 UNH 2ND FLOOR BLOOD BANK EXPANSION

7/15/2013 1/18/2014 Aaron Henderson

(323) 442 1546

NO BLD CODE PROJ NO PROJ DESCRIPTION START DATE END DATE PROJECT MAN CONTACT