Page 1: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

http://nodal.ercot.com 1

Update to NATF on Resource Registration

Feb 2, 2010

Page 2: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

Brief Overview of Resource Registration

• Review of Resource Registration activities:– GENMAP Registration Workshop Conducted January 14, 2010

• Excerpts of workshop included in appendix

• http://www.ercot.com/calendar/2010/01/20100114-GENMAP

• Highlights to bring forward to NATF– Current status of Resources in Network Model (next slide)– Resource activities and timeline

• Appendix 1- RARF Rules Update• Appendix 2- GenMap package (EPS meter and one-lines)

http://nodal.ercot.com 2

Page 3: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

http://nodal.ercot.com 3

Updates and Progress

• RARF Disposition in Model as of Jan 29

Page 4: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

http://nodal.ercot.com 4

Timeline of Activities

2010

DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

MP11 - GENMAP Verifications

(January 18 thru April 1)

MP11 – DME Declarations

(Dec 7 through January 8)

MP11 - RARF True-up

(February 1 thru April 1)

Nodal Market Go-Live

(December 1, 2010)

MP11 - RARF Transmission Data

(June 15 thru Dec 1, 2009)

Page 5: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

Summary of Resource Activities

http://nodal.ercot.com 5

•Activities in flight (measured by MP11 Metric)•Timeline on next page

•RARF (Resource Transmission Equipment- concluded)

•DME (Resource Decision Making Entity)

•RARF True-Up (Resource Business Rule Validation)

•GENMAP (Resource EPS meter mapping confirmation and one-line)• Resource Node mapping is per Procedure for Identifying Resource Nodes (July 23, 2008) http://nodal.ercot.com/mktrules/np/index.html

• Nodal procedure allows 5 business days to turn GENMAP package around (10 business days per MP11)

Page 6: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

http://nodal.ercot.com 6

Appendix 1:RARF Rules Update

Page 7: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

Resource Asset Registration Form – Business Rule updates

Site Information Tab– CMZ now a required field– If Generation load Split is 'Y', then Fixed Load Splitting % (for each ESIID's) must

total 100

Unit Information Tab– ALL: Unit Commercial date must be >= Site-In-Service Date– WIND: Latitude of Farm & Tower must be >=25 and <=37 decimal degrees– WIND: Longitude of Farm & Tower must be >=92 and <= 107 decimal degrees

Parameters Tab– ALL: HRL should be <= Real Power Rating (WARNING only)– ALL: LRL must be zero for Private Use Network Sites

Reactive Capability Tab– ALL: Lagging MVAR must be >= MVAR

Page 8: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

Resource Asset Registration Form – Business Rule updates

Operational Parameters Tab– ALL: Minimum On Line Time (Warning! If decimal value is submitted then

Downstream System may round it UP)– ALL: Minimum Off Line Time (Warning! If decimal value is submitted then

Downstream System may round it UP)– ALL: Hot Start Time - (Warning! If decimal value is submitted then Downstream

System may round it DOWN)– ALL: Intermediate Start Time - (Warning! If decimal value is submitted then

Downstream System may round it DOWN)– ALL: Cold Start Time - (Warning! If decimal value is submitted then Downstream

System may round it DOWN)– ALL: Max Weekly Starts - Min value 1, Max value is 85 (WARNING)– ALL: Max Daily Starts - Min value 1, Max value 13 (WARNING)– ALL: Hot-to-Intermediate Time - (Warning! If decimal value is submitted then

Downstream System may round it DOWN)– ALL: Intermediate-to-Cold Time - (Warning! If decimal value is submitted then

Downstream System may round it DOWN)

Page 9: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

Resource Asset Registration Form – Business Rule updates

CC Transitions Tabs– CC: Transitions From Offline required– CC: Transitions To Offline required– CC: Transitions must not skip configurations (eg: Offline to CC1_2)– CC: Should have a Transition for each Configuration (WARNING)

Line Data Tab– Zero impedance lines within same substation must be modeled on the

breaker/switch tab– Line Ratings for zero impedance lines must be valid (eg: 9999 not allowed)

Capacitor and Reactor Data Tab– Connected Device must also be defined either in the Breaker/Switch or in the

Transformer Tab– This field should be unique (No two capacitors should have the same controlling

breaker or switch)– Warning if Desired, Minimum, and Maximum voltage fields values have a range

not within 10% of the Voltage level of the Bus Bar being Regulated

Page 10: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

Resource Asset Registration Form – Business Rule updates

Transformer Data Tab– Transformer High Side Manufactured Nominal Voltage must equal Voltage at

Highest Tap - Step Size voltage to reach Nominal Tap voltage– Error if the Transformer Resistance is less than 3 decimals, Warning if the

Transformer Resistance is greater than 2 but less than 5 decimals– Load Tap Changer must be 'Y' when AVR is ‘Y’– Error if Transformer Resistance to Reactance ratio >1, Warning if R/X >3

Load Data Tab– Connected Device must also be defined either in the Breaker/Switch or in the

Transformer Tab

Page 11: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

http://nodal.ercot.com 11

Appendix 2:GENMAP Package

Page 12: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

http://nodal.ercot.com 12

GENMAP Processing

Page 13: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

GENMAP Sample one-line

http://nodal.ercot.com 13

SAMPLE GENMAP ONE-LINE

Test_Line1 Test_Line2 Test_Line3

Dsw_G3Dsw_G2Dsw_S1

TEST_TESTUNIT3TEST_TESTUNIT1

12201210

TEST_TESTUNIT2

Dsw_1231

Page 14: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

http://nodal.ercot.com 14

GENMAP Unit-Associated Spreadsheets

Page 15: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

http://nodal.ercot.com 15

GENMAP Non Unit-Associated Spreadsheets

Page 16: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

GENMAP Defined

http://nodal.ercot.com 16

GENMAP Packet Defined

Unit and Associated Resource Nodes: The GENMAP’s first page contains the mapping of generating units to Resource Nodes, or Settlement Points. Information such as the Unit’s and Resource Node’s substation, as well as the Resource Node’s voltage level and Connected Devices are listed. The Connected Devices are of all of the devices at a connectivity node where the Resource Node is located. Note that the Resource Node may not be located at the same connectivity node as the generating unit.

Unit-Associated EPS Meters: The Unit-Associated EPS Meters page shows the mapping of each generating unit to one or multiple EPS Meters. Information such as the Unit and EPS Meter’s substation, as well as the EPS Meter’s Meter ID, RID and Connected Devices are given. The Connected Devices consist of the devices at the connectivity node(s) where the EPS Meter is located. Note that a Unit-Associated EPS Meter may be located at a different substation than its mapped generating unit.

Unit-Associated EPS Flow-Calculation Modeling: The Unit-Associated EPS Meter Flow-Calculation Modeling page shows the mapping between a Unit-Associated EPS Meter and its associated conducting equipment used in the Flow-Calculation. Information such as the Unit and EPS Meter’s substation, Meter ID, RID and Connected Devices are given. The Flow-Calculation’s direction at the connected device is also given. See Explanation Verifying EPS Meter Flow-Calculation Modeling below.

Page 17: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

http://nodal.ercot.com 17

GENMAP Unit-Associated Resource Node Spreadsheet

Page 18: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

http://nodal.ercot.com 18

GENMAP Unit-Associated EPS Meter Spreadsheet

Page 19: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

http://nodal.ercot.com 19

GENMAP Unit-Associated EPS Flow Spreadsheet

1. EPS Flow is FALSE if it points FROM the connected device listed2. EPS Flow is TRUE if it points TO the connected device listed

Page 20: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

http://nodal.ercot.com 20

GENMAP Non Unit-Associated EPS Meter Spreadsheet

Page 21: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

http://nodal.ercot.com 21

GENMAP Non Unit-Associated EPS Flow Spreadsheet

1. EPS Flow is FALSE if it points FROM the connected device listed2. EPS Flow is TRUE if it points TO the connected device listed

Page 22: Http://nodal.ercot.com 1 Update to NATF on Resource Registration Feb 2, 2010

General Info

http://nodal.ercot.com 22

•The one-lines are provided for two reasons – one to verify the accuracy of the meter and unit location on the one-line; the second as a tool to verify the mapping.•Each node and meter will have reference “Connections”. Each item listed in the connection column will refer to all equipment electrically connected to the node or meter point. These connections are represented as [CB]1234 or [XFMR]U1 and are shown on the one-line screenshots. •The connections column identifies the equipment type by offsetting the type in brackets, such as [CB]1234, where [CB] refers to the equipment type Circuit Breaker. The list below identifies the common equipment types:

o[XFMR] Transformer o[CB] Circuit breaker o[DSC] Disconnect (switch) o[UN] Generation Unit o[LN] Line o[LD] Loado[SERIES] Series Deviceo[SVC] Static-Var

Note: Transformer naming convention in GENMAP pkg is power transformer concatenation and may not match names provided in the RARF.

•The one-line screenshot uses several colors to define the operating voltage of the equipment and buses represented. The list below identifies the voltages associated with each color:

oPurple: 345kV oGreen: 138kV oBlue: 69kV oPink: Other voltages