  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    1/219

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16 MSTP Optical

    Transmission SystemV300R005

    Installation Guide

    Issue 02

    Date 2008-09-10

    Part Number 00435192

    Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    2/219

    Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. For anyassistance, please contact our local office or company headquarters.

    Huawei Technologies Co., Ltd. Address: Huawei Industrial Base

    Bantian, LonggangShenzhen 518129People's Republic of China

    Website: http://www.huawei.com

    Email: [email protected]

    Copyright Huawei Technologies Co., Ltd. 2008. All rights reserved.

    No part of this document may be reproduced or transmitted in any form or by any means without prior writtenconsent of Huawei Technologies Co., Ltd. Trademarks and Permissions

    and other Huawei trademarks are the property of Huawei Technologies Co., Ltd. All other trademarks and trade names mentioned in this document are the property of their respective holders. Notice

    The information in this document is subject to change without notice. Every effort has been made in thepreparation of this document to ensure accuracy of the contents, but the statements, information, andrecommendations in this document do not constitute a warranty of any kind, express or implied.

    Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    mailto:[email protected]://www.huawei.com/
  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    3/219

    Contents

    About This Doc ument.....................................................................................................................1

    1 Installation Prep aration............................................................................................................1-11.1 About the Opt iX 155/622H.............................................................................................................................1-2

    1.2 Installatio n Flow..............................................................................................................................................1-31.3 Required Documents and Tools......................................................................................................................1-3

    1.3.1 Tech nical Documents.............................................................................................................................1-4

    1.3.2 Tool s and Instruments............................................................................................................................1-4

    1.4 Installation E nvironment Check......................................................................................................................1-9

    1.5 Unpacking th e Equipment...............................................................................................................................1-9

    1.5.1 Unpacki ng the Cabinet...........................................................................................................................1-9

    1.5.2 Unpacki ng the Chassis.........................................................................................................................1-12

    1.5.3 Unp acking Boards................................................................................................................................1-14

    1.5.4 Req uirements of Inspection..................................................................................................................1-16

    1.6 Ch ecking the Equipment...............................................................................................................................1-16

    2 Installing the Chassis................................................................................................................2-12.1 Installing the OptiX 155/622H Chassis in a Series-C Integrated Cabinet......................................................2-2

    2.2 Installing the OptiX 155/622H Chassis in an ETSI 600 mm-Deep Cabinet or a 19-Inch Cabinet.................2-3

    2.2.1 Installin g the OptiX 155/622H Chassis Along the Slide Rail................................................................2-4

    2.2.2 Installin g the OptiX 155/622H Chassis with the Mounting Ears Facing Upward.................................2-6

    2.2.3 Insta lling the OptiX 155/622H Chassis with the Mounting Ears Facing Downward............................2-9

    2.2.4 Insta lling the OptiX 155/622H Chassis Cabling from the Front Panel.............................................2-12

    2.3 Installing the OptiX 155/622H Chassis in an ETSI 300 mm-Deep Cabinet.................................................2-13

    2.4 Installing the OptiX 155/622H Chassis in the Open Rack............................................................................2-18

    2.5 Installing the OptiX 155/622H Chassis in an Access Network Cabinet.......................................................2-20

    2.6 Installing the OptiX 155/622H Chassis on the Wall.....................................................................................2-21

    2.6.1 Insta lling the OptiX 155/622H Chassis by Using a Rotary Subrack...................................................2-22

    2.6 .2 Installing the OptiX 155/622H Chassis by Using the Suspension Bracket..........................................2-25

    2.7 De sktop Mounting.........................................................................................................................................2-27

    2.8 Checking the Installation...............................................................................................................................2-27

    3 Installing an Integrated Wall-Mounting Chassis................................................................3-13.1 About the Chassis............................................................................................................................................3-2

    3.2 Environmental Requirements..........................................................................................................................3-2

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission SystemInstallation Guide Contents

    Issue 02 (2008-09-10) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    i

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    4/219

    3.3 Installing the Chassis.......................................................................................................................................3-3

    3.3.1 Locating Installation Holes of the Chassis.............................................................................................3-3

    3.3.2 Installing the Expansion Bolts................................................................................................................3-5

    3.3.3 Installing Mounting Parts ......................................................................................................................3-7

    3.3.4 Fixing the Chassis..................................................................................................................................3-8

    3.3.5 Installin g the Handle..............................................................................................................................3-9

    3.3.6 Asse mbling the Chassis .......................................................................................................................3-10

    3.3.7 Installin g and Routing the Cables .......................................................................................................3-11

    3.3.8 Installat ion Result ................................................................................................................................3-13

    3.4 Checking the Installation ..............................................................................................................................3-13

    4 Installing the UP M Power System .........................................................................................4-14.1 About the UP M Power System ......................................................................................................................4-2

    4.1.1 Pow er Box .............................................................................................................................................4-2

    4.1.2 Storage Battery ......................................................................................................................................4-4

    4.1.3 Installat ion Mode ...................................................................................................................................4-5

    4.2 Installing the Storage Battery and Power Box ...............................................................................................4-6

    4.2.1 Installin g the Storage Batteries..............................................................................................................4-6

    4.2.2 Installin g the Power Box in a 19-Inch Cabinet or an ETSI Cabinet .....................................................4-8

    4.2.3 Insta lling the Power Box on the Wall .................................................................................................4-10

    4.3 Installing the UPM Power Cables ................................................................................................................4-12

    4.4 Checking the Installation ..............................................................................................................................4-14

    5 Installing and Routing the Cables .........................................................................................5-15.1 Installing the PGND Cables............................................................................................................................5-2

    5.1.1 About the Cables....................................................................................................................................5-2

    5.1 .2 Installation Procedures...........................................................................................................................5-2

    5.2 Installing the Power Cable..............................................................................................................................5-3

    5.2.1 Abo ut the Power Cables ........................................................................................................................5-4

    5.2.2 Insta llation Procedures ..........................................................................................................................5-4

    5.3 Installing the E1/T1 Cables.............................................................................................................................5-6

    5.3.1 About th e E1/T1 Cables.........................................................................................................................5-6

    5.3.2 Installat ion Procedures ..........................................................................................................................5-9

    5.4 Installing E3/T3/STM-1e Cables..................................................................................................................5-115.4.1 About th e E3/T3/STM-1e Cables.........................................................................................................5-11

    5.4.2 Installat ion Procedures ........................................................................................................................5-11

    5.5 Installing Eth ernet Cables ............................................................................................................................5-12

    5.5.1 Abo ut the Ethernet Cable.....................................................................................................................5-12

    5.5 .2 Installing Procedures............................................................................................................................5-14

    5.6 Installing the Framed E1 Cable.....................................................................................................................5-15

    5.6.1 About th e Framed E1 Cable.................................................................................................................5-15

    5.6.2 Installat ion Procedures ........................................................................................................................5-18

    5.7 Installing the NM Cable ...............................................................................................................................5-19

    5.7.1 About th e NM Cable ...........................................................................................................................5-20

    Contents

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    ii Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    5/219

    5.7.2 Installation Procedures ........................................................................................................................5-20

    5.8 Installing the External Clock Cable..............................................................................................................5-21

    5.8.1 About the External Clock Cable...........................................................................................................5-22

    5.8.2 Installation Procedure...........................................................................................................................5-22

    5.9 Installing the Transparent Data/Housekeeping Cable ..................................................................................5-23

    5.9.1 Abo ut the Transparent Data/Housekeeping Cable...............................................................................5-24

    5.9 .2 Installation Procedure ..........................................................................................................................5-26

    5.10 Checking the Cable Installation..................................................................................................................5-28

    6 Installing and Routing Fiber Jumpers...................................................................................6-16.1 About Fib er Jumpers ......................................................................................................................................6-2

    6.2 Installatio n Procedure .....................................................................................................................................6-3

    6.3 Checking the Installation ................................................................................................................................6-6

    7 Installing the Orderwire Phone ..............................................................................................7-17.1 About the Orderwire Interface........................................................................................................................7-2

    7.2 Installing the Orderwire Phone ......................................................................................................................7-2

    7.2.1 Insta lling the Orderwire Phone in the Cabinet ......................................................................................7-2

    7.2.2 Insta lling the Orderwire Phone in an Open Rack ..................................................................................7-3

    7.3 Checking the Orderwire Phone Installation....................................................................................................7-5

    8 Powering On and Checking the Equipment.........................................................................8-18.1 Po wering On the Cabinet................................................................................................................................8-2

    8.1.1 Chec king Fuse Currents of the Power Supply.......................................................................................8-2

    8.1.2 Test ing the Resistance Between the Power Cable Terminals of the Cabinet ........................................8-38.1.3 Powerin g On a Cabinet..........................................................................................................................8-5

    8.2 Powering On the Chassis ................................................................................................................................8-6

    8.3 Checking the Fan Running Status...................................................................................................................8-7

    9 Operation Environment Requirements.................................................................................9-19.1 Re quirements for the Equipment Room Environment....................................................................................9-3

    9.2 Layout of Equipment Room............................................................................................................................9-4

    9.3 Construction of the Equipment Room.............................................................................................................9-4

    9.4 Cleanliness of the Equipment Room...............................................................................................................9-6

    9.5 Temperatu re and Humidity.............................................................................................................................9-79.6 Corrosive Gas Control Requirements.............................................................................................................9-8

    9.7 El ectromagnetic Requirements.......................................................................................................................9-8

    9.8 Antistatic Protection........................................................................................................................................9-9

    9.9 Lightning Protection and Grounding Requirements.......................................................................................9-9

    9.10 Power S upply..............................................................................................................................................9-11

    9.11 L ighting in the Equipment Room................................................................................................................9-15

    9.12 Protection System........................................................................................................................................9-15

    10 Grounding Spe cifications.....................................................................................................10-110.1 General Gro unding Specifications..............................................................................................................10-2

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission SystemInstallation Guide Contents

    Issue 02 (2008-09-10) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    iii

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    6/219

    10.2 Grounding Specifications for the Building.................................................................................................10-2

    10.3 Equipment Grounding Specifications.........................................................................................................10-2

    10.4 Grounding Specifications for Office Power................................................................................................10-3

    10.5 Grounding Specifications for Signal Cables...............................................................................................10-4

    10.6 Specifications for Managing Ground Cables..............................................................................................10-4

    11 The Requireme nts of Cabling and Bundling...................................................................11-111.1 The Req uirements of Cabling.....................................................................................................................11-2

    11.2 T he Requirements of Bundling...................................................................................................................11-2

    12 Engineering La bels................................................................................................................12-112.1 Introduction to Labels.................................................................................................................................12-2

    12.1.1 Materi al..............................................................................................................................................12-2

    12.1.2 Ty pe and Shape..................................................................................................................................12-2

    12.2 Information Carried on Labels....................................................................................................................12-412.2.1 For Po wer Cables...............................................................................................................................12-4

    12.2.2 For Signal Cables...............................................................................................................................12-4

    12.2.3 Remarks..............................................................................................................................................12-5

    12.3 Filling Infor mation on Labels.....................................................................................................................12-5

    12.3.1 Printin g Labels...................................................................................................................................12-5

    12.3.2 Writin g Labels....................................................................................................................................12-8

    12.4 Affixing Lab els...........................................................................................................................................12-8

    12.4.1 Affixin g the Label to the Signal Cable...............................................................................................12-9

    12.4.2 Affixin g the Label to the Power Cable.............................................................................................12-10

    12.5 Common En gineering Labels....................................................................................................................12-10

    12.5.1 Po wer Cables....................................................................................................................................12-11

    12.5.2 Extern al Alarm Cables.....................................................................................................................12-12

    12.5.3 Ethern et Cables................................................................................................................................12-13

    12.5.4 Fib ers Between Two Devices...........................................................................................................12-14

    12.5.5 Fiber T hat Connects the Device and the ODF.................................................................................12-16

    12.5.6 Trunk Cables....................................................................................................................................12-17

    12.5.7 Sub scriber Cables.............................................................................................................................12-20

    13 Binding Strap... .......................................................................................................................13-113.1 Binding Stra p...............................................................................................................................................13-2

    13.1.1 Archite cture........................................................................................................................................13-2

    13.1.2 Cut ting................................................................................................................................................13-2

    13.2 Bundling the Binding Strap.........................................................................................................................13-4

    13.2.1 Proced ures for Bundling the Binding Strap.......................................................................................13-4

    13.2.2 Ex pected Result..................................................................................................................................13-5

    13.2.3 Precautions.........................................................................................................................................13-6

    14 Making and Testing the Cable Connector........................................................................14-114.1 Making t he Connector for the Coaxial Cable..............................................................................................14-2

    14.1.1 Making the Straight BNC Male Connector for the Coaxial Cable.....................................................14-2

    Contents

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    iv Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    7/219

    14.1.2 Making the L9-M Male Connector for the Coaxial Cable.................................................................14-7

    14.1.3 Making the Straight SMB Female Connector for the Coaxial Cable...............................................14-11

    14.2 Continuity Test of the Coaxial Cable........................................................................................................14-15

    A Glossary.....................................................................................................................................A-1

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission SystemInstallation Guide Contents

    Issue 02 (2008-09-10) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    v

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    8/219

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    9/219

    Figures

    Figure 1-1 A ppearance of OptiX 155/622H.........................................................................................................1-2

    Figure 1-2 Installation flow..................................................................................................................................1-3

    Figure 1-3 St raighten the tongues......................................................................................................................1-11

    Figure 1-4 Re move the cover.............................................................................................................................1-11

    Figure 1-5 Re move the surrounded wooden board............................................................................................1-12

    Figure 1-6 Unpacking the chassis......................................................................................................................1-13

    Figure 1-7 Bo ard carton.....................................................................................................................................1-15

    Figure 2-1 Fixing the chassis................................................................................................................................2-2

    Figure 2-2 O ptiX 155/622H that is installed in a series-C integrated cabinet......................................................2-3

    Figure 2-3 Fixing the mounting ears....................................................................................................................2-5

    Figure 2-4 Fixing the chassis................................................................................................................................2-5

    Figure 2-5 Installing the chassis along the slide rail............................................................................................2-6

    Figure 2-6 Re moving the screws from the side of the chassis ............................................................................2-7

    Figure 2-7 Fa stening the chassis on the mounting ears........................................................................................2-7Figure 2-8 Fastening the captive nuts to the standing posts.................................................................................2-8

    Figure 2-9 Installing the OptiX 155/622H in an ETSI 600 mm-deep cabinet with the mounting ears facing upward...................... .........................................................................................................................................................2-9

    Figure 2-10 Fixing the mounting ear of the chassis...........................................................................................2-10

    Figure 2-11 Fixing the chassis to the cabinet.....................................................................................................2-11

    Figure 2-12 Installing the OptiX 155/622H in a 19-inch cabinet with the mounting ears facing downward...................... .......................................................................................................................................................2-12

    Figure 2-13 Fixing the mounting ear to the chassis...........................................................................................2-13

    Figure 2-14 Structure of the rotary subrack.......................................................................................................2-14

    Figure 2-15 Putting flat the suspension bracket.................................................................................................2-15Figure 2-16 Fixing the chassis............................................................................................................................2-15

    Figure 2-17 Positioning hole at the bottom of the OptiX 155/622H chassis.....................................................2-16

    Figure 2-18 Fixing the chassis ...........................................................................................................................2-16

    Figure 2-19 O ptiX 155/622H in an ETSI 300 mm-deep cabinet.................................................. .....................2-18

    Figure 2-20 O ptiX 155/622H installed in the type-B open rack................................................................... .....2-20

    Figure 2-21 O ptiX 155/622H equipment in the ONU512 and ONU1000A..................... .................... .............2-21

    Figure 2-22 Positioning the suspension bracket.................................................................................................2-22

    Figure 2-23 Inserting expansion bolts and expansion nuts................................................................................2-23

    Figure 2-24 Positioning the suspension bracket.................................................................................................2-23

    Figure 2-25 Schematic diagram for wall mounting............................................................................................2-24

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission SystemInstallation Guide Figures

    Issue 02 (2008-09-10) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    vii

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    10/219

    Figure 2-26 OptiX 155/622H that is installed on the wall by using the rotary subrack.....................................2-25

    Figure 2-27 Hanging the chassis on the suspension bracket..............................................................................2-26

    Figure 2-28 Fixing the chassis............................................................................................................................2-26

    Figure 2-29 OptiX 155/622H installed on the wall by using the suspension bracket........................................2-27

    Figure 3-1 Outline drawing of the OptiX 155/622H chassis................................................................................3-2

    Figure 3-2 Al lowing 350 mm clearance above the chassis..................................................................................3-4

    Figure 3-3 Determining the locations for the installation holes...........................................................................3-5

    Figure 3-4 Ex pansion bolt assembly............................................................................................ ........................3-6

    Figure 3-5 Pu tting the expansion bolt assembly into the hole.............................................................................3-6

    Figure 3-6 Re moving the bolt assembly...............................................................................................................3-7

    Figure 3-7 Se curing the hangers...........................................................................................................................3-8

    Figure 3-8 Fixing the chassis................................................................................................................................3-9

    Figure 3-9 Fixing the handle..............................................................................................................................3-10

    Figure 3-10 Installation result............................................................................................................................3-11Figure 3-11 Connecting the cables of the UPM ................................................................................................3-12

    Figure 3-12 Wall-mounted OptiX 155/622H chassis.........................................................................................3-13

    Figure 4-1 Fr ont view of the power box ..............................................................................................................4-2

    Figure 4-2 Re ar view of the power box ...............................................................................................................4-3

    Figure 4-3 Po wer cable and management cable ..................................................................................................4-4

    Figure 4-4 Storage battery pallet..........................................................................................................................4-5

    Figure 4-5 Storage battery box.............................................................................................................................4-5

    Figure 4-6 Th e pallet removed two partition bars................................................................................................4-7

    Figure 4-7 Ba tteries installed in the pallet ...........................................................................................................4-8Figure 4-8 Installing the mounting ears (in a 19-inch cabinet)............................................................................4-9

    Figure 4-9 Installing the mounting ears (in an ETSI cabinet)..............................................................................4-9

    Figure 4-10 Installing the power box ................................................................................................................4-10

    Figure 4-11 Installing the expansion bolt and expansion tube...........................................................................4-11

    Figure 4-12 Securing the OptiX 155/622H chassis ...........................................................................................4-11

    Figure 4-13 Fixing the suspension bracket ........................................................................................................4-12

    Figure 4-14 Connecting the DC power to the system........................................................................................4-13

    Figure 4-15 Cable connection of the integrated wall-mounting cabinet ...........................................................4-14

    Figure 5-1 PG ND cable........................................................................................................................................5-2

    Figure 5-2 Installation result of the PGND cable on the equipment side of the OptiX 155/622H......................5-3

    Figure 5-3 Po wer cable ........................................................................................................................................5-4

    Figure 5-4 Co nnection of the power cable...........................................................................................................5-5

    Figure 5-5 St ructure of the 75-ohm E1 cable.......................................................................................................5-6

    Figure 5-6 12 0/100-ohm E1/T1 cable..................................................................................................................5-8

    Figure 5-7 Installing the cable with a DB78 connector .....................................................................................5-10

    Figure 5-8 E3 /T3/STM-1e cable........................................................................................................................5-11

    Figure 5-9 Co nnector of the Ethernet cable.......................................................................................................5-13

    Figure 5-10 Framed E1 cable on the FP2D board .............................................................................................5-15

    Figure 5-11 Installing the Framed E1 cable.......................................................................................................5-19

    Figures

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    viii Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    11/219

    Figure 5-12 Standard shielded network cable....................................................................................................5-20

    Figure 5-13 Position of the NM interface on the SCB board.............................................................................5-20

    Figure 5-14 Installing the NM cable..................................................................................................................5-21

    Figure 5-15 Structure of the external clock cable..............................................................................................5-22

    Figure 5-16 Structure of the transparent data/housekeeping cable....................................................................5-24

    Figure 5-17 Installing transparent data/housekeeping cable .............................................................................5-27

    Figure 6-1 Fi ber connectors................................................................................................................................. 6-3

    Figure 6-2 Ca ble holes on the cabinet .................................................................................................................6-5

    Figure 6-3 Installing the fiber jumper ................................................................................................................. 6-6

    Figure 6-4 At taching a label.................................................................................................................................6-6

    Figure 7-1 Or derwire interface ............................................................................................................................7-2

    Figure 7-2 Fixing the orderwire phone set in the cabinet ....................................................................................7-3

    Figure 7-3 Po sition for installing the orderwire phone in the open rack .............................................................7-4

    Figure 8-1 Figure 12-1 Positions of the terminals in the DC distribution box.....................................................8-4Figure 9-1 La yout of the equipment room........................................................................................................... 9-4

    Figure 9-2 In ternal partition wall of the equipment room....................................................................................9-6

    Figure 9-3 Tr ansient noises................................................................................................................................9-14

    Figure 11-1 Cable bundling................................................................................................................................11-3

    Figure 12-1 Label for signal cables....................................................................................................................12-3

    Figure 12-2 Label for power cables....................................................................................................................12-4

    Figure 12-3 Label for signal cables....................................................................................................................12-5

    Figure 12-4 Template of label............................................................................................................................12-6

    Figure 12-5 Warning prompt before printing.....................................................................................................12-7Figure 12-6 Writing direction of the label..........................................................................................................12-8

    Figure 12-7 Sticking the label onto proper position of the signal cable.............................................................12-9

    Figure 12-8 A ppearance of affixed labels on power cables.............................................................................12-10

    Figure 12-9 Example of the labels on the DC power cable..............................................................................12-12

    Figure 12-10 Example of the label on the alarm cable.....................................................................................12-13

    Figure 12-11 Example of the label on the Ethernet cable................................................................................12-14

    Figure 12-12 Example of the label on the fiber jumper between two devices.................................................12-15

    Figure 12-13 Example of the label on the fiber jumper between the device and the ODF..............................12-17

    Figure 12-14 Example of the label on the trunk cable between two devices...................................................12-19

    Figure 12-15 Example of the label on the trunk cable between the device and the DDF................................12-19

    Figure 12-16 Example of the label on the subscriber cable.............................................................................12-21

    Figure 13-1 Binding strap...................................................................................................................................13-2

    Figure 13-2 Install binding strap on cutterbar....................................................................................................13-3

    Figure 13-3 Cut the binding strap.......................................................................................................................13-3

    Figure 13-4 Step 2 of bundling optical fiber......................................................................................................13-5

    Figure 13-5 Step 3 of bundling optical fiber......................................................................................................13-5

    Figure 13-6 Bundling result of optical fiber.......................................................................................................13-5

    Figure 14-1 B NC connector and the coaxial cable.............................................................................................14-3

    Figure 14-2 Stripping off the coaxial cable........................................................................................................14-3

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission SystemInstallation Guide Figures

    Issue 02 (2008-09-10) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    ix

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    12/219

    Figure 14-3 Size of the straight BNC male connector and the stripping size of the coaxial cable....................14-4

    Figure 14-4 Leading the heat shrink tube and crimping sleeve through............................................................14-5

    Figure 14-5 Unfolding the external conductor of the coaxial cable...................................................................14-5

    Figure 14-6 Inserting the straight BNC male connector into the coaxial cable.................................................14-5

    Figure 14-7 Welding the internal conductor......................................................................................................14-6

    Figure 14-8 Crimping the external conductor....................................................................................................14-6

    Figure 14-9 Blowing the heat shrink tube..........................................................................................................14-6

    Figure 14-10 Installing the components of the coaxial cable.............................................................................14-7

    Figure 14-11 L9-M connector and the coaxial cable..........................................................................................14-8

    Figure 14-12 Stripping off the coaxial cable......................................................................................................14-8

    Figure 14-13 Size of the connector and the stripping size of the coaxial cable.................................................14-9

    Figure 14-14 Leading the protection tube and crimping sleeve through............................................................14-9

    Figure 14-15 Unfolding the external conductor of the coaxial cable.................................................................14-9

    Figure 14-16 Inserting the coaxial connector into the coaxial cable................................................................14-10Figure 14-17 Welding the internal conductor..................................................................................................14-10

    Figure 14-18 Crimping the external conductor................................................................................................14-10

    Figure 14-19 Rotating the protection tube tight...............................................................................................14-11

    Figure 14-20 Components of the straight SMB female connector and the coaxial cable................................14-12

    Figure 14-21 Stripping off the coaxial cable....................................................................................................14-12

    Figure 14-22 Size of the connector and the stripping size of the coaxial cable...............................................14-13

    Figure 14-23 Leading the crimping sleeve through.........................................................................................14-13

    Figure 14-24 Unfolding the external conductor of the coaxial cable...............................................................14-13

    Figure 14-25 Inserting the coaxial connector into the coaxial cable................................................................14-13Figure 14-26 Welding the internal conductor..................................................................................................14-14

    Figure 14-27 Crimping the external conductor................................................................................................14-14

    Figure 14-28 Installing the components of the coaxial cable...........................................................................14-14

    Figure 14-29 Testing the coaxial cable............................................................................................................14-15

    Figures

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    x Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    13/219

    Tables

    Table 1-1 Ins tallation tools...................................................................................................................................1-4

    Table 1-2 Me ters...................................................................................................................................................1-8

    Table 1-3 Ite ms to be checked before the equipment installation......................................................................1-16

    Table 4-1 De scription of the Indicators ...............................................................................................................4-3

    Table 4-2 Pin definitions of the management interface .......................................................................................4-3Table 5-1 Pin assignments of the 75-ohm E1 cable............................................................................................. 5-7

    Table 5-2 Pin assignments of the 120/100-ohm E1/T1 cable...............................................................................5-8

    Table 5-3 Co nnection relation of the straight-through cable..............................................................................5-13

    Table 5-4 Co nnection relation of the crossover cable........................................................................................5-13

    Table 5-5 Pin assignment of the 75-ohm Framed E1 cable................................................................................5-15

    Table 5-6 Pin assignment of the 120-ohm Framed E1 cable..............................................................................5-17

    Table 5-7 Pin assignment of the SYNC 1/2 external clock interface.................................................................5-22

    Table 5-8 Pin assignment information of the interface integrating the COM2 and ALM OUT1/MODEM (F)interfaces....... ......................................................................................................................................................5-24

    Table 5-9 Pin assignment information of the interface integrating the COM3 and OUT2 interfaces................5-25

    Table 5-10 Pin assignment information of the interface integrating the COM4 (F3) and IN1/2 interfaces.......5-25

    Table 5-11 Pin assignment information of the interface integrating the F2 and IN3/4 interfaces.....................5-26

    Table 9-1 Co nstruction requirements for the equipment room............................................................................ 9-4

    Table 9-2 Lim its of dust diameter and density in the equipment room................................................................9-6

    Table 9-3 Lim ited density of harmful gas in the equipment room.......................................................................9-6

    Table 9-4 Re quirements for temperature and humidity........................................................................................9-7

    Table 9-5 Co rrosive gas content specification..................................................................................................... 9-8

    Table 9-6 Ele ctromagnetic specification..............................................................................................................9-8

    Table 9-7 Re quirements for lightning protection and grounding.......................................................................9-10Table 9-8 DC charge/discharge status and voltage requirements.......................................................................9-12

    Table 9-9 DC voltage specifications..................................................................................................................9-13

    Table 10-1 General grounding specifications.....................................................................................................10-2

    Table 10-2 Grounding specifications for the building........................................................................................10-2

    Table 10-3 Equipment grounding specifications................................................................................................10-3

    Table 10-4 Grounding specifications for office power.......................................................................................10-3

    Table 10-5 Grounding specifications for signal cables......................................................................................10-4

    Table 10-6 Specifications for managing ground cables.....................................................................................10-5

    Table 12-1 Standard typeface for handwriting...................................................................................................12-8

    Table 12-2 Information on labels affixed to the DC power cables...................................................................12-11

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission SystemInstallation Guide Tables

    Issue 02 (2008-09-10) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    xi

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    14/219

    Table 12-3 Information on labels affixed to the external cables of the alarm box...........................................12-12

    Table 12-4 Information on labels affixed to the Ethernet cables......................................................................12-13

    Table 12-5 Information on labels affixed to the fiber between two devices....................................................12-14

    Table 12-6 Information on labels affixed to the fiber between the device and the ODF.................................12-16

    Table 12-7 Information on labels affixed to the trunk cable between two devices..........................................12-18

    Table 12-8 Information on labels affixed to the trunk cable between the device and the DDF.......................12-18

    Table 12-9 Information on labels affixed to the subscriber cables...................................................................12-20

    Table 14-1 Stripping sizes of the common coaxial cables.................................................................................14-4

    Tables

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    xii Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    15/219

    About This Document

    OverviewThis document describes the procedures for installing the OptiX 155/622H(Metro1000)(hereinafter referred to as the OptiX 155/622H), including the installation of the chassis,

    integrated wall-mounting chassis, UPM power system, and fibers/cables. This document alsodescribes the grounding specifications for the OptiX 155/622H.

    Related VersionsThe following table lists the product versions related to this document.

    Product Name Version

    OptiX 155/622H V300R005

    Intended AudienceThe intended audience of this document is:

    Hardware installation engineer

    OrganizationThe manual is organized as follows:

    Chapter Description

    1 Installation Preparation This chapter describes the appearance, installation flow,and installation preparation of the OptiX 155/622H.

    2 Installing the Chassis This chapter describes how to install the OptiX 155/622H.

    3 Installing an IntegratedWall-Mounting Chassis

    This chapter describes how to install the integrated wall-mounting chassis.

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission SystemInstallation Guide About This Document

    Issue 02 (2008-09-10) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    1

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    16/219

    Chapter Description

    4 Installing the UPM PowerSystem

    This chapter describes how to install the UPM power system, and the precautions for the installation.

    5 Installing and Routing theCables

    This chapter describes how to install the fibers/cables, andthe precautions for the installation.

    6 Installing and RoutingFiber Jumpers

    This chapter describes the connection relation andinstallation procedures of fiber jumpers, and the precautionsfor the installation.

    7 Installing the OrderwirePhone

    This chapter describes how to install the orderwire phone.

    8 Powering On and Checkingthe Equipment

    This chapter describes the operations required to power onthe OptiX 155/622H.

    9 Operation EnvironmentRequirements

    This appendix describes the environment required for thenormal operation of the OptiX 155/622H.

    10 Grounding Specifications This appendix describes the grounding specifications for the normal operation of the OptiX 155/622H.

    11 The Requirements of Cabling and Bundling

    This appendix describes the plan for routing and bundlingthe cables, and the relevant precautions.

    12 Engineering Labels This appendix describes the structure of the engineeringcable labels and the rules to follow when filling the labels.

    13 Binding Strap This appendix describes the structure of the binding strapfor fiber jumpers, the method of using the binding straps,and the relevant precautions.

    14 Making and Testing theCable Connector

    This appendix lists the methods for connecting the BNC,SMB, and L9 connectors to a coaxial cable and the methodfor testing the continuity of the cable.

    A Glossary This appendix lists the terms used in this document.

    Conventions

    Symbol Conventions

    The following symbols may be found in this d ocument. They are defined as follows.

    Symbol Description

    DANGER

    Indicates a hazard with a high level of risk which, if not avoided,will result in death or serious injury.

    About This Document

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    2 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    17/219

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    18/219

    GUI Conventions

    Convention Description

    Boldface Buttons, menus, parameters, tabs, window, and dialog titles are inboldface . For example, click OK .

    > Multi-level menus are in boldface and separated by the ">" signs. For example, choose File > Create > Folder .

    Keyboard Operation

    Format Description

    Key Press the key. For example, press Enter and press Tab .

    Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt+A means thethree keys should be pressed concurrently.

    Key 1, Key 2 Press the keys in turn. For example, pressing Alt, A means the two keysshould be pressed in turn.

    Mouse Operation

    Action Description

    Click Select and release the primary mouse button without moving the pointer.

    Double-click Press the primary mouse button twice continuously and quickly withoutmoving the pointer.

    Drag Press and hold the primary mouse button and move the pointer to a certain position.

    Update HistoryUpdates between document versions are cumulative. Therefore, the latest document versioncontains all updates made to previous versions.

    Updates in Issue 02 (2008-09-10)l The name of this document is modified.

    l Certain known defects are fixed.

    Updates in Issue 01 (2008-07-01)

    Initial field trial release.

    About This Document

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    4 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    19/219

    1 Installation PreparationAbout This Chapter

    This chapter describes the tools and docu ments that are required for installing the OptiX155/622H, and the installation procedures.

    1.1 About the OptiX 155/622HThis section d escribes the structure, dimens ions, and installation mode of the OptiX 155/622H.

    1.2 Installatio n FlowCorrect instal lation flow is the key to ensuring a smooth and trouble-free installation.

    1.3 Required Documents and ToolsTo ensure the smooth installation of the equipment, the necessary documentation, tools andinstruments m ust be available.

    1.4 Installatio n Environment Check The OptiX 155/622H can operate normally only when the equipment room is in good condition.The OptiX 15 5/622H is protected against lightning and interference only when it is properlygrounded.

    1.5 Unpackin g the EquipmentThis section directs you to unpack cabinets a nd boards. Unpack integrated subrack and other cases in the same way.

    1.6 Checking the EquipmentThe cabinet, boards, network management computer and internal cables need to be checked

    before the equipment installation.

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission SystemInstallation Guide 1 Installation Preparation

    Issue 02 (2008-09-10) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    1-1

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    20/219

    1.1 About the OptiX 155/622HThis section describes the structure, dimensions, and installation mode of the OptiX 155/622H.

    The OptiX 155/622H is integrated case-shaped equipment, which consists of the chassis, fan board, power board, and board area.

    There are a number of modes that can be used for installing the OptiX 155/622H.

    You can choose one of the following modes based on your requirements:

    l Installation in the OptiX 155/622H-C series integrated cabinetl Installation in the 600 mm-deep ETSI cabinetl Installation in the 19-inch standard cabinetl Installation in the 300 mm-deep ETSI cabinetl

    Installation in the open rack l Installation in the cabinet of the access network l Wall mountingl Desktop mountingl Installation in the integrated wall-mounting chassis

    The dimensions of the OptiX 155/622H are 436 mm (width) x 293 mm (depth) x 86 mm (height).When the OptiX 155/622H is fully configured, the equipment weight is 10 kg. The maximum

    power consumption is 100 W. For the equipment structure, see Figure 1-1 .

    Figure 1-1 Appearance of OptiX 155/622H

    1 Installation Preparation

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    1-2 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    21/219

    1.2 Installation FlowCorrect installation flow is the key to ensuring a smooth and trouble-free installation.

    Figure 1-2 shows the procedures for installing the OptiX 155/622H.

    Figure 1-2 Installation flow

    Start

    Installationpreparation

    See Chapter 1

    Installing the UPMpower system

    Power-on check

    See Chapter 8

    Installing androuting the cables

    See Chapter 5

    End

    Installing and routingfiber jumpers

    See Chapter 6

    Installing theorderwire phoneSee Chapter 7

    Installing the transparentdata and housekeeping

    cableSee section 5.9

    Installing the PGND cable See section 5.1

    Installing the FramedE1 cable

    See section 5.6

    Installing the NM cable See section 5.7

    Installing the externalclock cable

    See section 5.8

    See Chapter 4

    Installing thechassis

    See Chapter 2

    Installing anintegrated wall-

    mounting chassis

    See Chapter 3

    Installing E1/T1 cables See section 5.3

    Installing E3/T3/STM-1ecables

    See section 5.4

    Installing Ethernetcables

    See section 5.5

    Installing the power cable See section 5.2

    1.3 Required Documents and Tools

    To ensure the smooth installation of the equipment, the necessary documentation, tools andinstruments must be available.

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission SystemInstallation Guide 1 Installation Preparation

    Issue 02 (2008-09-10) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    1-3

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    22/219

    1.3.1 Technical DocumentsThe relevant technical documentation must be available before you install the equipment.

    1.3.2 Tools and Instruments

    The required tools and instruments include the general tools, special tools, general instrumentsand special instruments.

    1.3.1 Technical DocumentsThe relevant technical documentation must be available before you install the equipment.

    l Written contracts, agreements and complete equipment configuration tables, provided bythe user.

    l Design specifications of equipment room, detailed engineering drawings and sketches, provided by the user.

    l The installation guide provided by Huawei.

    1.3.2 Tools and InstrumentsThe required tools and instruments include the general tools, special tools, general instrumentsand special instruments.

    lists of the tools and instruments used in installation, refer to Table 1-1 and Table 1-2

    Table 1-1 Installation tools

    Name and Function Appearance Name and Function Appearance

    Steel tape:Used to measure thelength less than 5 m.

    Measuring tape:Used to measure thelength greater than 5m.

    Ruler (1 m):

    Used to measure thelength less than 1 m.

    Spirit level:

    Used to check thelevelness.

    Marker pen:

    Used to make markswhen you draw lines.

    Pencil:

    Used to take notes.

    Powder marker:

    Used to make marks.

    Hand-held electricdrill:

    Used to drill holes.

    1 Installation Preparation

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    1-4 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    23/219

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    24/219

    Name and Function Appearance Name and Function Appearance

    Cord end pliers:

    Used to crimp the cord

    end terminal adaptedto a power cable witha small cross section.

    Pliers:

    Used to fold, bend, or

    cut wires.

    Wire stripper:

    Used to remove theinsulation layer and

    jacket from acommunication cablewith a small crosssection.

    Crimping pliers:

    Used to crimp themetal jacket at the endof a coaxial cableassembly.

    RJ-45 connector crimping pliers:

    Used to crimp theRJ-45 connectors of telephone lines andnetwork cables.

    Wire punchdown tool:

    Used to installsubscriber lines andtrunk lines onto thecable distributionframe. This tool is alsoused to connect cablesand modules to thecable distributionframe.

    Handsaw:Used to cut feeders.

    File:Used to smoothen thecut edge of a feeder.

    Crowbar:

    Used to carry, lift, or lay down a device.

    Rubber hammer:

    Used to knock or shape a workpiece.

    Brush:Used to clean sundriessuch as dust andscraps.

    Tweezers:Used to pick up lightand small objects.

    1 Installation Preparation

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    1-6 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    25/219

    Name and Function Appearance Name and Function Appearance

    Label:

    Used to mark

    equipment and cables.This facilitatesequipment installationand maintenance.

    - Tape

    Solder wire:

    Used together with anelectric soldering ironfor soldering.

    Electric solderingiron:

    Used to solder aconductor with a smallcross section to aconnector.

    Antistatic wrist strap:Used to prevent theelectrostatic discharge(ESD) when you touchor operate a device or component.

    Antistatic gloves:Used to prevent theESD from damaging a

    board or other electrostatic sensitivedevices (ESSDs).

    Ladder:

    Used for work atheights.

    Fiber cleaning tools:

    Used to clean fibers.

    Telescope Hoisting tools:

    Used to hoist outdoor devices andcomponents.

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission SystemInstallation Guide 1 Installation Preparation

    Issue 02 (2008-09-10) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    1-7

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    26/219

    Table 1-2 Meters

    Name and Function AppearanceName andFunction Appearance

    Optical attenuator:Used to adjust the

    power level of anoptical signal byadjusting theattenuation.

    Optical power meter:Used to test theoptical power.

    Spectrum analyzer:

    Used to identify,analyze, and monitor the signals of opticalwaveform.

    Multimeter:

    Used to measure theinsulation of acabinet, connectionof a cable, andelectric performanceindexes of a device,such as voltage,current, andresistance.

    SDH analyzer:

    Used to test all the

    indexes of the SDHnetwork.

    2 Mbit/s bit error tester:

    Used to measure the bit error rate (BER)of 2-Mbit/s signalsduring transmission.

    Ground resistancemeter:

    Used to measure theground resistance.

    500 VM ohmmeter:

    Used to measure theinsulation resistance.

    Compass GPS

    1 Installation Preparation

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    1-8 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    27/219

    NOTE

    The special tools and instruments shall be supplied by the party specified in the contract. The general toolsand instruments are provided by the installer. All instruments should be tested and calibrated before use.

    1.4 Installation Environment CheckThe OptiX 155/622H can operate normally only when the equipment room is in good condition.The OptiX 155/622H is protected against lightning and interference only when it is properlygrounded.

    It is recommended that you read through Appendix 9 Operation EnvironmentRequirements and Appendix 10 Grounding Specifications , and then check the equipmentroom accordingly before the construction. Reconstruct the places in the equipment room that donot comply with the relevant requirements to prevent troubles that may occur in later installationand maintenance.

    1.5 Unpacking the EquipmentThis section directs you to unpack cabinets and boards. Unpack integrated subrack and other cases in the same way.

    1.5.1 Unpacking the CabinetThis procedure describes how to unpack the cabinet so that you can proceed to the nextinstallation procedure.

    1.5.2 Unpack ing the ChassisThis section describes how to unpack the chassis.

    1.5.3 Unpack ing BoardsIf the board is separately delivered, unpack the board before you install it.

    1.5.4 Require ments of InspectionThe received goods must be inspected against the Packing List item by item.

    1.5.1 Unpacking the CabinetThis procedure describes how to unpack the cabinet so that you can proceed to the nextinstallation procedure.

    Prerequisite None

    Tools, Equipment and Materialsl Spanner

    l Screwdr iver

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission SystemInstallation Guide 1 Installation Preparation

    Issue 02 (2008-09-10) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    1-9

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    28/219

    Precautions

    WARNING

    Since the cabinet is rather heavy, erecting the cabinet improperly may cause personal injuries.

    CAUTION

    l The wooden case is direction-oriented and should not be placed upside down. Otherwise,fatal damages would be caused to the product.

    l

    During the transportation and handling of products, spare parts or components, make sure toavoid the collision of such things against doors, walls or shelves.

    l To avoid equipment damage in the course of moving, move the packing box to the equipmentroom or a place near the equipment room before unpacking.

    l In the process of transporting, handling and installing the equipment, it is forbidden to reachthe uncoated metal surface of equipment parts or components with sweaty or dirty gloves.

    CAUTION

    l When handling the cabinet, both hands should hold on the solid places such as the base, theupper cable rack or bone frame, do not apply too much force on such places with poor rigidityas cable support, cable fixing beam, so as to avoid any damage to the cabinet or any accident.

    l Remove the lining board of the rack at the place where the cabinet is to be installed.Otherwise, the signal lines and boards may be damaged during transportation or handling.

    Procedure

    Step 1 Move the packing box to the equipment room or a place nearby before unpacking it.

    Step 2 Check the outer package. Stop unpacking immediately, if there isl Serious damage to the outer package.

    l Water on the outside packaging box

    l Rust/water on the equipment.

    Find the cause. Then, feed back the information to the local representative office.

    Step 3 Insert one end of the ejector lever into the hold for the tongue of the wooden case cover.

    Step 4 Turn the ejector lever to straighten the tongue, as shown in Figure 1-3 . Or use a screwdriver or a hammer to operate the tongue.

    1 Installation Preparation

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    1-10 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    29/219

    Figure 1-3 Straighten the tongues

    Spanner Tongue

    WoodenboardSteeledge

    Step 5 After straightening all the tongues on the cover, remove the cover, as shown in Figure 1-4 .

    Figure 1-4 Remove the cover

    Step 6 Straighten all the tongues that join the wooden boards around the wooden case.

    Step 7 Remove the wooden boards, as shown in Figure 1-5 .

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission SystemInstallation Guide 1 Installation Preparation

    Issue 02 (2008-09-10) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    1-11

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    30/219

    Figure 1-5 Remove the surrounded wooden board

    Step 8 Take the cabinet out of the packing box.

    Step 9 Remove the plastic packing of the cabinet and erect the cabinet.

    WARNING

    At least three persons are required to erect the cabinet: one person to hold the cabinet bottom,and two persons to lift the top of the cabinet and make the cabinet vertical.

    Step 10 Compare the equipment inside with the packing list. If there are any discrepancies, notify thelocal customer service center.

    NOTE

    To protect the equipment , place the already unpacked equipment indoor. Take photos of the site storageenvironment, the rusted or corroded equipment/packing box/packaging materials. Properly keep these

    photos and store the packing box/packing materials.

    ----End

    1.5.2 Unpacking the ChassisThis section describes how to unpack the chassis.

    PrerequisiteThe chassis must be delivered to the installation site.

    Tools/Instrumentsl ESD gloves

    1 Installation Preparation

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    1-12 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    31/219

    l Diagonal pliers

    l Paper knife

    Required/As Needed

    Optional

    Procedure

    Step 1 Move the packaging case to the equipment room.

    Step 2 Check the packaging case. Stop unpacking in the following cases:l Serious damage to the outer package

    l Water on the outside packaging box

    l

    Rust/water on the equipmentFind out the cause, and provide feedback to the local office of Huawei.

    Step 3 Check the equipment configuration according to the label on the carton, and make records.

    Step 4 Use a diagonal pliers to cut the binding straps. Use a paper knife to cut the adhesive tape alongthe edge of the carton cover. Do not cut in too deep; otherwise, the goods inside the carton may

    be damaged. See Figure 1-6 .

    Figure 1-6 Unpacking the chassis

    1

    3

    2

    7

    56

    4

    1. Carton 2. Packing strap 3. Carton label 4. Equipment carton

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission SystemInstallation Guide 1 Installation Preparation

    Issue 02 (2008-09-10) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    1-13

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    32/219

    5. Foam plate 6. Equipment 7. Moisture barrier bag

    Step 5 Open the carton, and take out the chassis packaging case.

    Step 6 Open the chassis packaging case, and take out the chassis. Check whether the chassis is damaged.

    ----End

    1.5.3 Unpacking BoardsIf the board is separately delivered, unpack the board before you install it.

    Prerequisite None

    Tools, Equipment and Materialsl

    ESD wrist strap or ESD glovesl Diagonal pliersl Paper knife

    Background InformationGenerally, the board has been installed in the subrack properly before delivery and is shippedtogether with the subrack. If a carton is used to pack boards for shipping, unpacking and checkingare necessary when the boards arrive at the destination. (Generally, a carton is used when boardsare required for capacity expansion.) The boards are put into shielding bags for transportation.Take ESD protection measures when you unpack the boards to prevent damage to them.

    Precautions

    CAUTION

    Electronic circuits and components are extremely sensitive to electrostatic discharge (ESD).When handling circuit boards, make sure that you wear a securely grounded ESD wrist strap or ESD gloves, and only hold the edge of boards during operation.

    ProcedureStep 1 Wear a securely grounded ESD wrist strap(or ESD gloves) and make sure that it is securely

    grounded.

    Step 2 Cut the straps with diagonal pliers and use a paper knife to split the tape along the seam betweenthe cover and the box body. See Figure 1-7 .

    CAUTION

    Do not cut too deep into the carton with the paper knife. Otherwise, the knife might scratch the

    articles inside.

    1 Installation Preparation

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    1-14 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    33/219

    Figure 1-7 Board carton

    StrapCarton label

    Pressure-sensitiveadhesive tape

    Foam plate Label on theboard box

    Shielding bagBoard

    Board box

    Board box

    Cushon foam

    NOTE

    l Each board is packed in both a cushion foam and an shielding bag. Keep the bags properly. They can be used later for keeping the boards or packing the damaged boards returned for repair.

    l The ambient temperature and humidity may have an impact on the boards. In each shielding bag thereis a small bag of desiccant, which shall not be thrown away.

    l Wait for at least 30 minutes before unpacking if the board is just moved from a cold, dry place to awarm, damp place. Otherwise, moisture will condense on the board surface and damage thecomponents.

    Step 3 Open the carton and check whether the number and type of the boards are consistent with whatis marked on the carton label.

    Step 4 Check that there is no evident damage on the board package.

    Step 5 Open the board box and take the board out of the shielding bag.l Hold the bottom of the shielding bag with the left hand.

    l Take the board out of the bag gently by its front panel with the right hand.

    l Do not touch any electronic component on the board surface to avoid damage.l Keep the bags properly.

    Step 6 Check whether any board is physically damaged. If any board damage is found, contact Huawei.

    Step 7 If no problem is found, put the board back into the board box and put it in the place specified by the customer.

    l If you are going to install the board right after unpacking, place the board on an antistaticsurface to discharge the static electricity.

    l If you are going to install the board at a later time, pack the board using the original materialsand place them at a cool dry place without direct sunshine or strong electromagnetic radiation.

    ----End

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission SystemInstallation Guide 1 Installation Preparation

    Issue 02 (2008-09-10) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    1-15

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    34/219

    1.5.4 Requirements of InspectionThe received goods must be inspected against the Packing List item by item.

    l After the goods are inspected complete and intact, both the engineering supervisor and thecustomer must sign the Packing List. After that, the customer takes over the goods.

    l During the inspection, if some equipment is stated undelivered in the Packing List, directlyreport the situation to the order management engineer of the local office of Huawei for subsequent handling. Both the engineering supervisor and the customer shall sign thePacking List to confirm the situation.

    l If any short, wrong, extra or damaged equipment is found during the inspection, both partiesshall sign the Unpacking Memo and the Packing List. The project supervisor shall fill inthe Equipment Problem Report and send it to the order management engineer of the localoffice of Huawei within three days.

    1.6 Checking the EquipmentThe cabinet, boards, network management computer and internal cables need to be checked

    before the equipment installation.

    Table 1-3 lists the items to be checked before the equipment installation.

    Table 1-3 Items to be checked before the equipment installation

    Item Sub-Item Requirements

    Cabinet andchassis

    Appearance Neat, no scratch or disrepair, and no loosenedcomponents.

    Inside part No foreign items or water stain.

    Internal cables Neatly bundled. No cable is scattered, loosened, or damaged.

    Silkscreen Clear.

    Connectioncomponent

    The connection components are installed properly, withthe pins neat.

    Boards Appearance Neat, no scratch or disrepair, no loosened components.

    Quantity Consistent with that on the delivery list.

    Installationcompact disk

    The required software installation compact disks areintact.

    Internal cables Appearance Wiring is complete, reasonable and neat.

    Connectors Firm, correct, and no float insertion.

    1 Installation Preparation

    OptiX 155/622H(Metro1000) STM-1/STM-4/STM-16MSTP Optical Transmission System

    Installation Guide

    1-16 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    Issue 02 (2008-09-10)

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    35/219

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    36/219

  • 8/12/2019 Huawei OptiX Metro 1000 Installation Guide(V300R005)

    37/219

    2 Installing the ChassisAbout This Chap ter

    Choose the p roper method for installing the OptiX 155/622H depending on the actual situation.This chapter describes how to install an independent chassis.

    CAUTION

    Do not place any item heavier than 8 kg on the chassis.

    2.1 Installing the OptiX 155/622H Chassis in a Series-C Integrated CabinetThis section describes how to install the OptiX 155/622H in a series-C integrated cabinet .

    2.2 Installing the OptiX 155/622H Chassis in an ETSI 600 mm-Deep Cabinet or a 19-InchCabinetFour modes can be used to install the OptiX 155/622H in an ETSI 600 mm-deep cabinet or a19-inch cabinet.

    2.3 Installing the OptiX 155/622H Chassis in an ETSI 300 mm-Deep CabinetThis section describes how to install the OptiX 155/622H in an ETSI 300 mm-deep cabinet.

    2.4 Installing the OptiX 155/622H Chassis in the Open Rack

    This topic describes how to install the OptiX 155/622H in the open rack.2.5 Installing the OptiX 155/622H Chassis in an Access Network CabinetThis section des