hydro australia pty ltd - industry capability network
TRANSCRIPT
www.hydroaustralia.com.au
HYDROAUSTRALIA PTYLTD
ABN: 83 080 457 049
Capability
Statement17 December 2020
INDUSTRIES SERVED
| MANUFACTURING | MINING | OIL, GAS & ENERGY | RETAIL, TRADE AND OTHER SERVICES | STEEL | WATER |
Company Details
Address: 8 Minchington Road, MORWELL VIC, 3840 Australia
Ph: +61 3 5165 0390
Fax: +61 3 5165 0395
Email: [email protected]
Web: www.hydroaustralia.com.au
ICN Gateway Company ID: 16054
Employees: 38
ABN: 83 080 457 049
Locations: 4
Local Manufacturer: Yes
Foreign Manufacturer: Yes
Importer: Yes
Exporter: Yes
NT CAL Accredited: No
Works in Remote Locations: No
Australian Indigenous Owned: No
Contacts
Mr Michael CooperPh: +61 3 5165 0390Mob: +61 440 284 468Email: [email protected]
Mrs Sue SmithMob: +61 403 501 100Email: [email protected]
www.hydroaustralia.com.au | Capability Statementwww.hydroaustralia.com.au | Capability Statement 2
HYDRO AUSTRALIA PTY LTD
Hydro Australia offer full pump overhauls (Onsite & Workshop) -specialising in multi stage high pressure pumps, onsite line boring,system and pump analysis. Additionally, we offer WirelessCondition Monitoring of pumps.
Since our inception in 1998 we have grown considerably and withthe assistance of our parent company, Hydro Inc, we now form apart of the largest independent pump company in the world. We are not a pump OEM nor a distributor for any pumpmanufacturers. We operate totally independent which allows us toprovide un-biased reviews on any pumping equipment regardlessof the brand. We supply quality engineered spare parts utilisingour reverse engineering capabilities at our facility or on siteutilising our portable Romer arms and 3D scanner.
Summary
Hydro Australia specialises in the refurbishment ofhigh energy pumps, rotating equipment, fluid drives,gearboxes and we also have onsite machiningequipment that can be utilised for repairs Insitu
amongst other engineering services. Additionally, wedo offer Wireless Condition Monitoring of pumps.
Description
Hydro Australia specialises in the refurbishmentof high energy pumps, rotating equipment, fluiddrives, gearboxes and we also have onsitemachining equipment that can be utilised forrepairs Insitu amongst other services.
We offer full pump overhauls (Onsite &Workshop) - specialising in multi stage highpressure pumps, onsite line boring, system andpump analysis.
Since our inception in 1998 we have grownconsiderably and with the assistance of ourparent company, Hydro Inc, we now form a partof the largest independent pump company in theworld.
We are not a pump OEM nor a distributor forany pump manufacturers. We operate totally
www.hydroaustralia.com.au | Capability Statementwww.hydroaustralia.com.au | Capability Statement 3
HYDRO AUSTRALIA PTY LTD
independent which allows us to provide un-biased reviews on any pumping equipmentregardless of the brand. We supply qualityengineered spare parts utilising our reverseengineering capabilities at our facility or on siteutilising our portable Romer arms and 3D
scanner.
Additionally, we offer Wireless ConditionMonitoring of pumps.
www.hydroaustralia.com.au | Capability Statementwww.hydroaustralia.com.au | Capability Statement 4
HYDRO AUSTRALIA PTY LTD
Industries Served
• Manufacturing
• Mining
• Oil, Gas & Energy
• Retail, Trade and Other Services
• Steel
• Water
Other Accreditations
• ISO/NZS 9001:2000
Products & Services
• Pump refurbishment
• Rotating equipment, fluid drives, gearboxes,turbines, etc repair
• Pump Wireless condition monitoring
• Pump testing
• Reverse engineering of spares etc
• Full on site capabilities
www.hydroaustralia.com.au | Capability Statementwww.hydroaustralia.com.au | Capability Statement 5
HYDRO AUSTRALIA PTY LTD
Major Clients
• Active Mechanical Services Pty Ltd
• Active Services Pty Ltd
• Aditya Birla Minerals - Birla Nifty Pty Ltd
• Advanced Fire Technology
• AETV Power - Aurora Energy
• AGL - Loy Yang A
• AGL Loy Yang Power Mine
• AGL Macquarie - Bayswater Power Station
• Alcoa - Pinjarra
• Alinta Energy NZ
• APT Management Services Pty Limited
• Australian Paper
• Barnes Precision Engineering
• Beach Energy
• Beach Energy - Lang Lang
• Bell Bay Aluminium
• Bien Dong 1
• Bluewaters Power Station
• BMC Group
• BOC
• Broadspectrum
• Broadspectrum Limited
• Bumi Wangsa
• Central Coast Council Gosford
• ConocoPhillips
• CS Energy - Callide Power Station
• CS Energy Kogan Creek Power Station
• CSBP
• David Brown Satasalo Pty Ltd
• Downer EDI Engineering Power
• Ebara Pumps Australia
• Elgas Ltd
• EMACS
• Energy Australia - Tallawarra Power Station
• Energy Australia - Yallourn Power Station
• Energy Australia Mt Piper
• EnergyAustralia Ecogen Pty Ltd
• Enermech
• Engie - Pelican Point
• Exxon Mobil
• Firmins Lane Engineering
• Flowserve - New Zealand
• Flowserve Flow Solutions Division
• Galbraith Engineering
• Genertech
• GHD
• Gippsland Central Water Corp
• Goodline
• Goulburn Valley Water
• Grange Resources (Tasmania) Pty Ltd
• Hardchrome Engineering
• Hazelwood Power
• Hazelwood Power
• Hydro Australia
• Hydro East
• Hydro Middle East
• Hydro Vietnam
• ICET Ironwood Clean Energy Technologies
• IndustriTech
• Ingmire Electrical Engineers
• INPEX Operations Australia Pty Ltd
• Interlink Power
• John Crane Australia
• Jubilee Almonds Orchard
• KEMPE Engineering
• Kwinana Power Station
• Lower Murray Water
• LYB Operation & Maintenance Pty Ltd
• LYP Infrastructure Services
• Mallawa Irrigation Ltd
• Melbourne Water - Eastern Treatment Plantwww.hydroaustralia.com.au | Capability Statement
www.hydroaustralia.com.au | Capability Statement 6
HYDRO AUSTRALIA PTY LTD
• Melbourne Water - Head office
• Melbourne Water - Head office
• Millmerran Power Station
• Mobil Refining Australia - Altona
• Muja Power Station
• New Zealand Steel
• NewGen Kwinana Power Station
• Newport Power
• NRG Gladstone Power Station
• Nyrstar
• Onesteel
• OPEC Systems Pty Ltd
• Orica Mining Services - Yarwun
• Orica NSW - Kooragang Island
• Origin Energy - Eraring Power Station
• Origin Energy - Lang Lang Gas Plant
• Origin Energy Kangaroo Valley
• Petroleum Maintenaince Services J.S.C (PMS)
• Phu My 3 BOT Power Co., Ltd
• Power Projects International Pty Ltd
• Pumpseal
• Qenos
• Qualitech
• Queensland Alumina Limited
• Renroc Group
• Ribshire Pty Ltd
• Rio Tinto Alcan
• Santos Ltd
• SGS Australia Pty Ltd
Facilities & Equipment
• Grit blasting
• High speed dynamic balancing machine
• Long & short bed lathes
• CNC Vertical Boring
• Horizontal borer
• Co-ordinate measuring machine
• Painting
• Milling
• 12 Tonne overhead crane
• CNC Balancing machine
• Measuring machine
• Gripwell slotting machine
• Skilled plant
• Hydrostatic test unit
• Lathe
• Compressor
• Spray booth
• Cranes
• Grinder
• Borer
• Coupling
• Forklift
• Scissor lift
• On site tool store
• Romer Arm
• Creaform 3D scanner
• Performance testing equipment
• Rotor alignment machine
• Tensioning
• Boring bar package and tooling
• CNC Mill/turn centre
• Welder
• Portable ultrasonic flowmeter
• Engineering vice
www.hydroaustralia.com.au | Capability Statementwww.hydroaustralia.com.au | Capability Statement 7
HYDRO AUSTRALIA PTY LTD
Previous Significant Projects
Client: CS Energy-Callide C Power Station
Project: 1,400mm Cooling Water Pumps Impeller Upgrade
Year: 2020 Value: $3,000,000
Description: The four pumps have suffered from severe cavitation since inception. The result being crackedand broken impeller vanes, resulting in vibration, a drop in efficiency and flow.Hydro Australia & Hydro UK performed a forensic analysis with the resultant findings being inlet backflowrecirculation as the root cause of the problem.Hydro redesigned the impellers & manufactured four complete rotating element assemblies to ISO 9001standards, installing during 2019 and 2020.
Client: Woodside
Project: Lean Solvent Pump Overhaul
Year: 2020 Value: $500,000
Description: Turnkey overhaul of the 2 x Lean Solvent Pumps at Karratha GasPlant, Karratha, WA Disassembly, inspection, engineering, repair, upgrading and assemblyCost 250K each (ie 500K)
www.hydroaustralia.com.au | Capability Statementwww.hydroaustralia.com.au | Capability Statement 8
HYDRO AUSTRALIA PTY LTD
Client: AGL Loyang Power Station
Project: Maintenance contract of Boiler Feed Pumps
Year: 2020 Value: $10,000,000
Description: Ongoing maintenance contract of Loyang power station boiler feedpumps.1998-2020
Client: Newgen Power Station
Project: BFP overhaul
Year: 2019 Value: $300,000
Description: Turnkey overhaul of the BFP at Newgen Power Station Kwinana, WA Including managing, disassembly, inspection, engineering, repair, assembly,installation, recommissioning and testing of the BFPCost 250K
www.hydroaustralia.com.au | Capability Statementwww.hydroaustralia.com.au | Capability Statement 9
HYDRO AUSTRALIA PTY LTD
Client: Territory Gen
Project: BFP Overhaul
Year: 2019 Value: $175,000
Description: Turnkey overhaul of the BFP at Channel Island Power Station (CIPS) nearDarwin, NT. Including managing, removal, disassembly, inspection, repair, assembly, installation,recommissioning and onsite testing of the BFPCost 160K
Client: Water NSW, Burrawang Water Pumping Station
Project: 2,100mm Low Lift Water Pump Refurbishment x qty 2 1,500mm valveoverhaul x qty 4
Year: 2018 Value: $1,000,000
Description: The four valves and two vertical pumps, weighing 40 T, 15m3/min flow, 4,000kWwere fully refurbished by Hydro Australia, during the stations major electrical upgrade.Due to their size, the pumps had to be removed in sections, requiring 7 truckloads to ship toHydro in Morwell Victoria. The pumps had severe corrosion on all the cast iron components and pitting of the chrome steel shaft , all that had to be repaired and protectively coated.
www.hydroaustralia.com.au | Capability Statementwww.hydroaustralia.com.au | Capability Statement 10
HYDRO AUSTRALIA PTY LTD
Client: Vermilion Oil & Gas
Project: Sea Water Lift Pump Overhaul
Year: 2018 Value: $300,000
Description: Turnkey overhaul of the Sea Water Lift Pump offshore at Wandoo Platform,Karratha, WA Including managing, removal offshore, disassembly, inspection, engineering, repair,upgrading, assembly, installation and recommissioning offshoreCost 200K
Client: Origin Energy-Eraring Power Station
Project: Condensate extraction pump, thrust bearing upgrade
Year: 2017 Value: $3,000,000
Description: Eraring PS has qty 8 - 1,850 kW, 4 stage, 100% duty & 100% standby, condensate extractionpump.The pumps had old design tapered roller bearing thrust bearings, failing too regularly.HA won the contract to redesign and upgraded to white metal combined thrust and journal bearing cartridge. During the project HA fully refurbished the pumps, laser scanned and reverse engineered many components,manufactured parts so a complete spare pump could be built up.
www.hydroaustralia.com.au | Capability Statementwww.hydroaustralia.com.au | Capability Statement 11
HYDRO AUSTRALIA PTY LTD
Client: Wood Group
Project: 1000 - 1200mm split case pump
Year: 2000 Value: $175,000
Description: Overheating bearings on a large water pump transfer.Repairs included :Deck and line boring of the bearing housingsRepairs to white metal bearingsReplacement of wear rings and bushes to anti galling materialsInstallation and alignment of the overhauled rotorIncluding modification of the sites alignment procedures
www.hydroaustralia.com.au | Capability Statementwww.hydroaustralia.com.au | Capability Statement 12
www.hydroaustralia.com.au
Powered by:
icn.org.au | 1300 961 139
This report on Industry Capability Network Limited (ICNL) has been generated from ICN Gateway. Although every effort has been made to ensure the accuracy ofthe data contained within this report, Industry Capability Network Ltd accepts no responsibility for inaccuracies or omissions. The material contained in this reportconstitutes Industry Capability Network copyright and is intended for general use and information. You may download, display, print and reproduce this report inunaltered form only (retaining this notice, and any headers and footers).
Powered by TCPDF (www.tcpdf.org)