I-394 Express Lane Community Task Force. March 18, 2004. Agenda. Welcome and Introductions Preliminary Traffic Operations and Simulation Results Discussion of Vehicle Types Allowed Range of Toll Rates Discussion of Hours of Operation Community Outreach Future Meetings – Discussion Topics. - PowerPoint PPT PresentationTRANSCRIPT
I-394 Express Lane Community Task ForceI-394 Express Lane Community Task Force
March 18, 2004
AgendaAgenda
• Welcome and IntroductionsWelcome and Introductions• Preliminary Traffic Operations and Simulation Preliminary Traffic Operations and Simulation
ResultsResults• Discussion of Vehicle Types AllowedDiscussion of Vehicle Types Allowed• Range of Toll RatesRange of Toll Rates• Discussion of Hours of OperationDiscussion of Hours of Operation• Community OutreachCommunity Outreach• Future Meetings – Discussion TopicsFuture Meetings – Discussion Topics
Model Simulation ProcessModel Simulation Process
PRICING/MARKETSHARE
MICRO-MODEL
HYPOTHETICALSIMULATIONS
WITHMNPASS
I-394 CORSIMSIMULATION
MODEL
BASE CASEOPERATIONSSIMULATION
COMPARISON WITHBASE CASE
OPERATIONS
FINALSIMULATIONS WITHMNPASS/PRICING
AND REFINEDCONFIGURATION
DETAILEDTRAFFICPROFILE
DETAILEDNETWORKPROFILE
BY TIME PERIOD ANDCONFIGURATION ALTERNATIVES
Purpose of CORSIM Simulation ModelPurpose of CORSIM Simulation Model
““To assist in geometric design of HOT lanes” To assist in geometric design of HOT lanes” • Evaluating the location of entrances/exits Evaluating the location of entrances/exits • Evaluating the length of the weaving sections Evaluating the length of the weaving sections • Evaluating closure of specific entrance/exitsEvaluating closure of specific entrance/exits• Evaluating the impacts to existing bottleneck Evaluating the impacts to existing bottleneck
areas areas
• Existing I-394 / I-94 volumesExisting I-394 / I-94 volumes• Base case striping optionBase case striping option• Access to / from HOV lanes is only allowed at Access to / from HOV lanes is only allowed at
specific locationsspecific locations• HOV demand assumed as a percent of total HOV demand assumed as a percent of total
volume at each rampvolume at each ramp
CORSIM Model Assumptions for Existing ConditionsCORSIM Model Assumptions for Existing Conditions
Access ConfigurationAccess Configuration
Special CORSIM Coding ConventionsSpecial CORSIM Coding Conventions
• Separate, adjacent HOV ramps used by HOVs to Separate, adjacent HOV ramps used by HOVs to access I-394access I-394
• Direct ramp-to-ramp connections are not Direct ramp-to-ramp connections are not allowed. Mainline “dummy” links used at allowed. Mainline “dummy” links used at selected locationsselected locations
• Access to/from HOV lanes separated by Access to/from HOV lanes separated by “dummy” barrier“dummy” barrier
Special CORSIM Coding ConventionsSpecial CORSIM Coding Conventions
Special CORSIM Coding ConventionsSpecial CORSIM Coding Conventions
Traffic Simulation ExamplesTraffic Simulation Examples
• Baseline Conditions - AM Peak Hour (7:30 – 8:30)Baseline Conditions - AM Peak Hour (7:30 – 8:30)• Baseline Conditions - PM Peak Hour (5:00 – 6:00)Baseline Conditions - PM Peak Hour (5:00 – 6:00)• HOT Lane near capacity - AM Peak Hour HOT Lane near capacity - AM Peak Hour • HOT Lane near capacity - AM Peak HourHOT Lane near capacity - AM Peak Hour
Modification of access configuration (near Rev. Modification of access configuration (near Rev. Lane)Lane)
Closure of entrance / exit (near Plymouth Road) Closure of entrance / exit (near Plymouth Road)
Current Level of CongestionCurrent Level of Congestion
Color-coded schematics (PM Peak Hour)Color-coded schematics (PM Peak Hour)• Eastbound I-94: Tunnel to I-35WEastbound I-94: Tunnel to I-35W• Eastbound I-394: Penn Ave to tunnel Eastbound I-394: Penn Ave to tunnel • Eastbound I-394: Louisiana to TH 100Eastbound I-394: Louisiana to TH 100• Westbound I-394: Downtown to I-394 entranceWestbound I-394: Downtown to I-394 entrance• Westbound I-394: Louisiana to TH 169 Westbound I-394: Louisiana to TH 169
Current Level of CongestionCurrent Level of Congestion
Current Level of CongestionCurrent Level of Congestion
Current Level of CongestionCurrent Level of Congestion
Current Level of CongestionCurrent Level of CongestionSimulation Simulation
EastboundEastbound• Tunnel to I-35WTunnel to I-35W• Penn Ave to tunnelPenn Ave to tunnel• Louisiana to TH 100Louisiana to TH 100
WestboundWestbound• Entrance from downtownEntrance from downtown• Louisiana to TH 169Louisiana to TH 169
HOV Lane at Near-Capacity VolumesHOV Lane at Near-Capacity Volumes
Simulation assumptionsSimulation assumptions• Current I-394 geometrics with base case striping Current I-394 geometrics with base case striping
optionoption• Started with existing HOV volumes Started with existing HOV volumes • Assumed MnPass SOVs increase volume to 1500 Assumed MnPass SOVs increase volume to 1500 • Assumed that 50% of demand for general Assumed that 50% of demand for general
purpose lane is backfilledpurpose lane is backfilled
Simulation – Input to Design Simulation – Input to Design
Evaluating the location of entrances/exits & length Evaluating the location of entrances/exits & length of access configurationsof access configurations
• HOT Lane near capacity - AM Peak HourHOT Lane near capacity - AM Peak Hour
• EB I-394 exit to reversible lanes (AM Peak)EB I-394 exit to reversible lanes (AM Peak)
Evaluate entrance / exit closuresEvaluate entrance / exit closures
• HOT Lane near capacity - AM Peak HourHOT Lane near capacity - AM Peak Hour
• Closure of entrance / exit between Plymouth Closure of entrance / exit between Plymouth Road and Ridgedale DriveRoad and Ridgedale Drive
Simulation – Input to Design Simulation – Input to Design
Vehicle Types AllowedVehicle Types Allowed
• BusesBuses• Light Comercial VehiclesLight Comercial Vehicles
Toll RatesToll Rates
• Range of Toll RatesRange of Toll Rates• Number of Toll Rates Displayed on SignsNumber of Toll Rates Displayed on Signs
Hours of Operation – Current HoursHours of Operation – Current Hours
East of Highway 100 (Reversible Section)East of Highway 100 (Reversible Section)• Eastbound: 6 AM – 1 PMEastbound: 6 AM – 1 PM• Westbound: 2 PM – MidnightWestbound: 2 PM – Midnight• Weekends – As NeededWeekends – As Needed
• West of Highway 100West of Highway 100• Eastbound: 6 - 9 AMEastbound: 6 - 9 AM• Westbound: 3 - 6 PM Westbound: 3 - 6 PM
Entire FacilityEntire Facility• 6 AM – Midnight (or 24 hours/day)6 AM – Midnight (or 24 hours/day)
East of Highway 100 – OptionsEast of Highway 100 – Options• Eastbound: 6 AM – 1 PMEastbound: 6 AM – 1 PM• Westbound: 2 PM – MidnightWestbound: 2 PM – Midnight
WeekendsWeekends
Hours of Operation – Proposed OptionsHours of Operation – Proposed Options
Community InvolvementCommunity Involvement
Future Meetings – Discussion TopicsFuture Meetings – Discussion Topics
April 15, 2004April 15, 2004• Final Traffic Operations and Simulation ResultsFinal Traffic Operations and Simulation Results• Final Entry/Exit Point LocationsFinal Entry/Exit Point Locations• Final Toll Rates Final Toll Rates • Preliminary Demand, Cost and Revenue AnalysisPreliminary Demand, Cost and Revenue Analysis• Enforcement Plan DiscussionEnforcement Plan Discussion
Future Meetings – Discussion TopicsFuture Meetings – Discussion Topics
May 20, 2004May 20, 2004• Final Demand, Cost and Revenue AnalysisFinal Demand, Cost and Revenue Analysis• Final Enforcement Plan DiscussionFinal Enforcement Plan Discussion• Customer Service PlanCustomer Service Plan• Final Operations Plan – Hours of OperationFinal Operations Plan – Hours of Operation
October 2004October 2004• Potential Meeting Prior to System TestingPotential Meeting Prior to System Testing