I-495 EXPRESS LANES NORTHERN EXTENSION PUBLIC INFORMATION MEETING Virginia Department of Transportation Cooper Middle School 977 Balls Hill Rd., McLean, Va. June 11, 2018

Upload: others

Post on 16-Aug-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

I-495 EXPRESS LANES NORTHERN EXTENSION

PUBLIC INFORMATION MEETING

Virginia Department of Transportation

Cooper Middle School 977 Balls Hill Rd., McLean, Va.

June 11, 2018

Page 2: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

§  Welcome and introductions §  Project background §  About the study §  Scope of the study §  Agency stakeholder coordination §  Project website §  Schedule §  Questions and feedback

Agenda

Virginia Department of Transportation 2

Page 3: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

§  Final Environmental Impact Statement and Record of Decision issued by FHWA – June 2006 §  Included Express Lanes improvements to George Washington Memorial Parkway

§  Environmental document (NEPA) reevaluations completed

§  Express Lanes and Dulles Interchange open to traffic November 2012

§  I-495 North Shoulder Lane Use Project (1½ mile Express Lanes merge to GW Parkway) §  Study completed June 2014, Open to traffic June 2015

Project Background I-495 Express Lanes History

Virginia Department of Transportation

§  May 2007 (revised IJR project limits to south of Old Dominion Drive)

§  June 2008 §  December 2008

§  May 2009 §  July 2009 §  Dulles Interchange November 2009

3

Page 4: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

§  I-495 congestion routinely extends between American Legion Bridge and Tysons (south of Dulles Toll Road)

§  Multiple hours of congestion during AM and PM peak periods and weekends

§  Cut-through traffic using local roads and residential streets on either side of I-495

Project Background Existing Conditions

Virginia Department of Transportation 4

Page 5: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

§  90+ mile express lanes network by late 2022 §  54 miles in service

§  I-95, I-495, I-66 Inside the Beltway

§  31 miles under construction §  I-395 Northern Extension, I-66 Outside the Beltway

§  10 miles in development §  I-95 to Fredericksburg

§  3 miles under study §  I-495 Northern Extension

§  Three individual operators

Project Background Northern Virginia Express Lanes Network

Virginia Department of Transportation 5

Page 6: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

Virginia Department of Transportation

About the Study Potential Express Lanes Access

6

Dulles Toll Road (VA Route 267) at I-495

Existing Express Lane Access New Express Lane Access To Be Studied

495 South to Rt. 267 West Rt. 267 East to 495 North

495 North to Rt. 267 West Rt. 267 West to 495 North

Rt. 267 East to 495 South 495 South to Rt. 267 East

George Washington Memorial Parkway (GWMP) at I-495

Existing Express Lane Access New Express Lane Access To Be Studied

n/a 495 South to GWMP East

n/a 495 North to GWMP East

n/a GWMP West to 495 North

n/a GWMP West to 495 South

New Access Between Express Lanes and General Purpose Lanes

Page 7: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

§  NEPA environmental assessment – build vs. no-build §  Traffic analysis §  Preliminary engineering

§  Engineering-level survey §  Functional plan set

§  Traffic and revenue study §  Evaluation of procurement methods

Scope of Study Project Elements

Virginia Department of Transportation 7

Page 8: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

Scope of Study NEPA – Environmental Assessment

Technical studies •  Air quality analysis •  Alternative analysis •  Hazardous materials •  Historic resources •  Indirect and cumulative effects •  Natural resources •  Noise analysis •  Socioeconomic and land use

analysis •  Traffic analysis

8 Virginia Department of Transportation 8

Page 9: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

Virginia Department of Transportation

Scope of Study Traffic Analysis

9

§  Operational and safety analysis §  I-495 & Dulles Toll Road mainlines §  Parallel arterials within study corridor

§  Traffic and Transportation Technical Report §  Interchange Justification Report §  Comparison of one build alternative versus

no-build alternative §  2025 opening year §  2045 design year

Page 10: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

Virginia Department of Transportation

Preliminary Engineering

10

§  Identify concepts for widening and connections

§  Develop conceptual drainage and stormwater management requirements

§  Evaluate existing structures §  Old Dominion Drive (VA 783) §  Georgetown Pike (VA 193) §  Live Oak Drive §  George Washington Memorial Parkway

§  Identify Right of Way impacts §  Develop conceptual cost estimate and

project schedule

Page 11: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

Virginia Department of Transportation

Project Implementation Plan

11

§  Complete traffic and revenue study §  Coordinated with traffic analysis §  Consistent with other studies

§  Evaluate and develop a project implementation plan

Page 12: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

Virginia Department of Transportation

Agency Stakeholder Coordination

12

§  Fairfax County Department of Transportation §  Fairfax County Park Authority §  Federal Highway Administration §  Maryland Department of Transportation §  Metropolitan Washington Airports Authority §  Metropolitan Washington Council of Governments §  National Park Service §  Northern Virginia Transportation Authority §  Virginia Department of Rail and Public Transportation §  Capital Beltway Express, LLC (Transurban) §  Others TBD

Page 13: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

Virginia Department of Transportation 13

Project Website: www.495NorthernExtension.org

Page 14: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

Key Milestone Begin Dates

Public Outreach and Technical Coordination May 2018

Public Information Meeting – Cooper Middle School June 11, 2018

Begin NEPA – Environmental Assessment June 2018

Environmental Assessment – Available for Public Comment Winter 2018/2019

Public Hearing Spring 2019

NEPA Decision from Federal Highway Administration 2019

Develop Project Implementation Plan 2019

Schedule Key Milestones

Virginia Department of Transportation 14

Page 15: I-495 EXPRESS LANES NORTHERN EXTENSION · 2021. 6. 17. · Potential Express Lanes Access 6 Dulles Toll Road (VA Route 267) at I-495 Existing Express Lane Access New Express Lane

Questions and Feedback

Virginia Department of Transportation 15