i/an vignette seminar - aia houston · cds vignette february 20 - keith shuley – cds seminar...

15
I/AN Vignette Seminar Construction Documents & Services Building Section Vignette

Upload: others

Post on 06-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn

I/AN Vignette SeminarConstruction Documents & Services

Building Section Vignette

Page 2: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn
Page 3: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn

AREARE 4.0

7 Sections

Construction Documents & Services

Programming, Planning & Practice

Site Planning & Design

Building Design & Construction Systems

Structural Systems

Building Systems

Schematic Design

ARE 5.0

6 Sections Late 2016

Practice Management

Project Management

Programming & Analysis

Project Planning & Design

Project Development & Documentation

Construction & Evaluation

Vignettes Eliminated and Replaced

with “Drawing Solutions”

http://www.ncarb.

org/ARE/~/media/Files/PDF/Guidelines/ARE_G

uidelines.pdf

Page 4: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn
Page 5: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn

Finish In FiveFocus on the three exams in 4.0 that will give you credit for four exams in 5.0

Construction Documents & Services

Building Section Vignette

Programming Planning & Practice

Site Zoning Vignette

Site Planning & Design

Site Grading Vignette

Site Design Vignette

Page 6: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn

CD+S Seminar February 20, 2016

9:00 AM - 1:00 PM

$35 AIA members

$50 non-members

[email protected]

Keith Shuley1. How to take a multiple choice exam on Construction

Documents

2. What to study

3. Analysis of Specic Documents and Discussion of Specic

Legal Issues

https://aiahouston.org/v/registration/Construction-

Documents-Seminar-for-ARE-2016/f0/

Page 7: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn

Proposed Calendar January 12

General information session, Kick-off Meeting, introduce “Finish

in Five”

February 9

CDS Vignette

February 20 - Keith Shuley – CDS seminar

March 8

SPD Vignette

April 12

PPP Vignette

May 10

Destination Archtiect , Gary Dunn

June 14

SD Vignette

ARE 5.0 Comes out

Structures With David Thaddius

Re-Evaluation (Mid Year Committee Meeting)

July 12

SS Vignette

August 9

Building Systems

September 13

BS Vignette

October 11

BDCS Vignette

November TBD

Convention - San Antonio (

How we Passed the ARE - Round Table

December 13

2017 Planning

Page 8: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn

ARE ResourcesKaplan - Books for 7 section + History - Additional Q&A Books - Flash Cards https://www.

kaplanarchitecture.com/complete-catalog

PPI (Ballast) - ARE review manual - Additional Q&A books per division - Flash Cards

http://ppi2pass.com/shop/are/are-review-materials

Funkaar - Intensive 15 Week Course http://www.funkaarstudios.com

NASLA - Archiflash - Vignette Practice (Norman Dorf) https://www.nalsa.com

NCARB - Exam Guides - Vignette Practice tools http://www.ncarb.org/ARE/Preparing-for-the-ARE.aspx

Gang Chen - ARE Q&A Books http://www.amazon.com/Gang-Chen/e/B001JS00RK

Page 9: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn

ARE ResourcesARE Coach (ARE Forum) - Online Forum http://arecoach.com/coachforum/

Jenny’s Notes- PDF and Blog https://arendurance.wordpress.com/study-guides/

Caroline’s Notes - PDF’s (Google Search)

ARE Help - Resource Website - http://arehelp.webs.com/

ARE 4.0 community - forum + videos NCARB run - https://plus.google.com/communities/116031021237378921174

Page 10: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn

ARE Resources

Page 11: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn

Vignette Tips● Approach as a graphical solution rather than a true architectural section.

● About reading the program and drawing it accurately, reading comprehension. No

extra credit for designed solutions.

● The vignette on the exam should be similar to the practice exam. Large "open to

below" space and a two story portion with a hallway.

● Practice and become proficient and efficient with the software, and the behaviors

of the objects.

● Put together from the bottom up.

● Determine critical dimensions.

Page 12: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn

Read the ProgramThe structural system consists of top chord bearing

steel joists on masonry bearing walls with

continuous concrete spread footings and a

concrete slab on grade.

1. All ceilings and roofs are flat.

2. Non-bearing corridor and lobby walls have a

one-hour (minimum) fire-resistance rating.

3. Exterior and bearing walls have a two-hour

(minimum) fireresistance rating.

4. The ceiling height of the laboratory is 15’-0”, the

ceiling height of the remaining first floor spaces is

8’-4”, and the ceiling height of the second floor

spaces is 9’-0”.

5. Ceilings are used as return air plenums. All

ceilings are non-rated.

6. Assume fire/smoke dampers and transfer grilles

are provided as needed.

Page 13: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn

Read the Program7. The space between each ceiling and floor or roof

slab must be held to the minimum dimension

required to accommodate light fixtures and the

structural and mechanical components shown on

the plans.

8. All ducts are placed below the joists.

9. Provide 8” of clearance between the bottom of

all the ducts and the finished ceiling to

accommodate light fixtures.

10. Parapets must extend 2’-0” above the top of

adjacent roof decks.

11. The frost depth is 5’-0” below grade.

Page 14: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn

Live Vignette Walkthrough

Page 15: I/AN Vignette Seminar - AIA Houston · CDS Vignette February 20 - Keith Shuley – CDS seminar March 8 SPD Vignette April 12 PPP Vignette May 10 Destination Archtiect , Gary Dunn

Questions ?