![Page 1: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/1.jpg)
Dr. Tomas Hladik | Eng. Ondrej Stejskal
IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY
CASE STUDY
![Page 2: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/2.jpg)
CONTACT
Text
OMAINTEC 2
TOMAS HLADIK
Senior consultant Logio
ONDREJ STEJSKAL
Consultant
Logio
+420 731 151 276
![Page 3: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/3.jpg)
OMAINTEC 3
AGENDA
SITUATION
METHODOLOGY
PHYSICAL IDENTIFICATION USING SMARTPHONES
MATCHING – FINDING DUPLICATE ITEMS AND FIRST BENEFITS
PROJECT PITFALLS
1
2
3
4
5
![Page 4: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/4.jpg)
OMAINTEC 4
INTRODUCTION TO CASE - SITUATION
European petrochemical and refinery plant
Multinational holding – group of companies
Area of 10 square km More than 1000 buildings Thousands of km of
electrical wiring, telecommunications wiring, pipes, pipe bridges
Road, rail and pipes
![Page 5: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/5.jpg)
OMAINTEC 5
INTRODUCTION TO CASE Production facilities Reactors, tanks, columns, heat exchangers, silos, furnaces, flare stacks, piping, energetics, and others More than 50 000 active items worth of 100s M EUR Fasteners, fittings, power equipment, chemical equipment, cables, loaders, conveyors, feeders, couplings, rotating machines, dcs systems, bearings, electrical equipment, seals, measurement and control, filters and other special devices
![Page 6: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/6.jpg)
6
![Page 7: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/7.jpg)
OMAINTEC 7
SPARE PARTS
![Page 8: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/8.jpg)
OMAINTEC 8
SPARE PARTS EVERYWHERE
![Page 9: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/9.jpg)
OMAINTEC 9
SPARE PARTS MANAGEMENT INITIAL SITUATION Squirrel warehouses – pirate stocks Created historically from unconsumed and renovated items
![Page 10: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/10.jpg)
OMAINTEC 10
SPARE PARTS MANAGEMENT INITIAL SITUATION Squirrel warehouses – pirate stocks
![Page 11: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/11.jpg)
OMAINTEC 11
SPARE PARTS MANAGEMENT INITIAL SITUATION Imperfections in master data Incomplete information in master data (missing links to documentation and norms, missing BoMs Duplicates – identical items under several ID numbers
No unified methodology of spare parts identification (naming) Different names for identical items No common requirements on technical parameters Incompliance with methodology of other companies in the group
No division to generic items and specific spare parts Entire stock managed by the same strategy
![Page 12: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/12.jpg)
OMAINTEC 12
IDENTIFICATION – GOALS 1. Create common methodology of identification for all maintenance materials To reach compatibility among existing methodologies within the holding 2. Perform physical identification To conduct physical identification of items in squirell WHs and in SAP managed WHs according to developer methodology 3. Eliminate squirrel warehouses To match squirrel items with SAP managed items and unify their stock, or to create new master data for unmatched items 4. Set up safety stock levels for generic items To calculate one common safety stock level for each item, based on joint needs of all consumers in plant
PROJECT OF MAINTENANCE MATERIAL
![Page 13: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/13.jpg)
OMAINTEC 13
Preparation Stage
Identification Stage
Develop standards to unify identification of Spare parts and Generic items • One identification standard - Identical names for identical spares and
Identical categories for Spare parts and Generic items • Development of database, parsing of current SAP master data and reshaping
to master data record according to new identification standard • Development of software (App) for collection and processing of data for
physical identification on site • Fixing Master data structure in SAP • Definition of responsibilities and approval processes
Physical identification of spare parts in warehouses and fix SAP data in the system
• Physical identification/inspection of maintenance materiál in warehouses • Summarization and correction of data in SAP (master data clean-up) • Elimination of temporary warehouses without SAP management
PROJECT OF MAINTENANCE MATERIAL IDENTIFICATION – GOALS
![Page 14: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/14.jpg)
OMAINTEC 14
PARSING OF ORIGINAL SAP MASTER DATA By parsing and cleaning of data strings we can prepare correct master data form
SHORT NAME OF MATERIAL PLANT AND WAREHOUSE NUMBER
UNITS OF MEASURMENT MATERIAL GROUP NAME DIVISION ON SP AND GI
CATEGORY OF STOCK (CRITICAL ITEM, STRATEGIC ITEM)
Current SAP master data record
Purchasing orders
Transformation to correct master data record structure
LINKS TO STANDARDS ATEST NUMBERS, SPECIFICATIONS
(DIMENSIONS, TEMPERATURES, PRESSURE, SURFACE
ADJUSTMENTS)
Yet incomplete, but correct form of short text (to be completed by physical
identification) VUZA PRIR V. 111 PN??/DN65.0 Flanged globe valve DN65 PN?? 422643
![Page 15: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/15.jpg)
OMAINTEC 15
STEPS OF IDENTIFICATION Each item is identified in the following steps:
Step Description Output
1 SELECTION OF MATERIAL CATEGORY Fasteners
2 SELECTION OF KEY WORD (ITEM NAME) Stud screw with bolt
3 SELECTION OF MATERIAL GROUP PIP_FAS
Screws, bolts, washers – general, not atested
4 FILLING IN REQUIRED INFORMATION – IDENTIFICATION ATTRIBUTES
CZ: Svorník s maticí 40x200xW ¾“ NEREZ Eng: Stud with nut 40x200xW ¾“ Stainless
SHORTCUT: SVOR+M 12050.6 100MM W ¾“
5 FILLING IN MAXIMUM OF OTHER REQUESTED ATTRIBUTES
Material of bolt: 12050.6; Logistic dimensions: 30x15x15; Norm: ČSN 2515.2
6 ASSESMENT OF TECHNICAL CONDITION NEW/OLD/REPAIRED
![Page 16: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/16.jpg)
OMAINTEC 16
IDENTIFICATION TREE – EXAMPLE FOR CENTRIFUGAL PUMPS Rotary machines
Pumps Whole pumps
Spares for pumps Plunger pumps
Plunger crank system Housing set
Pump housing Housing lid Excenter
Crankshaft set Crankshaft Crankshaft bushing Oil flinger ring
Plunger pump Centrifugal pump Screw pump Gear pump …
…
… …
Category Subcategory
Keyword Keyword EU Keyword ENG Keyword CRC Keyword N16
![Page 17: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/17.jpg)
OMAINTEC 17
HOW THE NAME IS CREARED?
Added to name according to defined syntax
Categories and key words as selected by identificator Basic name
Key Identification attributes Přivařovací koncentrická [DN1]/[DN2] [various text]
Redukce
Redukce přivařovací koncentrická nerez DN80/50 40/VII
Přechod přivařovací koncentrický DN80/DN50 Z 17248.4
Welding-neck concentric reduction SS DN80/50 40/VII
RED PRIV KON 17248.4 3/3 DN80/50
Name example CZ:
Name example N16:
Name example ENG:
Name example CRC:
Redukce přivařovací koncentrická [material] DN[DN1]/[DN2] [various text]
Přechod přivařovací koncentrický DN[DN1]/DN[DN2] [type] [material]
Welding-neck concentric reduction [material] DN[DN1]/[DN2] [var text]
RED PRIV KON [material] [thicknes1]/[thicknes2] DN[DN1/DN2]
Syntax example CZ:
Syntax example N16:
Syntax example ENG:
Syntax example CRC: All identification data stored in database.
The syntax can be
changed EX POST, if needed, all created
names will be updated
![Page 18: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/18.jpg)
OMAINTEC 18
Forecasting and diagnostics with neural networks and AI
Identification of spare parts in Android phone app
Augmented reality in maintenance
What is possible today?
INNOVATIONS AND MAINTENACE 4.0
![Page 19: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/19.jpg)
OMAINTEC 19
PLAN OF IDENTIFICATION – WAREHOUSES 09/08/2017 28/02/2017
![Page 20: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/20.jpg)
OMAINTEC 20
20
NH3
POX
CENTRAL WAREHO
USE
CW
JESL
CW
VNR C
W POX
VH
VH
VH
VH
VH
Investments
PHYSICAL IDENTIFICATION COMPLETED, VALIDATION IN PROGRESS IDENTIFICATION NOT STARTED YET
IDENTIFICATION IN PROGRESS
STARTED 2018
Project plan: NH3 – validation ready POX – validation ready CW – started NOV2016 JESL – started NOV2016 VH – started 2017 PCH+EJ started 2018 INVESTMENTS – started DEC2016
DECISION PENDING
POX 1319
Started 28. 8. 2017
PCH + EJ
Started 20. 9. 2017
![Page 21: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/21.jpg)
OMAINTEC 21
WEB-BASED IND – DETAIL OF IDENTIFICATION Application for Validation and Administration of created records
![Page 22: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/22.jpg)
OMAINTEC 22
WEB-BASED IND
Application for Validation and Administration of created records
![Page 23: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/23.jpg)
OMAINTEC 23
PROGRESS OF IDENTIFICATION
Identified items in „Black“
warehouses
Identified items in Central
warehouse
![Page 24: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/24.jpg)
OMAINTEC 24
KEY NUMBERS – PROGRESS AUGUST 2018 Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and 14 706 in temporary warehouses.
All items were stock counted, 5 740 obsolete items identified in both central and black WHs.
All items are being validated by maintenance technicians. Validation of Hi-pressure parts in Ammonia unit was fully accomplished.
3 680 items already validated (Ammonia unit, validation 1.
Matching of hi-pressure parts in Ammonia unit finished (coupling black materials with SAP items in Central warehouse). Validation 2 of matched pairs finished, ), items imported into testing ERP database.
![Page 25: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/25.jpg)
VALIDATION LEVELS
Validated by master data admin
Validated by responsible maintenance technician
VALIDATION OF IDENTIFICATION
Name + attributes
VALIDATION OF DUPLICATES
SQUIRREL – Central WH
VALIDATION OF DUPLICATES IN CENTRAL WH
VALIDATION OF MRP CONTROL LEVELS
REVISION AND VALIDATION OF IDENTIFICATION METHODOLOGY Keywords, identifikation trees, translations
Validated by responsible maintenance technician
Validated by master data admin
Validated by Maintenance Engineer nominated for particular material category
1 2 3 4
0
![Page 26: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/26.jpg)
OMAINTEC 26
PROGRESS OF VALIDATION STATES OF ITEMS IN AMMONIA UNIT
0
200
400
600
800
1000
1200
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
V1 V3 V4 V5 V6Weeks
Risk: Validation of
identified items takes
time!
For validation
Rejected
Corrected
Validated
![Page 27: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/27.jpg)
OMAINTEC 27
PROGRESS OF VALIDATIONS – AMMONIA
0
200
400
600
800
1000
1200
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37
V1 V4 V6
Rejected
Validated
Risk: Validation of
identified items takes
time!
Weeks
Activity of maintenance engineers responsible for validation (states Rejected and Validated only)
![Page 28: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/28.jpg)
OMAINTEC 28
WEB-BASED IND – VALIDATOR ACCOUNT Application for Validation and Administration of created records
![Page 29: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/29.jpg)
OMAINTEC 29
EXAMPLE: MATCHING OF BLACK SPARES WITH CENTRAL WAREHOUSE
844 N16 items in black warehouses of NH3 unit
Lxxxxx
377 N16 items in Central
warehouse
Objectives:
1 Joining duplicates 2 Estimate of value
![Page 30: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/30.jpg)
OMAINTEC 30
MATCHING OF BLACK INVENTORIES – SEARCHING FOR DUPLICATES
844 items in black warehouses
Paired black items 844 100% match (similarity = 1) 172 No match (max similarity = 0) 641 Partial match (similarity between 0 and 1) 31
377 items in Central
warehouse
![Page 31: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/31.jpg)
OMAINTEC 31
MATCHING OF BLACK SPARES WITH CENTRAL WAREHOUSE
Example for one unit
Black items matched 844
100% match (similarity = 1) 172 No match (max similarity = 0) 641 Partial match 31
Estimate of nominal value of black items 3 500 000 EUR
Estimate of scrap value of black items 20 000 EUR
![Page 32: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/32.jpg)
OMAINTEC 32
TRANSFER OF BLACK INVENTORIES INTO SAP
![Page 33: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/33.jpg)
OMAINTEC 33
PREREQUISITES FOR IDENTIFICATION ACTIVITY CONTRACTOR CUSTOMER
To provide App for identification and to service App during identification x
To provide initial and operational trainings to explain identification procedure x
To register handling and consumption of items in WHS during identification x
To provide personnel and equipment for material handling for purposes of identification x
To ensure security during identification x
To validate correctness of master data records x
To provide sufficient human resources according to scope of items to be identified x
To accomplish minimum volume of data records agreed in contract x
To prepare and hand over all documentation related to identified parts x
![Page 34: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/34.jpg)
OMAINTEC 34
PROJECT PITFALLS
Kategorie CCT
Kategorie CRC
Some annexes are not finished yet
Some categories can not be simply linked
Comparison of material groups of different methodologies
![Page 35: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/35.jpg)
OMAINTEC 35
PROJECT PITFALLS
Revisions and customization of identification methodology must be done before physical identification starts
Time of employees is limited, thus there is need to plan time of technicians, admins, etc.
Output quality control of performed identifications prior to validation has to be introduced
When using sub-sontractors for identification, need to set monitoring and reporting according to defined indicators of performance
![Page 36: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/36.jpg)
OMAINTEC 36
THANK YOU
![Page 37: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/37.jpg)
OMAINTEC 37
Q A
![Page 38: IDENTIFICATION OF SPARE PARTS IN PETROCHEMICAL INDUSTRY · 2019. 5. 27. · Since the project started, 54 770 materials were identified, out of them 40 064 on central warehouses and](https://reader030.vdocument.in/reader030/viewer/2022011920/6029d5c6e781be19cd08680f/html5/thumbnails/38.jpg)
Text
TOMAS HLADIK Senior consultant Logio
ONDREJ STEJSKAL
Consultant
Logio
+420 731 151 276