ifatca the controller - september 2009

36
Also in this issue: 4 ATR72 Accident in Palermo 4 Paris Le Bourget Air Show 2009 4 NATCA-FAA Relations I N T E R - N A T I O N A L F E D E R A TIO N O F A IR T R A F F IC C O N T R O L L E R S A S S N S . THE CONTROLLER Journal of Air Traffic Control September 2009 4 FOCUS ON TRAINING

Upload: ifatca

Post on 27-Jul-2016

239 views

Category:

Documents


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: IFATCA The Controller - September 2009

Also in this issue:4 ATR72 Accident in Palermo4 Paris Le Bourget Air Show 2009 4 NATCA-FAA Relations

INTE

R-NA

TIONA

L FEDERATION OF AIR TRAFFIC CONTROLLERS’ ASSNS.

THE CONTROLLER

Journal of Air Traffi c ControlSeptember 2009

4 FOCUS ON TRAINING

Page 2: IFATCA The Controller - September 2009

Bidding Roster Planning OJT Planning Check In BreakPlanner

Leave Planning Duty Swapping StatusChecker Check OutFlow from A-Z

Staff Planning Made Simple

Contact : Integra - Michael Silau - [email protected] - +4522666120

The Traf�cPlanner provides �ow managers with a perfect overview of the future traf�c situation.

The Traf�cPlanner calculates the workload impact for each working position, based ontraf�c load and complexity calculations. Adjustable parameters such as weather conditions,�ight data, military activity and con�ict detection are calculated and analysed by the system.

The Traf�cPlanner features intuitive traf�c monitoring in an easy-to-use layout, featuring:

Developed by Air Traf�c Controllers

The Traf�cPlanner provides �ow managers with a perfect overview of the

Traf�cPlanner

Traf�cPlanner

Page 3: IFATCA The Controller - September 2009

Contents

THE CONTROLLER

DISCLAIMER: The views expressed in this magazine are those of the International Federation of Air Traffic Controllers’ Associations (IFATCA) only when so indicated. Other views will be those of individual members or contributors concerned and will not necessarily be those of IFATCA, except where indicated. Whilst every effort is made to ensure that the information contained in this publication is correct, IFATCA makes no warranty, express or implied, as to the nature or accuracy of the information. No part of this publication may be reproduced, stored or used in any form or by any means, without the specific prior written permission of IFATCA.

VISIT THE IFATCA WEB SITES: www.ifatca.org and www.the-controller.net

In this issue:

Photo:Brisbane Airport Control Tower Cockpit Sukhoi 100

Photo credits:Airservices Australia Sukhoi

September 20093rd quarter 2009 Volume 48 ISSN 0010-8073

Also in this issue:4 ATR72 Accident in Palermo4 Paris Le Bourget Air Show 2009 4 NATCA-FAA Relations

THE CONTROLLER

Journal of Air Traffi c ControlSeptember 2009

4 FOCUS ON TRAINING

PUBLISHERIFATCA, International Federation of Air Traffi c Controllers’ Associations.

EXECUTIVE BOARD OF IFATCA

Marc BaumgartnerPresident and Chief Executive Offi cer

Alexis BrathwaiteDeputy President

Alex FiguereoExecutive Vice-President Americas

Henry NkondokayaExecutive Vice-President Africa/Middle East

Raymond TseExecutive Vice-President Asia/Pacifi c

Patrik PetersExecutive Vice-President Europe

Dale WrightExecutive Vice-President Finance

Scott Shallies Executive Vice-President Professional

Andrew Beadle Executive Vice-President Technical

Jack van DelftSecretary/Conference Executive

EDITOR-IN-CHIEF

Philippe DomogalaEditorial address: Westerwaldstrasse 9D 56337 ARZBACH, GermanyTel: +492603 8682email: [email protected]

Residence: 24 Rue Hector BerliozF 17100 LES GONDS, France

DEPUTY EDITOR AND WEB SITEPhilip Marien (EGATS)

CORPORATE AFFAIRSKevin Salter (Germany/UK)

REGIONAL EDITORSAfrica-Middle East: Mick Atiemo (Ghana) Americas: Doug Church (USA) Phil Parker (Hong Kong)Patrik Peters (Europe)

COPY EDITORSPaul Robinson, Helena Sjöström, Stephen Broadbent, Brent Cashand Alexis Brathwaite

PRINTING-LAYOUTLITHO ART GmbH & Co. Druckvorlagen KGFriesenheimer Straße 6aD 68169 MANNHEIM, GermanyTel: +49 3 22 59 10email: [email protected]

Foreword by Patrik Peters .……..……………….….…………........... 4 Editorial by Philippe Domogala ……………………….…………......... 5

ATC International Day of the Air Traffic Controller …............................ 6 Training Entry Point North by Philippe Domogala .…..............………..... 7

News and briefs Remote towers update: Australia intends to implement! .…................................. 8 News from the Greek Air Traffic Controllers‘ Associaton ..…....………................... 8

Australia ATC training at home: the future by Ainslie Rowland ...................... 9Russia ATC education and training in Russia

by Eduard Kolodnyi ....….........….........….........…................................... 10Europe Ecole Nationale de L‘ Aviation Civile by Daniel Casanova ..................... 11 Training for Air Traffic Controllers in Germany by Kevin Salter ...………….……..…......................................... 12USA Air Traffic Control Training in the United States

by Clyde Ledgerwood Jr .....….........….........….........…................................ 14Aviation English Compliance with ICAO English Standards by Graham Elliott .. 16FABEC looks for more efficient training by Philip Marien ................................... 17ATR When Justice and Media are Creating the Ideal Culprits …..….................. 18

Interview with Tuninter ATR72 pilots by Philippe Domogala ..................... 18Le Bourget Paris air show – 100 years by Philippe Domogala ......................... 21Asia News Controller Aviation English Training in Asia by Phil Parker ............ 24Books Review AENA Discover series ……….……......................................... 25Electronic strips by Philippe Domogala ..................................................... 26

Europe News Changing ATC facility by Bernhard Romanik ..................... 27NATCA Controllers in USA: Hope and optimism by Doug Church ........ 28

Africa News Service delivery in West Africa by Mick Atiemo ............. 30Special Feature Space junk by Philip Marien ................................... 31

Charlie‘s Corner ……….……....……………..........….........…........ 34

Page 4: IFATCA The Controller - September 2009

Foreword fromthe Executive Board

4 THE CONTROLLER

^ by Patrik Peters, Executive Vice-President Europe

Foreword

are faced with a declin-ing number of trainees in many regions of the world, not being able to cope with the global de-mand on air traffic control staff. Today staff shortage in the European Region amounts to ca. 5% and figures in our other IFATCA regions do not look more comforting.

Service providers in Europe agreed on a “common core content” of training to fa-cilitate harmonization. These requirements for basic training have seen their inclusion into the European Community directives on ATCO licensing, allowing the aviation community to provide the necessary ca-pacity for growth.

This is now being challenged: EASA wish-es the ATCO license to become an im-plementing rule which could, to achieve states’ acceptance, weaken the existing current requirements. Additionally, Func-tional Airspace Blocks initiatives in Eu-rope will apply market forces to training by creating their own standards to offer short term benefits. These benefits would include a reduction of costs and duration of basic training, ultimately resulting in a deviation from the common core content. One of the benefits of the ATCO licensing in Europe was improved controller mobil-ity. This could be jeopardized by FAB ini-tiatives wishing to protect the efficiency of their economy of scales, but perhaps we

are painting a too dark picture and Entry Point North (Scandinavian ATC Academy) and FABEC are just going through some rough labor pains?

Looking into the future, training also has to reflect the increasing level of automation. There is no space for regional and com-mercially driven training. Future airspace design associated with a high level of cross-border integration and automation calls for harmonized ab-initio controller training and continuation training standards.

Training in general appears to be under-mined by short term thinking. Over the last twenty years we repeatedly witnessed ups and downs of staff intakes and shortages. Rather than building on a solid and con-tinuous training rate, a commonly agreed set of requirements and a solid pool of resources, what actually takes place more resembles a fire-fighting exercise.

Controllers have had to learn to undergo training throughout their career to main-tain and improve their high level of pro-fessionalism. Will this learning process also spread to “higher” levels of the aviation community? ^

[email protected]

Dear controllers around the globe, I am sure you still remember your training days: looking forward to become a fully li-censed air traffic controller, finally leaving the nerve-wrecking training time, where your career is put on a knife’s blade, be-hind you. You anticipated working togeth-er with your professional colleagues in a more relaxed atmosphere, concentrating solely on the provision of the services you were trained for – air traffic control!

And where do you find yourself now? Training continues – you are, thanks to a more sophisticated safety culture, follow-ing refresher training and CBT sessions to maintain a high level of professionalism. You are attending courses to enhance your managerial, team building and team resource supporting skills. You are trained to operate new highly advanced data processing and flight plan processing sys-tems. New technologies that become an integral part of your day to day work re-quire your constant attention.

We have seen the importance of continued training as we wish to maintain our high professional goals in a constantly chang-ing, challenging and growing industry.

Training requires continuity, agreed stand-ard and resources – both in financial terms and manpower. And it is the continuity, the standards and resources which are at shortfall. IFATCA has always stressed these points to service providers, states and other professional entities. And yet we

Training in general appears to be undermined by short term thinking.

Training – whenever we can get some … Patrick Peters (credit: DP)

Page 5: IFATCA The Controller - September 2009

Editorial

Editorial

5 THE CONTROLLER

^ by Philippe Domogala,Editior

laundry.“ So controller basic aviation train-ing is slowly being replaced by automation training (i.e. how to feed information into computers, and obtain tasks out of them).

The same seems also to be valid for pilot training where, especially on fly-by-wire aircraft, the emphasis is far stronger on how to operate the various on-board com-puters than on actual flying techniques (how to fly aerodynamically an aircraft in unusual conditions). In ATC units where very advanced automation is introduced (like the new FDPS in Maastricht for in-stance) the same tendency is observed. The primary training is now more directed on how to operate the various computer systems, and basic controlling techniques are slowly becoming secondary.

Training and accidentsTraining issues have been mentioned in the final report of the GOL/Legacy collision in Brazil as some of the major causes of this accident. These issues pertained to both the pilots (flight planning, international procedures knowledge, phraseology, etc) and the controllers (rushed basic training, lack of courses, lack of training records, phraseology, English language, etc).

Looking at some of the very recent aircraft accidents one can see a pattern – in most of these, the information released so far

indicates that pilots seem to have been caught, or at least confused, by automa-tion. In three of these (the Turkish airlines B737 in Amsterdam, the XL Airways A320 in Perpignan, and the Air France A330 in the South Atlantic) the failure of a small single point sensor induced false information to be fed to advanced automation computers – the radar altimeter in the B737, the angle of attack sensor on the A320, and the air-speed indicator pitot on the A330. It would seem that the training received by the (very) experienced crews on those aircraft did not allow them to recover the errors.

Could we see a similar trend in ATC in the future, where the failure of a single sub system (let’s take a flight plan tracker as an example) could cause, in a very busy en-vironment, multiple conflicts that the con-troller would be unable to solve?

We perhaps need to look again at the way we train controllers, and ensure that it is not restricted to operating ATM comput-ers in a record time.

This issue covers many aspects of training. ^ [email protected] this issue,

Philippe

This seems a reasonable question to ask if one looks at the reality of the ATC world today, where the overall controller short-age and the need to reduce costs have driven the current mantra “Let’s reduce training time!”

Until 15-20 years ago, it was normal for the training of any position with respon-sibility to possess some general knowl-edge. Controllers were taught aviation history, advanced meteorology, naviga-tion, and even air law to name but a few. Some were even taught to fly as part of their ATC training. Generally basic theory training could take up to a year.

Reducing training timeThe “let’s reduce training time“ mantra means that today controller training can be reduced to a few months, and only ad-dresses strictly what is needed to perform the job to a basic level. New training tech-niques such as Computer-Based Training (CBT) and Simulators have replaced most of the (sometimes long and boring) class-room lectures. Automation has replaced many tasks eliminating the need for the controller to “think” about what is behind the current situation, making us more reli-ant on automation to perform some tasks. As the famous engineer’s saying goes, “You do not need to know how a wash-ing machine works to be able to wash your

Photo Credit: DP

We perhaps need to look again at the way we train controllers,

and ensure that it is not restricted to operating ATM computers in a record time.

4 Philippe training in an aircraft simulator

Is our training adequate?

Patrick Peters (credit: DP)

Page 6: IFATCA The Controller - September 2009

4 ATC

THE CONTROLLER6

4 Controllers in South AfricaPhoto credit: atns

In 1961, on 20 October, air traffic controllers from 13 countries came together to form the International Federa-tion of Air Traffic Controllers’ Associations. After 48 years that fledging organization is now a respected and influen-tial voice in the global aviation community with 137 member associations.

In that same year, 1961, Rus-sia claimed a momentous first in the ‘space race’ when Yuri Gagarin became the first hu-man to travel into space. With-in eight years America made history with Apollo 11 and the moon landing by Neil Arm-strong and Buzz Aldrin. Then, both of these events were headline news around the world; today, another Space Shuttle or a Russian mission to the International Space Station frequently goes unreported or unoticed by the general pub-lic. How can the public’s inter-est in such incredibly advanced and technologically complex events wane so quickly? One reason is that space travel has become so frequent and for the most part so safe – even the few tragic accidents are seen as the accepted risk of our space adventure.

The same can be said about aviation generally. In 1909 the world celebrated the first in-ternational flight when Louis Bleriot successfully crossed the English Channel by flying from Calais, France to Dover, Eng-land. Now 100 years later, thou-sands of international flights are safely completed every day.

What is the common thread linking all of these events? It is

In 1961, on 20 October, air traffic controllers from 13 countries came together to form the International Federa-tion of Air Traffic Controllers’

20 October 2009

International Day of the Air Traffic Controller

the dedication and skills of the support teams that ensured the success of each of these brave explorers. The names of Gagarin, Arm-strong, Aldrin and Bleriot are famed through-out the history of modern civilisation, but the members of the Baikonur Cosmodrome team, the Mission Control group at Houston and the aircraft engineers in Calais remain nameless.

Air traffic controllers provide twenty-four hour support to an aviation system that moves more than two billion passengers an-nually; these passengers will know the name of their airline; they may even remember the name of the pilot of their flight from the brief but reassuring ‘this is your captain speaking’ message; but they will never know the names of the air traffic controllers who are commit-ted to ensuring that they arrive safely home.An air traffic controller’s voice will never have the profound effect that Neil Armstrong’s simple message ‘That’s one small step for

[a] man, one giant leap for mankind’ did. However, every air traffic controller around the world can be proud that on this Inter-national Day of the Air Traffic Controller, and on every day of the year, our voices are heard “talking to planes” so that each pas-senger gets on and off an aircraft with never a worried thought in between.

The continuing success of the Federation is but a symbol of the team-work that is air traffic control. Celebrating on 20 October each year is but a recognition that air traf-fic controllers are a vital worldwide support team critical to the success of the aviation industry. We are all very proud to be part of this team and of the role we play in making aviation safe and efficient. ^

4 Celebrating the day of the controller in Iran.Photo credit: iran atca

Page 7: IFATCA The Controller - September 2009

4 Training Europe

THE CONTROLLER 7

Entry Point North

^ by Philippe Domogala, Editor

Entry Point North (EPN) is the Nordic ATS Academy, set up by Avinor, Naviair and LFV in 2006 and located in Malmo airport (Sweden). Anne Kathrine is the first Man-aging Director. She is a former controller in Copenhagen ACC and also holds an MBA. She also participated in IFATCA conferenc-es in the past.

Philippe: How is EPN doing today?AKJ: We are doing extremely well! When we started EPN, the prediction was train 36 new students a year, but suddenly Avinor (Nor-way) decided they needed 100 new control-lers, LFV (Sweden) increased their require-ments too, and today we find ourselves with 220 students from 3 countries attending ini-tial training at the academy. To perform the training we have invested in a brand new simulator platform from MICRO-NAV providing the student a real life experi-ence. The high numbers of students means we are recruiting many new instructors with ATCO experience. To establish an interna-tional environment the recruitment also looks outside our typical Scandinavian “box”: we have recently recruited instructors from the UK, Iceland and New Zealand for instance.

Ph: What is your success rate?AKJ: You have to differentiate between suc-cess rate assessing/ leaving the training at the academy, which is 90%, to the success rate after On the job training (OJT) at the facili-ties. The total success rate upon completion of OJT and to fully qualified status is 75%.

Ph: Many controllers are now leaving their ATC careers at a relatively young age. Can training be adapted to reduce this tendency? AKJ: Difficult to say. The young people today are very different from the previous genera-tions. Many enter the ATC profession at a lat-er age. For instance, a typical trainee control-ler today is 24-25 years old, and has maybe studied something else before deciding to become a controller. Many of the trainees have a diploma in another completely dif-ferent field. Mobility is also something they are considering when deciding to begin the training. So they will most probably not want to spend their whole career in the same place at the same job. We indeed have to adapt to this together with the Service Providers.

Ph: What are your training strategies for the coming 10 years?AKJ: The goal of EPN is to attract students from all over Europe. To meet this goal we must ensure that we can offer the students a best-in-class experience. EPN is actively work-ing towards a harmonized training program. We work closely with Eurocontrol to establish a standard that applies to the safety standards The training is a very important part of air navi-gation service provision which is why we want to play a leading role in this work.

Ph: Are you planning to change some things as a direct consequence of the current finan-cial crisis? AKJ: We have seen some hesitation from the ANSPs as a result of the decline in traf-fic. However, as many controllers retire rela-tively early there is a continuous demand for new controllers to replace the ones leaving. The last major crisis in the industry was 9/11. Many ANSPs put a hold on training and they are still recovering from the shortage of con-trollers. According to Eurocontrol the short-age of controllers in Europe is around 10% (estimated 1500). The current decline could help to level out the actual shortage of con-trollers but we still see an increased demand for controllers. As we have proved that we

actually can reduce the cost of training per student we see an opportunity to help the ANSPs to lower their costs by out-sourcing the training to acad-emies to the likes of EPN.

Ph: Do you envisage develop-ing or introducing new training methods beyond the old class-room lectures?AKJ: The introduction of new simulators gives us an oppor-tunity to improve the existing training methods. We are con-tinuously striving to improve the training methods and by recruiting staff with operative ATC experience from different countries. By using the best ex-perience we believe that we can increase the quality of the train-ing resulting in a higher success rate. Today, the ATS academies face a shortage of instructors as well as there are high costs as-sociated with the training, this is a challenge we strive to solve by introducing improved train-ing techniques and enhancing the use of CBT. ^[email protected]

Training is a very important part of air navigation service

provision.

4 Anne Kathrine JensenPhoto credit: DP

4 Entry point north signPhoto credit: DP

Interview with Anne Kathrine Jensen, Managing Director Entry Point North (Nordic ATS Academy)

Page 8: IFATCA The Controller - September 2009

4 News and briefs

THE CONTROLLER8

VV ApproachTM is a self-contained training course that teaches the art of Radar Vectoring and the sequencing of high-speed aircraft onto a runway. The recently released Home Learning Edition enables you to test your aptitude for the most complex job in Air Traffic Control in the comfort of your own home, developing sound skills before entering the high-pressure live training environment.

An investment in VV Approach is an investment in a career.

For details visit our website www.visualvectoring.com or call +61 7 3899 1173

take control of your training

Visual Vectoring Pty Ltd, Australia

Remote Towers Update: Australia Intends to Implement!Civil air informs us that the CEO of Airservices Australia has committed to the SAAB remote tower concept for Australia. It’s likely that the system will first be deployed in Karratha, Western Australia. This airport has seen an as-tronomical traffic growth on the back of a mining boom. Although a traditional tower exists, by the time it is re-commissioned and staffing issues sorted (almost no ac-commodation available in the town), there is a real concern the traffic peak may have moved on. The remote tower concept requires relatively little in local infrastructure and the staff can remain in their own centre. As reported in our last issue, many issues remain to be resolved, but that doesn’t seem to have stopped manufacturers selling the system! ^ [email protected]

News from the Greek Air Traffic Controllers' Association

On the occasion of the forthcoming 26th IFATCA ERM in Greece, I would like to make evident to all IFATCA family the situation in Greece. I hope that in the near future when Greek controllers will find themselves far from the modernization already implemented in Europe for years, they shall rely on IFATCA's support and aware-ness. There is immediate need for the Greek ANSP to gain its own administrative and financial independence. The present bureaucratic structure of the Hellenic Civil Aviation Authority does not permit any flexibility in deci-sion making process in order to meet the SES legislative requirements. There are significant delays identified al-ready by the EU regarding compliance to the EU regula-tions due to this old fashion structure. Although for many years the Greek controllers Association (GATCA) strives for changes in the ATC field it seems that there is no po-litical will for real change.The situation as such does not leave much hope for improvements in the ATS field mak-ing us unable to meet the users’ demands and to achieve the goal of high quality services to the public.

We hope that with your support things will become bet-ter soon. ^ [email protected]

Remote Towers Update:

News and briefs:

^ by Leon TOURNAVITIS, Greece ATCA Vice President

Page 9: IFATCA The Controller - September 2009

ing rate, and unlimited prac-tice at handling realistic traffic must be available if successful outcomes are to be achieved. These are what our Radar Ap-proach training course VV Ap-proach provides. For the first time real, high-level, practical training is available, and at low cost. Training can be done anywhere and at any time the trainee desires, even at home, under no learning pressure. The vital change has arrived, and ATC training in the future will be very different to what it has been in the past. It will not be long before full ICAO mod-ules, both theory and practi-cal, are done without the need for a formal training environ-ment. ^

[email protected]

ContinuityAnother factor that affects ATC training is that each trainee is taught by more than one instructor. Every controller does the job, and therefore teaches it, slightly differently. Trainee pilots generally have the same in-structor every lesson, one with whom com-patibility has been established; trainee con-trollers generally do not.

ATC training blunders on from year to year. Training efficiency never really improves, in spite of all the technological advances over the decades. Enormous amounts of money are expended just to keep up the necessary supply of controllers whilst never-diminishing numbers of (usually young) people have their aspirations dashed, possibly due not to a lack of ability on their part but rather a train-ing methodology that is back in the ‘Dark Ages’.

The solutionHow is the problem to be solved? Many have tried but none have succeeded, all because the primary cause has never been addressed. Until the manual training delivery method is changed the problem will remain, and ATC training will continue to be the burden on the Aviation Industry that it is.

The only solution is to change to computer-based delivery of basic practical training, something that has been done, in part at least, in virtually every other field of human endeavour. Training needs to be standard-ised, done at the trainee’s individual learn-

The pastThe manner in which training for Air Traffic control is delivered has not changed since the 1930s. Every controller who has ever done the job has been taught the necessary skills by others – in person. The trainer and the trainee are placed in a situation where aircraft traffic can be managed, either live or in simu-lation, and a process of ‘osmosis’ takes place; the skills of the trainer very gradually flow to the trainee. Certainly, the introduction of simulators in the 1970s made the process eas-ier, but it did not change the manual delivery method. And, simulators made the process far more expensive, mainly because in simula-tion both participants are revenue-negative.

Disadvantages of current systemIgnoring the massive cost of training by per-sonal contact, the current method has major disadvantages for the trainee, due to the Hu-man Factors associated with training. These factors include any issue that could adversely affect the efficacy with which one person can teach another, or with which one person can learn from another. Such issues exist in all training, but in ATC they become dominant, because of the pressures on the trainee, both from the fact that they are learning a safety-critical job and that their career depends on their being able to learn the required skills. The interpersonal compatibility between trainer and trainee is one of the most signifi-cant factors that determine the outcome.

A trainee entering ATC, is immediately un-der pressure, even before the first aircraft is handled. He/she knows that training time is limited, due to its enormous cost. If the necessary skills cannot be obtained in the specified time their aspirations for a career evaporate; there is a ‘brick wall’ at the end of all ATC training. If a trainee reaches that wall without attaining the required standard they can generally forget any ideas of moving into ATC. This training stress is unique to ATC. In any other similar profession (flying, for exam-ple), the trainee knows that, if he/she does not pass the first licence test, further lessons can be taken – there is no ‘brick wall’.

4 Training Australia

THE CONTROLLER 9

Training can be done anywhere and at any time the trainee desires, even at home,

under no learning pressure.

ATC Training at Home: the Future?^ by Ainslie Rowland,

Visual Vectoring Pty Ltd, Australia

Photo credit: photoeuphoria/dreamstime

Page 10: IFATCA The Controller - September 2009

pens under the supervision of an experienced controller. It lasts from one to six months, depending on the operational environment. Once qualified on the first sector, further train-ing opportunities are available to increase your control area. Each subsequent sector or posi-tion takes less time, generally about a month. A controller who fails to complete the on-the-job training can either get a prolongation of this training or may be dismissed.

DifferencesThere are some differences between the ATC training in Russia and in other countries:

• There are no private ATC educational insti-tutions or companies;

• Rather than specialising in tower, approach or en-route air traffic, students get a broad education about all these functions/positions;

• Despite the growing demand for qualified controllers, young air traffic controllers still have to fulfil their military duty after completing their education. Some of them chose a different career after this and don’t return to ATC;

• Especially in the big Area Control Centres, there is no requirement to be certified on all control positions;

• New controllers don’t start their career as Flight Data Assistants or Specialist, but start real training on their assigned sector or position;

• Controllers must pass a full physical exami-nation each two years;

• Licenses need to be prolonged every two years. Also bi-annually, controllers follow a month-long English language course with a test at the end;

• There’s no possibility to work abroad with our license.

ATC education and training in Russia has been through times of troubles. At one time we graduated more then 500 air traffic con-trollers per year, but that dropped to an all time low of about 50 at one point. Now, as a result of the increased demand, we can see an increase of graduated air traffic control-lers in Russia. I hope this is only the begin-ning. I’d like to take an opportunity and to wish the ATC training industry around the world to have as many intelligent students as possible. ^ [email protected]

4 Training Russia

THE CONTROLLER10

ATC Education and Training in Russia

^ by Eduard Kolodnyi, ATC instructor, Rostov-on-Don Training Center, Russia

Whether or not becoming a controller in Russia is a good idea, I don’t know. But if you want a challenging, but very in-teresting job – welcome.

The "State ATM Corporation of Russia" is the exclusive em-ployer of all air traffic control-lers in the country. If you want to be hired by this corporation, you have to pass two impor-tant phases.

Basic trainingFirst hurdle is a three- or five-year degree program in air traffic control at college or university. The program is de-signed to provide the students with essential knowledge of ATC and includes, among oth-ers, aviation law, flight rules, meteorology, ATC procedures,

First hurdle is a three- or five-year degree program in air traffic control at

college or university.

aircraft operations, air naviga-tion, navigation aids, communi-cations, and so on.

Simulation is also used extensive-ly under the guidance of quali-fied ATC instructors to ensure maximum training efficiency, high skill levels and exposures to emergency conditions.

Students should be aware, that completing the program re-quirements does not guarantee employment with "State ATM Corporation of Russia". All the above-mentioned relate to gen-

eral public applicants only, without any prior experience in aviation.

If you have experience as a military controller or pilot you have a good chance to get into a special short training course. It takes about six months to complete this course and start on-the-job training. "State ATM Corporation of Russia" guarantees employment to gradu-ates of this course.

At the moment, the demand for new and qualified air traffic controllers is extremely high. As a result, there is one more special program for people with a technical college or institute education. After a test, these applicants go through an intensive training program for twelve months. "State ATM Corporation of Russia" also guarantees em-ployment, provided they:

• are Russian citizen;• have at least a secondary school

diploma or equivalent;• pass a medical examination;• pass tests and examinations;• have a good knowledge of English;• pass a security background check.

On-the-job trainingFollowing the basic training, future control-lers then relocate to an airport or air traffic control centres. Before they become certi-fied, they will undergo on-the-job training.

This training consists of a combination of class-room, simulation, and on-the-job training at the trainee’s assigned sector. The latter hap-

4 Training in RussiaPhoto credits: EK

Page 11: IFATCA The Controller - September 2009

4 Europe Training

THE CONTROLLER 11

Over 1600 ab-initio students attend courses

at ENAC per year.

4 Inside the large simulator room

Photo credits: enac

ENAC was founded in Paris in 1948 and moved to Toulouse in southern France in 1968. It is a public corporation within the French administration. It operates under the supervision of the Direction Générale de l’Aviation Civile (DGAC – the French equiva-lent of a CAA).

ENAC’s mission is to provide both ab-initio and continuation training for the civil avia-tion community. This genuine University of Civil Aviation offers a wide range of activi-ties which are tailored to meet the require-ments of the public and private sectors both in France and in other countries. The cur-riculum includes general training, specialist Master’s degrees, research, instructor train-ing and international activities.

ENAC is member of the “Aeronautics, Space and Embedded Systems” world competi-tiveness cluster and PEGASUS the partner-ship for European group of aeronautics and space universities.

AB-Initio trainingSome of the basic courses ENAC offers, enable students to pursue a career in the following fields:

• ENAC Engineer, which is a multidisciplinary training course aimed, including aircraft and avionics manufacturing, information technology, airline and airports operations and administrative functions within the DGAC.

• Air Navigation Control Engineer: profes-sional training for air traffic controllers working in the French administration.

• Air Safety Systems Electronic Engineer: professional training for DGAC installa-tion and maintenance of air navigation equipment

• Civil Aviation Design and Operation Senior Technician: professional training for DGAC assistant, aerodrome air traffic controllers

• Air Transport Pilot• Aircraft Dispatcher• Aeronautical engineer in China

Over 1600 ab-initio students attend courses at ENAC per year. All French air traffic control-lers have been taught at ENAC, since 1948.

Specialist diplomasENAC also offers specialist Master’s degrees. Subjects, taught in English, include:

• Aviation Safety• Aircraft Airworthiness• Cooperative Avionics• Air Operations and Air Traffic Management• Airport Management• Air Transport Management• Satellite-based Communication,

Navigation and Surveillance• International Air Transport Operations

Management

Furthermore, ENAC has partnered with sev-eral universities for several Master’s degrees: the university of Tianjin, China; the LUISS Business School Roma, Italy; and in France with the University of Toulouse.

Continuation trainingOver the years, this has become a major ac-tivity at ENAC. The University has developed their recognized know-how in specific fields to ensure that professionals keep up with the latest trends and developments in their field. Subjects here include: air traffic, electronic systems, information technology, aeronauti-cal techniques, safety, languages and social sciences. ENAC welcomes about 6000 con-tinuation trainees per year, of which about 2000 are air traffic controllers.

International activitiesSince 1949, ENAC has recognised a require-ment for international cooperation and ex-change as part of its mission. For this reason, over 6000 foreign students or trainees (a large part of them air traffic controllers) from 100 different countries have completed all or part of their training at the University.

Currently, ENAC provides both ab-initio and specialized courses in English. It liaises with

ENAC was founded in Paris in 1948 and Over 1600 ab-initio students attend courses at

Ecole Nationale de L‘ Aviation Civile (ENAC)The French Civil Aviation University

^ by Daniel Casanova

ASECNA (African ATC Agency) and with nine countries in Cau-casia and Central Asia; Its in-structors teach in Egypt, Saudi Arabia, Algeria and Morocco.

Controller trainingFor a controller , training at ENAC has added value be-cause of the diversity of stu-dents, the high qualifications of the instructors and the different laboratories. All aeronautical technologies and technicians are present on the campus.

ENAC’s know-how in air traf-fic control is widely recognized and the ATC department has a European agreement. For many years, the ATC department at ENAC has trained air traffic controllers from many different countries, generally in French language for ab-initio trainees and in English for continuation training. Since 2005, ENAC has hosted ab-initio training for Swiss controllers and since 2008, for Egyptian students. In 2009, they will start train-ing people for the Eurocontrol Maastricht centre. ^

[email protected]

Page 12: IFATCA The Controller - September 2009

use of an Internet based advertising plat-form, marketing in the media (TV, Cinema, Radio, newspapers, magazines etc) and re-gional recruiters at DFS Units.

Those who apply then are processed using the following pre-selection filters:• Paper sift• Biographical Questionnaire• re-selection• Main Selection• Medical

The selection criteria results in the fact that to be able to select 100 candidates for training as future ATC controllers, the DFS needs to attract the interest of at least 1500 applicants.

Training StructureOnce this selection process is completed the candidates are contracted to the company for training in their required disipline. The license structure of the DFS means that the Air Traffic Controller training is sub-divided into three specialisations.

These are: • training for Tower Controllers• training for APS Controllers (Approach

control – Lower airspace including TCL en-dorsement) and

• training for ACS Controllers (Area Control – Upper airspace)

Due to this licence requirement our train-ing is divided into defined modules that are

4 Europe Training

THE CONTROLLER12

Training for Air Traffic Controllers in Germany^ by Kevin Salter

Kevin Salter is Head of Air Traf-fic Management Training at the DFS Academy at Langen. He joined the DFS in 1994 af-ter retiring from the Royal Air Force in Berlin. Kevin is also IFATCA’s Corporate Affairs member and regularly provides `The Controller´ magazine with its CM feature `Spotlight´.

As with many ANSPs, DFS Deutsche Flugsicherung GmbH, the German Air Navigation Services Provider, established a centralised training center to provide the company with air traffic controllers for the future. Since 1988 the DFS Academy of Air Navigation Services has been located at Langen, 13 kms south of Frankfurt Interna-tional Airport.

The DFS AcademyThe DFS Academy has ap-proximatly 250 instructional and support staff. The facil-ity is co-located with the DFS Headquarters and the Langen ATCC and provides training for company employees in all areas that where support is required. The management of

We attract our future controlling staff by

the use of an Internet based advertising plat-form, marketing in the

media (TV, Cinema, Radio, newspapers,

magazines etc).

the training requirement is divided into two main divisions, these are `Air Traffic Manage-ment Training´ and `General and Technical Training´. As the DFS is committed to sup-porting the worldwide training demands from our ATS partners, whenever possible training courses are provided for various other ANSPs such as Croatia, China, Poland, Estonia etc.

Of course controller training in the DFS is a joint effort with operations, however, in this article I will concentrate on the institu-tion training (IT) structure we provide for the preparation of DFS student controllers for both the Tower and Radar disiplines by the Air Traffic Management Training division of the Academy. My department has over 150 teachers and instructors from various coun-ties around the world including Germany, UK, USA, Italy, Australia, Hungary, and India. Included in this number are several non-ATC teachers and instructors who specialise in the teaching of Aviation English, Equipment, Aircraft, Navigation and Meteorology.

Selection Process for Future ControllersBefore we can start training we require a process to find the suitable candidates. The selection process for those interested in a fu-ture career as an air trafic controller is a joint process using DFS Staff and the external support of the Department of Aviation and Space Psychology from the DLR, the Institute of Aerospace Medicine based at Hamburg. We attract our future controlling staff by the

All photo credits: dfs

4 Control TWR simulator

Page 13: IFATCA The Controller - September 2009

Upper Area Control Center at Karlsruhe. This is required as specialised knowledge of the VAFORIT system is paramount and therefore the last 11 weeks of the course will take place at Karlsruhe using their instructors with the required valid sector and equipment endorsements under the supervision of the Academy.

ConclusionThe DFS Academy has a proven excellent training record. One important factor in maintain-ing this record is the dedicated staff who ensure that all efforts are made to provide an inter-esting, enjoyable and success-ful training environment.

This environment combined with the large amount of prac-tical exercises that support the training modules meant that the Academy achieves an IT pass rate of trainees into OT of over 90%. ^

[email protected]

traffic in their daily DFS duties. In this course each trainee also receives practical training in an advanced simulator with the associated feedback and assessment.

APS CourseThe APS course provides the advanced knowledge and practical skills that are re-quired for a controller to provide Approach and lower airpace service. The course is di-vided into 2 phases and lasts 41 weeks. The course includes 5 theoretical examinations, 2 Phase Reports and 3 practical examinations. In this course each trainee receives a mini-mum of 500 hours of practical radar training in an advanced simulator with the associated feedback and assessment.

ACS CourseThe ACS course provides the advanced knowledge and practical skills that are re-quired for a controller to provide an ATC area service in the upper airspace. The course is divided into 2 phases and lasts 37 weeks. The course also includes 6 theoretical exami-nations, 3 Phase Reports and 2 practical ex-aminations. In this course each trainee also receives a minimum of 500 hours of practical radar training in an advanced simulator with the associated feedback and assessment.

Note: In the near future the ACS course will be de-centralised to meet the needs of our

4 Europe Training

THE CONTROLLER 13

dependant on the future role of the ab-initio trainee. These modules are the:• BASIC Course• ADI (Aerodrome Instrument) Course

(VFR and IFR Tower Controllers)• RAD (Radar for information purposes)

Course• RAD-S (Radar for Separation) Course • APS (Approach and Lower Airspace

including TCL) Course• ACS (Area – Upper Airspace) Course

English TrainingAs a pre-requisite to commencing ATC train-ing all students start at the Academy with a 2 week Aviation English course at the end of which is an examination to assess their Eng-lish ICAO level. All trainees must achieve a minimum standard of ICAO Level 4 prior to commencing their ATC training course.

Basic CourseAfter completion of their English course all trainees commence training with the BASIC Course. This course lasts 17 weeks and fo-cuses on the foundation knowledge and tools that are required to become a controller. The course includes 3 theoretical examinations and 1 practical assessment. For a trainee to continue to the next phase of their training they must pass all examinations and show the required appititude in the practical assessment. On completion of the course the trainees move to the next module for their future role.

ADI CourseThe ADI course is provided to give the stand-alone VFR / IFR Tower units the student controllers they require. This course last 16 weeks and focuses on the practical skills that a Tower controller needs to work within the company. The course includes 3 theoretical examinations and a practical examination. On completion of the course trainees are is-sued with a student licence and sent to their unit to commence pre-OJT and OJT training. In this course each trainee receives practical training in an advanced simulator with the as-sociated feedback and assessment.

Note: For the DFS trainees, the RAD course is not conducted separately. It is integrated into the ADI course.

RAD-S Course The RAD-S course is provided on comple-tion of the ADI course to any trainee who requires a radar separation endorsement to the student licence. The course lasts 13 weeks and focuses on the radar skills that are used by the tower control for separation of

4 Tower simulator room

Page 14: IFATCA The Controller - September 2009

In order to achieve these lofty goals and maintain the highest standard in the air traf-fic environment, sound training is fundamen-tal to success.

Mike Moroney Aeronautical CenterThe Federal Aviation Administration’s air traffic academy is located at the Mike Moro-ney Aeronautical Center, in Oklahoma City, Oklahoma. Under the oversight of David Haddad, Air Traffic Division Manager, and his talented staff, new ATC hopefuls enter the initial phase of transformation.

Background and experience play an impor-tant role in the determination of what train-ing syllabus will be followed. Applicants often have previous air traffic experience in the military, or Department of Defense (DOD). Others are graduates of a Collegiate Training Initiative (CTI) school. These are col-leges and universities, with which, the FAA has partnered. These schools offer two- and four-year non-engineering aviation degrees that focus on basic courses in air traffic con-trol. Other applicantants, without any air traffic experience, are admitted based upon pre-employement testing and screening.

Levels of instruction and associated timeframeDepending upon which option the trainee is assigned, (en route, tower, or terminal ra-dar), the first 5 weeks (25 days) of instruction is dedicated to Air Traffic Basics. During this period, classes will cover subjects such as, aviation weather, airspace structure, air traf-fic rules, dynamics of flight, separation, and phraseology.

Upon completion of this phase of training, additional option specific instruction begins. Predicated on the speciality which the indi-vidual will follow, the training will last up to 13 weeks, (66 days). This period is divided into two well defined areas; low-medium fi-delity simulation, and high fidelity simulation; both of which entail additional classroom in-struction. The success of each phase of train-ing is measured by a series of examinations

4 USA Training

THE CONTROLLER14

Air Traffic Control Training in the United States^ by Clyde Ledgerwood Jr

surgent importance in air traffic training. For the most part, this is reflective of a global air traffic controller shortage. The United States has, historically, been one of the world lead-ers of air traffic control training; therefore, in this issue we will closely examine how they accomplish this task.

The U.S. air traffic system spans much of the world. From the South Pacific islands of Pago Pago and Kwajalein, to remote area of Alaska (mere miles from Russia), to the Vir-gin Islands, and Puerto Rico; U.S. air traffic controllers ensure flights reach their destina-tions in a safe, organized, and expeditious manner.

Training and potatoes Training, especial-ly air traffic control training is much like potatoes. There are many ways to prepare pota-toes; Boiled, fried, baked, mashed, au gratin, soup, etc. The desired result is three fold, to be filling, to be satisfying, but, most importantly,

to be capable of sustaining life. Concerning air traffic training, there are many venues and approaches to training; however, much like potatoes, the desired result is also three fold; an individual who is capable of providing air traffic control that is, organized, expeditious, but, most importantly, safe.

4 US academy studentsPhoto credit: CL

Photo credit: demonike/dreamstime

Clyde Ledgerwood Jr, a former FAA controller / man-ager, is now employed at the DFS, German ANSP, Acad-emy at Langen near to Frank-furt International Airport. He is currently working as a spe-cialist advanced ATM training instructor.

A prominent economist once said that the greatest single impact on the US economy during the late 20th century was the air traffic controller’s strike of 1981. If the disrup-tion, or inability of the air traf-fic system to function properly, had such a dramatic impact on one of the world’s major econ-omies, what happens during difficult economic conditions if the air traffic system is unable to function properly because of a lack of qualified control-lers? Training is paramount in the maintenance of a qual-ity air traffic system; hence, air traffic training is paramount in the maintenance of a healthy economy.

A recent article, July 09, on www.aero-news.net, an-nounced that the FAA plans to hire 15,000 air traffic con-trollers over the next 10 years. This is indicative of an aging air traffic community and the re-

Page 15: IFATCA The Controller - September 2009

to the laboratory predicated on the type of radar equip-ment they will encounter in their assigned facility. Each laboratory will accommodate 6 students and 6 instructors. Ad-ditional monitor positions are also available. Currently, two STARS Labs and two ACD labs are being utilized.

The en route students receive their simulation training in on of the two simulation laborato-ries available. Again, this high fidelity training has proven to be an effective tool in the de-velopment and refinement of basic air traffic skills. Each lab has 10 training positions.

SummaryThe U.S. system of air traf-fic training is only one among many global institutions; but it has proven to be a good one, if not great one.

As long as safety remains the focus and goal of the air traffic profession, neither economic constrains, current or future, nor technological advance-ments, will diminish the global demand for quality air traffic training. Irregardless, of how you eat your potatoes. ^

[email protected]

Interactive Instructional Delivery System (IIDS)The FAA Academy presently has 9 Interac-tive Instructional Delivery System (IIDS) Labs to provide low to medium fidelity training. Used in both the en route and terminal initial qualification programs, this type of instruc-tion provides interactive simulation exercises and has additional academic application. The simulation scenarios (part tasking) use Acad-emy developed software.

Tower Simulation SystemDuring the 37 days training days, the Tower Simulation System is used to provide high fidelity training and can be utilized for site specific locations should the need arise. It has proven to be an effective tool in the sim-ulation arena. Presently, 10 labs are in use and 4 more are scheduled to be operational by the Fall of 2009.

Radar SimulationTerminal radar simulation utilizes two dif-ferent types of laboratories; the Standard Terminal Automation Replacement System (STARS), and the ARTS Color Display (ACD). Pictured above is one of the STARS simu-lation laboratories. Students are assigned

4 USA Training

THE CONTROLLER 15

Air traffic training is paramount in the maintenance of a healthy economy.

dispersed throughout the instruction. Each course culminates in a performance verifica-tion process. It is at this point where full per-formance controllers from the field, general-ly, supervisory personnel, gather to evaluate each student individually. The exercises are designed to measure the student’s ability to apply basic air traffic control procedures un-der limited traffic conditions in a simulated environment. Successful completion of the requirements of the F.A.A. academy now al-low the student to enter the individual train-ing programs at their assigned air traffic field facilities.

The instructional tools and teaching methods at the academy are as diverse as possible to achieve a quality product.

Low fidelity non-radar en route labLow fidelity training is used to illustrate and apply non-radar separation techniques and develop essential skills associated with pro-cedural control. This low technology is de-signed to use constructed air traffic scenarios as teaching tools.

Tower simulation laboratoryIn the tower simulation laboratory, low fi-delity training is utilized in conjunction with classroom coaching to teach airport surface and local control concepts, principles and techniques. The model airport layout is con-figured to a table top with a variety of air-craft/vehicle types.

Page 16: IFATCA The Controller - September 2009

terials and pronunciation courseware than to develop your own.

C: Create Program Design and ContentAs well as buying training materials and preparing classroom materials your instruc-tors will have to customize program delivery to suit your needs, to allow for local work schedules. Some questions to ask are: Where will you conduct the classes? How many hours daily/weekly? How many participants per class? What specialist equipment do you need? You may seek to use authentic ATC recordings for customized activities that ad-dress your local needs.

D: Deliver the Training Most people believe they start here: a teach-er, a few participants, a few books – a recipe for disaster. You will find that well-qualified instructors can make a range of materials work while automatically managing varied learner levels, meeting individual needs, and motivating people to be successful. Poorly prepared instructors, who don’t know how to help people learn English, will destroy even the most carefully planned activities.

E: Evaluation Process Your aim is to prepare valid, reliable, effi-cient, and fair assessment for your employ-ees. Information from this testing provides for course placement, identifies what’s need-ed in training, and allows you to conduct li-censing that meets ICAO English directives.

V: Validate your Program To consider how you could do the same job faster and cheaper, measure impact of the program by using course feedback and job performance data. Validation processes look at how you analyze English training needs, your program design and length, suitabil-ity of instructors, classroom materials and equipment, testing and licensing processes, and should reduce costs.

Two Final Words Don’t bring this costly problem inside your organization. Tell candidates with weak Eng-lish, “We want to consider you for future work with us. Please come back and see us (in 3 months) and we’ll test your English again.” And lastly; aim high. The ICAO L4 Standard was not established by empirical research – you may find that you assess employees as meeting L4, but English-on-the-job does not allow fully independent operation. ^

Comments to: [email protected] or [email protected]

4 Aviation English Training

THE CONTROLLER16

er, a few participants, a few books – a recipe for disaster. You will find that well-qualified instructors can make a range of materials work while automatically managing varied learner levels, meeting individual needs, and motivating people to be successful. Poorly prepared instructors, who don’t know how to help people learn English, will destroy even the most carefully planned activities.

E: Evaluation Process Your aim is to prepare valid, reliable, effi-cient, and fair assessment for your employ-ees. Information from this testing provides for course placement, identifies what’s need-ed in training, and allows you to conduct li-

Compliance with ICAO English Standards: How to Train and Test?

^ Some guidelines and questions by Graham Elliott

A teacher, a few partici-pants, a few books: a recipe for disaster.

ing and testing we suggest you identify six phases in the process.

A: Analyze your Organizational NeedsTo identify your specific needs, conduct benchmark testing to do two things: 1. meas-ure the size of the issue for budgeting and programming, and 2. use the test results to analyze specific learner needs to be rem-edied in the training. There are now two dozen Aviation English tests on the market; only three of them that conform to the ICAO recommendations on testing have published data on how the test performs. If you use a poorly designed or unprofessionally pre-pared assessment you won’t be able to make reliable judgments from results – use the brief ICAO test checklist at www.icao.int/anb/fls/AUD001/checklist.pdf to help you decide.

B: Build the Budgetary and Staff ResourcesPlan to start with your best English speak-ers – in this way you’ll return qualified peo-ple to your staff rosters faster. To be ready for March 2011, if you do not already have solid English training already in place, use experienced aviation English consultants and training contractors. It is less expensive to buy published aviation English training ma-

Graham was Program Man-ager at the FAA Academy in Oklahoma City to establish the FAA training response to address ICAO Doc. 9835 is-sues. Today he works in Iraq installing English testing & training on contracts with the USAF and Iraqi Civil Aviation Authority.

There are no short cuts in lan-guage learning. Time, moti-vation, and mature effort are always required. ICAO Doc 9835, Chapter 4. 6. page xi

There still appears to be a lot of uncertainty on what to do about English training and test-ing for pilots or controllers to meet the ICAO English direc-tive by March 2011. To guide you, the writers invite requests for clarification of information in this article and requests for development of plans; contact information is at the end. To install efficient English train-

Phot

o cr

edit:

A.B

.

Page 17: IFATCA The Controller - September 2009

Task Force is currently look-ing into how the duration and schedule for all the different training phases can be harmo-nised across the board, pro-viding further synergies and flexibility.

FABEC is looking as well in a much closer cooperation in selecting the future Air Traffic Controllers. Beside the effect of harmonization an improved quality of students at a lower cost for selection is the aim.

As training is usually the entrance to an ANSP, harmonized training across FABEC will serve well as catalyst for further collaboration in operations. ^

[email protected]

After the 15 weeks, the students go to Euro-control’s own training institute in Luxem-bourg. There, they continue their training to obtain their area rating. The final stages of their training take place at the Maastricht Upper Area Centre in the Netherlands. Fol-lowing simulator and on-the-job training, they obtain their sector qualifications in one of the three main sector groups at the cen-tre. On average, a trainee is expected to be fully qualified in 2,5 years.

Competence In the domain of controller competence as-sessment, LVNL and Maastricht UAC also un-dertook to cooperate more closely. As part of its training process, Maastricht UAC will therefore start to use a methodology devel-oped by LVNL, called CBAS: Competence Based Assessment System.

The system is comprised of a set of tools which allow student air traffic control-lers to be assessed and monitored objec-tively throughout their training. One of the strengths of CBAS is that potential trainee weaknesses are spotted and pinpointed at a very early stage, allowing for additional targeted training. This should increase the trainee’s chances of success and ultimately benefit the overall effectiveness and cost of the training process.

HarmonisedFinally, the FABEC Training Task Force is currently developing a common basic train-ing course, which will be used in future throughout the region. Since this course will be completely harmonised, it will be possible to embark on any subsequent training phase (e.g. rating training for tower, approach or ACC), regardless of the training station with-in FABEC. In addition, the FABEC Training

4 FABEC Training

THE CONTROLLER 17

Especially in these times of economic turmoil,

every efficiency initiative counts.

As reported on in previous issues, one of the results of the European Single European Sky (SES) initiative is the creation of several so-called Functional Airspace Blocks or FABs. One of those, the FAB Europe Central, has the commitment of seven air navigation serv-ice providers (ANSPs) in six European States: Belgium, France, Germany, Luxembourg, the Netherlands and Switzerland. The sev-en ANSPs are Belgocontrol (BE), DFS (DE), DGCA-DSNA(FR), LVNL (NL), skyguide (CH), ANA (LU) and Maastricht UAC (currently pro-viding upper area control for 4 of the 6 states already).

As with others FABs, the main goal is to increase ATM performance by creating a flexible, harmonised and seamless network, independent of national boundaries. This should eventually lead to greater safety and improved capacity and cost effectiveness.

Basic trainingEspecially in these times of economic tur-moil, every efficiency initiative counts. One of the first concrete projects the FABEC has recently undertaken involves the basic train-ing module for Maastricht UAC student con-trollers. Since the early 70’s, the first phase of their training took place at Eurocontrols’ own institute in Luxembourg. This phase comprises mostly theoretical subjects, such as rules, regulations and meteorology.

Since October 2008 however, Maastricht UAC, skyguide, Belgocontrol, DFS and ENAC (Ecole Nationale de l’Aviation Civile) have made important strides towards great-er cooperation for the provision of basic air traffic controller training – a training phase lasting approximately 15 weeks – for future Maastricht UAC controllers.

Instead of going to Luxembourg, a first group of MUAC student controllers started their training at skyguide in Zürich. The sec-ond group started in March 2009 at Belgo-control’s premises in Steenokkerzeel and the third group went to DFS, Langen, in June 2009. Another group is due to join ENAC (see elsewhere in this issue) in Toulouse, France in January 2010.

FABEC Looks for More Efficient Training^ by Philip Marien,

Deputy Editor

4 The FABEC area covers a large part of the core area of EuropePhoto credit: FABEC

4 MUAC students together with Patrick Coppens, ATC Training Center Manager BelgocontrolPhoto credit: Belgocontrol

Page 18: IFATCA The Controller - September 2009

the gauge, and not to an independent sensor in the tanks.

A media campaign against the pilots and the airline ensued in Italy, but curiously not against the aircraft manufacturer ATR, and this despite calls within the industry to modify the fuel gauges to prevent a recurrence. The Italy Safety Board issued safety bulletins first one month after the accident (ANSV 6 and 7/05) and another on the fuel level gauges in December 2005 (ANSV 13/05) requesting EASA to change the certification of ATRs.

Both pilots (together with technicians and management from Tuninter) were prosecut-ed by a Judge in Palermo for homicide. No one from ATR was prosecuted. The verdict in March 2009 condemned everyone to long sentences in prison. Each pilot received 15 years jail, reduced to 10 years because a fast trial option was agreed. They are planning an appeal. ^

Philippe: How do you feel after this verdict? Capt Gharbi: We both feel really, really sorry for what happened to our passengers, and to our friends the two crew members, who died in this accident. It is a very difficult emotional thing for us. But we are also victims of this ac-cident, yet we were treated as criminals both in the Press in Italy, and by the Italian judges. The verdict fell on 23rd March 2009 – it was for 10 years jail for each of us, and we feel frustrated and sad after this verdict.

Philippe: Do you feel you had a good defense? Capt Gharbi: There were nine people pros-ecuted from our company, including the mechanics, the Technical Director, and the CEO. So Tuninter provided us with a team of lawyers. We all agreed in advance that the interests of everyone would be safeguarded. I think we got best possible defense, but it did not help much in the end. F/O Kebaier: If I had the possibility, I would have preferred to hire my own lawyer, but the costs were prohibitive. I could never afford this.Capt Gharbi: Yes, good international law-yers are very expensive, and we could not afford that by ourselves. I think however that we got one of the best lawyers via the insur-ance company.

4 ATR

THE CONTROLLER18

the gauge, and not to an independent sensor

When Justice and Media Create the Ideal Culprits

^ by Philippe Domogala, Editor

The Facts in Brief:

On 6 Aug 2005, an ATR72 from Tunisian airline “Tuninter” was on a flight from Bari (Italy) to Djerba(Tunisia). After 50 min-utes flying time over the sea, it suffered a double engine fail-ure at FL230. Fuel indication was 1800 Kg, and the crew attempted to restart engines following standard emergency procedures. When it became evident that a restart would be impossible, the crew asked to divert to Palermo (Sicily) or any nearby airfield. But there was no other than Palermo.

The altitude by then did not permit the aircraft to reach the airfield, and they ditched some 20NM before the airport. Of

the 39 persons on board, 16 died, including 2 crew. The captain and co-pilot survived.

The investigation identified a faulty Fuel Quantity indicator. On ATRs, this gauge is digital (see photo) and although internally dif-ferent between the smaller ATR42 and larger ATR72, they look physically the same and were interchangeable. But each model has different shaped tanks, hence providing dif-ferent indications. On a previous maintenance intervention, the smaller quantity ATR42 indi-cator was fitted in error to the ATR72, and as a result about 2000 Kg more was displayed on the fuel gauge than the actual amount of fuel present in the two tanks.

No-one spotted the error until that fateful flight. In addition, the low level fuel warning system (a light and a chime) that should have warned the pilots well ahead that there was a fuel problem did not activate because on ATRs it is linked to the numbers displayed by

Philippe:a good defense?Capt Gharbi:ecuted from our company, including the mechanics, the Technical Director, and the CEO. So Tuninter provided us with a team of lawyers. We all agreed in advance that the interests of everyone would be safeguarded. I think we got best possible defense, but it did not help much in the end. F/O Kebaier:

^ by Philippe Domogala, Editor

The ideal culprits:

Interview with Tuninter ATR72 Pilots

4 Both pilotsPhoto credit: DP

During the IFALPA Accident Analysis and Prevention (AAP) Com-mittee meeting in Casablanca last May I had the opportunity to interview both pilots involved in the crash: Capt. Chafik Gharbi and First Officer Ali Kebaier.

Page 19: IFATCA The Controller - September 2009

4 ATR

THE CONTROLLER 19

Philippe: How did the Judge treat you? Capt Gharbi: I think we were treated like criminals, and many things were unexplain-able. For example, just before touching the water, as the manufacturer check list states, I increased pitch to get slower and smooth in the water. And while doing this the stall warning alarm chimed and was heard in the CVR tape. The judge concluded that we were flying in a reckless way! F/O Kebaier: The Tunisian authorities were kept out of the investigation, so was the French BEA by the way, the Italian Judge argued that the crash had happened in their territorial waters and that according to ICAO Annex 13 Italy was the only body able to make the investigation. But the position of the crash was in international waters ac-cording many others, especially if one uses WGS84 coordinates, and our government contested Italy’s position on this.

Philippe: How were you treated by the media?Capt Gharbi: The Italian media was terri-ble to us. There were television programs made where the ”experts” were the family of the victims or passengers. No-one ever asked us for an interview or even our opin-ion. Even when National Geographic made

a reconstruction of the accident, the fami-lies of the victims got to speak but we were never asked. It is all biased, and we have the impression that all this was a coordinated set-up. The Cockpit Voice Recorder (CVR) was leaked to the press in flagrant violation of Annex 13. But they leaked only the last 6 minutes, not the full 30 minutes, because in the other 24 minutes one can see how Italian ATC handled us. Some British media trans-lated the words I used invoking God just be-fore ditching as “Pilot was reading the Koran instead of following procedures” to make us look like ignorant and religious fanatics…

Philippe: What went wrong according to you?Capt Gharbi: We never knew that we had the wrong fuel gauge or a wrong fuel indica-tion. For us we departed Bari with more than enough fuel. We had refueled there. But in an ATR, when you ask for fuel, the amount is diminished by the amount left inside the tanks. This amount is visible on a small indica-tor outside beside the central refueling point (both tanks are refueled from a single central point) and the amount shown there is just a repeat of what the master indicator says in the cockpit. It is just a slave. So if the mas-ter indicates or says something wrong, the

whole system is based on that wrong information. Same for the fuel low warning – it is not independent, but based on the master gauge. So we received no warning at all. When the engines stopped, we still had 1800 Kgs of fuel indicated and no low fuel warning. Therefore we followed the procedure and tried to restart the en-gines. Had we received a low fuel warning, we would have of course reacted differently.

Philippe: Did you have con-tacts with ATR after the crash? Capt Gharbi: No, never. We learned they denied all the points about the fuel gauges swap possibilities, arguing that it was the responsibility of the mechanics to verify the part numbers before refitting a new part. On the low level alarm, they said that having a separate sensor in the tanks to determine actual fuel level was not a requirement and not part of European certification. Same

We are also victims of this accident, yet we were treated as

criminals.

Page 20: IFATCA The Controller - September 2009

Philippe: What are you both doing now? Capt Gharbi: In the accident I was seriously injured (compression of the vertebral column) and was on sick leave for two years. I am now responsible for training, I am an SFI (Simulator Flight Instructor) and I have not flown again. F/O Kebaier: I am back at work as a co-pilot for Sevenair since 2007.Capt Gharbi: We would also use this oppor-tunity to thank all who supported us since the beginning: Eurocockpit (ECA), IFALPA, US-ALPA, ANPAC (the Italian Pilots Association), IFATCA, AMPL, BCPT (the Tunisian Pilots As-sociation) and many around the world. ^

4 ATR

THE CONTROLLER20

thing for the outside refueling indicator. These were latent er-rors in the system. There was a similar incident-error on an ATR in Germany a year after us (see box), but fortunately for them the aircraft was in tran-sit and it was the same crew before and after the gauges change, so they could spot the fuel error. F/O Kebaier: Now ATR has quietly modified all its new

We never knew that we had the wrong fuel gauge or a wrong fuel

indication.

aircraft (the 500 series) which was never in the news like we were. We feel like we were the scapegoats, and that the justice sys-tem in Italy made us the ideal culprits. Eve-ryone focused on “pilot’s errors” and the Italian and British media helped in that matter.Capt Gharbi: On the National Geographic TV program everything was very one-sided. Only the families of the victims, the Italian Civil Aviation authorities, and the manufacturer ATR were interviewed. The Tunisian side was totally absent, no-one from our DGAC, the airline, the pilots or the mechanics. Even the “expert” pi-lot interviewed was an ATR test pilot!

EASA Response: As a result of the Tuninter accident and the German incident, EASA issued a safety recommendation in 2006: Safety Recommendation GERF-2006-014: EASA should arrange that the construction of one of the Fuel Quantity Indicators (FQI) of the ATR 72 or ATR 42 be changed to such an extent that they cannot be interchanged any more. ^

IFALPA Backs Demands to Reinstate CaptainThe Bureau de Coordination des Pilotes Tu-nisiens (BCPT) launched an awareness cam-

paign in support of Capt. Chafik Gharbi, the com-mander of the ill-fated Tuninter

flight UG1153. The BCPT is calling for Capt. Gharbi to be returned to flight status forth-with in recognition of the outstanding air-manship he, together with his First officer, displayed when they were forced to ditch their ATR72 in the open sea off the coast of Sicily following a double engine failure.

The BCPT has repeatedly requested the Tu-nisian Ministry of Transport to reinstate Capt. Gharbi’s licenses but so far these private en-treaties have met with no response. It is this lack of response that has lead to the launch of the public campaign. In addition to its work behind the scenes, IFALPA is also throwing its weight behind the public campaign. Com-menting on the case, the Federation said that it “is dismayed by the fact that Capt. Gharbi is unable to practice his profession through no fault of his own”. Noting that the techni-cal investigation into the circumstances lead-ing to the crash revealed that the flight crew reacted to the loss of power in a textbook fashion the Federation cannot understand why there is a delay in reinstating his flight privileges and insists that this miscarriage be corrected forthwith. ^

[email protected]

The Incident In Düsseldorf, Germany – 2006 On 18th March 2006 during flight preparations for a flight from Düsseldorf to Dresden, an ATR 72 crew noticed a difference of about 1,800 kg fuel between the remaining fuel quantity after the last flight and the currently indicated one. Because there was no explanation and no refuelling order the crew refused to fly and insisted that the matter was looked into. Maintenance checked the aircraft and determined that a Fuel Quantity Indicator (FQI) of an ATR 42 had been installed during the previously performed maintenance work. This FQI indicated a fuel quan-tity which was about 1,800 kg higher as the actual one. (source: German BFU). ^

4 Sevenair ATR 72Photo credits: ATR

4 The ATR42 (top) and ATR72 fuel quantity indicators

paign in support of Capt. Chafik Gharbi, the com-mander of the ill-fated Tuninter

flight UG1153. The BCPT is calling for Capt.

4 The ATR42 (top) and ATR72

ATR Response: During the Paris Air Show I met with David Vargas, Press Relations with ATR and asked him for their side of the story. He confirmed that both gauges were physi-cally interchangeable, but that under normal operations it is impossible to mix them up as they have different part numbers, and that after removal/ installation, a series of verifications have to be made to check that the correct part is in place and works properly. In the case of Tuninter, the investigation said that both proc-esses (part number verification and verification after installation) were not done by their mechanics. I then asked whether a modification had been made in the meantime to prevent physically a wrong installation. The answer was no, nothing had been changed because there was no need if the mandatory procedures to install them were followed.

As to the Low Fuel Warning system, “There has been (since 1997) an independ-ent warning system not related to the fuel gauge readings in the ATR aircraft, and standard in all new ATR models, with possibility of retrofit into previous models. ATR developed this double and independent warning system even be-fore any recommendation of the certification authorities.“ he said. ^

Page 21: IFATCA The Controller - September 2009

4 Le Bourget

THE CONTROLLER 21

For its 100th anniversary, one would

have expected some glamour and festivities.

Paris Le Bourget Air Show 2009100 Years!^ by Philippe Domogala,

Editor

As Editor of The Controller, I was invited to at-tend the 100th Paris Air Show in Le Bourget on 18 June. For its 100th anniversary, one would have expected some glamour and festivities, but in fact the economic crisis turned it into a rather lower key than usual event. There is no money available, and that showed. Approxi-mately 140,000 trade visitors attended (some 10% less than the previous event 2 years ago), but considering the effects of the crisis this can be judged a success.

The new aircraftThere was only one new civil aircraft present – the Sukhoi Superjet 100 (a regional jet look-ing much like an Embraer 175) and it did not take part in the flying display (at least when I was there), which was a pity because it looks promising (see box).

The two missing stars were the Airbus A400M (the Hercules replacement) and the Boeing 787, both of which should have been there two years ago. Huge development costs for the engines of the A400M, and technical difficul-ties with composite for the B787, have caused these delays.

Boeing was present but did not bring any air-craft, and when questioned about its ambitious

ATM plans and latest B787 avionics replied very embarrassed that no-one was there from either of these projects, and that the financial crisis has changed some priorities. The B787 will fly “when it is ready“. After the show we learned that some more serious structural problems have been identified and that the project is even further delayed.

I talked to a few Airbus A380 pilots, who re-ported that everything is now under control, no major problems with production any longer, and deliveries are back to normal. We as con-trollers should see more and more of them in the coming months.

News in ATM I visited the standard ATM stands, and there were lots of projects but all on paper as usual. Thales is now part of SESAR JU, and is devel-oping a new ATM console based on the auto industry, but unfortunately I was not able to see it.

Controlling UAVs (Unmanned Aircraft) The French military have now a large UAV (the HARFANG, see photo) a 1.3 ton 17m wing-span aircraft. It is the size of a business jet, and cruises up to FL250 for up to 24 hours at 110

kts. They currently have three based in Afghanistan, and two in France. They are piloted from the ground , and a pilot can han-dle two UAVs at the same time. The take-off and landing are au-tomatic, and in case of an emer-gency it will find an airport and land using the ILS signals.

I talked to one of the pilots, and was shown the system, which was very impressive from an ATC point of view. There will be many more UAVs in the near future. For instance the French Police are interested in them, and are evaluating the Harfang. For the Pope’s visit to Lourdes in the south of France a few months

4 A380 during the show

Page 22: IFATCA The Controller - September 2009

THE CONTROLLER22

ago, a UAV was (unknown to the general public) used to ensure security above the cities where the Pope was present. At the moment it is used in civil airspace only by segregation (i.e. creat-ing temporary prohibited zones). However they want to use them everywhere without restrictions, and for this they need a tool to avoid civil aircraft which I was ad-vised is their primary problem.

For this the European Defense Agency has just given EUR 50 million to a consortium to develop a system called MIDCAS for Mid-air Collision Avoidance System (nice name!), to act as the “sense and avoid” system for UAVs. The system must be reliable, cost-effective, and the technical description should be available within 4 years. The aim is clearly to have all UAVS fly-ing in all airspace alongside civil traffic at all altitudes. According to them, Eurocontrol, Eu-rocae, EASA, and RTCA are currently working on the “sense and avoid” standards.

The aim is clearly to have all UAVs flying in all airspace alongside civil traffic at all altitudes.

Passengers: 78 to 98. Max Flight Altitude: FL 400.Cruise speed: Mach 0.78. Wingspan: 91 feet/28 metres.

Western avionics, and in feet (a first in Russia!). Will be certified by EASA at the same time as in Russia.

Price: aprroximately 15-20% less than its competitors.Currently two prototypes flying, production has started,

with 100 aircraft ordered so far.

4 Cockpit Sukhoi 100

Sukhoi Superjet 100 – ATC relevant characteristics.

4 Le Bourget

4 Harfang UAV on display

Page 23: IFATCA The Controller - September 2009

THE CONTROLLER 23

Auto-pilot flown RA” are flown in a much smoother

way than manoeuvres executed by human pilots.

Airbus A380 new featuresAirbus is incorporating many new systems in its A380, and some of them have direct influence on ATC. We knew about the “brake to vacate” feature (covered two years ago in The Control-ler) in which the pilots have a display of the air-port layout on one of their screens during ap-proach and they can select a runway exit, put the brakes on “Auto”, and the auto-pilot and auto-throttles will ensure that the speed of the aircraft will be below 10 kts prior that exit. Another feature is the runway overrun protec-tion. If at anytime during the approach some detected parameters change (speed, wind, etc), the computer may call “Runway too short“ or “Land anyway“ helping the pilot to make the final decision (pretty easy I would guess).

TCAS RAs flown by auto-pilot.The last feature is far more controversial among pilots – it is the automatic following of TCAS RAs by the auto-pilot. The system, when activated, will display the word “TCAS” on the auto-pilot screen and then, should a TCAS tar-get turn into an RA, the auto pilot will follow the RA. I was told that these “auto-pilot flown RA” are flown in a much smoother way than manoeuvres executed by human pilots and that they are then unnoticeable by the passen-gers, and this even in a sense reversal RA (e.g. first a climb then a descent).Also in corrective RAs, the speed at which the system reacts is faster than human pilots, and

because promptness to respond to such is critical in the success of the resolution, safety is enhanced when using the auto-pilot function (or so they claim). I intend to learn more about this feature in my forthcoming visit to Airbus planned later this year in Toulouse.

Data streaming (continuous down-linking of aircraft parameters)After the failure so far (at the time of writing this article) to recover the FDR/CVR from the Air France A330, everyone in Paris was specu-lating about what really went wrong over the South Atlantic that day. This prompted a small Canadian firm (Aero Mechanical Services) to advertise a new technique called data stream-ing that they were marketing. Data streaming is a new technique where all aircraft parameters and even cockpit recordings can be encoded and compressed in order to be easily down-linked to the aircraft operator base.

The frequency of refreshment can be every five minutes, or faster if requested by the airline or the pilots (in case of a mechanical or techni-cal problem for instance). The system uses the existing Iridium global communication satel-lite system. All parameters which are currently recorded on the CVR/FDRs (and potentially more) can be encoded in the system. This com-pany enjoyed many queries during the show.

Finally AIRBUS celebrated the 40th year anniversary of the first Airbus aircraft, the A300B. This was the first wide body twin en-gine jet, and was launched in 1969 by the German and French Governments. At the time the large commercial jet business was dominated by the three USA giants, McDonnell Doug-las, Lockheed, and Boeing, and nobody gave much hope for this new European project. But today only Airbus and Boeing remain, a real achievement for the Europeans. ^

[email protected]

All photo credits: dp

4 Le Bourget

Page 24: IFATCA The Controller - September 2009

For those Asian ATS providers that don’t have the advantages of Hong Kong, I put forward the following ideas:• Have an English only day, once per week

at all facilities• Have at least some of the ATC training

done totally in English• Training videos in English• Access to aviation books and magazines in

English• Consider using experienced native English-

speaking controllers who have retired or are about to retire, as instructors. (That way you are getting 2 people for the price of one).

• Consider using experienced expatriate controllers for aviation related English con-versation and comprehension training, ei-ther in the training school or as roving em-ployees. They could be attached to a major ATC centre, but travel to other centres and towers around the country.

The thing to remember about the above is that it is not necessarily required to teach English to working controllers who, even now, have at least a reasonable ability in the language. Otherwise they would not be do-ing the job. What is needed is the continuing use of the language to improve their fluency and comprehension, enabling them to reach at least Level 4 or higher and maintain it. ^[email protected]

4 Asia News

THE CONTROLLER24

Controller Aviation English Training in Asia^ by Phil Parker,

Asia Pacifi c Regional Editor

Training controllers is an on-going requirement for all ATS providers throughout the world. Classroom work, simu-lation and on-the-job training, all require resources in man-power and equipment which are beyond the capability of some of these ATS providers, even when they are only train-ing a small percentage of their staff at a time. Is it any won-der that there were, and are, problems in meeting the ICAO ‘Aviation English Proficiency’ requirements.

In many cases however, I be-lieve there is not the desper-ate need to ‘teach’ English, just a requirement to improve the English language ability the controller already has. Let me start off by saying that I am not an expert in English language training. I am, how-ever, a controller with 40 years experience with 22 years of that time in Asia. I have had the privilege of teaching hun-dreds of controllers during that time in Australia, Hong Kong, Macao and China.

In Asia/Pacific, for most Eng-lish is not the ‘mother tongue’. With this in mind, I would like to share with you some obser-vations on English language ability in the Asian area. These are based not only my observa-

Training requires resources in man-

power and equipment which are beyond the

capability of some ATS providers.

tions, but those of my son and my wife. Now you might say what has this to do with Avia-tion English. Let me explain. My son taught English in Tokyo for 3 years and my wife cur-rently lives in Tokyo for about 9 to 10 months a year where she is studying the Koto, (Japa-nese Harp), and trying to learn Japanese. Both have many Japanese friends who can speak English and most of these English-speaking friends have the same problem. Lack of ex-posure to a native English speaker so that they can improve their comprehension and fluency. They can read and write English well, however, in the main, their English teachers were Japanese, who themselves had prob-lems with fluency. The other problem is that even if taught by a native English speaker and having developed good language skills, unless they have continual exposure to the language, it will deteriorate.

Possible solutions and strategies Hong Kong ATC has always been lucky with regard to English. English is one of its official languages and all ATC operational conversa-tion and coordination must be in English. All the controller training is in English. It always had expatriate native English speaking con-trollers from all over the world, however most are from Australia or New Zealand. (There are still approximately 40 working here) This gives a natural advantage to all Hong Kong controllers to improve and maintain their Eng-lish ability. Hong Kong CAD had no problem in being easily able to reach the ICAO Level 4 requirements. In fact 95% were level 6.

4 Learning to play KOTO All photo credits: Phil Parker

4 Hong Kong airport

Page 25: IFATCA The Controller - September 2009

4 Books Review

THE CONTROLLER 25

4 Hong Kong airport

Books Review

The Spanish organization AENA is continuing publish-ing books in English on its series “Discover” which are very valuable for the training of various aviation profes-sionals, and controllers in particular.

The 2 latest publications in this series are “Airline Companies“ and “Airport Operations”. Both books are well written and heavily illus trated making it easy to read for any student. A must read for all aviation schools and academies, as well as for reference material in ATS facilities libraries.

Discover Airline Companies: 144 pages: ISBN: 978-84-92499-14-4Price: 13,46 EUR + delivery charges

Discover Airport Operations: 200 pages: ISBN: 978-84-92499-07-6Price: 14,42 EUR + delivery charges

To order visit: www.aena.es/publicaciones or contact: [email protected]

International Federation of Air Traffic Controller’s Associations20th Africa Middle East Regional Meeting

Ouarzazate , Morocco : 3rd – 5th November 2009

For info co co cntacc cc c t : [email protected] or [email protected]

^ by Philippe Domogala, Editor

Page 26: IFATCA The Controller - September 2009

For more info, visit Sensis at www.sensis.com

The new Indra- based system currently be-ing developed and tested for the German DFS is called FAVORIT and also includes electronic strips as a carbon copy of the pa-per ones. Currently used by the Karlsruhe (Rein radar) UAC. All 3 systems are similar but show many differences. So just like the old paper strips, the future electronic strips are not going to be standardized!

It is difficult to change a culture … ^[email protected]

tiny strips obsolete and an important piece of ATC history will be lost. Do you think that someone will ever regret this decision?

The ancient Romans said: "Verba volant, scripta manent" "which in English means:" (Spoken) words fly away, written ones re-main". Perhaps an important sentence for the next generation

Regards, Biagio.

4 Electronic Strips

THE CONTROLLER26

Electronic Strips ^ by Philippe Domogala,

Editor

Voice recognition and electronic strips Many ATM manufacturers are proposing electronic strips and innovative ways to update them. During the last ATC Glo-bal exhibition in Amsterdam I had a chance to look at a few and (briefly) work with them.

My impressions: Frequentis (Austria) has developed a very intuitive voice recognition sys-tem where clearances to air-craft on the R/T are decoded in

Ciao Philippe,

My name is Biagio and I am a retired Italian air traffic con-troller. After so much time I have found in my hands one article/editorial of yours which appeared in "The Control-ler 2/2007, where you men-tioned the loss of the tiny pieces of paper, affectionate-ly known as ‘strips’.

real time and shown on a screen. If validated (by a single input) the electronic strips are au-tomatically updated. I have tried the system myself and it really works quite well. Will this be the future?

More info at www.frequentis.com

As reported in the last issue of the Controller, Sensis teamed up with Nav Canada to design and deliver an upgrade for 26 control tow-ers in Australia that will provide the so-called “Glass Towers” that also includes electronic strips. Those are more conventional, but the man-machine interface is interesting.

For many years, I worked with those tiny pieces of paper in an ACC without radar. They were our companions for life. We wrote everything on them, so that whoever was be-side you could follow the traffic. They showed who was on the frequency and enabled coor-dination as the traffic progressed from sec-tor to sector. I’m worried to think what good electronic strips would be if a sudden loss of electrical power occurs.Air traffic control is not a video game. You are right, new technology will make these dear

Ode to Lost Strips

4 The electronic strips by Nav Canada All photo credits: DP

4 The electronic strips in the Frequentis system

Page 27: IFATCA The Controller - September 2009

days off, but it was also that IFATCA-virus I am infected with. You know controllers all over the world, know their problems and benefits, you are curious and at a certain point you get the chance and you have to decide. It was not an easy decision especially hav-ing family with a child in school, but the new experiences were worth the move… ^[email protected]

observation and good feedback from your coaches to build up your abilities.

And after the exams, you take some time for holidays…. a short period of relaxation before you start again: On-Job-Training. The pres-sure starts all over with new colleagues, who are mostly younger and fitter, doing the job easily you are fighting to get into. You want to become familiar with all colleagues and their different working styles, which vary sometimes from team to team and person to person. You need to get used to a new and completely dif-ferent system. Being the new guy, you accept a lot of things you would normally have argued about in your former environment. So – how often did I ask myself WHY?? Why did you do it?? Why did you leave your safe workplace and put all that stress on your back; you had a good job… was it that bad back home??

Grass is always greener on the other side of the fence… but it helps talking to your old friends and listening to their stories to keep your memory fresh and remember why you left the previous company. It was not only salary, less (compulsory) overtime and more

4 Europe News

THE CONTROLLER 27

You really want to show to your new colleagues,

who are now your instructors, that you

know how to do the job – you have done it already for years.

Being a conversion controller – a very personal look

My training in Vienna ACC (Austria) lasted from 1996 to 1999. That is almost a decade ago. Today I find myself in a classroom again, together with 5 other colleagues facing a pile of letters of agreements and confronted with a big problem: I forgot how to learn…

Of course you open a ‘Letter of Agreement’ and you know which chapters it has, but to really learn all new procedures is not so easy being in your mid-thirties. This was my first problem to overcome when I started here at EUROCONTROL’s Maastricht Upper Area Control Centre (Netherlands) as a conver-sion controller about a year ago.

Our theory lessons were well structured and we had sufficient time to study and find our own way into it. After that we went to the simulator and thought: “OK I can do that, I worked as a controller for years, so what can happen…” Suddenly however, you realize that everything is different except for flight levels and callsigns. All the tricks that you collected over the years don’t work anymore and you really have to take it up from the be-ginning. (OK, you don’t react as hasty as a 19 year old ab-initio controller when the conflict alert starts flashing on your screen.) And on top of that – you want to perform! You really want to show to your new colleagues, who are now your instructors, that you know how to do the job – you have done it already for years. The confrontation of the guy (or girl) – 10 years younger – sitting next to you, who easily does what you’re struggling to do, is quite a reality check for your ego! That’s pressure coming from inside! You have to fight. It takes a really careful and continuous

Changing ATC facility: retraining

On the Move ...^ by Bernhard Romanik

4 Bernhard Romanik at work in Maastricht Photo credit: BR

Page 28: IFATCA The Controller - September 2009

negotiating table. The Secretary announced the talks would be overseen by a team of three mediators, led by former FAA Admin-istrator Jane Garvey, who in 1998 signed the last employee ratified contract.

Talks began in early May, and resulted in the agreement of over 100 articles, which are now subject to ratification by the NATCA membership. That left just a few articles – al-beit crucially important ones – dealing mostly with pay and annual leave to be decided by those same mediators; now acting as arbitra-tors. The arbitrators heard arguments from both sides on July 6 and had up to 30 days to render a binding decision that would not be subject to NATCA member ratification.

Simply writing the words “binding” and “ar-bitrators” in the same paragraph of this story constitutes a mammoth step forward for NATCA. We are proud to report to the world-wide IFATCA community that our long strug-gle against a historically and extremely unfair and draconian FAA imposition of pay cuts and work rules is nearing a successful end as we met the mid-July deadline of this issue.

ing approach to labor relations over the past few years. FAA has cut NATCA out of any meaningful roles in improving or moderniz-ing the country's national airspace system.

In spite of the FAA’s hardline tactics, there is finally positive movement to report re-garding the biggest issue of contention, our three-year-old contract battle and quest to restore fair collective bargaining rights.

The new administration made it clear that our contract issue was a high priority and the White House was eager to resolve the dis-pute and move forward with a renewed focus on problem solving and advancing system modernization efforts. The Obama Admin-istration – within the well-known 'First 100 Days' benchmark for evaluating the progress of a new U.S. president – met with NATCA to discuss going back to the contract table.

On April 30, Transportation Secretary Ray LaHood used a high profile speech before an assembled group of aviation community leaders to announce that he was sending NATCA and the FAA back to the contract

Controllers in USA: Hope and Optimism^ by Doug Church, Director of Communications

NATCA (USA Controllers association)

More than halfway through his first year in office, U.S. Presi-dent Barack Obama – a major champion of NATCA’s issues in the U.S. Congress since 2006 – has begun to transform the Department of Transportation and Federal Aviation Adminis-tration. We hope to return to a productive, collaborative rela-tionship that will increase mo-rale and help the United States safely, effectively and efficient-ly install the much anticipated Next Generation Air Transpor-tation System (“NextGen”).

But change, even for a deter-mined, multi-tasking leader like President Obama, often comes slowly to U.S. govern-ment agencies, especially the FAA, which has a well-earned reputation for moving at gla-cier like speed when it comes to modernization and a pro-foundly stubborn, union-bust-

NATCA does believe there is reason to be

optimistic that the FAA, […] is going to move toward a collaborative

relationship.

4 US controllers at work Photo credit: NATCA

4 NATCA

THE CONTROLLER28

negotiating table. The Secretary announced

Controllers in USA: Hope and Optimism

Page 29: IFATCA The Controller - September 2009

across the country and also plans to close numerous TRA-CONS, moving those services into larger, centralized TRA-CONS in major cities. Already this year, the FAA has sepa-rated the combined tower/TRACONs at Orlando and Memphis’ airports, despite ve-hement objections from NAT-CA and members of the U.S. Congress. The split at Mem-phis occurred one week after new FAA Administrator Randy Babbitt took office, which was an ominous sign for NATCA Members hoping the new FAA Administrator would step in and call a halt to the previous Administration’s go-it-alone approach.

While the FAA slyly continues with its tactics from the previ-ous Administration, the overall attitude for NATCA toward the new Administration is one of hope and optimism. The need-ed changes to our working conditions and the safety of our system are slow in coming, but there is reason to believe the light is indeed at the end of the tunnel. ^

[email protected]

With the bold step of returning the FAA and NATCA to contract talks, President Obama fulfilled his commitment to the safety and modernization of the air traffic control sys-tem and to the dedicated men and women safety professionals who run the system each day. President Obama is showing the leader-ship that will guide a positive way forward in which aviation safety professionals will be in-cluded as valued stakeholders. As the Presi-dent made clear, a resolution to the contract dispute is critical to successfully installing NextGen, which is needed to spur economic development and increase the safety, effi-ciency and effectiveness of air travel.

The Obama Administration definitely under-stands how the FAA’s pay rules have forced new trainees to quit, led thousands of our most experienced controllers to retire early to escape the FAA's callous treatment and the lack of an increase to their retirement an-nuity, and removed any incentive for air traf-fic controllers to transfer to busier facilities. Today, many large TRACONS and other key facilities are dangerously understaffed and overburdened with inexperienced trainees. NATCA continues to see optimism that a permanent fix to a collective bargaining

process that allowed an Administration to impose what the Bush Administration called an "agreement" is close at hand thanks to efforts by members of the U.S. Congress. In May, the House of Representatives passed legislation that includes language to fix the process and prevent future administrations from taking actions similar to the Bush ad-ministration. Similar language is being con-sidered in the U.S. Senate, though no bill to date has yet been passed.

NATCA does believe there is reason to be optimistic that the FAA, while excruciatingly slow in doing so, is going to move toward a collaborative relationship on modernization. In fact, one of the contract articles agreed to at the negotiating table specifically requires NATCA's “full participation” in the devel-opment and implementation of NextGen. However, until we finalize and implement the new agreement, today’s situation is a far cry from that panacea as the FAA continues forward with plans and technologies without NATCA's participation.

First, the FAA is moving swiftly to install a new computer system for the country’s en route fa-cilities, known as ERAM (En Route Automation Modernization). It’s a cornerstone of NextGen and a massive undertaking. But the system has several outstanding bugs and flaws, things controllers could have helped identify and fix had we been invited into the process.

Second, the FAA is separating radar and tower air traffic services at several airports

4 President Obama support Photo credit: NATCA

4 yes we can change? (Obama campaign poster) Photo credit: Wikipedia

4 NATCA

THE CONTROLLER 29

Page 30: IFATCA The Controller - September 2009

cate on two frequencies for two sectors at the same time. Radars are used as back up or monitoring. As such non- radar separation is used in these air spaces, putting health stress on the air traffic controllers and eco-nomic stress on the airline, as bigger, time based separations are required. In the rare cases where radar is available, non-radar op-erations are considered adequate back up. Radar refresher courses for air traffic control-lers are non-existent and yet no one sees this as a safety issue.

The human resource policies are also poor. This is evident in the number of air traffic controllers, their level of competence and motivation. Although staff shortage is a worldwide issue, the African scenario is made worse in most cases because of the lack of or inadequate training. Air traffic controllers work in poor conditions, long hours without breaks, lack of refresher courses, low remu-neration and deliberate denial of manage-ment and career development. Cases have been reported of eighteen hours without fa-tigue break. Similarly the required rest peri-od between watches is often not respected. These are just a few of the numerous issues that are slowing the development of the in-dustry on the continent in general. In a lot of cases, management has shown little or no appreciation of the differences between an air traffic controllers’ job compared to those of other professionals. There is a service pro-vider whose mission statement simply reads “Safety is You”!

All stakeholders needs to combine their ef-forts to enable the continent to develop the African Air Traffic Management systems to be able to cope with the predicted growth in the foreseeable future. We shouldn’t be looking back to try and find out who’s responsible for the current situation, but should ensure that all the necessary steps are taken to rectify the situation. Let this be a wake-up call! ^[email protected]

4 Africa News

THE CONTROLLER30

ANS Service Delivery in West Africa

^ by Mick Atiemo, Africa Regional Editor

Air navigation service delivery in most parts of the African continent, and especially in the western part, leaves much to be desired. In fact, most of the industry still needs to over-come some of the basic prob-lems in this continent, from management, through facilita-tion to human resources.

One can ask whether the charg-es, levied by the service provid-ers, can be justified. Similarly, why do airlines continue to pay these charges for services that are way below standard? Profit has become more important than safety and security. More often than not, priority is given

Why do airlines continue to pay these charges for services that are way below standard?

to issues that do not develop ANS provision and money is wasted on frivolous projects.

Facilitation is either unavailable or where available, it is unreliable and lacks integrity due to poor human resource management. While there are more than enough technical experts who can be trained to take up the management of the industry, they have been relegated to the background. Consequent-ly, there is a lack of the required technical knowledge at the top...

Some FIRs have a single HF frequency that is unreliable at best or even totally unavailable. Despite this, airlines that use this airspace pay for charges even with no contact and subsequently no service provision. Where there is a means of communicating with the airplanes, an ATCO transmits to communi-

Photo credit: Mick Atiemo

Page 31: IFATCA The Controller - September 2009

ble for the junkyard that circles our planet:• Launches: To launch a rela-

tively small payload into or-bit, a proportionally large amount of equipment is needed. Most of this is not re-usable – the booster rockets of the Space Shuttle are noteworthy exceptions. Other rocket stages usu-ally orbit for a while before they eventually re-enter the atmosphere and (hopefully) burn up. Other by-products include solidly frozen blocks of vented rocket fuel.

• Explosions: an estimated 40% of ground-trackable space de-bris comes from explosions. Over the last years, engineers have taken steps to contain and/or avoid such events as much as possible, but there are new threats: In January 2007, a Chinese anti-satellite weapons test created more

to spare. While the trajectory or orbit of most (active) spacecraft can be changed, an avoid-ance manoeuvre can be risky, costs fuel – which is an expensive commodity in space as you can imagine – and can interfere with the normal functioning. For those reasons, ma-noeuvres are avoided as much as possible…

It’s the first time that two intact satellites col-lided, but satellites, space shuttles and the International Space Station ISS continuously suffer impacts from smaller objects, so-called space debris: objects that somehow ended up in orbit. Objects in lower orbits (up to 2000 km) generally don’t stay up long: their orbit degenerates and they burn up when re-entering our atmosphere. Higher up how-ever, the can stay in orbit for many decades: the oldest known piece of space junk is an American satellite launched in 1958, the Van-guard I. It stopped functioning in 1964, but it’s still happily circling the planet over 51 years after it was launched!

Sources of debrisBut where does all the stuff come from? There are several sources that are responsi-

4 Special Feature

THE CONTROLLER 31

More than 600,000 objects larger than

1 cm in orbit around our planet

On February 10th 2009, at 16:56UTC, a colli-sion occurred high above the Taymyr Penin-sula, Siberia. At an altitude of 789 kilometres above the earth, two satellites collided at a near right angle. It was the first time in over 50 years of human space exploration that two intact satellites hit each other. It’s esti-mated that the collision left over 1000 pieces of debris in orbit around our planet…

ProblematicOrbit around our planet is rapidly becoming very crowded. The European Space Agency estimates there are more than 600,000 ob-jects larger than 1 cm in orbit around our plan-et. And while there’s quite a bit of “space” in space, Iridium, the company that owned one of the satellites involved in the collision, esti-mates that they have around 400 near-misses per week for their entire fleet of communi-cation satellites. With about 100 spacecraft, that’s about 4 close calls per unit… By the way, a near-miss in space is defined as two objects passing with less than 5 km. Prior to the actual collision, best estimates showed their satellite and a defunct Russian craft would pass each other with some 580 meters

Space Junk^ by Philip Marien,

Deputy Editor

4 An attempt to map what’s fl ying in a low earth orbit (up to 2000 km) above our heads.Photo credit: ESA

Page 32: IFATCA The Controller - September 2009

out their flying years, Space Shuttles have moved out of the way about a dozen times to avoid an oncoming object. Even a tiny speck of paint measuring just 0.2mm in diameter can leave a crater in shuttle windshield glass nearly half a centimetre wide. About 80 win-dows have had to be replaced because of such damage. To minimize the exposure of the crew quarters, the Shuttle actually orbits backwards: the engines are facing the direc-tion of travel, so the relative speed of any im-pact on the crew compartment at the front, is as low as possible.

The International Space Station also has had to dodge several large tracked objects. The station is equipped with a set of gyroscopes, which produce the torque needed to keep the station oriented without having to waste propellant. But this isn’t enough to push the ISS into a different orbit: for that, it uses good old-fashioned rockets. Most convenient are the thrusters on the unmanned supply ships (either Russian Progress or European Jules Verne) that regularly dock with the Space Sta-tion. They burn their engines for several min-utes to push the ISS a few kilometres higher. When no supply ship is attached, they can fall back on the Russian Zvezda service mod-ule thrusters. As with satellites, moving the ISS is not a trivial issue and about 1 ½ orbits (2 hrs) are need to execute the manoeuvre. If a treat is detected late, as in March 2009, the crew actually evacuate the Station to their escape capsule, allowing a quick evacuation

4 Special Feature

THE CONTROLLER32

than 35,000 pieces of debris larger than 1 centimetre, in-cluding 2,400 objects larger than a baseball, single-hand-edly increasing the planet's debris cloud by 25%, accord-ing to a NASA spokesperson. In addition to larger pieces, explosions tend to gener-ate lot of tiny piece such as scraps of paint, screws, bolts: while generally not posing a serious threat, debris this size can 'sandblast' sensitive op-tics and instruments.

• Rubbish: Manned space-flights, especially longer mis-sions, generate rubbish just like you and I. Until recently, this was simply dumped in space and some of it is still out there. And yes, that in-cludes thoroughly frozen human waste. Only recently have they been recycling (e.g. urine on the Interna-tional Space Station is now filtered into drinking water again) or ferrying the rubbish back to earth.

• Accidentally released stuff: several ‘famous’ releases in-clude a glove (lost during the first American space walk by Ed White), a toothbrush (?), a Hasselblad camera (in 1965

by Gemini astronaut Michael Collins), a foot restraint used on Space Shuttle’s ro-botic arm and – most recently – a bag of specialised tools used during a spacewalk (estimated value $100.000) which astronaut Heidemarie Stefanyshyn-Piper let slip while repairing a solar panel joint on the ISS. The latter is currently in a low earth orbit and will eventually burn up when it enters the Earths’ atmosphere. It can be seen with a good telescope (check YouTube for the video!).

• Collision debris: at the present rate, in 20 or 30 years, collisions will exceed explo-sions as a source of new debris. More than half of the 6,000 man-made satellites that have been launched into space are still in orbit, despite only about 800 of these re-maining operational: picture about 2000 small car-sized objects travelling at over 30,000 km/hr.

Hazards to spacecraftA 1cm aluminium sphere typically travelling at 10km/sec (36,000 km/hr) has the same ki-netic energy as:• a Ford Escort travelling 90km/h• a bowling ball hitting you at 520 km/h• a 30kg safe hitting you at 95km/h

Enduring such impacts is hard enough for a satellite, but obviously manned space mis-sions are even more vulnerable: given the hostile environment outside their pressurised cabin, a puncture is the very last thing you’d want to see while you’re up there. Through-

4 Debris of Delta Rockets found in Saudi Arabia and Texas. Photo credit: NASA Photo credit: NASA

And yes, that includes thoroughly frozen

human waste.

Page 33: IFATCA The Controller - September 2009

objects the size of peas and smaller. That leaves plenty of space junk large enough to cause damage and too small to spot. That means luck remains a large part of space explora-tion for the moment.

The collision in January 2009 has resulted in several new ini-tiatives and studies. The most ambitious of these call for one or more missions to go and clean up the most contaminat-ed orbits. Others call for more responsible spacecraft design, which would allow launching and decommissioning them without leaving junk flying around. Both approaches are not self-evident and it will take years to (re-)design. In addi-tion, there is of course a price tag: especially in the short run, it may well be much cheaper to lose an occasional satellite rather than having to pay to clean up your own – and other nations’ – rubbish. With more and more nations working to-wards manned space missions, it remains to be seen whether such risks remain acceptable… ^

[email protected]

TrackingFrom the very start of the space age, the U.S. has kept a detailed catalog of objects launched. The reason for this is less than ob-vious: the characteristics of a satellite return-ing to earth and an intercontinental ballistic missile are very similar. By tracking satellites, they could eliminate false positives.

Over the years, they’ve expanded their de-tection systems using a network of radars and optical detectors. The data is collected and processed by the SCC in Cheyenne Mountain Air Station in Colorado Springs, Colorado, USA. The network can track ob-jects down to about 10 cm in diameter. Generally, engineers design satellites and manned spacecraft to survive collisions with

THE CONTROLLER 33

should the Station be hit by a passing piece of junk.

Hazards on earthAccording to NASA, on average one non-functional spacecraft, launch vehicle orbital stage, or other piece of catalogued debris has fallen back to Earth every day for more than 40 years. The majority of these objects do not survive the intense re-entry envi-ronment and burn up before they can do any damage. The minority that do survive in whole or in part fall harmlessly into the oceans or onto sparsely populated regions such as Siberia, the Australian Outback, or the Canadian Tundra. Occasionally, compo-nents of spacecraft and launch vehicles are found. Closest call so far is a propellant tank of a Delta II rocket, which landed about 50 m from a house in Georgetown, Texas in 1997.

And while the risk is extremely small, even aircraft are also sometimes exposed. A well-known case is that of Flight 801 of Lan Air-lines (Chile) that reported a near miss incident with flaming objects overhead the Pacific on their way from Santiago to Auckland. While it was initially believed to have been parts of an old Russian satellite re-entering the at-mosphere, NASA later stated they believed it was a meteor. According to the crew, the objects were within 5 Nm of their aircraft and they clearly heard the sonic booms. Follow-ing the collision mentioned earlier, the FAA issued a NOTAM warning pilots of possible debris (see box).

FAA NOTAM Published 14 FEB 2009.

FDC 9/5902 FDC. SPECIAL NOTICE. EF-FECTIVE IMMEDIATELY UNTIL FURTHER NOTICE. AIRCRAFT ARE ADVISED THAT A POTENTIAL HAZARD MAY OCCUR DUE TO REENTRY OF SATELLITE DE-BRIS INTO THE EARTHS ATMOSPHERE. FURTHER NOTAMS WILL BE ISSUED IF MORE INFORMATION BECOMES AVAIL-ABLE. IN THE INTEREST OF FLIGHT SAFE-TY, IT IS CRITICAL THAT ALL PILOTS/FLIGHT CREW MEMBERS REPORT ANY OBSERVED FALLING SPACE DEBRIS TO THE APPROPRIATE ATC FACILITY TO IN-CLUDE POSITION, ALTITUDE.

4 Impact crater of a paint spec on space shuttle window Photo credits: NASA

4 Footrest accidentally released during spacewalk

4 Debirs impact of Hubble Telescope

Flight 801 of Lan Air-lines (Chile) that report-ed a near miss incident

with flaming objects overhead the Pacific.

4 Special Feature

Page 34: IFATCA The Controller - September 2009

Training Charlie

34 THE CONTROLLER

Struck by Lightning when calling Approach Newcastle (UK) airport July 2009 – a con-troller was struck by lightning while she was contacting Approach on the phone from the Tower. The lightning struck through the Tower cab, and hit her arm. Initially she thought that she had done something wrong, and that the Approach Supervisor had sent her a signal, but inves-tigations proved it was lightning.

“I was using a touch screen phone to ad-vise the radar room when a bolt hit the tower. My finger was in contact with the screen when it hit, I heard a crackle and I felt a shock in my finger.“ she said in a newspaper interview. “It was a totally sur-real experience."

The incident caused tingling in her left arm, a headache and made her feel un-well, but she was back at work after a few hours. Morale of the story: Always be care-ful when you call Approach.

Bride bouquet brings down aircraft In Italy (and in many other countries) it is customary during a wedding for the bride to throw her flower bouquet to her women friends. Supposedly the one who catches it can expect good luck in marrying the same year. Well in Suvereto near Livorno last July, this lady had a lot of friends (and money) and decided to have the bouquet thrown over the wedding party by a small light aircraft she rented for the occasion.

But when doing so, the bouquet got caught in the propeller (must have been a push propeller on the back I guess) and the engine stopped. The aircraft crashed in front of the guests, and the pilot was un-

Charlie‘s Corner

fortunately badly hurt – so much for good luck. Among the aviation community in Ita-ly this incident created a new motto “when the flowers hit the fan …”.

Translating into English A young Swedish controller was fresh from school, and issuing one of his first “out of the phraseology book “ instructions: After one of the aircraft under his control left his radar cover, he advised “Clear to leave my frequency, but use caution because now you are invisible.“

Making it simple A young trainee pilot on his first solo navi-gation to a busy exterior airfield, talking to an experienced and busy air traffic controller.Controller (speaking very fast): “Cessna ABC, cleared immediate take-off, wind 230 with 12, climb to maintain two thou-sand, right turn to SE, contact approach on 125.72 with seven zero four one on the squawk.”Pilot: “Errr sorry sir, could you please re-peat more slowly and perhaps make it easier for me?”Controller: “Sure! Push the throttles all the way forward NOW, raise the nose and watch out for the wind, climb to 2000ft then get out of the circuit!”

What my strip saysTrainee undergoing on-the-job training:Trainee Controller: “Good morning Airline 1234, radar identified, maintain FL 250 on reaching, traffic two o’clock, 6 miles op-posite direction 1000 feet above.”First Pilot: “Not in sight, what is the type of aircraft?”Trainee Controller: “It is a Bravo seven three Sierra.”First Pilot: “What is that?”

Trainee Controller: “I do not know exactly, that is what my strip says.”Second Pilot intervening: “We’re a Boe-ing 737-300 Maam.” Trainee Controller: “That is not what my strips says…”OJT Coach of Controller intervening: “Air 1234, disregard all after good morn-ing, climb FL320, the 737 is no longer a factor now.”

Bird SpiritLate July in Goa (India) a Boeing 737 from SpiceJet Airlines (nice name: put some spice in your jet!) had a bird-strike on land-ing and the large bird blocked the front landing gear. The aircraft could not steer, and had to be towed back to the terminal. The Technicians then proceeded to dislo-cate the remains of the bird and put it on the tarmac. The spirit of the bird did not liked to be treated this way and arranged a vengeance – the replacement B737 that the airline sent to take care of the strand-ed passengers taxied too close to the bird body, and it was sucked up in one of the engines – two aircraft down by the same bird!

Bird strike Talking about bird-strikes, this one come from Italy where labor relations disputes are frequent.Pilot: “Tower did you have any bird-strike reports?”Controller: “Negative sir”. Pilot: “Tower I ask because we see a lot of sea-gulls around.”Controller: “Well they are probably those that have not agreed to the strike.” ^

[email protected]

4 Watch out for bird remains! Photo credit: Sean D'Silva

Page 35: IFATCA The Controller - September 2009
Page 36: IFATCA The Controller - September 2009

From takeoff to touchdown and everything in between. The aviation world looks to Thales for its ATM systems, navigation aids and airport solutions. Managing the airspace of 170 countries, we providea complete range of solutions and services that span the entire flight planand security chain. From design and integration through to installation and maintenance, Thales offers seamless gate-to-gate coverage through providing world-leading intelligent systems that excel from start to finish.www.thalesgroup.com

Intelligent ATM Systems START WITH THALES

THA-Capability-ATM-MASTER-A4-uk 17/06/09 9:47 Page 1