igg agenda – 10 th january 2008
DESCRIPTION
Minutes from last IGG meeting10.00 – 10.10 Review of Action Items 10.10 – 10.20 CER Update10.20 – 10.30 Gemserv Update 10.30 – 10.40 Market Operations Update 10.40 – 10.50 Review of Retail Electricity Market Data Standards10.50 - 11.20 - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/1.jpg)
1IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
IGG Agenda – 10th January 2008
• Minutes from last IGG meeting 10.00 – 10.10
• Review of Action Items 10.10 – 10.20
• CER Update 10.20 – 10.30 • Gemserv Update 10.30 – 10.40
• Market Operations Update 10.40 – 10.50
• Review of Retail Electricity Market Data Standards 10.50 - 11.20
• Retail Market Design Service Update 11.20 – 11.30 • Market Design Update 11.30 – 11.40
• Next Steps 11.50 – 12.00
![Page 2: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/2.jpg)
2IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Minutes
• Minutes from IGG meeting – November 29th 2007
![Page 3: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/3.jpg)
3IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Action Items
• Actions Addressed in Advance of Meeting• Update on Action Items• Actions to be covered during remainder of presentation• Actions to be carried forward• Other Action Items
![Page 4: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/4.jpg)
4IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Action Items addressed in advance of meeting (closure proposed)
• Action Item 153
Give a progress report on Year End Arrangements at the next IGG
• Action Item 165
RMDS to raise the issue of meter roll-overs with ESB Networks
• Action Item 183
RMDS to correct slide for Action Item 95 and include thresholds for each consumption category
![Page 5: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/5.jpg)
5IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Action Items addressed in advance of meeting (closure proposed)
• Action Item 184
RMDS to advise ESB Networks Services year end arrangements separately to Market Participants.
• Action Item 190
MRSO to inform market participants (via RMDS) when the bug in the 595 QH Import Aggregation Message has been resolved.
• Action Item 191
MRSO to advise Market Participants (via RMDS) of the Year End arrangements for Aggregation once details have been agreed with the SMO
![Page 6: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/6.jpg)
6IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Action Items addressed in advance of meeting (closure proposed)
• Action Item 26
Update IGG on policy items
• Action Item 204
Determine the date and time for the January MPCCarchitecture TAG meeting and invite TAG attendees.
• Action Item 174 – RMDS to Advise IGG of assurance measures to detect issues with future schema changes by IPT stage– Action 188 refers.
![Page 7: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/7.jpg)
7IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Action Items to be covered later in the presentation
• Action Item 10
Prepare proposals on addresses in the Retail Market
• Action Item 88 Organise TAG meeting in Jan/Feb 2008 to discuss MPCC architecture
• Action Item 156
Give feedback on the impact the introduction of this new Universal Meter
Category Code, has on the Change of MCC and Meter Reading processes
![Page 8: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/8.jpg)
8IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Action Items to be covered later in the presentation
• Action Item 109 – New Commercial Policy required to cover Erroneous De-registrations
• Action Item 185 – Data Collector to issue the first quarterly report to suppliers listing sites where there has been no actual reading taken a the site for a long period
• Action Item 188 – RMDS to document measures that will be used to Advise IGG of assurance measures to detect issues with future schema changes
![Page 9: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/9.jpg)
9IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Action Items to be covered later in the presentation (Market Design)
• Action Item 173
Update the SoLR process to take account of the SoLR decision paper /07/171
![Page 10: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/10.jpg)
10IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Update on Action Items
• Action Item 7 (& Action Item 92) – RMDS to investigate the procedural issue whereby a duplicate MPRN is generated when a quotation is ‘rolled back’
– DR 0124 will be re-issued by RMDS
![Page 11: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/11.jpg)
11IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Update on Action Items
• Action Item 39 – To get information on the volumes of readings that are currently rejected because they are outside of the tolerance ranges for the different DGs
– Daily figure of 4% - 6% of all NQH readings are initially implausible
– Reduces to 1% outsorted after re-estimations
![Page 12: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/12.jpg)
12IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Update on Action Items
• Action Item 41 – Raise a DR to propose the initiation of the updates to the Central Market Systems of a QH to QH meter replacement at the same time as the MV90 is updated
– Working Practice 16 has been issued by RMDS on 22nd November
– Feedback awaited
![Page 13: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/13.jpg)
13IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Update on Action Items
• Action Item 108 (& Action Item 159) – Issue Data Storage and Archiving Document to Market Participants
– Originally issued on Thursday 22nd November and subsequently withdrawn
– Updated version will be re-issued shortly
![Page 14: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/14.jpg)
14IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Update on Action Items
• Action Item 117 – All Retail Market Participants who intend to use the QH Readings Processor software after SEM go-live should notify RMDS before July 26th
– Formal e-mail proposing de-commissioning of the software sent to CER on 8th January 2008
![Page 15: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/15.jpg)
15IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Update on Action Items
• Action Item 156 – Update on ‘Universal Meter’ (3 register meter)
The proposed approach is:
New Connection– Conventional MCCs will be used i.e. 24hr. or Day/Night– The service order will specify the MCC requested on the
application form.– At connection, the NT takes the appropriate readings and
completes the service order.– ESBN will do a development to ‘force’ the meter characteristics at
completion into the mode appropriate to the MCC– Meter Reader handhelds will hold only the registers for the MCC
![Page 16: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/16.jpg)
16IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Update on Action Items
• Action Item 156 – Update on ‘Universal Meter’ (3 register meter) (contd.)
Change in MCC– Conventional MCCs will be used i.e. 24hr. or Day/Night– The service order will specify the MCC requested on the supplier
message– The NT does not change the meter but takes the appropriate
readings and completes the service order.– On completion in database, the meter characteristics into the
relevant mode depending on the MCC.– The Meter Reader will ‘see’ only the relevant registers on his/her
handheld.
![Page 17: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/17.jpg)
17IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Update on Action Items
• Action Item 169 – Examine preventative measure with the message reconciliation and resending processes to ensure there are no exceptions over the Christmas period
– There were no message resends over the Christmas period
![Page 18: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/18.jpg)
18IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Update on Action Items
• Action Item 174/188 – RMDS to Advise IGG of assurance measures to detect issues with future schema
changes by IPT stage
– In the future, the Hub team will carry out extra tests prior to the issue of a new draft schema using a software tool:
• a compare between the live schema and the new schema to ensure that the only differences are those covered by MCRs
• To validate a sample of real XML messages against the draft schema
– Incorporate dependency for sign-off on completion of internal Regression Testing in advance of commencement of IPT
![Page 19: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/19.jpg)
19IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Update on Action Items
• Action Item 186– RMDS to provide update at the next IGG on message monitoring over the Christmas 2007/New Year 2008 period– Messages backed up in the Hub over the Christmas period and
were released on 29th December – There was an accidental second batch run of the QH readings
job which resulted in duplicate 341 messages issuing for 29
![Page 20: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/20.jpg)
20IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Action Items to be carried forward
• Action Item 24 (& Action Item 75) – DR 112 - New MPD 37 New Transmission Connected Sites
– Meeting has been arranged to finalise the proposed changes to MPD 37
![Page 21: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/21.jpg)
21IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Action Items to be carried forward
• Action Item 95 – Investigate the possibility of addressing inconsistencies between the DUoS rules and the MICs and DUoS Groups in the MPRN data
– Proposal document in preparation by ESBN
![Page 22: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/22.jpg)
22IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Action Items to be carried forward
• Action Item 187– Document covering message reconciliation and resending processes to be sent to the IGG
• Action Item 200 - RMDS to provide worked examples showing how the versioning of the 341 market message would work for the two proposed solutions
![Page 23: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/23.jpg)
23IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Action Items to be carried forward
• Action Item 197- Participants to detail their requirements for the publication of the Generator Unit ID / Generation Unit ID and The Export Arrangement ID on the Extranet
• Action Item 198 - RMDS to investigate the possibility of publishing the Generator Unit ID / Generation Unit ID and the suitability of using the Export Arrangement ID
on the Extranet
![Page 24: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/24.jpg)
24IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
CER Update
![Page 25: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/25.jpg)
25IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Gemserv Update
![Page 26: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/26.jpg)
26IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Recalculation of Estimates• Existing
– Recalculation only where present less than previous– Only as far back as present ceases to be less than previous
• Proposed– Recalculation of all estimates, subject to a significance
threshold
– DUoS tariff change flag
Actual Reading 2Actual Reading 1
Estimates
A1 E1
Time
E2 E3 A2
Consumption History with Estimates
![Page 27: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/27.jpg)
27IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Recalculation of Estimates (contd.)
• Present status:– Impacted: moderate development costs
– Operational impact of increased message volumes: • acceptable where thresholds in place• the impact in trhe scenario where every
estimate is recalculated has been requested.• Update awaited.
![Page 28: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/28.jpg)
28IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Market Operations Update
![Page 29: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/29.jpg)
29IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Data Standards and Addresses
![Page 30: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/30.jpg)
30
RMDSRMDSRMDSRMDS Retail Market Design Service www.rmdservice.com
Retail Electricity Market Issues Update
Cormac Madden, RMDS
![Page 31: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/31.jpg)
31IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Retail Electricity Market Issues Log
• Log continuing to issue on a weekly basis
• Summary Statistics (as per last release – 090108)
– Total Number of Issues Logged 149
– Total ‘Closed’ 134– Total ‘In Progress’ 10– Total ‘Being Monitored’ 1– Total ‘Logged’ 4
– Total Raised Since Last Issue 0– Total Closed Since Last Issue 0
![Page 32: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/32.jpg)
32
RMDSRMDSRMDSRMDS Retail Market Design Service www.rmdservice.com
Retail Market Design Service Update
C. Madden, RMDS
![Page 33: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/33.jpg)
33IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
DR 0118 and DR0128
• DR0118: Avoidance of Erroneous De-registrations
• DR0128: Increase in tolerance levels for NQH Meter Reading Validation
Will be discussed later in the presentation.
![Page 34: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/34.jpg)
34IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Retail Market Design Service Update
• 195 Outage Notification Process:– Local agreement between ITS and ESBN SLA holder prior to
authorisation– Notice to defined circulation list of contacts representing internal
and external stakeholders – includes RMDS on behalf of suppliers
– Now in place per meeting and e-mail with ITS co-ordinator– Will be formalised in revision to ESBN-ITS SLA.
• Derived Profiles: – available on memory stick
![Page 35: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/35.jpg)
35IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Action Item 188 – Document measures to assure future schema versions
• Progress:– Schema validation described at last IGG– Subsequent discussions with Support Centre
• Measures:– Validation of schema against existing market
messages and live schema by hub team prior to issue.
– Sign-off of internal testing by ESBN prior to IPT.– Suggest change to assurance process
![Page 36: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/36.jpg)
36
RMDSRMDSRMDSRMDS Retail Market Design Service www.rmdservice.com
Discussion Requests & Market Change Requests
Susan Morrissey, RMDS
![Page 37: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/37.jpg)
37IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
MCR 0063 - Provision of reconciliation data
1. Aggregation input file data:
• MPRN• Supplier Unit• SSAC• DLF• Usage factor by time
of use• Load Profile
2. ESBN records at the time of the aggregation run:
• MPRN• DG• Load Factor (if MD)• Usage Factor• Load profile per time of
use• Whether actual or
estimated consumption
MCR ready for circulation.
Requirement: For all MPRNs included in a specified aggregation run, 2 data extracts on request:
![Page 38: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/38.jpg)
38IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
MCR 0063 - Provision of reconciliation data
Assumptions
1. Suppliers can validate QH Export Aggregations by using the existing data (Generator Unit / Export Arrangement).
2. Timing of extract runs to fit in with the live production schedule
3. Output format will not be in the form of new messages
4. The frequency and costs of producing the reports would need to be discussed as an MRSO item at future IGGs.
![Page 39: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/39.jpg)
39IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
DR 0117 New Status Message for Meter Works and Special Read requests
• Where we are:– DR0177 circulated and agreed
– New IGG Action (18.10.2007):• add the list of codes• clarify how these messages tie in with
chargeable and non chargeable transactions (in DUoS) when there is a cancellation.
![Page 40: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/40.jpg)
40IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
DR 0117 (contd.) Current Meter Works Outcomes
Follow-up Actions
Call Type outcome By WhenDUoS
Chargee-mail to Supplier? Follow-up call?
W request?
Cancelled
Supplier via W message
in AREAS before scheduling N N? None N
Visited, left on. Code of Practice reason ESBN At visit Y Y None N
NPA De-energisationVisited, left on. Cust/supplier arrangement ESBN At visit Y Y None N
Visited. No Access ESBN At visit N* N
Yes. If N/A, e-mail supplier to request withdrawal. Charge. Y
NPA De-energisationVisited. No Access - Vacant ESBN At visit Y Y None N
De-energisation vacant Cancelled
Supplier via W message
in AREAS before scheduling N N? None N
Visited. No Access ESBN At visit Y Y None N
Re-energisation Cancelled Supplierbefore transfer to AREAS N N? None N
Cancelled Supplier
in AREAS before scheduling N N? None N
Visited. No Access ESBN At visit N N
If no follow-up, e-mail supplier to request withdrawal. Charge. Y
Meter Change Cancelled
Supplier via W message
before transfer to AREAS N N? None N
Cancelled
Supplier via W message
in AREAS before scheduling N N? None N
Visited. No Access ESBN N Y None N
![Page 41: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/41.jpg)
41IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
MCR 0127 - Decouple Connection Agreement requirement from Change of Supplier
• In order to maximise potential value to suppliers, will request impact on the following alternative proposal:– Removal of CA requirement for all
MPRNs connection at low voltage.• Advantages:
– Would remove a larger number of sites from the requirement.
– Compatible with NI design.
• DSO are in agreement in principle
![Page 42: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/42.jpg)
42IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Market Change RequestDR 0113 Supplier of Last Resort Update
DR ready to be circulated to the market• SoLR Process Assumptions
– For a defaulting Supplier only. Cannot be initiated by a defaulting Supplier Unit.– On day 1 all MPRNS are to be reviewed by MRSO / ESBN for any outstanding service orders.– The data file is issued by MRSO on Day 1 and a revised data file will be issued by close of business on day 19 to the SoLR -
excluding any MPRNS that have since been registered to Alternate Suppliers.– Existing CoS’s to the exiting Supplier are to be cancelled and notified by MRSO.– Existing CoS’s to Alternate Suppliers are processed to the SoLR event date and procedures.
![Page 43: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/43.jpg)
43IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Market Change Request
DR 0113 Supplier of Last Resort Update
• SoLR Assumptions– Alternate Suppliers are obliged to cancel 010 CoS’s
submitted after day 19 for MPRNs on the day 1 CSV file– Alternate Suppliers will not receive Customer Name for
domestic MPRNS (existing market rules).– Meter Work service orders to be analysed case by
case.– All 010 messages for SoLR MPRNs to contain the new
SoLR Read Arrangement Code.– Analysis work and actions will be carried out by MRSO
and ESB Networks on MPRNs with certain statuses.
![Page 44: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/44.jpg)
44IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Market Change RequestDR 0113 Supplier of Last Resort Update
New Working Practice• A new working practice will be initiated from this DR to provide guidelines on how to handle:
– Disputed reads– Inaccurate / poor estimates readings (e.g. withdrawals, present < previous)– Meter works
![Page 45: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/45.jpg)
45IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Next Schema Release
• June 2008
• Prioritised MCRs/DRs:– DR 117 – Meter Works status message– MCR 0063 – Aggregation Reconciliation Data– MCR 0127 - Decouple CA and CoS
• SoLR Read Arrangement code value
Status: • No impact as MCRs are not complete. Need to
complete rapidly to facilitate development.
![Page 46: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/46.jpg)
47IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Next Steps
• Proposed Diary dates for IGG meetings in 2008:
– 21.02.2008– 03.04.2008– 15.05.2008– 26.06.2008– 07.08.2008– 18.09.2008– 30.10.2008– 11.12.2008– 22.01.2009
– Proposed dates are on Calendar of Events on RMDS website
![Page 47: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/47.jpg)
48IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Next Steps
• Propose to continue with conference call every two weeks – proposed dates for Q1 and Q2, 2008.
- 24.01.2008 - 07.02.2008- 06.03.2008- 20.03.2008- 17.04.2008- 01.05.2008- 29.05.2008
• Call details have new contingency PIN No:– Number: 01-6647602 PIN : 77640 – Contingency number remains: 01-6647777 New PIN: 80490
![Page 48: IGG Agenda – 10 th January 2008](https://reader035.vdocument.in/reader035/viewer/2022062309/56814d40550346895dba6669/html5/thumbnails/48.jpg)
49IGGIGGIGGIGG Industry Governance GroupSecretariat:Secretariat: RMDS RMDS www.rmdservice.com
Thank You