![Page 1: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/1.jpg)
IIBA Ottawa-Outaouais Chapter
ECBA™/CBAP®/CCBA® Study GroupOctober 2018
Nancy Beatson, CBAP
![Page 2: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/2.jpg)
2
Session Date Chapter Topic
1 Sep 25 1
2
Introduction BA Key Concepts
2 Oct 23 3 BA Planning & Monitoring
3 Nov 27 4 Elicitation & Collaboration
4 Dec 12 5 Requirements Life Cycle Management
5 Jan 22 6 Strategy Analysis
6 Feb 26 7 Requirements Analysis & Design Definition
7 Mar 26 (tent.) 8 Solution Evaluation
8 Apr 23 (tent.) 9 Underlying Competencies
9 May 28 (tent.) 10 Techniques
10 Jun 25 (tent.) 11 PerspectivesEnd-of-Session Game
2018/2019 Study Group
![Page 3: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/3.jpg)
Agenda
1 Introductions10
min
2 Chapter 3: BA Planning and Monitoring30
min
4 7 Steps to Passing the CBAP® or CCBA® Exam15
min
6 Pop Quiz10
min
5 Upcoming Events for BAs5
min
3 Technique Spotlight15
min
![Page 4: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/4.jpg)
1 Introductions
![Page 5: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/5.jpg)
• Name• (Opt) Current assignment, project,
activity • Your stage in the BA certification
process:
❑My exam is booked!
❑All registered… just studying
❑Thinking about it
❑Business analysis? What’s business analysis?
Introductions
![Page 6: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/6.jpg)
3 Chapter 3: BA Planning and Monitoring
3.1 Plan Business Analysis Approach
3.2 Plan Stakeholder Engagement
3.3 Plan Business Analysis Governance
3.4 Plan Business Analysis Information Management
3.5 Identify Business Analysis Performance Improvements
![Page 7: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/7.jpg)
Business Analysis Core Concept Model™ (BACCM™)
![Page 8: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/8.jpg)
3.1 Plan Business Analysis Approach
• Defines how business analysis will be conducted
• Describes overall methods to be used, tasks to be performed and deliverables to be produced
![Page 9: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/9.jpg)
3.1 Plan Business Analysis Approach
![Page 10: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/10.jpg)
3.1 Plan Business Analysis Approach
![Page 11: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/11.jpg)
3.2 Plan Stakeholder Engagement
• Plan how to establish and maintain effective working relationships with stakeholders
• Identify the relevant stakeholders
– Roles
– Attitudes
– Decision-making authority
– Level of power or influence
![Page 12: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/12.jpg)
3.2 Plan Stakeholder Engagement
![Page 13: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/13.jpg)
3.3 Plan Business Analysis Governance
• Defines how decisions will be made about requirements and designs, reviews, change control, approvals and prioritization
![Page 14: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/14.jpg)
3.3 Plan Business Analysis Governance
![Page 15: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/15.jpg)
Brainstorming Used to generate an initial list of potential stakeholder names who may need
approval roles in the defined governance process.Document
Analysis
Used to evaluate existing governance processes or templates.
Interviews Used to identify possible decision-making, change control, approval, or
prioritization approaches and participants with an individual or small group.Item Tracking Used to track any issues that arise when planning a governance approach.
Lessons Learned Used to find if past initiatives have identified valuable experiences with
governance that can be leveraged on current or future initiatives.Organizational
Modelling
Used to understand roles/responsibilities within the organization in an effort to
define a governance approach that involves the right stakeholders.
Process
Modelling
Used to document the process or method for governing business analysis.
Reviews Used to review the proposed governance plan with key stakeholders.
Survey or
Questionnaire
Used to identify possible decision-making, change control, approval, or
prioritization approaches and participants.
Workshops Used to identify possible decision-making, change control, approval, or
prioritization approaches and participants within a team setting.
3.3 Plan Business Analysis Governance - Techniques
![Page 16: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/16.jpg)
3.4 Plan BA Information Management
• How BA information will be stored and accessed
• Comprised of all the information the BA elicits, creates, compiles and disseminates in the course of performing business analysis –examples?
![Page 17: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/17.jpg)
3.4 Plan BA Information Management
![Page 18: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/18.jpg)
3.4 Plan BA Information Management –Requirement Attributes
CARA’S SOUPS
Absolute reference
Author Complexity Ownership Priority Risks Source Stability Status Urgency
Some use this mnemonic to
remember
![Page 19: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/19.jpg)
3.5 Identify BA Performance Improvements
• Assess how well business analysis is being performed
• Identify improvements to be made
![Page 20: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/20.jpg)
3.5 Identify BA Performance Improvements
![Page 21: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/21.jpg)
3 Technique Spotlight
10.18 Estimation
10.26 Item Tracking
10.35 Process Modelling
![Page 22: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/22.jpg)
3 Technique Spotlight
10.18 Estimation
![Page 23: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/23.jpg)
10.18 EstimationPurpose To forecast the cost and effort involved in pursuing a course of action
Can be used in the following
Knowledge Areas and Tasks:
BA Planning and Monitoring (3.1, 3.2, 3.3)
Elicitation and Collaboration (4.1, 4.2, 4.3)
Requirements Life Cycle Management (5.2, 5.4)
Strategy Analysis (6.1, 6.2)
Requirements Analysis and Design Definition (7.3, 7.5)
Solution Evaluation (8.4)ELEMENT: Estimation Methods • Top-down
• Bottom-up
• Parametric Estimation
• Rough Order of Magnitude (ROM)
• Rolling Wave
• Delphi
• PERTELEMENT: Information Sources Analogous Situation
Organization History
Expert JudgementOther ELEMENTs: Accuracy, Precision, Reliability, Contributors
![Page 24: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/24.jpg)
10.18 Estimation – Example using PERT
INITIATIVE: Acme Brewing Co. has been in the business of creating beers of distinction for over 100 years. With recent changes in legislation to permit in-store brewing, the company is looking to improve efficiencies and reduce the costs in its operations in order to compete with smaller retailers
ESTIMATE the time needed to develop a business case to address Acme Brewing Co.’s needs using the Program Evaluation and Review Technique (PERT)
• MO (Most Optimistic) = 5 days• ML (Most Likely) = 12 days• MP (Most Pessimistic) = 21 days
• Plugged into algorithm (MO + 4ML + MP)/6 = (5 + 4(12) + 21) / 6 = (5 + 48 + 21)/6 = 74/6 = 12.33
Therefore the estimated (expected) time to develop the business case = 12.33 days
![Page 25: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/25.jpg)
Strengths Weaknesses
• Estimates only as good as the knowledge level of the elements being estimated
• Without local/org knowledge, estimates can vary widely from actuals
• Using only 1 estimation method may lead to unrealistic expectations
10.18 Estimation – Usage Considerations
• Provides a rationale
• Basis upon which a change can be budgeted/scheduled
• Updating (refining) the estimates during the initiative increases confidence
• Team of knowledgeable estimators better than single individual
![Page 26: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/26.jpg)
3 Technique Spotlight
10.26 Item Tracking
![Page 27: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/27.jpg)
10.26 Item TrackingPurpose To capture and assign responsibility for issues and stakeholder
concerns that pose an impact to the solution.Can be used in the following
Knowledge Areas and Tasks:
BA Planning and Monitoring (3.1, 3.2, 3.3, 3.4, 3.5)
Requirements Life Cycle Management (5.3, 5.4, 5.5)
Strategy Analysis (6.1)
Requirements Analysis and Design Definition (7.2, 7.3)
Solution Evaluation (8.3, 8.4)
ELEMENT: Item Record • Item Identifier
• Summary
• Category
• Type
• Date Identified
• Identified By
• Impact
• Priority
• Resolution Date
• Owner
• Resolver
• Agreed Strategy
• Status
• Resolution Updates
• Escalation Matrix
Other considerations Item Management
Metrics
![Page 28: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/28.jpg)
10.26 Item Tracking – ExampleItem Identifier
Summary Category Type Date Identified
Identified By
Impact Priority Owner Resolver Agreed Strategy
Status
001
GoC Cloud Adoption Strategy may impact our current solution strategy… may require us to add “Cloud” as solution option for consideration
Policy Risk Feb. 14, 2008 J. Smith TBD High W. Jones OPEN
002
003
![Page 29: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/29.jpg)
Strengths Weaknesses
• Must ensure that time spent tracking items does not outweigh the benefits realized
• Stakeholder effort might be better spent on other work
10.26 Item Tracking – Usage Considerations
• Ensures stakeholder concerns and issues are captured, tracked and resolved
• Permits stakeholders to rank the importance of outstanding items
![Page 30: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/30.jpg)
3 Technique Spotlight
10.35 Process Modelling
![Page 31: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/31.jpg)
10.35 Process ModellingPurpose A standardized graphical model used to show how work is carried out and is the
foundation for process analysis.Can be used in the
following Knowledge
Areas and Tasks:
BA Planning and Monitoring (3.1, 3.2, 3.3, 3.4, 3.5)
Elicitation and Collaboration (4.2)
Requirements Life Cycle Management (5.2)
Strategy Analysis (6.2,6.4)
Requirements Analysis and Design Definition (7.1)
Solution Evaluation (8.4)Key elements of
process models
• Activity• Event• Directional Flow• Decision Point• Link• Role
Models and
Notations
• Flowcharts and Value Stream Mapping (VSM)
• Data Flow diagrams
• Unified Modelling Language (UML) diagrams
• Business Process Model and Notation
(BPMN)
• Integrated DEFinition (IDEF) notation
• Input, Guide, Output,
Enabler (IGOE) diagrams
• Supplier, Input, Process,
Output, Consumer (SIPOC)
• Value Stream Analysis
![Page 32: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/32.jpg)
10.35 Process Modelling – UML Example
![Page 33: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/33.jpg)
10.35 Process Modelling – BPMN Example
![Page 34: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/34.jpg)
10.35 Process Modelling – VSM Example
![Page 35: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/35.jpg)
Strengths Weaknesses
• Project time may not be allocated to developing process models
• Can become complex if not structured carefully
• Complex processes are difficult to model
• Problems not always evident in high-level models
• Models quickly become obsolete in a dynamic environment
10.35 Process Modelling – Usage Considerations
• Easily understood
• Different perspectives possible
• Effective to demonstrate large number of scenarios
• Helps to identify stakeholders
• Highlights pain points (to improve)
• Can be used as a baseline for improvement
• Provides documentation of processes
![Page 36: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/36.jpg)
4 7 Steps to Passing the CBAP® or CCBA® Exam*
#1 — Obtain and Skim the BABOK® v3
#2 — Apply for the Exam
#3 — Read the entire BABOK®
#4 — Absorb the BABOK®
#5 — Take Practice Exam Questions
*https://www.modernanalyst.com/Resources/Articles/tabid/115/ID/3430/Seven-Steps-to-Passing-the-CBAP-or-CCBA-Exam-A-Foolproof-Plan.aspx (Accessed October 2018)
#6 — Do Final Preparation
#7 — Do a “Brain Dump” then Pass the Exam
![Page 37: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/37.jpg)
7 Steps to Passing the CBAP® or CCBA®
#1: Obtain and Skim the BABOK® v3– Familiarize yourself with BABOK terms
– Understanding of KAs and Tasks important for exam application
– Softcopy free for IIBA members
– Hardcopy can be purchased online via retailers
– EEPs may provide a hardcopy during certain courses, e.g. CBAP Boot Camp
37
![Page 38: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/38.jpg)
7 Steps to Passing the CBAP® or CCBA®
#2: Apply for the Exam– Familiarize yourself with exam prerequisites:
• # hrs of professional business analysis experience
• # hrs demonstrated experience aligned to KAs
• # hrs BA professional development
• Minimum high school education
• 2 work references
– Pay application fee
– Agree to IIBA Code of Conduct
– Submit application & await approval (~21 days)
38
![Page 39: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/39.jpg)
7 Steps to Passing the CBAP® or CCBA®
#3: Read the entire BABOK®
– Read the entire book (not necessarily in one sitting) before doing any other preparation
– Take notes as you go
– Business analysis is iterative and non-linear, therefore pick your favourite KA first then concentrate on others
– 6 KAs / 32 tasks / 50 techniques / 5 perspectives
39
![Page 40: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/40.jpg)
7 Steps to Passing the CBAP® or CCBA® #4: Absorb the BABOK®Study according to your learning style – choose a method or several methods that suit you:
– For some, reading and rereading the BABOK– For others, using a study guide (tips and tricks)– For others, attending study groups– For others, answering exam questions– For others, attending classes– For others, individual study– Consider flash cards for BABOK terminology new to you
(premade, online or homemade will do)
40
![Page 41: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/41.jpg)
7 Steps to Passing the CBAP® or CCBA®
#5: Take Practice Exam Questions
– In this phase, begin practicing exams
– Take numerous quizzes and exams
– Track your progress
– Revisit KAs that you are not scoring well on
– Consider online exam simulators
– Do a few timed simulations to check your speed
41
![Page 42: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/42.jpg)
7 Steps to Passing the CBAP® or CCBA®
#6: Do Final Preparation
– Focus on areas you have had trouble with
– Further study and practice questions on these areas
– Get a good sleep the night before the exam:
“REST WELL = TEST WELL”
42
![Page 43: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/43.jpg)
7 Steps to Passing the CBAP® or CCBA® #7: Do a “Brain Dump” then Pass the ExamOn the day of the exam:
– Eat a nutritious breakfast or lunch– Drink enough water… but not too much– Allow plenty of time to get to the exam location– “brain dump” just before the start of the exam (inside
the exam room) – helps to clear your brain, reduce test anxiety and can serve as a reference during your exam
– Don’t be intimidated by the first questions
43
![Page 44: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/44.jpg)
5 Upcoming Events for BAs
![Page 45: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/45.jpg)
Upcoming Events:
– (Nov 17) Skills Workshop: Introduction to Discovery Driven Innovation
• Saturday, Nov 17, 2018 - 8:15 am to 4:30 pm• Cartier Place Suite Hotel, 180 Cooper Street, Ottawa, Ontario
– (Nov 20) November Chapter Meeting• Tuesday, Nov 20, 2018 - 5:00 to 7:30 pm• Feature Presentation: Role of a BA in a World of Artificial Intelligence• Ottawa Police Association, 141 Catherine St, Ottawa
– (Nov 27) November Study Group Session• Tuesday, Nov 27, 2018 - 6:00 to 7:30 pm• Chapter 4 – Elicitation and Collaboration
More info is available at: www.ottawa-outaouais.iiba.org
![Page 46: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/46.jpg)
6 Pop Quiz
![Page 47: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/47.jpg)
• 10 questions
• Open-book
• Hand back your quiz (earn PDUs)
• Make note of or take a photo of your answers if you want to grade yourself
![Page 48: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/48.jpg)
QUIZ REVIEW
– How’d you do?
![Page 49: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/49.jpg)
Study group materials are available for download at the Ottawa-Outaouais Chapter website
– https://ottawa-outaouais.iiba.org/ecbar-ccbar-cbapr-study-groups
![Page 50: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/50.jpg)
Get on the Chapter Mailing List
From the IIBA Ottawa-Outaouais homepage, go to ottawa-outaouais.iiba.org → News →Newsletter Subscription
https://ottawa-outaouais.iiba.org/newsletter-subscription
![Page 52: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/52.jpg)
SUPPLEMENTAL SLIDES
![Page 53: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/53.jpg)
53
*http://www.iiba.org/certification-handbook/ccba-blueprint.htmhttp://www.iiba.org/certification-handbook/cbap-exam.htm
12%
20%
18%
12%
32%
6%
14%
12%
15% 15%
30%
14%
0%
5%
10%
15%
20%
25%
30%
35%
Business AnalysisPlanning andMonitoring
Elicitation andCollaboration
Requirements LifeCycle Management
Strategy Analysis Requirements Analysisand Design Definition
Solution Evaluation
Exam Blueprint - CCBA & CBAP*
CCBA® CBAP®
![Page 54: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/54.jpg)
IIBA Certification Program: 4 Levels
Entry Certificate
in Business
Analysis™
(ECBA™)
Certification of
Capability in
Business Analysis™
(CCBA®)
Certified Business
Analysis
Professional™
(CBAP®)
Certified Business
Analysis Thought
Leader™
(CBATL™)
Exam Yes Yes Yes ?
Work
Experience
No 3750 hrs
in past 7 yrs
7500 hrs
in past 10 yrs
?
Professional
Development
hours
21
in past 4 yrs
21
in past 4 yrs
35
in past 4 yrs
?
Intended for New grads,
people changing
careers
Doers, perform BA
with competency
Influencers,
influences decisions
to deliver value
Thought Leaders, giving
back to the community,
shaping the profession
![Page 55: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/55.jpg)
• Fees (refer to http://www.iiba.org/Certification-Recognition/Certification/pricing.aspx)
![Page 56: IIBA Ottawa-Outaouais Chapter Study Group Session...Brainstorming Used to generate an initial list of potential stakeholder names who may need approval roles in the defined governance](https://reader034.vdocument.in/reader034/viewer/2022042103/5e80d800fce87a7a8606a4df/html5/thumbnails/56.jpg)
Need more information on certification?
• IIBA Mult-Level Certification Handbook
– refer to http://www.iiba.org/certification-handbook/intro-cert-framework-intro.htm
• IIBA Certification Program FAQs
– refer to http://www.iiba.org/Certification-Recognition/Certification-FAQs.aspx