illinois statewide its architecture and strategic plan ......o need add’l traveler info iowa has...
TRANSCRIPT
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
CHICAGOLAND NOVEMBER 17, 2016
1
TRANSPORTATION NEEDS
Ensure we have access to all of the data as
a philosophy
Explore Private sector data sources
aggressively considering value of agency
data
Consistent access to traffic count data
independent of county/district/route type
Improve the connectivity between GIS
systems and Transportation Systems
Explore the Connected Vehicle space more
aggressively
Coordinated DRSC Rules deadlines
exploration
Commitment to addressing fatalities
Continued advancement of integrated fare
systems
On-Going commitment to Transit safety
programs
Parking Management
Work Zone Management
More Active Engagement of FHWA with
Statewide needs
High Risk CVO Carrier Detection
Oversize Overweight (OSOW) initiatives
Real-time data requirements
Performance measures reporting
requirements
Public-private partnerships (alternate
funding)
Sorting through the data from different
sources, e.g., public & private (e.g., OnStar)
Funding – need to track FAST ACT funding
opportunities, build team to pursue
FAST Act requirements for real-time
traveler information deployment
Regional Special Events management
Continued Enhanced Emergency Alerting
ITS security – data, infrastructure, control
Connect further to Array of Things,
Internet of Things (IoT) activities
Fill geographic and resolution gaps for
traffic data
Identify a characterize the Private Data
Markets in a manner that better supports
transportation needs relative to market
availability
Enhance TMC to Transit Integration
Communication Infrastructure
Opportunity development and
Redundancy planning
Robust & diverse communications
infrastructure
Exploration of Regional TMCs or "shared
services"
Pedestrian Safety Initiative
Connected Pedestrians
Advanced Corridors - I-55, I-94/US 41
Integrated Corridor Management
Grade Crossing safety and Efficiency
Rail crossing condition
reporting/alert/coordination system
(including predictive)
Transportation Security - Assets,
Environmental
Cloud Migration of FMCSA
Truck Routing Enhancements
Truck access/delivery/loading zone
management in the downtown (pricing
component)
Incident information (detection and
clearance)
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
CHICAGOLAND NOVEMBER 17, 2016
2
CMAP interest for traceability that regional
goals are being met
Linkages between planning and operations
Simplicity of service model – from user
perspective
Collision avoidance
ITS PROJECTS
Develop Connected Vehicle Pilot (ISTHA,
IDOT, Pace)
Integrated dynamic transit vehicles pilot
project (Pace)
Multimodal traffic signal system (Pace) –
integration of signals and CVs
Integrated dynamic transit vehicles pilot -
Pace proposal for connected vehicles
MMTS
DSRC
Explore projects such as HASS and other
wide area notifications for Transportation
application
Acoustic alarm detection system on fire
trucks
Pedestrian Safety Proximity and
Intersection detection
Smart Arterial Corridors
Integrated corridor management
Transit ITS safety projects (Pace)
Internet of Things (IOT) for infrastructure
monitoring (BNSF)
“Array of Things” project (ANL) – weather
information
Truck Parking Management Systems (IDOT)
Regional truck delivery management
system (CDOT-trucking dispatch centers)
Truck route clearance system
Overheight warning system (Deerfield,
LCDOT)
Fill geographic and resolution gaps for
traffic data. Speed, Volume, Classification,
Pedestrians, ridership
Identify a characterize the Private Data
Markets in a manner that better supports
transportation needs relative to market
availability
Includes OnStar, and all actively available
sources
Work Zone Management - Statewide
Integration
Data transfer between centers vs. in the
field, e.g., transit AVL & centralized TSP
(Pace)
CAD integration
Lake County TMC as a shared TMC for
other counties
I-55 Managed Lanes (IDOT)
I-94/US 41 Smart Corridor (IDOT)
I-290 project (IDOT)
Special event information/reporting
systems
Real-time transit information
Travel time predictive modeling (UIC)
360 SmartView (commercial vehicle high-
risk identification), updated PrePass
Positive train control (PTC)
DSRC data collection and integration o 5Ghz BSMS o Data collection - Weather, speed,
etc.
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
CHICAGOLAND NOVEMBER 17, 2016
3
OSOW and other commercial vehicle
permitting systems/process
Truck route systems (CVISN)
FMCSA cloud migration
Parking management systems, data
integration (CDOT)
o Smart cities, freeways and corridors
o Fleet management
STAKEHODLERS
PROJECT - Expanded Gateway data integration
MnDOT,
MDOT,
GLRTOC,
Counties,
Cities,
Iowa,
Ohio,
Ontario,
Private Sector,
Media,
IDOT PROJECT - Connected Vehicle DSRC test
ISTHA,
Pace,
FHWA
PROJECT - Lake County shared TMC w/other counties
IDOT,
Tollway,
Cook Co,
DuPage,
Kane,
McHenry,
Will,
municipalities,
ICC,
FHWA,
Gateway, P
SAPs,
Pace
INVENTORY OF SYSTEMS
PROJECT - Expanded Gateway data integration
Minnesota CARS and IRIS,
Michigan ATMS & LCAR,
Probe data,
D4 ATMS (includes D3&5) with Tazewell and Peoria Co CAD,
Gateway Guide (D8),
Station One,
Weather
PROJECT - Lake County shared TMC w/other counties
Traffic signal control,
ATMS,
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
CHICAGOLAND NOVEMBER 17, 2016
4
AGREEMENTS
PROJECT - Expanded Gateway data integration
MDOT data sharing,
Counties (planned),
IDOT/CMAP probe data, performance measures
IDOT/UIC intergovernmental for system ops
PROJECT - Lake County shared TMC w/other counties
Existing: IDOT, Tollway, municipal, Cook, FHWA, Pace, PSAPs
Planned: remaining counties
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
ROCK RIVER VALLEY FEBRUARY 7, 2017
1
TRANSPORTATION NEEDS
Congestion at river crossing in Dubuque / Galena
o Trucks / farm equipment o Heavy tourist traffic o Need add’l traveler info
Iowa has more fine-grained weather / road condition data
o Improve this information on Illinois side
Sharing data / coordination across state lines
Out-of-area travelers don’t know what county they are in, which is a problem for severe weather alerts
Increase awareness of available info from smartphone alerts
Real-time info for rural transit passengers
Challenges with transporting passengers with mobility issues, especially across county lines
Transit agencies use different software o Difficult to coordinate services
Provide arrival time info to paratransit passengers
Use/share video for incident management o Assess the scene to help
determine appropriate response
Traveler info for work zones / construction
Maintenance of existing ITS equipment o Road Weather Information
Systems (RWIS) Only 1 of 8 is fully
functional o Dynamic message signs (DMS) o CCTV cameras o Spare parts for older equipment o Funding for upgrades /
replacements
Central operations / interconnects for ITS operations
Assistance from state for regional traffic management centers (TMCs), traffic signal control, etc.
Public-private partnerships (PPP) for communications (fiber network, etc.)
Emergency vehicle preemption (EVP)
Transit signal priority (TSP)
High-crash locations o I-39/90 near IL/WI border
Work zone / back-of-queue warning o Smart work zone (SWZ)
TRANSPORTATION NEEDS (Prioritized, with vote totals)
1. Better data sharing (e.g., across state lines) [11]
2. Statewide funding for regional projects / operations [9]
3. Real-time transit information [6] 4. Maintenance of existing ITS equipment [6] 5. Centralized operations for 24/7 traffic
management [6] 6. Communications infrastructure upgrades /
expansion [6]
7. Getting systems to talk to each other (integration) [6]
8. Better weather / road condition data [5] 9. Mitigating non-recurring congestion
(seasonal, special events) [4] 10. Improved / easier coordination between
transit agencies [4] 11. Standardization and procurement [4] 12. More specific traveler information [1]
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
ROCK RIVER VALLEY FEBRUARY 7, 2017
2
ITS PROJECTS
Red Alert
Education about ITS (potential)
Rural transit information app (potential) o Statewide or use Google Transit
Transit automatic vehicle location (AVL) o For urban, rural, and paratransit
Interagency video sharing
River bridge traveler info
River bridge ITS
Regional traffic signal control (potential)
ITS specification library
ITS funding source
Fiber buildout (public-private)
Traffic safety teams
Smart Work Zones (SWZ)
STAKEHOLDERS
SCENARIO – Dubuque bridge incident
ISP
County sheriffs
Local law enforcement
911 / county dispatch
Fire departments
EMS
Towing companies
IDOT
Public
Dubuque Transit
Commercial vehicles
Media
Private traveler info providers
US Coast Guard
SCENARIO – WB I-90 closure near WI state line
IDOT o District 2 Operations o Station One
WisDOT
Illinois Tollway
ISP
Winnebago and Boone Counties
Local fire departments and EMS
Towing companies
Transit agencies
County emergency management
Media
Local / county highway and public works departments
Travel Midwest / Gateway
Commercial vehicles
Tourist attractions
Local employers
Hospitals
INVENTORY OF SYSTEMS
SCENARIO – Dubuque bridge incident
911 systems
District 2 radio room
Public / private traveler info systems (Waze, Google, etc.)
CCTV (potential)
Computer-aided dispatch (potential)
Internet, radio, TV broadcasts, and apps for traveler info
SCENARIO - WB I-90 closure near WI state line
n/a
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
ROCK RIVER VALLEY FEBRUARY 7, 2017
3
SERVICES
SCENARIO – Dubuque bridge incident
ATIS01 – Broadcast Traveler Information
ATIS04 – Dynamic Route Guidance
ATIS05 – ISP Based Trip Planning and Route Guidance
ATMS06 – Traffic Information Dissemination
ATMS07 – Regional Traffic Management
ATMS08 – Traffic Incident Management System
ATMS23 – Dynamic Lane Management and Shoulder Use
ATMS24 – Dynamic Roadway Warning
CVO07 – Roadside CVO Safety
CVO08 – On-board CVO Safety
CVO10 – HAZMAT Management
CVO11 – Roadside HAZMAT Security Detection and Mitigation
EM01 – Emergency Call-Taking and Dispatch
EM02 – Emergency Routing
EM03 – Mayday and Alarms Support
EM04 – Roadway Service Patrols
EM05 – Transportation Infrastructure Protection
EM06 – Wide-Area Alert
MC01 – Maintenance and Construction Vehicle and Equipment Tracking
MC03 – Road Weather Data Collection
MC04 – Weather Information Processing and Distribution
SCENARIO - WB I-90 closure near WI state line
AD02 – ITS Data Warehouse
ATIS01 – Broadcast Traveler Information
ATIS02 – Interactive Traveler Information
ATIS04 – Dynamic Route Guidance
ATMS01 – Network Surveillance
ATMS06 – Traffic Information Dissemination
ATMS08 – Traffic Incident Management System
ATMS21 – Roadway Closure Management
CVO01 – Carrier Operations and Fleet Management
CVO10 – HAZMAT Management
EM01 – Emergency Call-Taking and Dispatch
EM02 – Emergency Routing
MC03 – Road Weather Data Collection
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
ROCK RIVER VALLEY FEBRUARY 7, 2017
4
AGREEMENTS
SCENARIO – Dubuque bridge incident
ISP & IDOT agreement for handlingincidents (formal)
Towing contractor with ISP / police (list)
MOUs between emergency responders
IDOT & UIC for Travel Midwest
Private traveler info providers and mediawith IDOT
CCTV image sharing (potential)
Detour route choice(s)o “Good neighbor policy”, which is
typically used for constructiondetours
CVO oversize-overweight rerouting
SCENARIO - WB I-90 closure near WI state line
Dispatch agencies
IDOT & Illinois Tollwayo Operations (handshake)o Funding (written)o Highway maintenance / response
IDOT & localo Informal agreementso State law for emergencies
IDOT & ISP – Joint Operating Policy
Mutual aid agreementso Includes access considerations
Look at ways to ensure efficiency andeffective communications
o New computer-aided dispatch(CAD)
o Co-locationo Radio system migrationo Utilize boilerplate agreements to
ensure consistent componentsand involve all stakeholders
o “Know you are part of the plan”
OPERATIONAL CONCEPT
SCENARIO: Dubuque bridge incident
Traveler calls 911
911 dispatches fire, police, EMS and ISPo Contacts Dubuque 911o HazMat (Fire) if needed
Police / ISP contact IDOT, County, andmunicipalities as needed
IDOT deploys maintenance vehicles ifrequested
Towing companies contactedo May provide traffic control at/near
scene
Fire department / EMS treat injuries
County Public Information Officer (PIO)disseminates information to media
Transit agency reroutes buses if necessary
Towing companies clean up sceneo IDOT, IDNR also help if needed
SCENARIO: WB I-90 closure near WI state line
n/a
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY COMMERCE CORRIDORS
JANUARY 31, 2017
1
TRANSPORTATION NEEDS
Build a backbone for communications and power
o Challenges with coordination with
other agencies, utilities, etc.
Getting users to tell us what they need
What resources are available?
Special event coordination
o Planning for traffic congestion, etc.
o Disseminate info to public, other
agencies
Seasonal traffic (such as holiday shopping)
Traveler information dissemination
o IDOT, Google, Waze, etc.
Traffic signal coordination /
synchronization
o Need more data
Funding for improvements
Secondary crash mitigation / prevention
o Advanced warning to travelers
Continue to improve traffic incident management
District 4 (Peoria) handles dispatch after-
hours (~4:30pm to 7:00 or 8:00am)
Predictive traffic modeling
Emergency vehicle pre-emption (EVP)
o Usually requested by locals
Emergency vehicle rerouting when
highway-rail intersections are blocked
No weigh-in-motion (WIM) in the district
Are we meeting guidelines for traveler
info dissemination for construction?
Timely road condition updates
o Guidelines vs. public expectation
District 1 has Lane Closure System
o Expand statewide?
TRANSPORTATION NEEDS (Prioritized, with vote totals)
1. Communications and power backbone [8] 2. Timely road condition collection
(construction, weather, etc.) [8] 3. Identifying funding sources [7] 4. Managing incident impacts (SWZ, queue
detection / warning) [7]
5. ATMS / traffic signal coordination [6] 6. Special event coordination [2] 7. Traveler information dissemination [2] 8. Predictive traffic modeling [2] 9. Emergency vehicle routing [1]
ITS PROJECTS
Fiber installation
Special event coordination
Expansion of Lane Closure System
District-to-district dispatch
Public-private data (traffic and emergency
information)
Traffic incident management
Portable weigh scales
Aries traffic signal management
Environmental condition data (via department fleet vehicles)
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY COMMERCE CORRIDORS
JANUARY 31, 2017
2
STAKEHOLDERS
SCENARIO – WB I-80 closure with serious injuries, potential HazMat, and construction on alternate routes
ISP
IDOT
LaSalle County o Engineer o Emergency management
Local law enforcement
Towing companies
Media
Station One
Social media
Rural transit agencies
Municipalities
911 centers
INVENTORY OF SYSTEMS
SCENARIO – WB I-80 closure with serious injuries, potential HazMat, and construction on alternate routes
CCTV cameras
Dynamic message signs (DMS)
Portable changeable message signs (PCMS)
Dispatch
Station One
Traffic signals
Maintenance equipment
911 systems
SERVICES
SCENARIO – WB I-80 closure with serious injuries, potential HazMat, and construction on alternate routes
APTS03 – Demand Response Transit Operations
ATIS01 – Broadcast Traveler Information
ATIS05 – ISP Based Trip Planning and Route Guidance
ATMS01 – Network Surveillance
ATMS03 – Traffic Signal Control
ATMS06 – Traffic Information Dissemination
ATMS07 – Regional Traffic Management
ATMS08 – Traffic Incident Management System
ATMS18 (potentially) – Reversible Lane Management
CVO10 – HAZMAT Management
CVO11 – Roadside HAZMAT Security Detection and Mitigation
EM01 – Emergency Call-Taking and Dispatch
EM03 – Mayday and Alarms Support
MC01 (potentially) – Maintenance and Construction Vehicle and Equipment Tracking
AGREEMENTS
SCENARIO – WB I-80 closure with serious injuries, potential HazMat, and construction on alternate routes
IDOT & ISP – Joint Operating Agreement
Law enforcement with EMS
Districts 3 & 4 (handshake agreement)
IDOT & municipalities for traffic signal maintenance
Districts 2 & 3 for ITS equipment maintenance
OPERATIONAL CONCEPT
n/a
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY GREAT RIVER COUNTRY
DECEMBER 6, 2016
1
TRANSPORTATION NEEDS
Emergency info dissemination via multiple
platforms
Incident management
o Detection
o Response
o Info Sharing
Fulton County issues
o No four-lane highways
o Problems getting info about
incidents, congestion, etc.
o No CCTV coverage
o Getting alternate route info to
travelers
o Safety issues – lack of passing
opportunities
o Hwy 24 is constrained by
topography
Providing travel info to private industry,
such as Google, Waze, etc.
Collecting traffic surveillance data in rural
areas
Weather / road conditions
D4 interconnects with additional counties
(already connected to some, such as
Tazewell Co, City of Peoria)
Accurate travel info (current delays, etc.),
including timely updates of incident
clearances
Advanced warning systems for known
crash issues (e.g., curves, speed advisories,
animal crossings, etc.)
Public safety agency access to real-time
data (video, etc.)
o Bandwidth is a limitation
Use of excess fiber capacity for point-to-
point communications (e.g., City of Peoria
to Galesburg)
Develop mobile connections with other
agencies (first responders, etc.)
o Currently limited to direct fiber
optic communications
o New software will have some
mobile capabilities
Railroad crossing blockage alerts
o Expand the system to other areas
o Current systems in East Peoria
Dissemination of railcar contents, lengths,
and routes to public safety agencies
o Railroads are very reluctant to
provide this info, due to concerns
about terrorism, competition, etc.
Statewide interactive transit maps and
info for trip planning
o Include real-time tracking
o Promote the existing systems to
travelers
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY GREAT RIVER COUNTRY
DECEMBER 6, 2016
2
TRANSPORTATION NEEDS (Prioritized, with vote totals)
1. Expand real-time emergency information
dissemination (on multiple platforms /
agencies) [12 votes]
2. Additional connections between IDOT and
other agencies, e.g., use excess fiber to
connect agencies [10]
3. Further improve incident management
(detection, response, info sharing) [9]
4. Exchanging information with private
sources, e.g., Google [8]
5. More accurate travel information [7]
6. Statewide transit routing information
source [7]
7. Capacity issues, e.g., 2-lane Highway 24 in
Fulton County [6]
8. Better weather/ road condition
information [4]
9. Monitoring data in rural locations [1]
10. Railroad crossing blockage information [1]
11. Freight content information (rail, to match
highway) [1]
ITS PROJECTS
Public-private data sharing for incident
management
Increased agency video sharing
CAD integration with traffic management
o Currently IDOT D4 with Tazewell,
and Peoria (City, County or both?)
o Add Knox, Fulton, McDonough
Real-time incident info sharing with private
traffic info providers (Google, etc.)
Drones for video
New D4 ATMS software for improved
video sharing
Snow plow data collection (incl. video)
Highway-rail monitoring
Freight tracking on rail
Dedicated, higher-bandwidth links between agencies (non-centralized)
Intermodal info, routing tool statewide
Crash warning systems
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY GREAT RIVER COUNTRY
DECEMBER 6, 2016
3
STAKEHOLDERS
PROJECT – CAD integration with Traffic Mgmt
IDOT District 4
Peoria & Tazewell County (existing)
Knox Co. 911 Center, McDonough, Fulton, Warren County and other counties in and near District 4 (planned)
Public safety agencies (emergency responders and PSAPs) within Peoria & Tazewell Counties
CAD integration vendors
Media PROJECT – Increased Agency Data Sharing
IDOT District 4
Municipal/county transportation agencies
Transit agencies
Chamber of commerce
Media
Universities/research centers
Law enforcement
MPOs/RPCs
PROJECT - Interactive Statewide Intermodal Information Tool
Transit agencies
Private bus companies
Amtrak
Travelers
Taxi/Uber
Law enforcement (for video requests)
Trucking industry
Chamber of commerce
IDOT
Freight rail companies
INVENTORY OF SYSTEMS
PROJECT – CAD integration with Traffic Mgmt
E911 system
Video system sharing
GIS databases
Web-based
Communications network infrastructure PROJECT – Increased Agency Data Sharing
Field devices (data collection)
Management centers
Media outlets
911 phone systems
Server infrastructure (back-up facilities)
PROJECT - Interactive Statewide Intermodal Information Tool
Transit vehicles
Transit management centers
Traveler information systems o Mobile apps o At stations (e.g., next bus)
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY GREAT RIVER COUNTRY
DECEMBER 6, 2016
4
SERVICES
PROJECT – CAD integration with Traffic Mgmt
ATMS08 – Traffic Incident Management System
AD1 – ITS Data Mart
EM01 – Emergency Call-Taking and Dispatch
PROJECT – Increased Agency Data Sharing
AD2 – ITS Data Warehouse
ATIS06 – Transportation Operations Data Sharing
ATMS01 – Network Surveillance
ATMS06 – Traffic Information Dissemination
ATMS26 – Mixed Use Warning Systems
APTS08 – Transit Traveler Information
EM06 – Wide-Area Alert
EM07 – Early Warning System
PROJECT - Interactive Statewide Intermodal Information Tool
APTS01 – Transit Vehicle Tracking
APTS02 – Transit Fixed-Route Operations
APTS05 – Transit Security
APTS08 – Transit Traveler Information
AD1 – ITS Data Mart
ATIS01 – Broadcast Traveler Information
ATIS02 – Interactive Traveler Information
ATIS03 – Autonomous Route Guidance
ATIS04 – Dynamic Route Guidance
ATIS05 – ISP Based Trip Planning and Route Guidance
ATIS06 – Transportation Operations Data Sharing
ATIS07 – Travel Services Information and Reservation
ATIS08 – Dynamic Ridesharing
ATIS09 – In Vehicle Signing
ATIS10 – Short Range Communications Traveler Information
AGREEMENTS
PROJECT – CAD integration with Traffic Mgmt
MOU between IDOT and individual PSAPs (for CAD integration and video sharing) – prefer to have a letter of understanding about data use (issue of delays with legal reviews) – use IDOT ITS Program Office agreement template (through office of Legal Counsel) with other agencies
Verbal agreement with local traffic news source
PROJECT - Interactive Statewide Intermodal Information Tool
n/a PROJECT – Increased Agency Data Sharing
n/a
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY GREAT RIVER COUNTRY
DECEMBER 6, 2016
5
OPERATIONAL CONCEPT
SCENARIO: EB I-74 incident east of I-474; All lanes blocked; 3 cars, 2 semis; potential HazMat
Peoria County dispatch o Receives calls from travelers o Potentially confirm incident with
CCTV (can control cameras) o Dispatch responders to scene o Send traveler info to media/ public
County Sheriff and ISP o Respond to incident o Provide incident status updates o ISP will conduct investigation if
needed o Incident command (traffic)
Fire Dept / Ambulance / LifeFlight & Air Evacuation (if needed)
o Respond to incident o FD Incident command (HazMat,
health/safety, cleanup)
IDOT Communications Center o Forward incident report to Station
One (Gateway will receive info for Travel Midwest)
o Disseminate traveler info (website, DMS, etc.)
o Provides camera control and camera snapshots to various agencies / public
IDOT District Bureau of Operations o Deploy CMS for longer-duration
incidents o Work with law enforcement on
traffic IM, queue warning, rerouting, etc.
o Contractors used for some cleanups
o OSOW routing, permit changes
SCENARIO: Train incident, Amtrak cannot make it to Macomb
Amtrak o Where to send passengers o Contact ICC, NTSB, 911/transit
centers o If Hazmat, IEPA o Contact local bus companies o Contact BNSF (rail owner)
BNSF o Prevent other trains from using
route
Emergency Services o Respond to incident o Secure the site o Transport victims o If HazMat spill, local evacuations
necessary
Local Transportation Agencies o Local municipal GIS-track chemical
spill o 911 call taking & dispatch o Provide info to media
ICC o Investigation o Notification to / communication
with NTSB, FRA, ITTF
IDOT
IEPA o Assessment and response if
HazMat
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
UNIVERSITY TRAIL DECEMBER 15, 2016
1
TRANSPORTATION NEEDS
Construction work zone information
Coordination for detailed daily roadwork
Provided across interstates and countyhighway boundaries
Multi-agency integration
Automated information flow to media andpublic
Robust partnership with private sector(PPP)
had to direct people to Google for info,had nothing further.
no need to recreate Google’s efforts(Google owns Waze)
Respond to traveler info inquiries
ability to respond/provide constructiondetails
State-owned sensors can be used tovalidate private sector data
Outreach to public via many methods –web, news, radio, DMS
Single source of traveler info
user expectations have increased rapidlywith access to smart phones/Google data.
Aggregate data sources better
Provide more timely and accurateinformation
adjust response based on confidence levelin data from various sources
Fax/email closures, etc. to local media –why can’t they tell google directly (or someother data source), so it is available topublic sooner?
Truck routing - Oversize/overweightvehicles and vertical clearances.
Prevent trucks from entering certain areas
delivery guidance, max height and turnradii, etc.
Clearance (Vertical) – Redirected inquiry toGIS consortium
Ability to tap into already-installed fibernetwork throughout city
No existing TMC
Some signal system sharing, IDOT accessto many signals
Access to advanced traffic signal systems –Money, staff and resources, ATM
Connections between county/state/city
Fiber sharing agreements
Integration of isolated systems
Statewide jurisdictional Maps to show IDswho owns/operates/maintains a given ILroadway
operational issue management
Funds and staffing for interconnectingsignals
Updating legacy systems
Life cycle O&M and replace
open architecture and compatiblesoftware for traffic signals
Statewide licensing from signal providers
removing proprietary blockades, easingregional support
Competition an issue; impact oninteroperability (sometimes need to pushvendors)
Vendor involvement, joint capability/specreviews
Provider Lists
Standards based deployments, opensource.
Station 1 and TMCs network
Rural transit operations ITS capabilities
Cybersecurity
IDOT ITS Program office - What supportwould you want over 5-10 years?
Obtain feedback regularly
Offer state-wide presence/support
CAD connectivity
CCTV remote access
Technology sharing, easier and morewidespread access
Coordination with stakeholders and
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
UNIVERSITY TRAIL DECEMBER 15, 2016
2
need funds and expertise (E.g., trafficsignals)
ICN (Illinois Century Network) & UC2B fibersharing/access
CMS, DoIT
as more ITS projects are deployed, datahandling needs increase
Private Comm providers
Multiagency project to designate oneentity to be centralized source ofinformation
Traffic signal real-time status reports ofknock downs, flashing reds, etc.
CAD integration and data sharing (policeand traffic)
important entities
Education and training
Interoperability assistance
Social media use for traveler info
Use existing info/apps to supplement theinfo we provide on web (combine)
Cost sharing and procurement
TRANSPORTATION NEEDS (Prioritized, with vote totals)
1. Connections between county/state/city -[16]
2. Access to advanced traffic signal systems –Money, staff and resources, ATM – [13]
3. Rural transit operations ITS capabilities –[9]
4. IDOT ITS Program office - What supportwould you want over 5-10 years?- [9]
5. Construction work zone information –[9]
6. Statewide jurisdictional Maps to show IDswho owns/operates/maintains a given ILroadway -[6]
7. Robust partnership with private sector(PPP) – [5]
8. Outreach to public via many methods –web, news, radio, DMS- [5]
9. Updating legacy systems – [3]10. Station 1 and TMCs network – [2]
ITS PROJECTS
MCORE Project: restructuring campus areabus routes, stops, access, signals, etc.(BRT)
Green from Neil to 4th, Wright from whiteto armory (All campus)
Funding solved, about to be awarded inSpring, 45 Million
D5 – Radio upgrade project for operationsvehicles (AVL specifically, for now)
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
UNIVERSITY TRAIL DECEMBER 15, 2016
3
STAKEHOLDERS
Smart Work Zone Project
IDOT
County Highway
MPO
Municipal
Department of Public Works
County EMA
Townships
Traveling public
METCAD
Contractors
First responders
Tow company
Police
Private businesses
Transit agency
Schools, University
Post office
Media
Vendor
Utility companies
INVENTORY OF SYSTEMS
Smart Work Zone Project
Getting around Illinois website
Travel Midwest website
Smart work zone applications
Online maps
Press releases - agencies and media
911 CAD system
Dispatch center
GIS databases/maps (MPO)
Contractor/vendor tools and capabilitiesper contract
Press releases posted on city website
Message boards
Joint information center
Email Subscriptions
SERVICES
• MC07 – Roadway maintenance and Construction• MC08 – WZ Mgmt• MC10 – Maintenance and Construction• ATIS01 – Broadcast Traveler Information• ATIS04 – Dynamic route guidance• ATIS06 – transportation operation data sharing• EM01 – Emergency Call taking and dispatch• EM02 – Emergency Routing• AD1 – ITS Data mart• APTS01 – Transit vehicle tracking• APTS02 – Transit Fixed-Route Operations• APTS08 –Transit Traveler Information
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
UNIVERSITY TRAIL DECEMBER 15, 2016
4
AGREEMENTS
MPO with member agencies
METCAD – emergency operations plan
Access and license data mart warehouse
Agency with contractors and vendors
OPERATIONAL CONCEPT
Operational Concept – Closure of I-74 in both directions, structure damaged (Fatality) Stakeholder Roles and Responsibilities
METCAD contact ISP to IDOT via phone
Emergency responder, dispatch and tow
District notifies Station 1 via email and phone
Emergency services close lanes and divert traffic
IDOT plans more specific diversion plans Depending on duration of incident
<2 hours, maybe no IDOT response
City and ISP and METCAD notify public works
Identify preplanned detour routes for IDOT, county and local jurisdictions
IDOT Incident Command training
Local public works and police respond to detoured traffic
signs, traffic management
Some experience with revised signal timing plans for planned closures
ISP notifies IDOT comm. center when lanes reopen
Press release notifications
Travel Midwest email subscriptions via Station 1
IDOT Bridge inspection (damaged structure)
Oversize/Overweight impacts
Portable and permanent DMS
Broadcast alerts for reroutes, detour, incidents, to avoid the area on arterials andfreeway,
IDOT assess pedestrian impacts due to added volumes to arterials, adjusted timingplans, etc.
Depending on length and severity of incident (fatality), All Clear may be given bydifferent entity (ISP, IDOT)
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
CAPITAL WEST DECEMBER 7, 2016
1
TRANSPORTATION NEEDS
Complete communications network in Springfield area
o WiFi point-to-point links o Use of cellular modems at traffic
signal cabinets
Improve signal timing / coordination on alternate routes
Additional CCTV cameras
Explore additional funding sources
Ability to share information / data with other agencies
Develop agreements for communication links
Connect comm. centers statewide
Sharing with other state agencies (e.g., IEMA SEOC)
Timely traveler information (social media, etc.)
Getting alerts to transit riders
Public & private traveler information sources
Determining impacts of hands-free laws/policies on in-vehicle traveler info
Connected vehicle technologies o Public-private partnerships o Vehicle-to-infrastructure (V2I) &
vehicle-to-vehicle (V2V) o Need consensus with states &
FHWA
“Smart State” model (DoIT)
Avoid redundancy / unnecessary overlap
Be industry leader in commercial vehicle deployments
o Commercial Vehicle Information Systems and Networks (CVISN) grant program now known as Innovative Technology Deployment (ITD) grant program
o Illinois is core compliant
Transit signal priority
Promotion of fixed-route and demand-responsive transit
Use of open-source feeds, such as General Transit Feed Specification (GTSF), Google Transit
Single-source transit dispatch to connect riders to correct system
Funding for rural transit dispatch & technology upgrades
TRANSPORTATION NEEDS (Prioritized, with vote totals)
1. Interagency data connections (agreements, information sharing, regional / statewide) [14]
2. Complete communications network [12] 3. Explore additional funding sources (all
modes) [10] 4. Eliminate duplications (coordinate
overlapping projects) [10] 5. Additional monitoring capabilities [7] 6. Connected vehicle preparations [7]
7. Improve signal timing on alternate routes (e.g., additional plans for traffic surges) [6]
8. Timely traveler information (social media, all modes, public and private sources) [6]
9. Promotion of fixed-route and demand-responsive transit (including TSP schedule protection) [4]
10. Combined transit dispatch centers [2] 11. Be industry-leader in CVO deployments [1]
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
CAPITAL WEST DECEMBER 7, 2016
2
ITS PROJECTS
Integrated Corridor Management (ICM)
Video / data sharing network
Fiber sharing o CMS o Private
Center-to-center communications
Going beyond email & telephone (use virtual private network (VPN)?
o Video o Data o Partner agencies
DoIT Smart State
International Fuel Tax Agreement (IFTA) – electronic credentialing and mandatory e-filing
Automated license plate readers (ALPR) at weigh stations
Mobile compliance vehicle
CVO exchange system
Transit signal priority
Single source transit service call-taking
STAKEHOLDERS
PROJECT – I-55 / Dirksen Integrated Corridor
ISP (dispatch and troopers)
IDOT (operations, Station One)
Local police, fire, emergency medical providers
Traveling public
Private / commercial traveler info services (Google, Waze, media, etc.)
Tow companies
County 911
Springfield Mass Transit District (SMTD)
SCENARIO – Illinois State Fair with flooding
IDOT
ISP
City of Springfield
Illinois Dept. of Natural Resources (IDNR)
Illinois Dept. of Agriculture (lead agency)
Sangamon County Sheriff
Fire Department
Springfield Mass Transit District (SMTD)
Hotels
Illinois Emergency Management Agency (IEMA)
Springfield Convention & Visitors Bureau (SCVB)
Governor’s Office
Media
City Water, Light and Power (CWLP)
INVENTORY OF SYSTEMS
PROJECT – I-55 / Dirksen Integrated Corridor
n/a
SCENARIO - Illinois State Fair with flooding
Traffic Control (IDOT)
Traveler Info / DMS (IDOT)
Parking Management (Dept. of Ag)
Buses
Internet / websites / social media
Dispatch centers (Fire, DNR, Sheriff)
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
CAPITAL WEST DECEMBER 7, 2016
3
SERVICES
PROJECT – I-55 / Dirksen Integrated Corridor
n/a
SCENARIO - Illinois State Fair with flooding
APTS02 – Transit Fixed-Route Operations
ATIS01 – Broadcast Traveler Information
ATMS01 – Network Surveillance
ATMS03 – Traffic Signal Control
ATMS06 – Traffic Information Dissemination
ATMS08 – Traffic Incident Management System
ATMS16 – Parking Facility Management
ATMS18 – Reversible Lane Management
EM01 – Emergency Call-Taking and Dispatch
EM02 – Emergency Routing
EM06 – Wide-Area Alert
EM09 – Evacuation and Reentry Management
EM10 – Disaster Traveler Information
AGREEMENTS
PROJECT – I-55 / Dirksen Integrated Corridor
IDOT and ISP – Joint Operational Policy
Gateway and Station One
State law requires list of approved tow companies and training
Illinois Public Works Mutual Aid Network (IPWMAN)
SCENARIO - Illinois State Fair with flooding
CWLP and IDOT for traffic signal maintenance
Reversible lanes (handshake agreement)
Parking (Dept. of Ag)
ISP and Dept. of Ag?
SCVB with hotels for promotion?
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
CAPITAL WEST DECEMBER 7, 2016
4
OPERATIONAL CONCEPT
SCENARIO: I-55 / Dirksen Integrated Corridor
ISP (dispatch and troopers) o Traffic control, incident command
IDOT (operations, Station One, maintenance)
o Detect and/or confirm incident and monitor with CCTV
o Disseminate traveler info (DMS, web)
o Deploy PCMS & HAR o Traffic control
Local police, fire, emergency medical providers
o Respond to incident, assist / treat injured
o Notify area hospitals of injuries o Traffic control on alternate routes
Traveling public o Report incident, receive traveler
info
Private / commercial traveler info services (Google, Waze, media, etc.)
o Disseminate traveler info
Tow companies o Remove disabled vehicles from
roadway
County 911 o Receives 911 call from motorists o Notify / dispatch ISP, local police,
fire, etc.
SMTD o Receives notification of incident,
traffic rerouting o Drivers notify transit dispatch of
delays on routes
SCENARIO: Illinois State Fair with flooding
Dept. of Ag. o Operates the State Fair o Leads coordination
ISP o Public safety o Traffic control
Springfield PD o Traffic control
SMTD o Transit provider
Governor’s Office o Emergency coordination o Assign Dept. of Ag. Coordination
Media, SVCB, Hotels o Promote event
CWLP o Maintain traffic signals
Parking Management o Manage parking
IDNR o Flood response o Public safety
IEMA o Emergency coordination
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
CAPITAL WEST DECEMBER 7, 2016
5
OPERATIONAL CONCEPT (continued)
SCENARIO: Ice Storm
IDOT o Monitors conditions (RWIS, weather reports, etc.) o Provides traveler info (DMS, PCMS, etc.) o Station One takes over if radio system over internet is down o Temporary traffic control if needed o Maintenance agreements o Pilot program for GPS/AVL of plow trucks (info about plow up/down position; spreader
on/off) o Virtual RWIS o Data sharing agreements
IEMA o Opens Emergency Operations Center (EOC) if emergency
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
LITTLE WABASH DECEMBER 14, 2016
1
TRANSPORTATION NEEDS
Better Traveler Information that is available and disseminated
Combines information items listed here
provide reasons for delay
Why am I sitting here in this congestion?
Detailed construction rerouting info – when ramps are not accessible
Major incidents info distribution for traffic and transit, similar to Amber Alert and Severe Weather Alerts
System Monitoring – extra traveler information and increased ‘en route’ traveler info
Status of interchange closures at IN state line
Camera use at interchanges for verification of incidents would help
Ongoing SWZ
Radio AM/FM broader accessibility and use
In vehicle communications (HAR)
Interstate & interagency advisories/closures across districts/states
Emergency services
Capacity for trucks during emergencies and severe weather – parking, fuel services, fuel supply status
CVO Truck stop amenities – what’s available? Fuel, lodging, etc.
Portable DMS
Using DMS signs to train/advise drivers on safety (Only sees Click-it or Ticket, Put Phone Down)
Restrictions are MUTCD oriented, IDOT – look at approval process (Loete)
Regional flexibility for DMS usage
Signs blocked/obscured by trucks when placed only on one side/right side of the road
Overhead DMS (weren’t ready before current construction project)
Transit fixed route – Christian county to Springfield connection
Transit scheduling software – more efficient operations
Transit vehicles equipped with AVL/GPS, CCTV
Currently Demand Responsive transit operations
Statewide transit route info
Where is CVP funding?
Data clearing house/standards, API for the state – PSAP consolidation
Improved access/communications between state/local emergency radio dispatch
City/county/fire/911
Integrated radio communications, camera use and access
CCTV sharing, weather station tie-in, CAD integration, traffic signals
State police reorganized, experiencing worsened communication/lag in information sharing
local police anticipates this issue to expand as that trend continues (Amount of PSAPs being greatly reduced)
Relaying locations for response, finding incidents based on descriptions more difficult, takes longer
Enhanced location marking - Support locating unfamiliar locations
Operator cooperation to support longer/coordinated operations (multi-agency)
State and local dispatch communication abilities, emergency dispatch (locals have to place too many calls, causes delays)
Off-hours control turned over to Station 1 - back to district for call outs
Status of National E-911??
Address Interoperability constraints
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
LITTLE WABASH DECEMBER 14, 2016
2
Connection with TNN trucker network
Developing fixed route transit and transfer center (RMT – previous contracts)
CMS – Master agreements, how to develop MOU templates
Traffic signal engineer – Tie-ins where
possible
TRANSPORTATION NEEDS (Prioritized, with vote totals)
1. City/county/fire/911 – [11] 2. Improved access/communications
between state/local emergency radio dispatch – [8]
3. Camera use at interchanges for verification of incidents would help – [7]
4. Data clearing house/standards, API for the state – PSAP consolidation- [6]
5. Using DMS signs to train/advise drivers on safety (Only sees Click-it or Ticket, Put Phone Down) – [5]
6. Better Traveler Information that is available and disseminated –[4]
7. Developing fixed route transit and transfer center (RMT – previous contracts) – [2]
8. Statewide transit route info – [1]
STAKEHOLDERS
FHWA
IDOT (RWIS)
ISP
ICC
Media
Travelers
Transit managers
Local police and fire
EMA – townships, statewide
County (Sheriff, hwy dept)
Towing
Private data – Google, TNN
Radio
INVENTORY OF SYSTEMS
Interactive Traveler Information
RWIS
Field personnel / email
Twitter feed
Press Releases
SWZ Cameras (by contract)
Getting around IL website
IDOT Communication Center Radio room
Transit Dispatch center
PSAPs (911)
Towing dispatch
Google/Waze
TNN
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
LITTLE WABASH DECEMBER 14, 2016
3
SERVICES
Interactive Traveler Information
MC08 – WZ Mgmt
MC03- Road weather data collection
MC04- Weather info processing and distribution
EM01 – Emergency Call-taking and dispatch
EM06 – Wide-area alert
EM10 – Disaster Traveler Info
ATIS01 – Broadcast Traveler info
ATIS06 – Transportation Ops data sharing
APTS08 –
AD1 – ITS data mart
ATMS21 – Roadway closure mgmt.
ATMS01 – Network Surveillance
ATMS06 – Traffic info dissemination
ATMS07 – regional traffic mgmt
AGREEMENTS
Interactive Traveler Information
IDOT ISP - Joint Operations Policy (existing)
Transit & County – (existing) MOUs for public transit use during emergencies such as providing buses as temporary warming/cooling shelters, transporting people displaced by fires, assisting derailments/HAZMAT emergency response.
Fiber sharing; IDOT to DoIT (planned)
CAD data sharing – IDOT, counties, ISP, Sherriff
OPERATIONAL CONCEPT
Major incident on I-57 CLOSED: Roles and Responsibilities:
ISP notifies DOT of lane closures/incidents/blockages
IDOT & local manage redirected traffic (initial)
Local emergency mgmt. and traffic personnel designate alt routes
HAZ MAT spills/cleanup by IDOT
IDOT will contact surrounding counties to coordinate resources
Local towing companies assist field safety response cones, lane protection, warning lights sand for cleaning up roadway spills
Duration of incident determines if IDOT portable DMS used
IDOT involvement impacted by availability of limited resources, Priority given to snow/severe weather events, etc.
Station 1/Central office handles broadcast distribution of event
Alt route signal timing by city/local (US 40)
Station 1 –Emergency Road Closure list distribution (text file) Expand Broadcast coverage to Indiana and Missouri
Travel Midwest receives Station 1 emails
Outreach to adjacent states (Station 1)
Discovery – Public, IDOT, ISP
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
METRO EAST – ST. LOUIS DECEMBER 8, 2016
1
TRANSPORTATION NEEDS
Use available CMAQ funds o Matching funding availability
Encourage reinvestment and maintenance
of ITS systems
Configure communications equipment to
work with network
Prioritize ITS as “bank-for-the-buck”
Additional specialized staffing at IDOT D8
Expand the sharing of data / video with
other agencies
Upgrade CCTV cameras
o Will allow streaming on website
Develop maps for rural transit services /
routes and vehicle tracking
Funding for rural transit capital,
operations, and management systems
o Transfer centers
o Software
Location referencing
Real-time customer access
Point-deviated services
o Security cameras
Agreements for transit transfers between
rural and urban systems (and ridesharing)
Overcoming transit passenger reluctance
to transfer between buses
Work with IPTA, HSTP, etc. to help
facilitate interagency cooperation
Billing Medicaid for rides
Incident management training, including for IDOT staff
o Already training some other agencies / responders
Getting timely incident info to IDOT so they can manage and disseminate info
o CAD integration o Getting info out to other agencies
(e.g., transit providers) o Agreements for sharing incident
data, cameras, etc., between IDOT and ISP / local law enforcement
IL residents / agencies getting traffic info and camera images on bridges and MO side (e.g., DMS in IL with travel times to St. Louis)
TRANSPORTATION NEEDS (Prioritized, with vote totals)
1. Utilize available CMAQ funds (matching funds, staffing to develop projects) {8}
2. Expand video / data sharing with other agencies {8}
3. Rural transit funding (capital, operations, and management) {8}
4. Provide timely incident information {7} 5. Upgrade CCTV cameras and stream
video {5}
6. Develop maps for transit routes {5} 7. Expand traffic incident management training
{5} 8. Getting traveler info to people when and
where they need it {3} 9. Disseminate transit info to riders {4} 10. Focus on maintenance and operations {2} 11. Overcome institutional issues to facilitate
rural transit transfers {0}
ITS PROJECTS
Traffic Incident Management training o Partnership with SIUE o IGA coming
CCTV upgrades
CTS transit software
Some video sharing with St Claire Co.
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
METRO EAST – ST. LOUIS DECEMBER 8, 2016
2
STAKEHOLDERS
PROJECT – CAD Integration
Illinois State Police (ISP)
IDOT
County Sheriffs
Local police
Emergency Telephone System Boards (ETSBs)
Emergency responders
Fire departments
County Emergency Management Agencies (EMAs)
Volunteer public safety
Media
Transportation providers
Trucking Industry
Local traffic management
MoDOT
City of St. Louis
Public safety answering points (PSAPs)
INVENTORY OF SYSTEMS
PROJECT – CAD Integration
PSAP, 911 system call center
CAD software
Emergency vehicles
Traffic management center
IDOT website
DMS
ATMS
Monitoring devices Maintenance vehicles (soon to have Automatic Vehicle Location (AVL) systems)
Transit dispatch
Trucking dispatch
Transit vehicles
Trucks (commercial vehicles)
SERVICES
PROJECT – CAD Integration
EM01 – Emergency Call-Taking and Dispatch
EM02 – Emergency Routing
EM04 – Roadway Service Patrols
CVO01 – Carrier Operations and Fleet Management
MC01 – Maintenance and Construction Vehicle and Equipment Tracking
AD1 – ITS Data Mart
APTS02 – Transit Fixed‐Route Operations
APTS03 – Demand Response Transit Operations
ATMS01 – Network Surveillance
ATMS06 – Traffic Information Dissemination
ATMS08 – Traffic Incident Management System
ATIS06 – Transportation Operations Data Sharing
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
METRO EAST – ST. LOUIS DECEMBER 8, 2016
3
AGREEMENTS
PROJECT – CAD Integration
ISP with ETSB and County Sheriffs
Joint operating policy between IDOT & ISP
Ambulance company agreements with IDOT and local responders
911 service areas
Mutual aid IDOT & MoDOT (handshake)
OPERATIONAL CONCEPT
Scenario: Flood Closing I-70 after Pocahontas exit. WB closes first, and quickly.
IDOT o Identification of the event? o Maintenance crews set up
detours o Added Web site o Secondary Route setup? o Some notification to Counties o Monitoring Concern of state of
alternate routes o Trucks to support rerouting o Media o Crews detailed the closure
information and additional routes impacted
o Automation of DMS use (future)
Station One o Road Closure Reporting
www.travelmidwest.com o Illinois and Missouri closure
Private CVOs stuck o Private Tow? o How to reroute, ensure safety
(future)
National Guard
IEMA o Unified Area Command set-up
Transit o Self-adjusted their routing o Simply adjusted to continue
operations
County and ESDA Coordinators County EMA
ISP Support WITH IDOT o Supporting coverage o Evacuation Plans (f)
District to District (future) o DMS use
MoDOT o District items for DMS
? criteria for use of sandbags and pumps to attempt to keep roadway open
Traffic Signal Systems (480 in D8)
Municipalities o ESDA would address local operations
with Public Works and County Police o Supporting Traffic Control o Split diversions – use more routes
with capacities (future)
OSOW – Central Office Permitting -Geno K. and Rich Telford
Weighted posted bridges (not exempt)
Evacuation Plans and Opportunities (future)
Office of Communications
Speed of flooding was incredibly quick
Bus Companies (charters)
IDOC o Filled sandbags
How to know what is open vs closed…
Waze o Private citizens could notify on all
routes o Whereas Agency X may not likely be
able to note that Agency Y has an open route
Bridge/roadway engineers o Post event inspections
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
LITTLE EGYPT DECEMBER 13, 2016
1
TRANSPORTATION NEEDS
Improved Toll Road informationo Instructions for online payment
systems.o System ‘user’ information –
expand beyond NE IL region forthose traveling in
o rural outreach for those who rarelyuse toll system
o Interoperablereaders/transponders, IPass, etc.
o License plate recognition
CAD integration - state police, agreements,local /county/sheriff
How to capture and use info from Cellphones (HERE, Inrix)
o Access to third party data/PPPSo more accurate detection from
Google at no cost
Wider coverage for traffic signal infoo Optimization user friendly
application/toolo tie together master controllerso traffic responsive and adaptive
systems (time-of-day plans)o how to use Google data to get
queue lengths for signaloptimization
Centralization and consistency of systemmetrics
Historic data beyond ADT.o hourly volumes due to massive
HV% on I-57, hinders simulation
Improve truck permit process from localend – potential centralization
Web based accessible systemo available to modelers, operators,o collects data and presents to
user/operator
Informed system operationso What is going on?o meet needs of daily traffic
demands
Coordinating transit routing services
Improved queue measurement tools
Re-routing info from I-57incidents/detours
At-grade rail crossings causing massivepeak-hour backups – diversion capabilities
Loop detector data not in a useableformat
Redundancy in assets (continuity andbackup)
Obtain, share and utilize regional,integrated traffic data;
o resources, access, institutionalcoordination
o Network – local, region, state
TRANSPORTATION NEEDS (Prioritized, with vote totals)
1. How to capture and use info from Cellphones (HERE, Inrix) – [10]
2. Web based accessible system – [10]3. Wider coverage for traffic signal info – [9]4. Improved queue measurement tools –[4]5. Informed system operations – [3]6. Coordinating transit routing services – [3]7. Re-routing info from I-57
incidents/detours – [3]
8. At-grade rail crossings causing massivepeak-hour backups – diversion capabilities– [3]
9. Improve truck permit process from localend – potential centralization – [2]
10. Improved Toll Road information – [1]11. CAD integration - state police, agreements,
local /county/sheriff- [1]
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
LITTLE EGYPT DECEMBER 13, 2016
2
ITS PROJECTS
• Statewide CAD integration with ISP (In-Progress)• Purchase private traffic data (future)• Smart Work Zones (sample project forinteractive Session)• Web-based traffic mgmt. system(future/potential)• Integrated Corridors on I-57 alternativeroutes/detours•
Communication links to field devices,signals
• Communication links between IDOT, localagencies• Advanced Traffic Signal Control Systems• Increased traffic monitoring for work zoneand alternate routing
Signal coordination / interconnect, e.g.,HW 13
STAKEHOLDERS
Smart Work Zone Project
IDOT
Contractors (Specialty)
Traveling Public
County/Municipality DOT’s
ISP
Trucking Industry
Media
Transit
Local Businesses
Private data providers
INVENTORY OF SYSTEMS
Smart Work Zone Project
Portable DMS
Roadway Sensors
Cameras
Private data feed
Contractor/Vendor website
Queue detection & modeling software
ISP vehicles
Speed enforcement signs
IDOT Photo enforcement van
Illinois Statewide ITS Architecture and Strategic Plan Update IDOT Job No. HPR-66-001-14
STATEWIDE ITS ARCHITECTURE WORKSHOP SUMMARY
LITTLE EGYPT DECEMBER 13, 2016
3
SERVICES
Smart Work Zone Project
AD1 – ITS data mart
ATIS01 – Broadcast traveler info (media)
ATIS06 – Transportation Operations data sharing
ATMS01 – Network Surveillance
ATMS06 – Traffic Info dissemination (E.g., dms)
ATMS08 – Traffic Incident Mgmt System
ATMS19 – Speed warning & Enforcement
MC08 – Work Zone mgmt.
MC09 – Work Zone safety monitorinG
AGREEMENTS
Smart Work Zone project
IDOT and Contractor
Contractor and Vendor
IDOT and local agency
work zone,
maintenance,
cost sharing
OPERATIONAL CONCEPT
Scenario: I-57 blocked near I-64 - SB @ Marion: NB @ 37 - Freight derailment - D7 divert from I-70 • D-7, D-9: Detect incident
o traffic control, traffic diversion,o cleanup, Traveler info/twitter,o Inter-agency coordination
• County Hwy Dept.: Traffic control and rerouting• ISP: detect incident, manage incident site, close ramps• Station 1: Coordinate information dissemination• Contractors: Place DMS• Media: Spread the word• Local agencies: traffic signal operation, traffic control