im 8 incinerator

166

Click here to load reader

Upload: anurag-singh

Post on 28-Oct-2014

646 views

Category:

Documents


97 download

DESCRIPTION

SEC. NO.SHIP DESIGN OFFICE SHIP OUTFllTlNG DESIGN DEFT 4

TRANSCRIPT

Page 1: IM 8 Incinerator

SEC. NO.

TEL. NO.

23708

APPROVED

SHIP DESIGN OFFICE ( SHIP TYPE I SHIP OUTFllTlNG DESIGN DEFT 4 ( 105,000 DWT CLASS PRODUCT CARRIER I SHlP NO.

2069

SHlP NAME

RATNA SHALlNl (IMO NO.: 9439670)

B. H. BAEK I NAME OF DRAWING

CHECKED H. J. RYU I INCINERATOR I DRAWN

DATE 2010.01.21

a HYUNDAI HEAVY INDUSTRIES CO., LTD

SCALE

1

DRAWING NO

6U-2852-302

CONSOLIDATED NO. IM-8

Page 2: IM 8 Incinerator

I D O C U M ~ ~ T NO. : HHI-INC-1923-RO I

WASTE OIL INCINERATOR UNIT I TYPE : MAXI NGIOOSL WS

OWNER Messrs

SHIP NO. I 1923 124 147 l(2069 L!%

USED FOR Messrs HYUNDAI HEAVY INDUSTIRES CO., LTD

Date: ;I29 12.. 24,

CLASS

602-15, Gajwa-Dong, Seo-Gu, lncheon City ~ o r b a Tel : (032) 583 - 0671 Fax : (032) 583 - 0674

A B S ..

LICENSED by ATLAS 'AIs ' ( SHEETS WITH COVER )

---.

I CHECK I CHECK I DRAWN I

Page 3: IM 8 Incinerator

DESCRIPTION

1RIGINALLY PREPARED APPROVAL DRAWING

I VHS -1923 - 0 1 e

REMARK j) a

D W JEON

Page : - i,

TORY

HYUNDAI-ATLAS INCINERATORS

Page 4: IM 8 Incinerator

DRAWING LIST FOR APPROVAL 2006. 12. 11

FOR WORKING

HYU

N A M E

SPECIFICATION

PIPE DIAGRAM

OUTLINE DIMENSION DWG for W.O. lNCl,

OUTLINE OF TURBO FAN

EXPANSION JOINT

TEMPERATURE SENSOR (FOR EXH. GAS)

MAIN CONTROL PANEL (CP-1)

WASTE OIL TANK CONTROL PANEL (CP-2)

MILL PUMP

THERMO STAT

LEVEL SWITCH WITH LEVER

EM'CY STOP SNV BOX

LIST OF SPARE PART

I FOR FINISHED I DWG. NO.

HIE - PO6020020

HMM - NINC602-01

HIE - 100048

HC - 100036

HIF - NG0602001 0 NG0602501

HIF - 001 0 501

HIE - OUT030128D

HCD - 100043

LSP -HHI-1923

7: 1 REMARK

* Page: 0

Page 5: IM 8 Incinerator
Page 6: IM 8 Incinerator

3.1 CONTROL PANEL(CP-1)

THE CONTROL PANEL IS MADE WlTH A SPLASH-PROOF (IP44) CABINET WlTH PLC BUILT-IN CONTROL

CONTROL LAMP, MOTOR STATES AND BACK-UP FUSES.

1) INSTALLED MOTOR OUT-PUT : 18.21 Kw

2) DEMAND FACTOR : 1

3) ALARM : NORMALLY CLOSED CIRCUIT

3.2 COOLING SYSTEM (PRIMARY BLOWER) IS A HlGH PRESSURE CENTRIFUGAL FAN OF THE WELDED

DESIGN WlTH ATOTAL DIRECT DRIVE

1) CAPACITY : 5.200 M'IH

2) STATICPRESSURE ~. ~~ : 5.~885 PA:(6OOmmAq ) 3) REVOLUTION : 3.500 RPM

4) MOTOR : 18.5 Kw x 2P ( IP55,5OC ) /i\ 5) INSULATION : "F" CLASS

6) RATING CURRENT : 30.65 A

7) MOTOR WEIGHT : 136 Kg

3.3 W. 0 . DOSING PUMP(PU3)

IS A SELF-PRIMING POSITIVE DISPLACEMENT PUMP WlTH GEAR MOTOR

1) TYPE : HMD 012-12L

2) CAPACITY MAX. : Max. 233 UH at 92-483 RPM

3) HEAD(D1SCHARGE) : MAX. 2 BAR

4) GEAR TYPE : DISCO -VARIABLE h

5) MOTOR : 0.45Kw x 4P ( IP55.50'C ) /1', 6) INSULATION : "F" CLASS

7) RATING CURRENT : 0.88 A

8) WEIGHT : About 15 Kg

3.4 PRIMARY 8 SECONDARY BURNER (ST?. ST2)

IS A FULLY AUTOMATIC HlGH PRESSURE OIL BURNER

1) TYPE BURNER

2) TYPE OIL PUMP

3) FUEL OIL

4) CAPACITY

5) MOTOR

6) INSULATION

7) RATING CURRENT

8) WEIGHT

: DH 160 E2

: BFP 21 L5

: MARINE DIESEL OIL

: I 7 UH

: 0.13 Kwx2P (IP50,50C)

: " B CLASS

: 0.8 A

: about 15 Kg

3.5 W.0 BURNER

IS A SPECIAL BURNER FOR IMPURITIES OF MAX. 8mm OF THE COMPRESSED AIR ATOMIZING

TYPE MADE OF HEAT-RESISTANT STEEL

Page: 2

Page 7: IM 8 Incinerator

3-6 FLUE GAS DAMPER

IT IS INSTALLED ON FLUE GAS OUTLET AND ADJUST BY MANUAL

3-7 EXPANSION JOIN7

1) SlZE

3-8 TEMPERATURE SENSOR ( FOR EXH. GAS )

1) MODEL

2) F ln lNG

I. LOOSE PART 4-1 CONTROL PANEL FOR W.O. TANK (CP-2) 1 SET

4-2 MILL PUMP

1) MODEL

2) FllTlNG

3) CAPACITY

4) HEAD 5) MOTOR 6) INSULATION 7) RATING CURRENT

8) WEIGHT 9) R.P.M OF MOTOR 10) PRESSURE GAUGE WITH COCK VALVE

4-3 THERMOSTAT (LOW OIL TEMP.)

1) TYPE

2) RANGE

4-4 THERMO STAT (HIGH OIL TEMP.)

1) TYPE

2) RANGE

4-5 LEVEL SWITCH (FOR HlGHlLOW LEVEL )

1) MODEL

2) FllTlNG

4-4 EM'CY STOP SWITCH

1) SlZE

5. SPARE PART ACCORDING TO THE "SPARE PART LIST"

1 SET

: PU-5

INLET : JIS 10K-65A OUTLET : JIS 10K-50A

: 26 M?H~ : 0.04 Mpa

: 4.6 Kw x 2P (IP55, 50C)

: "F" CLASS : 8.26 A : ab. 50 Kg : 3,600 : 1 PC

2 PCS : HFS-24H-WS-T

: JIS 5K-65A

Page : 3 0

Page 8: IM 8 Incinerator

I LIST OF CONTROL I SAFETY 1 AUTOMATION I HULL: ISZ3/23/4112069 I '

W.0 TANK

NOTE.: I. MONITORING ( STATED BY x ) 2. SYMBOL a CP-2 FUNCTION. 3. PRIMARY BLOWER RUNNING 2 IOOC

$ HYUNDAI-ATLAS INCINERATORS Page : cg

Page 9: IM 8 Incinerator

I VHS - 1923 - 6 1 e PROCESS DIAGRAM INCINERATOR 3

TYPE : MAXI NG100 SL WS

Switch on SOLID WASTE \Burning I

Cooling / j Elapsed itime

0 j i >T j

j 1 Close the door and start I

i

i i Process timer

.~ ~ ~ ~~. ~~ ~~ ~ ~ - ~-~~ ~ ~

I I ! 1 Primary blower (VH) I

I I

Prepurging time 30sec (5xair changes) i I

i . . ! 1 ! j Secondary burner blower (ST-2)

! I I ! I j I

ST-2 Preheat to 650"C11202"F i I

I I I Primary burner blower

I Activation of the sluice will unlock I i the inside door and feed the waste 13

I Primary burner operating (ST-1) 1 I Secondary burner operating (ST-2) I w I Operating temperature (850 - 950°C)

for ST-1 (1 562 - 1742°F)

I Operating temperature (670 - 750°C) for ST-2 (1241 - 1382°F)

Page : CP

5

Page 10: IM 8 Incinerator

INCINERATOR PROCESS DIAGRAM TYPE : MAXI NGIOOSL WS

jBurning

j Elapsed 0 I

Switch on SLUDGE

Close the door and start

Primary blower (VH)

Prepurging time 30 sec (5 x air chang)

Secondary burner blower (ST-2)

ST-2 Preheat to 650'C11202"F

Primary burner blower (ST-1 )

Sludge burner atomizing aur (B)

Activation of the sluice will unlock the inside door and feed the waste

Primary burner operating (ST-1 )

Secondary burner operating (ST-2)

Sludge burner operating (B)

Operating temperature (850 - 950°C) for ST-1 (man) (1 562 - 1742'F)

Operating time for ST-1 (abut) (25sec)

Operating temperature (670 - 750'C) for ST-2 (1421 - 1382°F)

PID Control operating ( 950°C) temperature or B (1 742'F)

HYUNDAI-ATLAS INCINERATORS Page : 6

Page 11: IM 8 Incinerator

I VHS-1923-8 I

PROCESS DIAGRAM INCINERATOR TYPE : MAXI NGIOO SL WS

Safety function enabled changes to cooling and alarm

High temperature incinerator (1 050"C/1922"F)

L ~ w - p r e s s ~ r e - ~ o r n b ~ s t i o n ~ a i r ~ ~ 1 8 ~ ~ ~ a r ) ~ ~ ~ ~ -~

Low negative pressure primary combustion chamber

Low pressure atomising air(l.O KgICm2)

High temperature exhaust gas

Flame failure

Motor overload

Sluice inside door not closed

1 2 3 jBurning Cooling / I Elapsed time i i i > Ti I

Page 12: IM 8 Incinerator

INCINERATOR TYPE

PROPERTY OF EXHAUST GAS 12

MAXI NGI 00SL WS i

VOLUME

ALLOWABLE UHAUST GAS

TEMPERATURE

Page: s

50 mmAq

350 "C

Page 13: IM 8 Incinerator

0.0 LINE : W.0 UNE :

IUR UNE : STElW UNE :

W.O. FROM SLUDGE PUMP 1

FROM 0.0. TF3NS PUMP

I

WASE OIL FROM INCINEFATOR 32A - - SEW TWCINC bN0 INNLATION PIPE FOR Y M O - -

WASTE OllL TO INClNERaTOR 32A

Position of mill purn~(PU5) suction to be . . . . LIST OF TANK UNIT below 150rnrn than l o w level s w i t c h .

1 Scale I Name

LlST OF INCINERATOR UNlT

I MAXI NG100SL WSI NO,, I PIPING DIAGRAM

Page 14: IM 8 Incinerator

SHIP YbRD WALL

0 m

a o 288 , 930

I 0

~ ~~ ~~~ ~ ~ ~~ roTAIC :~(abi,) 5000 K p ~ z A O A K CODE- - - - - - M ~ = s I G . ~ ~ ~ - ~

- E 2007.04.0d d RMSEDBYYARDD-c~NT 1 W. AHI N 2007 .07 .2d A REVISED BY YARD COMMENT Iw . AHI D A

Page 15: IM 8 Incinerator

USE : PRIMbRY BLOWER

M E N

AIR VOLUME : 5.200 M ' / H ~

STATIC PRESSURE : 5.885 PA (600 rnmAq)

MOTOR CAPACITY: 18.5 Kw x 2P

POWER SOURCE : 440V. 30. 6OHz

STARTING CURRENT : 214.55 A

MOTOR R.P.M:

WEIGHT : 280 Kg SHAFT ABSORBED POWER : 18.5 Kw

POWER CONSUMPTION : 16.3 Kw

I.P. GRADE : 55 1

DATE

2007.08.07

INSULATION CLASS :

10-012 HOLES

r 21

CODE

A

DETAIL OF FLANGE

SS400 SS400 55400

CASING SS400 MOTOR 55400

M E M O

REVISED BY SHIPWRD APPROVAL C ~ M E N T S

SIGN

SGKIM

NO. I NAME MATERIAL Q 7 Y I REMARK Type

HTF-#3 1/2

- Hyundai Marine Machinery Ca.. Lld.

hnp:Nw.hmm~o.~~.hr - Drawing numbs,

AT-ABB060010 - R2

/\ppmvad 2007.06.29.

Check 2007.06.29.

n ,no7nc?a

Scale

Non

J.H.Kim - H.5.Parh

S.C.Kim

w ah.

~ a m c OUTUNE OF PRIMARY ON MAX 600 and NClOO

Page 16: IM 8 Incinerator

6 7 see note.4 999 s=-

FLOW a -

-

MODEL I SIZE I A I B I T 1 D I d l 1 N-Od (Q 'N 1 REMARK MAXI NG l 00 I 450A 1 457 .2 1185 1 1 6 1 6 0 5 1 5 5 5 1 16-025 1 1 I EXH. GAS

1 DATE (CODE I M E M O SIGN

NOTE

1. TEMPERATURE : MAX. 500'C 2. SHRINKAGE : 23mm(MAX. 51mrn) 3. BELLOWS/INNER PlPE MATERIAL : SUS304 4. AFTER PIPING WORK SHIPPING BOLTS

MUST BE REMOVED. 5. SHRINKAGE CAN BE USEFUL WITHIN BRACKETED

DIMENSION BY ADJUSTING INSTALLING LENGTH SHIPPING BOLTS.

7 1 SHIPPING BOLT 1 55400 1 3 1 M Z 2

6 1 SHIPPING NUT & WASHER 1 55400 1 12 1 ~ 2 2

1 I FLANGE 1 SS400 1 2 1 NO. 1 W A M E I MATERIAL I Q'M I REMARK

Tuna l Scale I Name

5 SLEEVE 4 BELLOWS 3 END PIPE 2 HOLDER

EXPANSION JOINT

Hyundai Marine Machinery Co.. Lld. hllp:llunvur hmnlc0.m kr

Check 2006.12.1 1 Drswillg llll l l itlU'

Check 2006.12.1 1 S.G.Kim

Oram 2006.12.1 1 H I E - 1 0 0 0 4 8

7- f f ' & h . fi l 8 ' F 7 F ' 6 ' C ' d > B ' K ' 6 ' t ' k ' k \ f 3 6 . 5 6 % : 6 9 ( I -

SUS304 SUS304 SUS304

55400

1

1

2

6

1 .2 t

1 . 2 t x P45

6t

121 x FB50

Page 17: IM 8 Incinerator

,

.

NO. I DESCRIPTION I Q'W I REMARKS

TEMP. SENSOR WITH CABLE MIN. 6 m

@ H MMCO Hyundai Marlne Machimy Ca.. Ltd.

hllp:lhvww hmmm mkr

Drawing number

H C E - 1 0 0 0 3 6

Type

Pi-100 R Prolsct No.

1923/24/47/2069

scale

Non

@D Ap~mwd

Che*

Cned

Drawn

2006.12.1 1

2006.12.1 1

2006.12.1 1

2006.12.1 1

J.H.Kim -- H , & , P Q ~ s . c . ~ i m

S.G.Kirn

Page 18: IM 8 Incinerator

INCINERATOR MAIN CONTROL PANEL (CP-1)

I I

SHIP NO. : 1923/24/47/2069

Page 19: IM 8 Incinerator

INDEX LIST IPAGE l DESIGNATION IPAGE~ DESIGNATION I REMARK

FRONT CONTROL PANEL AND NAME PLATES

ALARM RESET AND ALARM HIGH FLUE GAS TEMPERATURE

TEMPERATURE CONTROLLER SECONDARY COMBUSTION CHAMBER

ALARM HIGH TEMPERATURE AND MOTOR STARTER CONTROL

2 0 PILOT LAMPS

2 1 PILOT LAMPS

2 2 PILOT LAMPS

2 3 PILOT LAMPS

2 7 EXTERNAL ALARM SIGNALS 30 LIST OF PARTS

3 7 LIST OF PARTS .

%

w 3 2 I IST OF PARTS - - -. - . - . . . . . . . - I I I

3 3 1 LIST OF PARTS

Page 20: IM 8 Incinerator

ORMAIN CONTROL PANEL (CP-1) POS TEXT BURNER NOT TO BE FIRED BEFORE

3Q2 MNN SWITCH E HAS BEEN PROPERLY PURGED

3. DO NOTTURN O F F M E MAIN POWER SWITCH 5U TEMPERATURE CONTROLLER PRIMARY COMBUSTION CHAMBER

EXXRNAL WHILE PRIMARY BLOWER IS RUNNING I SLUICE BOX 6A2 TEMPERANRE CONTROLLER SECONOARY COMBUSTION CHAMBER

4. NAME PLATE OF DETAIL SPECIFICATION FOR CPl 454 RESET A M M

9S2 INCINER4TOR STOP/START

959 WASTE OIL OFF/ON 15s5/

1 15H10 1 159 RESEI FLAME FULURE PRIMARY BURNER

1259 RESET FLAME FPJLURE SECONDARY BURNER

I 11% DELAY BURNER AUTO/MANUAL

.CABLE GLAND

- POWER SOURCE (30s-1. H-TPYC-25) (R:RED %WHITE T:BLACK)

- ABNORMAL. HIGH L M L A M M (200-1) (200. A-IC-1)

- RUN SIGNAL (15b-1. A-IC-1) - EMERCENCr STOP (15-1. A-IC-7) - W.O. TANK PANEL

A I AMP. METER I

& 0 0 0 0 0 0 0 & I

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O @ Name FRONT CONTROL PANEL ProiectNo.

AND NAME PLATES 1923/24/47/2069

195 Rev. 4 : Appmvea 2007.08.07. J.H.Kim

@ HMMCO Hyundai Marine Machinery Ca.. Ltd.

h l l p : N w . h m m ~ ~ . c ~ . k r Rev. 3

"A" VIEW A ~rawing nulnber Rev. 2 002 Chmx 2007.08.07. S.G.Kim

~ e v . 1 ram 2007.06.07. W. ~ h n H I F - N G 0 6 0 2 0 0 2 - R 1

f 6 6 % 8 \ 8 8 ' 6' 6 ' 6' ' 6 ' k ' k ' 6' 6 ' b' b'. 6 ' b ' h ' ( i

Page 21: IM 8 Incinerator

POWER SUPPLY 3 x W / 6 0 C/S

w 3M4

w 3M6

TRANSFORMER PRIMARY BLOWER W.0 DOSING PUMP CONTROL VOLTAGE 22OV

18.5Kv 0.45Kw AN0 2 9 . 8 A - W / 6 0 C/S 1 .1A-44OV/60 C/S CONTROL VOLTAGE 24V ,

Page 22: IM 8 Incinerator

4 5 4 RESET k-

E m R N A L COKlROL VOLTAGE EMERGENCY STOP ON

HIGH FLUE GAS UNDER VOLTAGE E M ~ E ~ T U R E

MAX 35WC

ALARM HIGH FLUE GAS TEMPERATURE

@ HMMCO I Rev. 4 Page: Approved 2007.08.07. J.1

- - Hyundai Marine Machinery C o . , Lld.

Illlo.lIwww.hmmco.u1.kr Rev. 3

Rev. 2 Drawing number

H I F - N G O 6 0 2 0 0 4

IR.YII_' Drawn 2007.01

Page 23: IM 8 Incinerator

RELAY 1 RELAY 2 RELAY 3 RELAY 4 950'c PI0 CONTROL RE-START : 145'c START : 85O'C

-1 ALMM : 1050'C STOP : 100'c STOP : 950'C CONTROLLER SmlNC CONTROLLER S ~ I N C 5K9 CONTROLLER S ~ I N G AL-2 : 1050'C AL-3 : 145'C AL-4 : 95WC ~ d b : SO'C(RESEI) U d b : 45'C A4db : IOO'C

15 4 - 2 0 m d ON-OFF 0 2 0 3

ON-OFF ON-OFF

(AH.7) 0 4 0 5 (AH.6 0 12 0 13 ( ~ . r ) O 8 0 6 0 7 ( A H . 9 0 9 0 1 0 I

SHI LDEO CULE (COW

+ 0 -

TEMPERANRE THERMO ELEMENT CaNTROLLER COMBUSTION

COMBUSTION CHAMBER CHAMBER

PROCESS TEMPERATURE COMBUSTION

J-' HIGH TEMPERANRE

COMBUSTION CHAMBER INCINERATOR SHUT DOWN

DOOR BLOCKING SOLID WASTE BURNING and COOUNG DOWN AUTO OPERATION

(PRIM4RI BLOWER STOP)

Nams TEMP. CONTROL PRIMARY

Pmjecl No. 1923/24/47/2069

~ ~-

@ HMMCO H y m d a i Marine Machinery Co.. Lld.

l l l lp' l i iv~vw 1h~llmco.co.kr

Drawing nulnber

H I F - N G 0 6 0 2 0 0 5

Rev.4

Rev. 3

Rev. 2

Rev. I

Page :

005

Approuid

Check

Check

Draw

2007.08.07.

2007.08.07.

2007.08.07.

2007.08.07.

J.H.Kirn pp

H . S . P O ~ ~

S.G.Kim

W. Ahn

Page 24: IM 8 Incinerator

RELAY 1 RELAY 2 REL4Y 3 REIAY 4 ST&QT : 6 7 0 2 RE-START : 145'c START : 650's STOP : 75Uc M M : 1050'C STOP : 1 0 0 ' ~ STOP : 550's CONTROLLER SEmNG 6K5 CONTROLLER SETTING CONTROLLER SETTING 6x9 CONTROLLER S m l N G AL-1 : 750'C AL-2 : 1050'C AL-3 : 145'C AL-4 : 650'C A l d b : 8WC A2db : 50'C(RESET) A3db : 4SC A4db : IOO'C

15 ON-OFF ON-OFF ON-OFF ON-OFF

(AH.7) 0 1 0 11 ( A H . r ) 0 1 2 0 1 3 ( A H . r ) 0 8 0 6 0 7 (AXF) 0 9 0 10

(COW

I \ I \ I \ /

5 8 9 PTRHIO-PT

W E S

T N P W T U R E YERMO K R E N T PRO_CmWXF?+NRE CONTROLLER COMBUSTION COMBUSTION

COMBUSllON C W B E R CHAMBER CHAMBER

HIGH IEMPERANRE COMBUSTION CnaUBER

INClhERATOR SHUT OOhh

DOOR BLOCKING and COOLING DOWN

(PRIMAW BLOWER STOP) SIGNAL TO

PRIMARY BURNER START

Name TEMP. CONTROL SECONDARY

Project No. 1923/24/47/2069

~ ~ -~~ ~ ~ ... .: mJ6 Rev. 2 Check i 2 0 0 7 0 8 0 7 1 "Kim Drawing number

Rev. 1 Drawn 2007.08.07. W. Ahn H I F - N G 0 6 0 2 0 0 6 -

Rev.4

I R e v 3 1

-

@ Hyundai Marine HMMCO Machinery CO., ~ t d . I~l lp: i iwwwl ln~n~co.co.h~

t ? I ; P i I ' 6 - . - 7 7 -

Page 25: IM 8 Incinerator

7 s 4 B PRESSURE S f W COMBUSTION AF

7 K 4 12 SEC

7 5 7 PRESSURE S/W 1 O.-bar 4K4 COMBUSTION I

CHAMBER I

I

ASH DOOR OPEN

12 SEC

LOW PRESSURE ALARM COMBUSTlON AIR LOW PRESSURE

COMBUSTION AIR

3 SEC A M M LOW

NEGATIVE PRESSURE PRESSURE COMBUSTION COMBUSTION

CHAMBER C W B E R

Page 26: IM 8 Incinerator

13K2 1 +--

2 0 SEC

PRIMARY BLOWER W.O. DOSING PUMP ALARM MOTOR OVERLOAD

Hyundai Marine Machinery Co.. Ltd,

F - N G 0 6 0 2 0 0 8

.y-.a;r -

Page 27: IM 8 Incinerator

INTERLOCK CP2

I I

x4 4

939 1-

FROM

OFF ON

\; 959

START/STOP S/\FEIY INCINEPATOR CIRCUIT START INCINERATOR

3 0 SEC

EXTER PREPURGE TIME

INCINERATOR RUNNING

AUTO START SIGNAL TO CP-2

WASTE OIL

Name Pmlecl No. START/STOP INCINERATOR 1 9 2 3 / 2 4 / 4 7 / 2 0 6 9

Rev. 4 Page: ~ppmved 1 2007.08.07. 1 J . H . K ~ ~ @ HMMCO Hyundai Marine Machinery Co.. Lld. . , , - . ,,. . . . . . . . - - -- - - ,. .

""p.,,"".'"""1L".LY."1 Rev. 3 ChecX ( 2007.08.07. 1 H . S . P O ~ ~

ROY. 2 Chmh 1 2007.08.07. 1 S.G.Kim Drawng number

RBV. 1 on- 1 7007 OR n 7 1 w bkn H I F - N G 0 6 0 2 0 0 9

Page 28: IM 8 Incinerator

10K8 100-14SC a 0

5K7 4 1 100-14SC

9K7 9K4

7K2

8 6 @ @ - - 6K7

4

@ 100- 1 4 s c

X l 3 0 (? X I 23 0 X l 19 y

I I X2 1 X2 1

I I

lOY3 & CURRENTLESS I 220V 220V CLOSED I

I X2 2 X2 2

VALE BLOCKING A5H DOOR

INCINEPATOR

SECONDARY BURNER MOTOR

PRIMARY BLOCKING

INCINERATOR DOORS 'IJRNER 'OToR (OR PRIMARY BLOWER STOP)

Name Pmjecl No. INCINERATOR CONTROL 1923/24/47/2069

@ H M M C 0 ~ a u 4 1 I I page: I ~oomued 1 2007.08.07. 1 J . H . K ~ ~ Hvundai Marine Machinerv Ca.. Ltd , .

hllp:llwww.hmn~co,m.kr Rev. 3

I Drawlog number

Page 29: IM 8 Incinerator

1159 6K9 RESEI 5

I 55uc -65UC FLAME

@ FAILURE

10 @ 0 1 4 1 2 14 5 19 21

-+7 LAL 2.25

PRIMARY BURNER CONTROL

@ 13K9 f 25 SEC

AUT MAN

1: 1 I S 6

11112 IGNITION CONTROL BOX TRANSFORMER P R I M BURNER PRIMARY BURNER

OIL VALVES

PRIMARY BURNER

DELAY FUME PRIMMY BURNER DETECTOR W.0 SUPPLY PRIMARY BURNER

ALARM FLAME FAlLURE

PRIMPAY BURNER

Name Pmjsct No. BURNER CONTROL PRIMARY 1923/24/47/2069 I @ HMMCO

Rev. 4 : Approved 2007.08.07. J.H.Kim ~ h n d a i Marine Madlinery Co., Ltd. - Re". 3 htlp:llwww.hmmco.ca.Xr

Check 2007.08.07. H.s.P.,~

as". 2 01 1 C h ~ k 2007.08.07. S.G.Kim Drawing number

Rev. t Dram 2007.08.07. W. Ahn H I F - N G 0 6 0 2 0 1 1

Page 30: IM 8 Incinerator

60 @

11 30 S E C ~ 670.C-750.C 7 R E S n FLAME 1259 E

12A2 @ 1 4 12 14 5 2 1

1242 IGNmON OIL BURNER CONTROL BOX TRANSFORMER VALVES

SECONDARY BURNER SECONDARY BURNER SECONDARY BURNER SECONDARY BURNER

FLAME ALARM DETECTOR FLAME FAILURE

SECONDbRY BURNER SECONDARY BURNER

Page 31: IM 8 Incinerator

SOUD WASE BURNING A m 0 OPEWTION

2 0 SEC 13K2 4

rO(8-7.13-91

2 0 SEC

D E W VALE W.0 SUPPLY ATOMISING AIR

START/STOP AIR AIR BURNER V M VALVE

AND W.0 W.0 SUPPLY W.0 SUPPLY

25 SEC

DELAY BURNER

Name Pmjea No.

WASTE OIL CONTROL 1923/24/47/2069 1 @ HMMCo

Page 32: IM 8 Incinerator

12 SEC U M

LOW PRESSURE LOW PRESSURE ATOMIZING AIR ATOMIZING AIR

13 10 0 0 15 1 - - -

X I 3 8 (

I I

XS 7 4

-

ls2i' 4K4

PRESSURE S ATOMlSlNG AIP

I I I

XS 8 0

I I

X1 39

2 5 SEC 12 SEC

Page 33: IM 8 Incinerator

15K3

12 SEC

1555

b"- INSIDE GATE S/W

3 SEC

U M SLUICE 12 SEC AR VALE BLOCKING START INSIDE GATE SLUICE IN OUTSIDE GATE SLUICE NOT C L O S ~ ACTION SLUICE

15H10 GREEN

3 SEC SLUICE

OPENING TIME

SLUICE IN @ ACTION w

Name Pmjecl No. SLUICE CONTORL 1923/24/47/2069

~ e v . 4 Page: Appaved 2007.08.07. J . H . K ~ ~ @ Hyundai Marme HMMCO Machinery CO.. ~ t d .

Rev. 3 ---

hllp:liww.hlm~o.u),kr Chech 2007.08.07. H .S .PO~~

Rev. 2 01 5 Che* 2007.08.07. S.G.Kim orawing nunlber

Rev. I Omm 2007.08.07. W. Ahn H I F - N G O 6 0 2 0 1 5

Page 34: IM 8 Incinerator

W P TEST CONTROL VOLTAGE HIGH FLUE GAS TEMPERATURE

ASH DOOR OPEN

LOW PRESSURE COMBUSTION AIR

Page 35: IM 8 Incinerator

LOW NECATNE PRESSURE

COMBUSTION CHAMBER

Page 36: IM 8 Incinerator

W E FAILURE SECONDARY CHPNBER

Hyundai Marine Machinery Co.. Lld.

F - N G 0 6 0 2 0 2 2

Page 37: IM 8 Incinerator

23H2 RED

22 1 0 a

23H4 , RED

LOW PRESSURE ATOMISINC

SLUICE INSIDE DOOR NOT CLOSED

Page 38: IM 8 Incinerator

EXTERNAL &ARM SUPPLY FAILURE

HlGH FLUE GbS TEMPERATURE

LOW PRESSURE COMBUSTION AIR

@ LOW NEGATIVE "\ PRESSURE COMBUSTION

@ CHAMBER

HlGH TEMPERATURE COMBUSTION CHAMBERS

4K3 MOTOR OVERLOAD

FLAME FAILURE ( P R I W COMBUSTION CHAMBER)

FLAME FAILURE

@ lZK9 7 (SECONOAFY COMBUSTION CHAMBER)

I LOW PRESSURE 14&\ ATOMSING AIR

1 5 ~ 2 i SLUICE INSIDE GATE NOT CLOSE0

EXTERNAL INCINERATOR RUN SICNN

WASTE OIL TANK ABNORMAL

WASTE OIL TANK H l G H LEVEL

EXTERNAL ~VARM INCINERATOR

Page 39: IM 8 Incinerator

I 1 I CONTROL PANEL

DESIGN

I 3 2 2 I 1 I W N SWlTCH WITH 1 NO - 1 NC I 1 1 V4+VZ7+KCFZPZ I TELEMECANIQUE I

V-A-TIME-KW

1

PC. ADJUSTMENT

EXTERNAL BOX SLUICE

3 0 4

3 0 6

3 Q 4

3 0 6

3210.1

COMPONENT

3010 .2

3 0 1 1

4K6

8 K 5

FUNCTION TYPE

START SLUICE

1

1

1

1

1

Name LIST OF PARTS

MAKER

tl-BOX

1

1

1

1

Pmjed No. 1923/24/47/2069

CIRCUIT BREAKER

CIRCUIT BREAKER

AUX. BLOCK FOR CIRCUIT BREAKER 2 NO

AUX. BLOCK FOR ClRCUm BREAKER 2 NO

MINI ClRCUrr BREPKER

MINI ClRCUlT BREAKER

MINI CIRCUll BREAKER

AUX. RELAY

CONTACTOR w m AUX. BLOCK NO - INC

PRIMARY BLOWER

W.O. DOSING PUMP

P R I M BLOWER

W.O. DOSING PUMP

TRANSFORMER 440V

@ HMMCO Hyundai Mar ine Machinery Co., Lid.

hllp:llwww.hmmm.m.b

Drawing number

H I F - N G 0 6 0 2 0 3 0

Rev. 4

Rev. 3

Rev.2

Rev. 1

CONTROL VOLTAGE 220V

CONTROL VOLTAGE 24V

UNDER VOLTAGE TEST

PRIMhQT BLOWER

24-3%

2.5-4.OA

2.4-2POLE

Page:

030

4A-2POLE

U-2POLE

2 2 W COIL

18.5Kw-220V COIL

29.W (44W)

1.1A (440V)

Appmved

Chssk

Check

Drawn

C 6 0 N 2POLE 4A

C 6 0 N ZPOLE 2A

EUYR-220N70

AN0 AU-4 GMC-50

GW-ME32

GV2-ME08

GV3-A02

GV AE 2 0

C 6 0 N 2POLE 2A

2007.08.07.

2007.08.07.

2007.08.07,

2007.08.07.

TELEMECANIOUE

TELEMECANIQUE

TELEMEUNIQUE

TELEMECANIQUE

MERLIN CRElN

MERLIN GRElN

MERLIN GRElN

SbMWHA

L.G

J.H.Kim -- H.s.P,,~~

S.G.Kim

W. Ahn

W k

Page 40: IM 8 Incinerator

7K5

7K8

8K2

8K9

I 9K7 I 1 I AUX. RELAY 2NO - 2NC I INCINERATOR RUNNING I 220V COIL I I GMR-4 I L. G I

TYPE

GMR-4

GMR-4 AND AU-4

GMR-4 AN0 AU-2

GMR-4

ADJUSTMENT

I I I I

MAKER

L. G

L. G

L. G

L. G

V-A-TIME-KW

220V COIL

220V COIL

220V COIL

1

1

1

1

FUNCTION

CONTROL VOLTAGE

RESET W M

HIGH FLUE CAS TEMPERATURE

ASH DOORS OPEN

DESIGN

4K3

4K4

4K9

7K2

L. G

I I I I

AUX. RELAY 4N0 WlTH AUX. BLOCK 1NO - 1NC

AUX. RELAY 4N0 WlTH AUX. BLOCK I N 0 - 1NC

AUX. RELAY 4N0 WITH AUX. BLOCK I N 0 - INC

AUX. RELAY 4N0 WlTH AUX. BLOCK I N 0 - INC

GMR-4 AND AU-2

l l K 9

PC.

1

1

1

I

220V COIL

L. G

I I I I I I I

COMPONENT

AUX. RELAY 2NO - 2NC

AUX. RELAY 4N0 4N0 WITH AUX. BLOCK

AUX. RELAY 4N0 W H AUX. BLOCK 1NO - INC

AUX. RELAY 3N0 - 1NC

LOW PRESSURE COMBUSTION AIR

LOW NEGATIVE PRESSURE COMBUSTION CHAMBER

HIGH TEMPEFANRE

MOTOR OVERLOAD

START INCINERATOR 9K4

I I I

GMR-4 AN0 AU-2

1

14K3

220V COIL

220V COIL

220V COIL

24V COIL

220V COIL

1

WASTE OIL 9K9

AUX. RELAY I N 0 - 3NC

I

GMR-4 220V COIL

1

AUX. RELAY 4N0 WITH AUX. BLOCK 1NO - 1NC

L. G FLAME FAILURE SEMNOIRI COMBUSTION CPdMBER 12K9

GMR-4 AND AU-2

GMR-4 AN0 AU-2

GMR-4 AN0 AU-2

GMR-4 PND AU-2

1

FLAME FAILURE P M COUEWION W E E R

AUX. RELAY 4N0 WllH AUX. BLOCK 1NO - INC

L. G

L. G

L. G

L. G

AUX. RELAY 3NO - INC WlTH AUX. BLOCK 1NO - 1NC

1

220V COIL

AUX. RELAY 1NO - 3NC

LOW PRESSURE ATOMISING AIR

GMR-4

220V COIL

L. G

GMR-4 AN0 AU-2 L. G

Page 41: IM 8 Incinerator

I DESIGN I PC. I COMPONENT I FUNCTION I V-A-TIME-KW I ADJUSTMENT I TYPE I MAKER I 15K2

15K3

15K5

1

1

15K3

I

4K7

7K4

7K7

9K5

AUX. R W 4N0 WITH AUX. BLOCK 1NO - 1NC

AUX. RELAY 3N0 - 2NC

1

13K2

I 8K7 I 1 I A U X I W RELAY WITH BASE I W.0 DOSING PUMP I 22OV COIL I I SZR-MY2-Nl I HONEYWELL I

AUX. RELAY 2NO - 2NC

15K9

1

1

1

1

I I

M M SLUICE

SLUICE IN ACTION

1

TIMER BLOCK FOR RELAY

15K9

1

I l l K l I 1 I A U X I W RELAY WITH BASE I BURNER CONTROL PRIMARY I 2 2 0 ~ COIL I I SZR-MY2-Nl I HONEYWELL I

=ART SLUICE

AUX. RELAY 3N0 - 2NC

1

TEMPERATURE CONTROL RELAY

TIMER WITH BASE

TIMER WTM BASE

TIMER WTIH BASE

14K2

I I I I I I I

I 1 l K 7 I 1 I AUXILIARY RELAY WllH BASE

22OV COIL

22OV COIL

22OV COIL SLUICE OPENING TIME

SLUICE IN ACTION

TIMER WTIH BASE

13K9

I 1

-- I 220v COIL

220V COIL

3 SEC 3-30 SEC TIMER BLOCK FOR RELAY

HIGH FLUE GAS TEMPERATURE

LOW PRESSURE COMBUSTION AIR

LOW COMBUmON NEGATIVE CHPiMBER PRESSURE

E m PREPURGE

1

TIMER WllH BASE

lOK8

I 12K1 I 1 I AUXIUARY RELAY W W BASE I BURNER CONTROL S E C O N D A ~ 2 2 0 ~ COIL I I SZR-MY2-Nl I HONEYWELL I

GMR-4 AND AU-2

CAD326

CAD326

3-180 SEC

SLUICE OPENING TIME

DELAY W.0 SUPPLY

TIMER WllH BASE

3 0 sec (22OY) LOW PRESSURE ATOMISING AIR

1

L. G

TELEMECANIOUE

GMR-4

TELEMECANIOUE

LA2-OT2

0 - 5 0 0 ' ~ ( 2 2 0 ~ )

3 0 oec (22OV)

3 0 ( 2 ~ 0 ~ )

3 0 sec (220V)

3 0 ses (22OV) DELAY BURNER

AUXILIARY RELAY WITH BASE

L G

12 SEC

TELEMECANIOUE

3 0 sec (220V)

1 2 SEC

SZR-MY2-NI

I I I I I I I

350'C

1 2 SEC

3 0 SEC

3 0 SEC

25 SEC

DOOR BLOKING OR PRlMARl BLOWER STOP

HONEYWELL

15K10

LAJ-OR4

2 0 SEC

ATEI - 3OS

22OV COIL

12K7

Name LIST OF PARTS

TELEMECANIQUE

TZGP-14.5

ATEI - 305

ATE1 - 3 0 5

ATE1 - 305

ATE1 - 305

AUTONICS

1

1

PmJecl No. 1923/24/47/2069

AUTONICS

AUTONICS

AUTONICS

AUTONICS

ATE1 - 3 0 5

AUTONICS

AUXIUMlY RELAY WllH BASE

AUTONICS

220V COIL FLAME EYE

AUXILIARY RELAY WITH BASE

@ HMMCO Hyunda i Marine Machinery Co.. Lld.

l~llp:l/~ww.hmmco.co,kr

Drawing numbei

H I F - N G O 6 0 2 0 3 2

Rev. I

Rev. 3

Rev. 2

Rev. r

SZR-MY2-NI

SLUICE ACTION

HONMVELL

Page:

032

22OV COIL

~ p p ~ ~ ~ ~

Check

Check

Drawn

SZR-MY2-Nl

2007.08.07. --- 2007.08.07.

2007.08.07.

2007.08.07.

HONEYWELL

J . H . K ~

H.s.P.~~

S.G.Kim

W. mn

s -

Page 42: IM 8 Incinerator

I 3US I 1 I VARIABLE SPEED CONTROLLER I W.0 DOSING PUMP I 0.75KW-3X440V I 1 ALTIVA-31 I TELEMEWIOUE I

DESIGN I I I I I I I

FUNCTION PC.

3TB

-

11A2

V-A-TIME-KW COMPONENT P : 0 - 44OV 5 : 2 4 W D 22OV-5OOVA

12A2

1

~ ~

1 BURNER CONTROL BOX

5A2

ADJUSTMENT

W 42-5OOA2 TWNSFORMER

1

9 5 2

1 454 1 1 1 RED PUSHBUTTON 1 NO I RESET ALARM I I I KP-22 I KACON I

WOON YOUNG

PRIMARY BURNER

I

1

1 156

1159

1259

TYPE

LAL SOCKET FOR BURNER CONTROL BOX

BURNER CONTROL BOX

1

1

I Narns LIST OF PARTS

MAKER

220V

LANOIS & GYR

LAL SOCKET FOR BURNER CONTROL BOX

TEMPERANRE CONTROLLER

6A2

1

1

1

2052

, a i Marine Machinery Co., Lld. 11llp:Nwwhmmca.ca.kr

2007.08.07. 1 H S . P O ~ ~

SECONDARY BURNER

L4NDIS & GYR

SWITCH (SIOP-START) 1 NO - 1 NC

KRAUS & NNMER

V\L 2.25

PRIMARY CHMBER

HMMCO SECONDARY CHAMBER 1

CAlO RK2103.6E 959

WITCH (AUO-MANUAL) 1 NO

RED PUSHBUTON 1 NO

RED PUSHBUTON 1 NO

LANDIS & GYR

2 2 W

TEMPERATURE CONTROLLER

INCINERATOR

1

FREE VOLTAGE

FREE WLTAGE

1

DELAY BURNER

R E S n FUME FNLURE PRIMARY BURNER

RESET FLAME FNLURE SECONDARY BURNER

L/\MP TEST BUCK PUSHBUlTON 1 NO

1555/15H10

Ul 2.25

s ~ ~ ~ o - A o / z ~

CAI0 RK3104(R).E

WITCH (OFF-ON) 1 NO

START SLUICE

LANDIS & GYR

ST38O-RO/Zl

KRAUS & NAlMER

CAI0 RK2103.6E

KP-22

KP-22

KP-22

1

HMMCO

KRAUS & NNMER

KACON

KACON

KACON

GREEN PILOT VIMP with PUSHBUTON 2 NO TELEMECANIQUE 220V ZBE-lOl

Page 43: IM 8 Incinerator

I DESIGN I PC. 1 COMPONENT ~

I FUNCTION I V-A-TIME-KW I ADJUSTMENT I TYPE I MAKER

1 2OH3 I 1 I WHilE PILOT LAMP I CONTROL VOLTAGE I 24V I I KL-22 I KACON I I I I I I I

20H5

20H7

20H9

21H2

21H4

21HS

1

I

1

1

1

22H2

2ZH4

22H6

22H8

23H2

23H4

1

A

RED LOT LAMP

YELLOW PILOT LAMP

RED PILOT LAMP

RED PILOT LAMP

RED PILOT LAMP

21H8

1

1

1

1

1

1

GREEN PILOT W P

1

HlGH FLUE GAS TEMPERATURE

ASH DOORS OPEN

LOW PRESSURE COMBUSTION AIR

LOW NEGATbE PRESSURE COMBUSTION CHAMBER

HIGH TEMPERATURE

1

G R E N PILOT LAMP

GREEN PILOT LAMP

RED PILOT LAMP

RED PILOT LAMP

RED PILOT LAMP

RED PILOT LAMP

C.T

PRIMARY BLOWER RUNNING

PIMP. MEER

24V

24V

24V

24V

24V

RED PILOT LAMP

INCINERATOR RUNNING

W.0 RUNNING

FLAME FNLURE PRIMARY CHNBER

FLAME FAILURE SECONDARY CHWBER

LOW PRESSURE ATOMISING AIR

AURM SLUICE

1

24V

lOOA

KL-22

KL-22

KL-22

KL-22

KL-22

MOTOR OVERLOAD

24V

24V

24V

24V

24V

24V

CURRENT TWSFORMER

KACON

KACON

KACON

KACON

KACON

KL-22

0-200

KACON

24V

KL-22

KL-22

KL-22

KL-22

KL-22

KL-22

OAEBOONG

100/5

KACON

KACON

KACON

KACON

KACON

KACON

KL-22

CD-20s

KACON

OAEBOONG

Page 44: IM 8 Incinerator
Page 45: IM 8 Incinerator

I I WASTE OIL TANK CONTROL PANEL (CP-2) 1 I

SHIP NO. : 1923 124 / 47 / 2069

Page 46: IM 8 Incinerator

INDEX LlST D E S I G N A T I O N I REMARK I

1

2 3

INDEX LIST

FRONT CONTROL PANEL AND NAME PLATES

MAIN CURRENT

5 ALARM RESET, LOW LEVEL AND HIGH TEMPERATURE ALARM

21

2 5

3 0

PILOT LAMPS

EXTERNAL ALARMS

LIST OF PARTS

32

Page: Approved 2006.12.1 1 . J.H.Kim ~ h n d a i Marine Machinery Co.. Lld. hllp:ll~ww.hmmco.co,kr

Rev. 3 Check 2006.12.1 1. H . S . P O ~ ~ Drawing number

Rev. 2 0 0 1 Chsck 2006.12.1 1. S.G.Kim H I F - 0 0 1

6

LIST OF PARTS

Name INDEX LIST

MOTOR ALARM AND START UP CIRCUIT

Pmjecl No.

1923/24 /47 /2069 I @ HMMCO

5 0 1 TERMINAL STRIP X4 I I

Page 47: IM 8 Incinerator

NSULKTION ENCLOSURE I. CONTROL PANEL FOR W.0 TANK(CP-2) 3 1 4 4 0 V

30XCONSTRUCTION I a ~ ~ ~ ~ - ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

:REQUENCY 60 CIS

' NAME PLATE '

CABLE GLAND - -POWER(30b-1 PC) a

(R:RED. %WHITE. T:BLACK)

-MILL PUMP

-HIGH TEMP. (1 5b-1 PC) -LOW TEMP. (15b-1 PC) -HI GH LEVEL (1 5b-1 PC) -LOW LEVEL (15b-IPC)

-IN CINERATOR CONT.

PANEL<CP-I>.

4-015 HOLES

NAME PLATES

I POS I T E X T ~ - ~~

3 0 2 1 MAIN SWITCH I

5S3 6S5

20S2

RESET ALARM START UP MILL PUMP AUTO-0-MAN LAMP TEST

20H3 20H5 20H7 20H9

2 0 H l l 20H13 21H2

CONTROL VOLTAGE LOW LEVEL W.O. TANK LOW TEMPERATURE WASTE OIL

HlGH TEMPERATURE WASTE OIL MOTOR OVERLOAD HlGH LEVEL W.O. TANK MILL PUMP RUNNING

Page 48: IM 8 Incinerator

POWER SUPPLY 3~440V/60 C/S

MILL PUMP 4.6Kr 7.7A

RBV. 4 AppmvM 2006.12.1 1. J.H.Kim ~ i u n d a i Marine Machinery Co.. Ltd. -- hllp:IIw.hmmw.w.iV Check 2006.12.1 1. H . S . P O ~ ~

003 Check 2006.12.1 1. S.G.Kim Drawing number u ~ r - n n x

Name MAIN CURRENT

Pmiecl No. 1923/24/47/2069 1 8 HMMCO

Page 49: IM 8 Incinerator

TRANSFORMER

CONTROL VOLTAGE

PILOT VOLTAGE 24V

Name PmjecI No. MAIN CURRENT 1923/24/47/2069

Rev. 4 Page : Approved 2006.12.1 1. J . H . K ~ ~ @ HMMCO Hyundai Marine Machinery Co., Lld. --

Rev. 3 Check 2006.12.1 1. H.S.Park hllp:llw.hrnmco.co.kr

Rev.? 004 Check 2006.12.1 1. S.G.Kim Drawing number

Rev. I Orawn 2006.12.1 1. W. Ahn H I F - 0 0 4

Page 50: IM 8 Incinerator

5K 3 5K 3 (n

X4 7 X4 1 3 9 I

HIGH TEMP. LOW TEMP.

rn SWITCH SWITCH I I

r] r l F{ Ib15-121 5-13 ,20 -14 20-4.25-7 a 5-9.6-2 20-6.25-5

b 20-5 b 20-9 b 20-7

5 Sec 5 Sec

EXTERNAL CONTROL VOLTAGE ALARM EM'CY STOP ON RESET ALARM LOW LEVEL LOW LEVEL

W.O. TANK W.O. TANK

ALARM HlGH TEMP WASTE OIL

ALARM ALARM LOW TEMP HIGH LEVEL HIGH LEVEL WASTE OIL W.O. TANK W.O. TANK

Name Projea NO.

@ H M M C 0 Hyundai Marine Machinery Co.. Lld.

hllp:/Iww.hmmc~.~o.kr

Drawing number

H I F - 0 0 5

ALARM CIRCUIT

,II -\* \+ :+ -1 M~w!+~w H' b

1923/24/47/2069

Rev. 4

Rev. 3

Rev. 2

Rev. 1

Page:

005

Appmved

Check

Check

Drawn

2006.1 2.1 1.

2006.12.1 1.

2006.12.1 1.

2006.12.1 1.

J.H.Kim - 14.s.park

S.C.Kim -- W . Ahn

Page 51: IM 8 Incinerator

ALARM MOTOR

OVERLOAD

AUTO START SIGNAL FROM INCINERATOR CONTROL PANEL

INTERLOCK SIGNAL TO INCINERATOR CONTROL PANEL

Name ALARM AND START CP CIRCUIT

Pmjea NO.

1 9 2 3 / 2 4 / 4 7 / 2 0 6 9 @ HMMCO Hyundai Marine Machinery Ca.. Lld.

hllp:llww~.hmrn~~.co.hr

Drawing number

H I F - 0 0 6

Rev. 4

Rev. 3

Rev. 2

Rev. 1

PaQs :

0 0 6

Appmved

Check

Chmh

Dram

2006.12.1 1.

2006.12.11.

2006.12.1 1.

2006.12.1 1.

J.H.Kirn -- H . S . P O ~ ~

S.G.Kim

W. Ahn

Page 52: IM 8 Incinerator

6 11 a LOW LEVEL ALARM 5 K 5

MOTOR ALARM

6K 2

SAFETY CIRCUIT

MILL PUMP

Page 53: IM 8 Incinerator

20H3 WHITE ( 1 20H5

RED (

G3

2.9 RED 1 20H13 RED (

LAMP TEST CONTROL VOLTAGE LOW LEVEL LOW TEMPERATURE HIGH TEMPERATURE MOTOR OVERLOAD HIGH LEVEL

W.O. TANK WASTE OIL WASTE OIL W.O. TANK

I Name Pmjecl No.

PILOT LAMPS 1923/24 /47 /2069

Rev. 4 Hyundai Marine HMMCO Machinery CO., L I ~ .

ROY. 3 hllpIlw.llmmc0.m.hr

Rev.? I 1 Rev. 1 Dram 2006.12.1 1. W. Ahn H I F - 0 2 0

Page 54: IM 8 Incinerator

21H2 , GREEN

MILL PUMP

RUNNING

Name Project No. PILOT LAMPS 1923/24/47/2069

Rev. 4 Page: Appmued 2006.1 2.1 1. J . H . K ~ ~

@ HMMCO Hyundai Marine Machinery Co.. Lld.

hllp:Nlnvw.hmnlm.m.kr Rev. 3

Drawng nollbcr Rev. 2 021 Check 2006.12.1 1. S.G.Kim

Rev. 1 Oram 2006.12.1 1. W. M n H I F - 0 2 1

Page 55: IM 8 Incinerator

LOW LEVEL W.O. TANK

HlGH TEMPERATURE WASTE OIL

LOW TEMPERATURE WASTE OIL

33 MOTOR OVERLOAD

ABNORMAL ALARM HlGH LEVEL ALARM

W.O. TANK

Name Project No. EXTERNAL ALARMS 1 9 2 3 / 2 4 / 4 7 / 2 0 6 9

Rev. 4 me : Appmved 2006.12.11. J . H . K ~ @ HMMCO Hyundai Marine Machinety Co., Lfd.

Rev. 3 --

C h d 2006.12.1 I. H . S . P O ~ ~ h l l ~ : I I w v w . h m m ~ ~ ~ ~ . k r

Rev. 2 025 Chsh 2006.12.1 1. S.G.Kim "ullluer

Rev. I ram 2006.12.1 1. W. fin H I F - 0 2 5

Page 56: IM 8 Incinerator

0 0'

ADJUSTMENT DESIGN

3 0 2

FUNCTION WPE

VO+VZ7+KCFlPZ

V-A-TIME-KW

25A

PC.

1

1

MAKE

TELEMECANIQUE

COMPONENT

COMROL PANEL (60Ox600x220mm)

MAIN SWITCH WITH I N 0 - 1NC

Page 57: IM 8 Incinerator

DESIGN I PC. I COMPONENT I FUNCTION I v - A - T I M E - ~ I ADJUSTMENT I m E

7K4 I 1 I CONTACTOR 1NO - 1NC I MILL PUMP I 4.6Kw - 220V COIL I I CMC-12

AUX. RELAY 2NO - ZNC 5K2

GMR-4' WITH AUX. BLOCK 2NC CONTROL VOLTGAE 220V COIL AND AU-2 AUX. RELAY

5K3 4N0 GMR-4 ' WrEi AUX. BLOCK 2NO RESET ALARM 220V COIL AND AU-2

5K5 AUX. RELAY 4N0 GMR-4 WITH AUX. BLOCK I N 0 - INC LOW LEVEL W.0 220V COIL AND AU-2

5K7 AUX. RELAY 4N0 GMR-4 ' WlTH AUX. BLOCK I N 0 - INC HIGH TEMP. W.0 220V COIL AND AU-2

5K9 AUX. RELAY 4N0 GMR-4 WIm AUX. BLOCK I N 0 - 1NC LOW TEMP. W.0 220V COIL AND AU-2

S K I 2 1 AUX. RELAY 3N0 - 1NC HIGH LEVEL W.0 220V COIL GMR-4

6K2 AUX. R M Y 4N0 GMR-4 WlTH AVX. BLOCK 1NO - INC OVERLOAD 220V COIL AND AU-2

5K4 1 TIMER WITH BASE LOW LEVEL 0- 10 SEC(220V) 5 SEC ATE2- 105

5 K l l 1 TIMER WITH BASE HIGH L M L 0-10 SEC(22OV) 5 SEC ATE2-10s

P : 0 - 440V 4T8 1 TWSFORMER S : 24 AN0 22OV-JOOVA BHTB-DQSOO

MAKE I

AUTONICS I AUTONICS I BUMHAN ==k

Name Pmjecl No. LIST OF PARTS 1923/24/47/2069 / @ HMMCO

Rev. 4 Page: Approved 2006.12.1 -- 1. J.H.Kim ~ G n d a i Marine Machinery Co., Lld.

Rev. 3 hllp:liwww,l~n~mco.co.Xi Chec* 2006.12.1 1. H .S .PO~~

Rev. 2 03 1 Check 2006.12.1 1. S.C.Kim Drawing number

Rev. I Dram 2006.12.11. W. mn H I F - 0 3 1

Page 58: IM 8 Incinerator

I DESIGN I PC. I COMPONENT I FUNCTION Iv-A-TIME-KW (ADJUSTMENT I TYPE I MAKE

6S5

r 2 0 H 3 I WHITE PILOT LAMP

5 5 4

I CONTROL VOLTAGE I 24V I I KL-22 1 KACON

1

1

SWrrCH (AUTO-0-MAN) 2 NO - 2 NC

20H5

RED PUSHBUTTON 2 NO

20H9

START UP MILL PUMP

KP-22 LAMP TEST 2052

1

20H7

RESET ALARM

KACON

1

2 0 H l l

CAlO RK3202.6E

1

RE0 PILOT LAMP

1

20H13

KRAUS NNMER

KP-22

BLACK PUSHBlJlTON 2 NO

RED PILOT LAMP

1

21H2

KACON

LOW LEVEL W.O.

RED PILOT LAMP

1

HIGH TEMP. W.O.

RED PILOT LAMP

1

2 4V

LOW TEMP. W.O.

RED PILOT LAMP

24V

OVERLOAD

GREO'I PILOT LAMP

KL-22

24V

HIGH LEVEL W.O.

KACON

KL-22

24V

MILL PUMP

KACON

KL-22

24V

KACON

KL-22

2 4V

KACON

KL-22 KACON

KL-22 KACON

Page 59: IM 8 Incinerator

ER

ATO

R

CO

NT

RO

L P

AN

EL(C

P-1)

J

AB

NO

RM

AL

ALA

RM

. .

LOW

TE

MP

. S

WITC

H

I I H

IGH

TE

MP

. S

WITC

H

I

LOW

LE

VE

L S

WITC

H

I

1

INT

ER

LOC

K S

IGN

AL TO

IN

CIN

ER

ATO

R C

ON

TRO

L P

AN

EL

AU

TO

STA

RT

SIG

NA

L FO

R

INC

INE

RA

TOR

CO

NTR

OL

PA

NE

L

I * 2

0b

M

ILL P

UM

P

I * H

-TP

YC

-2.5 !

4.6 K

w

X

2P

I

(0.0

1

2.7

m

rnIi , ,

i P

-LS6-7A

C4

40

V

60

Hz

30

; (0.D

12

.7

rnm

)

PO

SlTK

TERM

INALS

X4

1 : 7

PART AREA SU

PPLIED

BY HM

MCO

*

INSTALLED

AND

D

ELIVERED

BY YARD

Page 60: IM 8 Incinerator

"A"

145 1 VIEW "A"

* OUTLET

4-019 HOLES

/ (PCD0140) SPECIFICATION

A DATE

N P E : Centrifugal pump

CAPACITY : 2 6 M' /Hr

HEAD : 0.4 bar

INLET FLANGE DETAIL

(Ja B 2212)

M 2007.08.06 1 ~REVISEO BY SHIPYARD APPROVAL COMMENTS I S.G.KIM

E I * I I

CODE

MOTOR : 4.6Ku x 2P

POWER : 440V. 30. 60Hz

'@JGHT : about. 5 0 Kg

ENCLOUSURE : IP55 A

CABLE GIAND : 2 0 b

POWER CONSUMPTION : 2.9 Kw

POWER FACTOR : 8 7 Z

RATING C U W N T : 7.7 A

STARTING CURRENT : 57.82 A

STARTING TIME : 1.0 SEC.

EmClENCE : 8 4 9.

AMBIENT TEMP. : 5 0 'C

TERMINAL COLOR -R(U):RED. S(V):WHITE. T(W):BLACK

OUTLET FLANGE DETAIL (JIS B 2212) INSULATION C W S : B

M E M O SIGN

Type PU-5 (JIS)

* NOTE * I . Mill pump should be inrtollotion

vertically.

2. Position of mill pump suction to be below 150rnrn t h m low level switch.

Sa le

Non

Name

MILL PUMP

g H M M c 0 Hyundai Marine Machinev Co., Lld.

hllp:Nw.hmrnca.~o.Lr

Drawing number

- 0UT030128D - R1

I Pmjest No.

l g 2 3 2 4 4 7 2 0 6 g 1 e 0 J.H.Kim

H.S.Park

S.C.Kim JHKim

mmved

Ch&

Check

"ram

2007.08.22 -- 2007.08.22

2007.08.22

2W7.08.22

Page 61: IM 8 Incinerator

KP-79 (LOW OIL)

2-06 HOLES

7

I SPECIFICATION

W E Code. NO. CPPILl4RY RANGE DIFF. MAX. PERM. TEMP. WEIGHT ( m ) ( 'C ) ( "2 ) ( 'c ) ( Kg )

KP 81 060L1125 2 80-150 7-20 200 0.4

KP 79 060L1126 2 50-100 5-15 150 0.4

WIRING DIAGRAM

SPDT LINE -

T Y P ~ Scale am^

Non THERMO STAT

Hyundai Marine Machinery Co.. Lld. h!!p:llw.hmmco.co.hr

Page 62: IM 8 Incinerator

WIRING DIAGRAM r' -

I

C-B IS MADE ON FALLING LEVEL C-A IS MADE ON RISING LEVEL

MEMO

55 167 78 1 2 CONNECTION FLANGE 58400 1 JIS 5K-65A

300 11 CABLE GLAND BC 1 1 5 / 2 0 c ab.115 1 0 NAME PLATE BS 1

9 FLOAT SUS316 1 047 x 78L

8 SPRING SUS304 1

7 LEVER SUS304 1

SIGN CODE A

I SPECIFICATION

- INSTAUATION : SlDE MOUNTING

- MAX. WORKING PRESS. : 5Bar

- MAX. WORKING TEMP. : -10-180'C

- PERMISSIBLE AMB. TEMP. : -10-6VC

DATE

6

3 MICRO SWITCH 1 15A 250VAC -

2 l BODY I l l

5 1 MAGNET I ALNICO I 1

GUIDE

4

- PERMISSIBLE SPECIFIC~GRAMM : 0.75-1.3~

- SWITCH W E : MICRO SWITCH

- CONTACT FORM : SPDT / aption(0PDT)

- CONTACT RATING : 15A 125VAC. 3A 250VAC

- ENCLOSURE : WEATHER PROOF IP56

SUS304

ALNICO MAGNET

1

1

, . k . O 6 7 k h ' l P P : 8 - ? 6 6 7 ~ 6 ? . C g ? C 6 ? . d i ( !

I ' I MATERIAL I Q'TY I REMARK N J ~ E ~ ~ ~ -~ ~

SlDE MOUNTING M P E FLOAT LEVEL SWTlCH WITH TEST DEVICE

@ H M M CO Hyundai Marine Machinery Co.. Lld.

"!lp:,l~~w.hmmco c o b

orawing ollmbei

HFS-24H-SW-T-060626

NO. DESCRIPTION Type ~~~ ~ ~ -~

Project NO.

I W / Z ~ / ~ ~ / Z O ~

Scale

iiwrove.3 - c h m

Check

Dram

2006.12.1 1

2006.12.1 1

2006.12.1 1

2006.12.1 1

J.H.Kim - H.s .P .~~

S.C.Kim

J.H.Kim

Page 63: IM 8 Incinerator

I ITEM I DESCRIPTION

I MATERIAL

I PROTECTION I IP56

I PUSH BUlTON COLOR I RED

ab.15 - 4-08 HOLES .I-

CABLE GLAND / 200

Type Scale Name

Non EM'CY STOP SWITCH I

PmJea No.

19~3/~4/47/~0691 @B +@ H M M C 0 Approved 2006.1 2.1 1 J.H.Kim Hyundai Marine Machinery Co.. Ltd. -- hllp:llww.hmmca.co.ar Chech 2006.12.1 1 H . S . P O ~ ~

Drawing number 1 Chech 2006.12.1 1 S.G.Kim

Dram 2006.1 2.1 1 D.W.Jeon HC0 - 100043

Page 64: IM 8 Incinerator

64 [ LSP : HMI - 1923 - ~ 0 1 - -

LIST of SPARE PART WASTE OIL INCINERATOR UNIT

TYPE : MAXI NGIOOSL WS

OWNER Messrs

USED FOR Messrs

f i HYUNDAI - ATLAS INCINERATOR

HYUNDAI HEAVY INDUSTRIES CO., LTD

CLASS

-1v Hvundai Marine Machinew Co., Ltd.

A B S

602-15, Gawja-Dong, Seo-Gu, lncheon &ty ~ o r e a TEL : (032) 583 - 0671 FAX : (032) 583 - 0674

Page

Page 65: IM 8 Incinerator

SPARE PART'S FOR W. 0 . INCINERATOR UNlT 6- TYPE : MAXI NGIOO SL WS

-

NO.

-

;201

-

1202

-

i 2 0 3

-

i204

-

i205

-

2 0 6

-

i207

MATERIAL

TYPE OR PART NO.

SUPPLY PER SHIP N A M E S K E T C H REMARKS

WORKING SPARE =F PRIMARY BLOWER MOTOR

BEARING

PRIMARY BURNER OIL NOZZLE FOR

D.O. BURNER

PRIMARY BURNER ELECTRODE UNlT

SECONDARY BURNER

PRIMARY BURNER

FLAME DETEDTOR SECONDARY BURNER

MECHANICAL SEAL W.O. DOSING PUMP

MECHANICAL SEAL MILL PUMP

SIGHT GLASS

IS%" I Name SPARE PARTS

Chech 1 2006.12.11 1 H.S.park Draw~ng number

, Chech 2006.12.1 1 S.G.Kim

Drawn 1 2006.12.11 1 o.w.~son LSP - OGlOOl - 01

Page 66: IM 8 Incinerator

66 SPARE PART'S FOR W. O. INCINERATOR UN~IT

-

VO.

-

208

-

209

-

2 1 0

-

21 1

-

2 1 2

-

2 1 3

,214

-

N A M E

DOOR PACKING

IGNITION CABLE

STATOR

AUX. RELAY

(220'4

TIMER

PILOT LAMP (INCANOESCEhT LAMP)

SOLENOID VALVE FOR

DOOR BLOCKING

TYPE : MAXI NG100 SL WS

MATERIAL S K E T C H

TYPE OR PART NO.

SUPPLY PER SHIP

WORKING

- SPARE

REMARKS

PRIMARY BURNER

NASTE OIL IOSING

Name Type

Pmjecl No.

i m / x / * 7 / 2 0 6 9

SPARE PARTS 1. Scale Nnn

0 La

@ H MMCO

/ 7

Hyundai Marine Machinery Co.. Ltd. h U p : l / w h m m . ~ o . L r

Drawing number

J.H.Kim -- H.S.Pork

S.G.Kim

D.W.Jeon

~ppmved

Check

ChssX

ram

12 2006.12.1 1

2006.12.1 1

2006.12.1 1

2006.12.1 1 LSP - OG1001 - 02 ('"

Page 67: IM 8 Incinerator

SPARE PART'S FOR W. 0. INCINERATOR UNIT TYPE : MAXI NGIOO SL WS

MATERIAL S K E T C H

SUPPLY PER SHIP N A M E -

SPARE -

REMARKS TYPE OR PART NO.

WORKING

PRIMARY BURNER COUPLING SLEEVE

FOR PUMP '

PRIMARY BURNER

COUPLING

SECONDARl BURNER

COUPLING SLEEVE FOR MOTOR

SECONDARY BURNER

MINI CIRCUIT BREAKER

SPARE PART BOX ith key : lock

Type Scale Name Non SPARE PARTS

Prajecl No.

/ 1 @% @ H MMCO Appmved 2006.12.1 1 J.H.Kim Hyundai Marine Machinery Co.. Lfd.

hllp://www.hmmco.m.kr

Check 2006.12.1 1 H.s.P~& Drawing number

C h m 2006.12.1 1 S.G.Kim

Draw 2006.12.1 1 D.w.~eon LSP - OGlOOl - 03

Page 68: IM 8 Incinerator

I APPLICATION FOR I I I

33 19%

I IS bUTrrnTIN4 1-1 I CLASS1 1 ABS I CLASS2 I

SUBCONTRACT NAME HYUNDAI MARINEMACHINERY CO., LTD. TEL 032-583-0671

FAX 1 032-583-0674

Page 69: IM 8 Incinerator

SAFETY DEVICE OF W.O. INCINERATOR G DESCRIPTION

. .

II . .

21

Page 70: IM 8 Incinerator

Test report no. : HFT - 2069 page : 1 of 11 ;)o

MAXI TYPE W.O. INCINERATOR FINAL TEST REPORT

I Purchaser I HYUNDAI HEAVY IND. CO.,LTD. I Ship no.

Serial no.

Date of test 23. Sep. 2009

HHI-INC-1923-R0

2069

HMR-SP07470101 I

Q.M DEPT @ HYUNDAl MARINE MACHINERY

TEL : +82-32-583-0671

Declaration of Conformity no.

MEDHF10-08-R3 HYUNDAI MARINE MACHINERY CO., LTD. A4

HMDOC-NIA

Page 71: IM 8 Incinerator

Test report no. : HFT - 2069 page: 2of 11

Test of components and functions qiz 2 7 1 ~ 4 3

Incinerator type : MAXI NG 100 SL WS Serial no : HMRSP07470101 2 q 7 1 B 4 NEW*

Date of test : 23. Sep .2009 Tested by : S. H. RYU aht.3 a+t

Remarks ABS 71Et

Control of components +S=l a lq Before start up of the incinerator, the incinerator equipment is checked in accordance with the order specification. 2 4 7 l t 4%8t7l Boll &471 W l 7 t AtOdYOll W2t +Ail 4%ltXI W!Wt.

Preparations before starting the incinerator for the first time e4714 X I S q Z g 0 I PtllAtHb

a 0 1 . Open all inlet and outlet valves of the incinerator for sludge, oil and air. 4l+, a;;, ~ 7 1 % ~ 7 1 0 1 n+ ~1.474 YE* 2 a.

0 02. Check that the holes in the refractory lining are open for air nozzles and sight glass. L H W o l l Slit S71 kBJt &'a Sz19 ?%Ol 'SW 9 - H *",I.

0 03. Check that the inside linnig of the combustion chamber for solid waste is not damaged. >A1 %"-21131 @&a24 419~01 +&' 514 3 2 k X I 4 W .

b 0 4 . Check that the feeding door opens and closes == I -0 ,Hr-I ,H.n(l% w.

0 05. Fill oil into the dosing pump. ~8 stnoll 7 1 ~ t as*.

06. Check the rotation of the blower and dosing pump. $971 3 5s an4 qg 9 ~ ~ s qg.

@ 07. Check the adjustment of the pressure (atomizing air for the sludge burner 1,5 - 2,5 bar). E!$Z*d g9 ( 41% tYLi% kAtS71 fF4 1,5 - 2,5 bar).

08. Check the micro switches. Wl3.S 6 4 4 *?!,

d 09. Check for leakage in the pipe system u s 9 # IS3 +S 2 ;3 w?!.

MEDHFIO-08-R3 HYUNDAI MARINE MACHINERY CO., LTD. A4

Page 72: IM 8 Incinerator

Test reportno. : HFT - 2069 page

Adjustment of time relays in control panel (incinerator) ZE5 P Y L H q EtOd #I371 3s (&471)

Time relay no.: ~ t ~ d 41371 '8s

Time relay no.: Timelsec. EtOd #1371E!S AI 211% I,

Adjustment of thermo relays 2 #I37101 P$'

Timelsec. *~wa

P E'

8- g B d

Function : I

Function : 71%

') During test adjusted to : 15 sec.

12

12

30

20

25

12

754

7S7

9K5

13K2

13K9

14K2

~. - Delay Alarm, sluice inside door open a% s== sa. Time for opening sluice inside door ?L1- o - x 2 8 4 3

-

Time for alarm for low combustion(cooling) air. @*a71 xist gn AIL^

Low negative pressure in combustion chamber F4*-2!4 +a xiet Time for pre-ventilation %71 "13 ( a w q Time for delay sludge supply SYXl SZ *I@ AIZt Delay for primary burner 92lOlry~I WLI XI@ Time for alarm for low atomizing air S A t Z 7 1 Xist a 9 421

Relay no.: A1871 '8s

MEDHFI 0-O&R3 HYUNDAI MARINE MACHINERY GO., LSD. A4

Adjustment z*d MAXI 25

b d

3Q4 (Blower)

3Q6 (Sludge pump)

As indicated on the ID-plate ID poll z A 1 ~ q a As indicated on the ID-plate ,, ,,, ,,,,. ,

Page 73: IM 8 Incinerator

Test report no. : HFT - 2069 page : 4 of 11

Adjustment of controller 5A2 Ylol7l 5 A 2 4 E B

Display no.:

AL -1

AL -2

AL -3

AL -4

MEDHF10.08-R3 HYUNDAI MARINE MACHINERY CO., LTD. A4

Adjustment of controller 6A2 rllW7l 6AZ 01 3 r d

Adjustment (t "C) r * d

950% PID C0N-r.

t < 1050

100s t

850 < t 950

$.

0

Function 71 k Combustion temperature primary chamber(S1udge) , i t 23 .g!ql,I+,

Alarm (Primary Chamber High Temp. Shut Down) l i t $*A ZE g?2

Blocking door and Primary blower stop EGi t4?J W X l 2 =.Z+ rdxl

Combustion Tepm. Primary Chamber(So1id Waste) I zt se eswi1ua71)

Control temperature pressure

Display no.:

AL-1

A L - 2

A L - 3

AL -4

Adjustment (t "C) 3rd

6 7 0 ~ t > 750

t c 1050

100s t

650

' Function 71 S Combustion temperature secondary chamber 2 i t $&A S 3 PE

Alarm (Primary Chamber High Temp. Shut Down) 2 x 1 i!E 739

Blocking door and Primary blower stop zoi s43 4 x 1 2 =nW SXI

Pre-heating-Primary Burner Start Signal. Wl% 94 l i t $&$ 9& 4%'

Page 74: IM 8 Incinerator

Test report no. : HFT - 2069 page: 5of 11

Start up of the incinerator *471 4Z

Function test : Switch is turned to "Sludge o f f (Solid waste burning) 71% *I3 : k? i * l t SYxl e r 8q.s etct.

01. Start the incinerator. *471 *I=

[0 02. Check that the feeding door is tight. SSSJl -2 W + " l 49.

p 0 3 . Check that the pre-ventilation time is 30 seconds. 41 %71 4ZtOl 30 %?!XI 49 (PZIWXI).

g 0 4 . Check that the blocking cylinder works. sea ollq '.lF!Li7t q = s t t * l w.

05. Check that the micro switches on feeding door works. %Z?&l 2 t 0t013.Z hWfl71. Y Z q+XI St?!,

06. Adjust the pressure of the primaly 12ND oil pump to approx. 10 bar. i r~tolW+l 2s ndPq EWQ 10 b a r s Z*d.

a 07. Check that the incinerator (incl. the fan) has stopped when the temperature in the combustion chamber is below 100'C. @*%I LHSI EE7t IOOtOlst UH *4717t(E2tOIqZl ES91E%)*dXl ZteXI 49.

Function test: Switch is turned to "Sludge on".(Sludge burning) 71k ~13 : Szixl P &wr ~ t c t .

ID

01. Check that the sludge burner operates within the set points 950C(PID Control ) . -h I.--' SY*I ~ (1471 ssoc=~ * d ~ B LHW Y Z ~ ~ X I w w r o Control). R*- h M S J - A + qb

02. Check that the primzry burner operates 25 sec. to ignite the sludge burner automatically when the "Delay primary burnee' is switched to automatic "AUT". IT2lOlqZI WLIOI XIS01 XtZ "AUT"OS gq q q X 4 2s UH 24x1 4471 XtZOZ HqWZ, "2lOlqZI 4Ljq 25 * ZEt GO1 WtXI 4 9 .

w 0 3 . Check that the primary burner operates al!the time together with the sludge burner when the "Delay primary burner" is switched to manual "MAN". Z2lOIqZl WLi7t 9Z "MANS'OZ :.q q q X 4 5% UH %Y*l W47t P2\01q2I WYQt 94 POI qZ q t x l 49.

MEDHF10-OM3 HYUNDAI MARINE MACHINERY GO., LTD, A4

ANURAG
Highlight
ANURAG
Highlight
Page 75: IM 8 Incinerator

Test report no. : HFT - 2069 page : 6 of 1 1

Control of component and alarm functions 5% %'BY 71k4 XI101

Alarm for low pressure combustion(cooling) air (PSI) g&a71 w x i a t 39 (PSI)

@ 01. Start the incinerator *+A 4B

u02. Adjust air pressure to 18 mbar by "Test Kit" ql&E 3 I E t # i l W %71B+18 18mbar Fi Pa.

03. Check that the flame goes out after: 12 sec. QZOI 9 s Toll z i x i t * ~ w.

0 04. Check that the "Low pressure combustion(cooling) air" alarm lamp switch on. '2!&Z71 EI+1 x i 3 ZISL+Z'Jl Y* l t * l 49.

m05. Check that the incinerator is cooling down &4717t % 4 q t * I W.

0 06. Reset the alarm aa 21%.

Alarm for motor overload (3Q4, 3Q6) atest an ( 3 ~ 4 , m )

@ 01. Activate the test button on the relay. AI37loll 9% A 1 3 W C q Z .

002. Check that the flame goes out. + 3-91 zi*l+Xl w!.

003. Check that the incinerator is cooling down. &4717t %4 q+*l W!.

kd 04. Reset the alarm. as. 219.

MEDHFIO-08-R3 HYUNDAI MARINE MACHINERY CO., LTD. A4

Page 76: IM 8 Incinerator

Test report no. : HFT - 2069 page:7of11 %

Alarm for flame failure (primary burner) 4s t +!a 729 (E~tOIW2l W W )

a 01. Start the incinerator +471 48

0 02. Remove the photoelectric cell E X 'ax171 WIA.

03. Check that the flame goes out = 201 ~ ~ I S I st?!. 04. Check that the "Flame failure" alarm lamp switch on

w.t+!nl &ISL%Ol 4 * l t * I e?!. 05. Check that the incinerator is cooling down.

&4717t %i4 qkx1 W!!. 06. Remount the photoelectric cell

s X ax171 qux l . a 07. Resetthe alarm

a@ 43.

Alarm for flame failure (secondary burner) 44 Y q &I9 (Yl3'21 W L I )

01. Start the incinerator 3 3 7 1 48

6d 02. Remove the photoelectric cell s x m 1 7 1 a l l .

a 03. Check that the flame goes out %+ ZOI 4XIkXl *?!.

04. Check that the "Flame failure" alarm lamp switch on w + ! q a s s o l XI w.

d 05. Check that the incinerator is cooling down &V717t 34 4 t x l W!.

06. Remount the photoelectric cell z z ax171 w w

19 07. Reset the alarm a* 219.

MEDHFIO-08-R3 HYUNDAI MARINE MACHINERY GO., LTD, A4

ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
Page 77: IM 8 Incinerator

Test report no. : HFT - 2069 page:8of11

Alarm for high temperature - Primary combustion chamber(5A2) I i t -a*&! ZPZ i9

01. Start the incinerator *471 4 %

02. Check that the "High temperature incinerator" alarm lamp switch on at setting temp. 1050°C by means of the temp. calibrator. Temp.Cal1bratort. Olg8tW lO5Otoll l!edetZ ZE gSEOl ?Xl+XI q9.

H 0 3 . Check that the flame goes out. s 201 nlXI+Xl q?!.

04. Check that the incinerator is cooling down &4717t 3 4 4 S X I 99.

v 0 5 . Reset the alarm 739 219.

Alarm for high temperature - Secondary combustion chamber(6A2) 2 i t ei*S ZPg9

EOI. Start the incinerator *471 4s

$ 02. Check that the "High temperature incineratof alarm lamp switch on at setting temp. 1'050'C by means of the temp. calibrator. Temp. Calibrator* 013E+W 1050COll *%St2 ZP a9EOl ?Xl+Xl q?!.

kf03. Check that the flame goes out. s ZOI nlXI+Xl w!.

0 04. Check that the incinerator is cooling down h4717t 9 4 4 t X I q?!.

d 0 5 . Reset the alarm Zin +I%.

MEDHFI 0-08-R3 HYUNDAI MARINE MACHINERY CO.. LTD. A4

ANURAG
Highlight
ANURAG
Highlight
Page 78: IM 8 Incinerator

Test report no. : HFT - 2069 page: 9 o f 11

Alarm For high exhaust gas temperature (4K7) aH717th 2s ag

b 01. Start the incinerator e w AIZ

a 02. Check that the "High Flue Gas TEMP." alarm lamp switch on at setting temp. 350C by means of the temp. calibrator. Temp. Callbrator t OlgatH 350Coll 9242 aH7I7E i!E a9501 4 X l S I W.

@03. Check that the flame goes out +%Ol nl*l+Xl *%I.

04. Check that the incinerator is cooling down 5=t01q21 NO1 #I+ qgq31 q?!.

05. Reset the alarm a 2 +I*

Alarm for low negative pressure in the combustion chamber (7S7) $ ~ # L H B$XIW a e

b 01. Start the incinerator 3 ~ 4 7 1 AIE

kl 02. Adjust air pressure to 0.5 mbar by "Test Kit". WILE 3154 +Ail 9+1% 0.5 mbarS Z*d.

03. Check that the flame goes out after: 12 sec. E ~ O I 'E s $41 n l x r s ~ w.

04. Check that the "Low negative pressure combustion chamber alarm lamp switch on 9eglLH B$Xi%t 7&!2%01 ?XltXl *%I.

05. Check that the incinerator is cooling down &4717t ' tY44tXl *%I.

d 06. Reset the alarm an 219

MEDHFIO-08-R3 HYUNDAI MARINE MACHINERY GO., LTD. A4

ANURAG
Highlight
Page 79: IM 8 Incinerator

Test report no. : HFT - 2069 page: l 0o f 11

Alarm for low atomizing air pressure (14S2) %At371 3+1xl3 92

U0l. Start the incinerator e471 *I=.

m02. Adjust the pressure to 1 bar WIS I b a r s =a.

n03. Check that the flame goes out after: 12 sec ZZOI s * eoll m t x ~ w.

u04. Check that the "Low pressure atomizing air" alarm lamp switch on %*t371 !wxiet F3YEOl YXltXl 49.

05. Check that the incinerator is cooling down e4717t %!44+Xl 4s.

0 06. Readjust the pressure: about 13.0 bar (min. 1 bar). W Q bar *dEZ(A& 1 bar) Z*d. '

0 07. Reset the alarm an 21%

ql. Start the incinerator &47l 4Z.

$02. Force the inner door in the sluice open by means of the solenoid valve XtZ;-+E!3ilq INSIDE DOOR E %341LOlC !!=B 4 Z 4 Y %Mzt

kf03. Check that the flame goes out after 12 sec. =zol 12% nlXItXl *9.

04. Check that the "Inside door not closed alarm lamp switch on 'INSIDE DOOR NOT CLOSED" F3PEOl f iX l tX l W!.

m05. Check that the incinerator is cooling down' e4717t % ! 4 Y t * I 49.

m06. Close the inner door in the sluice by means of the solenoid valve xtZ?E!Etil INSIDEDOORB %34lLOlS BE!% 4=*.1# @Q Z!.

0 07. Reset the alarm a 2 49.

MEDHFIO-08-R3 HYUNDAI MARINE MACHINERY CO., LTD. A4

ANURAG
Highlight
ANURAG
Highlight
Page 80: IM 8 Incinerator

Test report no. : HFT - 2069 page : 11 of 11 %

CHECK THE BURNER CAPACITY g+83St?A

Check the burnmg volume of sludge by scale of sludge tank during specified time +471 q Z % +*d Ala ZWIl 4(S llIS2dQ 4*dW4' 71+WCt.

COMBUSTION CAPACITY 72 Literslh HEAT v~LuN/E OF WASTE OIL 1 7.500 KcallKp SPECIFIC GRAVITY 960 KgflM HEATTING OF WASTE OIL 80 C

Calculate theburning capacity : $&SF3 #It!

V (Kcallh) = 923 ( Literlh) X hl% x %s (Kcallkg)

= 72 x 7,500 x 0.96 = 518.400 Kcallhr

= Soec. : 500.000 Kcallhr

Burning capacity : 518,400 KcallHr $+83

Check the temperature of surface : Max. 51 C +WI xg er 43

Remark : 71Et

The burning capacity test of waste oil incinerator is substitus to result of type approval test. Above burning capacity result type approval test data (please refer to attached IMO Certificate)

MEDHFIO-08-R3 HYUNDAI MARINE MACHINERY CO.. LTD. A4

ANURAG
Highlight
Page 81: IM 8 Incinerator

DIMENSION CHECK SHEET DATE :23rd.Sep.ZOp9

?ESULT SURVMOR SURVEYOR MEASURED CHECKED I

c7.2 6'

F10-10-R1 Hyundai Marine Machinery Co.. Ltd.

Page 82: IM 8 Incinerator

No 1MO-1KC-7 1

CERTIFICATE OF SHIPBOARD INCINERATOR

Ministry of Maritime AfFain and Fisheries, Republic of Korea

Thfs is to certify that rhe shipboard itwinerator listed has bcen cxamincd and rcqtcd in accordapcc with rhe requirements of the ~tdidard far Shipboard lncinen~tors for disposing of ship-geierated wasle appended to the Guideli~~es for the lmplementatio~i of AIW V of

MARROL 73/78 as amended by resolution MEPC.76(40) nnd referenced by regula~ion 16 of Annex PI to MNWOL 73/78.

incincrata-manufa.ctured by - Hyuudai ' ~ a r i n e rlliv&iucry. Co.. Llri. ~-

Type for rhe itsinentor IMO Type / MAXI NG1OC)SL WS ~~ . ~ . .

Max. capacity SW.000 I 0 0 .~ .. ....,

70 - 0:: Average in combuslion chamberlzono 8.2 40 Average in flue gas 13.8 -. .. - -- .. - Soot uu~nher average .. .. 1

!

C'o~~~hilstion ci~urnber flue gas o~ltlct . 950 t~~nperature average

~niount of unburned components i n ashes 7.1 %, by weight

I, copy of rliis cerlificate should he cam'cd OII hoard a vcsscl tittcd with (his cqiliprudnr at all limes.

Signed

Ministry ul' Marilirr;~ /iCfai!-?, ;:1r:1 Fishcries

lkpuhlic oi Kor-c;!. Daled rhi?; 13id (fay . i ! $!-p::wi!w Z.tlO'.

Page 83: IM 8 Incinerator

INSTRUCTION BOOK

FOR

INSTALLATION, OPERATION AND MAINTENANCE

OF INCINERATOR

Type MAXI NG5011001150SL WS

@f HYUNDAI MARINE MACHINERY CO.,LTD. 602-15, GAJWA-DONG SEO-GU, INCHOEN CITY, KOREA. TEL : +82-32-583-0671 FAX : +82-32-583-0460 URL : http:llwww.hrnrnco.co.kr E-mail : [email protected]

Update : V3-20070207

Page 84: IM 8 Incinerator

I MAXI NG5OllOOll5OSL WS 1

TABLE OF CONTENS INSTALLATION & STORAGE INSTRUCTION FOR INCINERATOR :

. . Installation of ~nc~nera tor .............................................................................. 2 Storage instruction for incinerator lnstruction for installation

Working principle Description of pro Main & Technical data for incinerator General instructi

Trouble shooting chart

INSTRUCTION FOR OPERATION AND MAINTENANCE OF PARTS : lnstruction for repair of refractory lining

. . . . . . . . . . . . . . . . . . . . . . . . . . , . .

LIST OF PARTS : Components incinerator 75 Additional components in 76 Primary & secondary burner 77 W.0 dosing pump ... ...... ... . . . ... ... ... ... ... ... ............... ... ...... ... . . . ... ... . . . ...... ,.. ... ,.. ...... .... 78 Sludge burner ...................................................................................................... 81

ADDITIONAL COMPONENTS : Mill pump ... . .......... ... ...... ... ...... ... ...... . . . . . . . . . . . . . . . ... ... . . . ... ... . . . . . . ... . . . . . .... . . . ......... ... .... 82

Update : V4-20060905

INSTRUCTION BOOK FOR INCINERATOR BHMMCO Hyunda~ Marme Mach~nery Co , Ltd 602-1 5 GAJWA DONG SEO GV, INCHEON C I n . KOREA

Tel 032 583 0671 Fax 032 583 0674 URL hHp llwvnv hrnrnco co kr

Page 1

Page 85: IM 8 Incinerator

INSTALLATION & STORAGE INSTRUCTION FOR INCINERATORS

1.0 INSTALLATION OF INCINERATOR

The incinerator should be installed and placed according to the rules of the Classification Societies and

to the National Shipping Boards.

When installing the incinerator the following points must be observed:

I It must be possible to stop the operation of the incinerator from a place outside the room in which

it is placed.

II Stationary placed fire-fighting equipment must be available for the room in which the incinerator

is placed.

2.0 STORAGE INSTRUCTION FOR INCINERAOTRS

Incinerators standard and the storage environmental conditions must be as follows ;

1. Air temperature : OC to +50C, temp. drop max. 10Clh 2. Humidity : 0 - 7% relative 3. Wind : Below IOmlsec 4. Shocks : Below l g , acceleration in all directions

El-panel must be stored in airtight packing Before packing the el-panel must equipped with some bags "Silica gel" inside in order to absorb possible humidity.

After elapse of storage period, all bolted gaskets must be tightened up

The incinerator must only handle by fork, truck of by the lifiing beam, and must not be exposed to mechanical damages.

Storage period :According to agreement.

The surface must not be heated to above 50-C by solar radiation or other sources

The incinerator must not to be exposed prolonged by sea water spray or rain must not hosed down or similarly expose.

After 12 month storage the lining has to heated-up and dried-up acc. to incinerators instructions

INSTRUCTION BOOK FOR INCINERATOR QHMMCO Hyundai Marine Machinery Co., Ltd.

602-15, GAJWA DONG, SEO GU, INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL' hnp:ilwvnv.hmmco.co.kr

Page 2

ANURAG
Typewriter
ie remote stop
ANURAG
Typewriter
ANURAG
Typewriter
fixed
ANURAG
Highlight
ANURAG
Highlight
Page 86: IM 8 Incinerator

INSTRUCTION FOR INSTALLATION

f-' I.,

1.0 REFERENCES For capacity, dimensions and connections we refer to :

- Technical data, incinerator - Technical data, components - Pipe diagram -Arrangement for control panel and diagrams.

2.0 INCINERATOR The incinerator should be installed and placed according to the rules of the classification societies and to the national shipping boards. In front of the feeding door for the sluice a space of min. 1.5m must be foreseen for feeding the refuse bags and inspection of the primary burner, thermocouple, valves, and the removal of ashes. The incinerator should be placed in the ship where the vibrations are as few as possible and especially with regard to the transportation of solid waste and for the lay-out of the funnel. We recommend floor plates around the incinerator rather than grids due to the risk of spillage of refuse and ashes.

3.0 DIESEL OIL SUPPLY - DIESEL OIL TANK The supply and return pipe for diesel oil to and from the incinerator, see the dimension drawing. Pressure and suction conditions, see technical data for components. The diesel oil supply pipes should be provided with strainers to avoid any blocking of the pipes. The pump on the primary burner is also provided with strainers built in the pumps. The oil pump of the primary burner is a gear wheel pump which constantly circulates the oil in the circulation pipe. The max. suction head for the diesel oil pump is 3 meters.

4.0 WASTE OIL TANK AND CIRCULATION PIPE For supply and return pipe for waste oil between the incinerator and the sludge tank, See pipe diagram (Final drawing)

4.1 WASTE OIL TANK The waste oil tank for waste oil has to be provided with a mill (PU-5) for agitation and comminution of the contents of the tank. The tank must be designed with a view to securing an effective homogenization; irregular shapes and webs should be avoided. The waste oil tank is to be provided with : a. Heater and temperature controller b. Level switch for "low level" for stopping of incinerator when the tank is empty.

Level switch for "High level" and "Low level" as alarm function on the main panel of the ship should also be installed.

c. Mill for comminution and agitation of the waste oil contents. d. Thermostat for "Alarm high waste oil temperature"

A INSTRUCTION BOOK FOR INCINERATOR @HMMCo Hyundai Marine Machinery Co.. Ltd.

602-15, GAJWADONG. SEO GU, INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwhrnmco.co.kr

Page 3

ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
ANURAG
Arrow
ANURAG
Highlight
Page 87: IM 8 Incinerator

4.2 MILL PUMP The suction branch of the mill should be placed as close to the waste oil tank as possible. If the mill is placed lower than the waste oil level, there should be a valve on the suction side. The return pipe of the mill should be made as short as possible, i.e. the length must not exceed the diagonal of a 2 to 3 m tank.

5.0 COMPRESSED AIR SUPPLY For supply of compressed air to sluice on incinerator, see dimension drawing (Final drawing). To avoid any blocking of the air pipe a strainer is needed in the air supply piping system.

5.1 SLUICE The built-on non-flareback sluice for continuous feeding of solid waste is operated automatically by two pneumatic cylinders from a pushbutton panel (CP-3).

6.0 FLUE GAS FUNNEL Dimension of funnel, see technical data of incinerator, dimension drawing, and installation drawing for mixing chamber. Max. counter pressure in funnel incl. outlet loss 300 Pa (30 mmWG).To obtain sufficient draught in the incinerator it is recommended to avoid too many sharp bending and dimension of funnel less than indicated in "Technical data of incinerator". If this is not possible, an in-line flue gas fan has to be mounted in the upper part of the funnel Thermocouple (TC-2) in funnel is supplied loose for mounting in funnel.

7.0 ELECTRICAL CABLE CONNECTION TO CONTROL PANEL The power cable is connected directly to the control panel of the incinerator. For cable entry, see arrangement for control panel and eldiagrams. The following connections are to be connected with the terminal row in the control panel:

- Main power - Remote alarm - Low levellhigh level switch on sludge tank (if needed) - Thermocouple in funnel (TC-2)

8.0 AIR SUPPLY TO INCINERATOR ROOM The air supply to the room where the incinerator is placed must be dimensioned in such a way that the air supply to the incinerator is sufficient and so that noise as well as inconvenience for the operator can be avoided.

9.0 ADDITIONAL INFORMATION Fire Extinguishing Systems: Fire extinguishing is to be provided to comply with regulation 6 of SOWS 74, chapter Il-2, as amended.

Each incinerator room is to be provided with one portable extinguisher for the extinguishing of oil fires.

INSTRUCTION BOOK FOR INCINERATOR ~ H M M C O Hyundai Marine Machinery Co., Ltd.

602-15. GAJWA DONG, SEO GU. INCHEON CIPI. KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL: hHp:llwwwhmmco.ckkr

Page 4

ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
ANURAG
Underline
ANURAG
Highlight
Page 88: IM 8 Incinerator

Fixed Fire Detection Fire Alarm System: If the incinerator room is to be periodically unattended, a fixed fire detection and fire alarm system is to be provided for the incinerator room. This system has to comply with regulation 14 of SOLAS 74, chapter 11-2, as amended.

Protection against Low Voltage: It is the responsibility of the customer to ensure that no abnormal operation of the incinerator occurs due to low voltage. In general, a ship's generator system is secured against low voltage. However, if this is not the case, the customer must design their electrical system so that the incinerator will not shut down at periods of low voltage.

Black out: The power supply to the incinerator must be connected as quickly as possible after black out. The cooling program of the incinerator will then automatically be activated.

Emergency Shut-Off Valve The pipe system for supply and return of diesel oil and oil sludge to incinerator and tanks has to be provided with emergency shut-off valve operated outside the room, in accordance with the rules of the classification societies.

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Go., Ltd.

602-15. GAJWA DONG SEO GV. INCHEON CITY. KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : http:lhuww.hmmco.co.kr

Page 5

ANURAG
Highlight
ANURAG
Highlight
Page 89: IM 8 Incinerator

BASIC PRINCIPLES OF INCINERATOR

THE INCINERATOR

The incinerator is designed with a primary combustion chamber for burning solid waste, and a secondary combustionchamber for burning out un-combusted exhaust gases. The primary combustion chamber is equipped with a diesel oil burner called primary burner.

ADJUSTMENT OF AIR INTAKE NOZZLES

Adjustment on board : Depending on the layout of the funnel and depending on the amount and type of solid waste burned, the nozzles might require readjustment. If no measuring tools are available, please observe if there is coming dark smoke out of the stack. If so, then open the air nozzles in the primary combustion chamber until it stops.

If the exhaust gas temperature is to high, or if sparks are developed, this can be overcorned by opening the air nonles in the secondary chamber (left turn -more air, right turn - less air).

PRIMARY COMBUSTION CHAMBER

The incinerator is designed to combustion solid waste. The heat from the primary burner will dry out and start burning the solid waste. The very large heat transmission area in the primary combustion chamber optimizes the drying and burning of the solid waste.

SECONDARY COMBUSTION CHAMBER

The primary and the secondary combustion chamber are separated by wall made of ceramic heavy duty refractory. In the secondary combustion chamber the gases from the primary combustion chamber will burn out.

INSTRUCTION BOOK FOR INCINERATOR ~ H M M C O Hyundai Marine Machinery Co., Ltd.

602-15, GAJWA DONG SEO GU, INCHEON CITY. KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : htto:ttw.hrnrnco.co.kr

Page 6

ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
ANURAG
Underline
ANURAG
Underline
ANURAG
Underline
ANURAG
Underline
ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
ANURAG
Underline
ANURAG
Underline
ANURAG
Highlight
Page 90: IM 8 Incinerator

WORKING PRINCIPLES OF INCINERATOR

COMPONENTS 1. Charging Door 2. Combustion Chamber 3. Afterburning Chamber 4. Secondary After burning Chamber 5. Oil Burner With Built-in pump 6. Ash Cleanmg Door 7. Air Blower 8. Induced Draught Air 9. Damper

10. Sludge Burner 11. Double Air-cooling Wall 12. Combustion Air Inlets 13. Oil Sludge Sewlce Tank 14. Mill Pump 15. Compressed Alr 16. Waste 011 Dosing Pump

17. Heating Element 18. Diesel Oil Tank 19. Sluice for Solid Waste 20. Self Cleaning Strainer

CONNECTIONS a. Sludge 011 lnlet b. steam lnlet c. Steam Outlet d. Sludge Oil Ventilation Outlet e. Diesel Oil lnlet f. Diesel Oil Ventilation Outlet Q . Compressed Air lnlet h. Electrical Power Supply i. Flue Gas Outlet

lNSTRUCTlONBOOK FOR INCINERATOR OHMMCO Hyundai Marine Machinery Co.. Ltd. 602-15, GAJWADONG. SEO GU. INCHEON CITY, KOREA

Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwhrnmco.co.k~

Page 7

ANURAG
Typewriter
steam in/out
ANURAG
Typewriter
sludge in
ANURAG
Typewriter
ventilation
ANURAG
Typewriter
d/o in
ANURAG
Typewriter
vent
ANURAG
Typewriter
ANURAG
Callout
sludge burner
ANURAG
Callout
pilot burner sec.chamber
ANURAG
Callout
pilot burner for pri. chamber
ANURAG
Typewriter
atomising air in
ANURAG
Typewriter
w.o. dosing p/p
ANURAG
Typewriter
ANURAG
Callout
ash cleaning door
ANURAG
Callout
charging door
ANURAG
Callout
sluice for solid waste
ANURAG
Callout
combustion air inlet
ANURAG
Typewriter
double air cooling wall
ANURAG
Arrow
ANURAG
Note
air blower:- supplies cooling air ,combustion air ,and draught air for removal of exhaust gases
Page 91: IM 8 Incinerator

THE INCIENRATOR IS DELIVED WITH THE FOLLOWING BULT-ON MAIN COMPONENTS:

-Air blower supplying air for the induced draught air ejector, cooling air and combustion air. - Primary burner for primary combustion chamber - Secondary burner for secondary combustion chamber - Control panel (CP-1) -Thermocouples for detecting primary and secondary combustion chamber temperatures and alarms. - Internal electric-cable, oillair pipes and valves - Semi-automatic sluice

SUPPLIED LOOSE FOR INSTALLATION IN FUNNEL :

Thermocouple for detecting high flue gas temperature and alarm (See drawing).

As a guide to understand the function of the incinerator, see process diagram and pipe diagram in this instruction book

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15. GAJWA DONG. SEO GU, INCHEON CIW, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hiip:Nwww.hmmco.co.kr

Page 8

ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
Page 92: IM 8 Incinerator

DESCRIPTION OF PROCESS DIAGRAM

Switch on Solid Waste See process diagram

POS. 1 - START OF INCINERATOR Process timer, primary blower, and primary bumer blower start.

POS.2 - STOP OF COMBUSTION Stop of combustion stops the supply of diesel oil to primary burner. Primary blower and primary burner blower are working on cooling programmed.

POS. 3 - STOP OF INCINERATOR The cooling programmed stops when the temperature in the incinerator drops below 100 'C. When the incinerator has stopped, switch off the main switch on the control panel.

POS. 4 - START OF PREHEATING After start of the incinerator and after 30 sec. Pre-purging time the secondary burner (ST-2) in the secondary combustion chamber will start.

POS. 5 - START OF COMBUSTION When the temperature in the secondary combustion chamber has reached 700C the primary bumer in the primary combustion chamber starts. The secondary burner continues to burn. The primary and secondary burners are equipped with a flame control which is activated during the first 10 seconds after start and also after restart.

Activation of the sluice by pushing the button on the sluice panel will unlock the inside door and feed in the waste.

POS. 6 - FLAME CONTROL The flame control is activated during the first 10 seconds after start-up. After this period the bumer is ignited or turned off according to the temperature in the chamber.

STOP OF COMBUSTION IN PRIMARY COMBUSTION CHAMBER When the temperature in the secondary combustion chamber reaches 750'C the ignition of the of the secondary burner will stop and the solenoid valve on the diesel oil pipe is closed. All the blower are operating.

RE-START HEATING IN SECONDARY COMBUSTION CHAMBER When the temperature drops below 6709: the secondary burner in the secondary combustion chamber restarts.

RE-START HEATING IN PRIMARY COMBUSTION CHAMBER When the temperature drops below 850°C the primary burner in the primary combustion chamber restarts.

INSTRUCTION BOOK FOR INCINERATOR QHMMCO Hyundai Marine Machinery Co., Ltd.

602-15. GAJWA DONG. SEO GU. INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : ht t~ : /h .hmmco.m.k r

Page 9

ANURAG
Underline
ANURAG
Typewriter
watse oil burner = sludge burner
ANURAG
Typewriter
ANURAG
Typewriter
primary burner = pilot burner in the primary chamber
ANURAG
Typewriter
sec.burner = pilot burner in the sec chamber
ANURAG
Highlight
Page 93: IM 8 Incinerator

( MAXI NGSOll 0011 SOSL WS I Switch on waste oil See process diagram

POS. 1 - START OF INCINERATOR Process timer, primary blower and primary burner blower start.

POS. 2 - STOP OF COMBUSTION Stop of combustion stops the supply of diesel oil to primary and secondary burner, and stops the sludge oil supply to the sludge burner.

Primary blower, primary burner blower and secondary burner blower are working on cooling program,

POS. 3 - STOP OF INCINERATOR The cooling program stops when the temperature in the incinerator drops below 100°C.

When the incinerator has stopped, switch off the main switch on the control panel.

POS. 4 - START OF PREHEATING ARer start of the incinerator and after 30 sec. pre-purging time the secondary burner (ST-2) in the secondary combustion chamber will start.

POS. 5 - START OF COMBUSTION When the temperature in the secondary combustion chamber is 700°C the primary burner in the primary

combustion chamber will be activated. After a preheating period of the waste oil burner starts automatically and operates within the set points. (950°C).

When the switch 'delay primary burner' is switched to automatic 'AUT', the primary burner operates for only 25 seconds to ignite the waste oil burner automatically.

When the switch 'delay primary burner' is switched to manual 'MAN', the primary burner operates all the time together with the waste oil burner.

The secondary burner continues to burn

Activation of the sluice by pushing the button on the sluice panel will unlock the inside door and fill in the waste.

INSTRUCTION BOOK FOR INCINERATOR ~ H M M C O Hyundai Marine Machinery Co.. Ltd.

602-15, GAJWADONG SEO GU, INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : htt~:l lw.hmmco.cokr

Page 10

Page 94: IM 8 Incinerator

I MAXI NGSOllOOllSOSL WS I %(

STOP OF PREHEATING IN SECONDARY COMBUSTION CHAMBER When the temperature in the secondary combustion chamber reaches 7509: the ignition of the

secondary burner will stop and the solenoid valve on the diesel oil pipe is closed. The secondary burner blower is operating.

RESTART HEATING IN SECONDARY COMBUSTION CHAMBER When the temperature drops below 650@ the secondary burner in the secondary combustion chamber

restarts.

RE-START HEATING IN PRIMARY COMBUSTION CHAMBER When the temperature in the primary combustion chamber temperature setting 950°C the waste oil

burner P.I.D. flow control burning.

When the switch 'delay primary burner' is switched to automatic 'AUT', the primary burner operates for only 25 seconds to ignite the waste oil burner automatically.

When the switch 'delay primary burner' is switched to manual 'MAN', the primary burner operates all the time together with the sludge burner.

INSTRUCTION BOOK FOR INCINERATOR ~ H M M C O Hyundai Marine Machinery Co., Ltd.

602-15. GAJWA DONG. SEO GU, INCHEON CITY KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwwwhmmco.co.kr

Page 11

Page 95: IM 8 Incinerator

I MAXl NGSOllOOllSOSL WS I

PROCESS DIAGRAM INCINERATOR TYPE : MAXl NGISO SL WS

I - Close thedoor and start

1 2 3~

SwRch on SOLID WASTE : !Burning Cooling

Elapsed $me 0 -- . . -- > T I

Process timer

Primary blower WHY

Pre-purging tirne'3Osec (5xalr changes)

Activation of the slulee will unlock the inslde door and feed ,!he waste

,

. . . . . : m? . . i

Secondary burner blower (ST-2)

ST-2 Preheat to 65OC11202'F

Primary burner blower (ST-1)

: : . .

1 . . . . . . : :

m . . . . L . . . .

I Operating temperature (850 - 950r ) far ST-1 (1 562 - 1742'F)

himary burner operating (ST-I)

Secondary burner operating (ST-2)

Operating temperature (670 - 750C) for ST-2 (1 241 - 1382'F)

-

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15. GAJWA DONG, SEO GU, INCHEON CIN, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hltp:llw.hrnrnco.co.kr

Page 12

Page 96: IM 8 Incinerator

I MAXI NGSOllOOllSOSL WS I

PROCESS DIAQRAM INCINERATOR TYPE : MAXI NGISOSL WS

1 2 3

Pre-purging , . time 30 sec (5 xair changes) . . .

Switch on SLUDGE :

Close the door and start

Process t i e

Primary blower ORI)

Burning Cooling Elapsed $me .!

0 & ----- -L-__- > q

f, ! j '

. . : : I Sludge b~rn.er@qrnhing air (B)) i .

I . .

S T 2 Preheat to 650X11202'F

Primary burner blower (ST-I)

. . . . L ,

a 5 i . . . . : :, . . : .

;' . . . . . .

Activation of the sluice will unlock . .

Primary burneroperating <ST-1)

Semndary bumer opewting (ST-2)

Sludge burner operating (B)

. . I Operating time lor ST-, (abut) (255ec) I m

the inside door and feed the waste !- . . I . .

; : : -. . . . .

; - . . . . . .

. .

Operating temperature (850 - 950'C) (1 562 - 1 742'F) for ST-1 (man)

. .

;I . . . .

INSTRUCTION BOOK FOR INCINERATOR ~ H M M C O Hyundai Marine Machinery Co., Ltd.

602-15. GAJWA DONG SEO GU. INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : http:llwww.hmmco.co.kr

. .

Operating temperature (670 - 750T) (1421 - 1382'F) for ST-2

PID Control operating ( 950.43) temperature for B (1 742°F)

Page 13

~.

! - ~.

I

I

Page 97: IM 8 Incinerator

( MAXl NGSOllOOllSOSL WS (

PROCESS DIAGRAM INCINERATOR TYPE : MAXl NGl50SL WS

1 2 3 'Burning Cooling.;

'Safety function enahled changes Elapsed time to cooling and alarm

jo . . . . >n High temperature incinerator

I1950CH922'F)

Low . pressure . .mmbu$kkn air(l8 mbar)

Lownegdtiw pressure primary d~mbu&ion chamber i 1

1 Sluice inside door notclosed 1.1

Low pressureatomiiing air(n.0 Ks,crn2)

High tempemture extfaust gas

, Flame failure

I 1 Motor overload

A INSTRUCTION BOOK FOR INCINERATOR

:!

@HMMCo Hyundai Mar ine Machinery Co., Ltd. 602-15, GAJWA DONG SEO GU. INCHEON C I l Y KOREA

Tel : 032 583 0671 Fax : 032 583 0674 URL : hn~://www.hmmco.w.kr

Page 14

Page 98: IM 8 Incinerator

I MAXI NGSOllOOllSOSL WS I

MAIN DATA 8 TECHNICAL DATA FOR 3-8 HYUNDAI-ATLAS INCINERATOR

TYPE MAlX NG50 SL WS Capacity based on IMO specification Calorific capacity : 372 kW (320,000 kcaUh) Solid waste : 80 kglh Waste oil : 38 kglh

DIMENSION BASIS FOR AIR AND OIL PIPE CONNECTION

Total air consumption incinerator Flue gas temperature Flue gas volume Max. counter pressure in funnel, incl. outlet loss Fuel oil consumption max. when Heating the incinerator Compressed air consumption- sluice Compressed air consumption Sludge burner Compressed air pressure Fuel oil Inside diameter of diesel oil pipe

: Approx. 17 llh

: max. 0,18 m3/h

: max. 32 m31h : 7-10 bar : Marine diesel oil Max. 14 cSt at 40 "C : 8 mm.

The consumption of diesel oil depends on the heat value of the solid waste. Stack diameter to be calculated according to maximum counter pressure.

INSTRUCTION BOOK FOR INCINERATOR OHMMCO Hyundai Marine Machinery Co., Ltd. 602-15, G A M A DONG, SEO GU, INCHEON C l N , KOREA

Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:l/wwwhmmco.co.kr

Page 15

Page 99: IM 8 Incinerator

MAIN DATA 8 TECHNICAL DATA FOR HYUNDAI-ATLAS INCINERATOR

TYPE MAlX NGIOO SL WS

Capacity based on IMO specification Calorific capacity : 581 kW (500,000 kcalh) Solid waste : 100 kglh Waste oil : 59 kgh

DIMENSION BASIS FOR AIR AND OIL PIPE CONNECTION

Total air consumption incinerator Flue gas temperature Flue gas volume Max. counter pressure in funnel, incl. outlet loss Fuel oil consumption max. when Heating the incinerator Compressed air wnsumption- sluice Compressed air consumption Sludge burner Compressed air pressure Fuel oil Inside diameter of diesel oil pipe

: Approx. 17 11h

: max. 0,18 mYh

: max. 32 m3/h : 7-1 0 bar : Marine diesel oil Max. 14 cSt at 40 "C : 8 mm.

The consumption of diesel oil depends on the heat value of the solid waste. Stack diameter to be calculated according to maximum counter pressure.

A INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15. GAJWA DONG. SEO GU. INCHEON CITY KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL: hHp:llwww.hmmca.cokr

Page 16

Page 100: IM 8 Incinerator

MAIN DATA & TECHNICAL DATA FOR HYUNDAI-ATLAS INCINERATOR

TYPE MAlX NG150 SL WS Capacity based on IMO specification Calorific capacity : 814 kW (700,000 kcalh)

Solid waste : I00 kg/h Waste oil : 82 kg/h DIMENSION BASIS FOR AIR AND OIL PIPE CONNECTION

Total air consumption incinerator : 7,200 mYh

Flue gas temperature : 350 "C

Flue gas volume : 17,500 m31h at 350 "C

Max. counter pressure in funnel, incl. outlet loss : 490 Pa (50 mm Aq.) Fuel oil consumption max. when Heating the incinerator : Approx. 17 11h

Compressed air consumption- sluice : max. 0,18 m3h Compressed air consumption Sludge burner : max. 32 m3h Compressed air pressure : 7-1 0 bar

Fuel oil : Marine diesel oil Max. 14 cSt at 40 "C

Inside diameter of diesel oil pipe : 8 mm.

The consumption of diesel oil depends on the heat value of the solid waste. Stack diameter to be calculated according to maximum counter pressure.

INSTRUCTION BOOK FOR INCINERATOR Hyundai Marine Machinery Co.. Ltd.

602-15. GAJWADONG SEO GU, INChEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwww.hmmco.co.kr

Page 17

Page 101: IM 8 Incinerator

, ,

1 MAXl NG5011001150SL WS I

HYUNDAI-ATLAS INCINERATOR TYPE MAXl NG50 SL WS

TECHNICAL DATA - COMPONENTS

Is a high pressure centrifugal fan of the welded design with direct drive.

Type air blower Capacity Static pressure Number of revolutions Motor

: HTF - #3 : 4,300 m'lh : 5,885 Pa (600 mm WG) : 3,530 RPM : 11.OKwx2P

W.0 DOSING PUMP Is a self-priming positive displacement pump with gear motor

Type pump Capacity max. Head Gear type Motor

: HMD 012-12 : Max. 174 Uh at Max. 475 cp.m : 2.0 bar : Disco-variation : 0.45 kW x 4P

CONTROL PANEL CP-1 The control panel is made with a splash-proof cabinet, built-in control lamps, motor starters, and back-up fuses.

TOTAL INSTALLED MOTOR OUTPUT : 11.71 KW Demand factor : 1 Alarm : Normally closed circuit

CONTROL PANEL CP-3 Control panel for activating the sluice. Splash-proof grade made of hot process steel plate.

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15. GAJWA DONG, SEO GU, INCHEON C I V KOREA Tel : 032 583 0671 Fax: 032 583 0674 URL : hnp:llwww.hmmco.co.kr

Page 18

Page 102: IM 8 Incinerator

I MAXl NGSOllOOllSOSL WS I

HYUNDAI-ATLAS INCINERATOR TYPE MAXl NGIOO SL WS

TECHNICAL DATA - COMPONENTS

PRIMARY AIR BLOWER Is a high pressure centrifugal fan of the welded design with direct drive.

Type air blower Capacity Static pressure Number of revolutions Motor

: KTF-#3 112 : 5,200 m3/h : 5,885 Pa (600 mm WG) : 3,520 RPM : 18.5Kwx2P

W.0 DOSING PUMP Is a self-priming positive displacement pump with gear motor

Type Pump Capacity max Head Gear type Motor

: MD 012-12L : Max. 174 L/h at Max. 475 r.p.m : 2.0 bar : Disco-variation : 0.45 kW x 4P

CONTROL PANEL CP-1 The control panel is made with a splash-proof cabinet, built-in control lamps, motor starters, and back-up fuses.

TOTAL INSTALLED MOTOR OUTPUT : 18.21 KW Demand factor : 1 Alarm : Normally closed circuit

CONTROL PANEL CP-3 Control panel for activating the sluice. Splash-proof grade made of hot process steel plate.

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd. Page 19

602-15, GAJWA DONG, SEO GU. INCHEON CIlY KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : http:/lwww.hmrnco.co.kr

Page 103: IM 8 Incinerator

PRIMARY AIR BLOWER

I MAXI NG5OllOOll JOSL WS I

HYUNDAIATLAS INCINERATOR N P E MAXI NG150 SL WS

TECHNICAL DATA - COMPONENTS

Is a high pressure centrifugal fan of the welded design with direct drive.

Type air blower Capacity Static pressure Number of revolutions Motor

: M F - # 3 112 : 7,200 m3/h : 6,375 Pa (650 mmAq) : 3,525 RPM : 25.3 Kw x 2P

W.0 DOSING PUMP Is a self-priming positive displacement pump with gear motor

Type pump Capacity max. Head . Gear type Motor

: MD 012-12L : Max. 233 Uh at Max. 243 r.p.m : 2.0 bar : Disco-variation : 0.45 kW x 4P

heat-resistant steel.

CONTROL PANEL CP-1 The contiol panel is made with a splash-proof cabinet, built-in control lamps, motor starters, and back-up fuses.

TOTAL INSTALLED MOTOR OUTPUT : 26.01 KW Demand factor : 1 Alarm : Normally closed circuit

CONTROL PANEL CP-3 Control panel for activating the sluice. Splash-proof grade made of hot process steel plate.

A INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15. GAJWADONG, SEO GU, INCHEON CIW KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hnp:llwww.hrnrnco.co.kr

Page 20

Page 104: IM 8 Incinerator

I MAXl NGSOllOOllSOSL WS 1

HYUNDAI-ATLAS INCINERATOR N P E MAXl NG50/100/150 SL WS

TECHNICAL DATA - COMPONENTS

PRIMARY BURNER Is a fully automatic high pressure oil burner.

Type burner Type oil pump Fuel oil Capacity Motor

SECONDARY BURNER Is a fully automatic high pressure oil burner.

Type burner Type oil pump Fuel oil Capacity Motor

: DH 160 E2 : BFP 21 L5 : Marine diesel oil : Ii'Vh : 0.13 kW

: DH I60 E2 : BFP 21 L5 : Marine diesel oil : I 7 1/h : 0.13 kW

WASTE OIL BURNER Is a special burner for impurities of rnax. 8 mrn of the compressed air atomizing type made of

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd. Page 21

M)2-15, GAJWADONG. SEOGU, INCHEON CITY, KOREA Tel : 032 583 0671 F a : 032 583 0674 URL . hH~:llwwwhmmco.co.kr

Page 105: IM 8 Incinerator

GENERA

CAUTION

LL INSTRUCTION FOR OPERATION OF INCINERATOR

If any problems occur during start-up and operation, the incinerator must be stopped immediately by switching 'stop' switch to 'incinerator-stop'.

REFRACTORY DRYING OUT When the incinerator is used for the first time the refractory should be dried out properiy before starting the combustion. If your incinerator has been stored for a long time under humid conditions, the drying out Procedure described below should be obse~ed carefully before commissioning the incinerator. If the drying procedure is omitted the refractory might be damaged. Drying procedure :

- Operate the incinerator for 5 minutes at m a . 650'C

- Stop the incinerator - Let it cool down to 100C

- Ventilate the incinerator by opening the door to the combustion chamber -The drying procedure is repeated several times and the temperature is raised by 200'C every time

until the operating temperature has been reached.

PREPARATION BEFORE START OF INCINERATOR 1. Check that on valve in the diesel oil pipe is closed. 2. Check that on valve in the air pipe and the oil sludge pipe are closed. 3. Check that there is no blockage of the exhaust funnel. 4. Check that compressed air is available. 5. Check that thereis necessary air supply to the incinerator room. 6. Check direction of rotation of primary blower by starting the incinerator for a short period. Correct

direction indicated with arrow on the blower. 7. Check the pressure in the primary combustion chamber by starting the incinerator for a short period. If

no vacuum is obtained, adjust the damper in the flue gas mixing chamber. See also instruction for trouble shooting.

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15. GAJWA DONG SEO GU. INCHEON CITY, KOREA Tel: 032 583 0671 Fax: 032 583 0674 URL : hn~:llmvw.hmmco.co.kr

Page 22

ANURAG
Highlight
ANURAG
Arrow
Page 106: IM 8 Incinerator

SET POINT FOR TIME - Combustion air failure shut down delay - Low negative pressure failure shut down delay - Pre purge incinerator start - Period of time between 'supply atomizing air and sludge -Stop diesel oil supply ST-I when burning sludge

SET POINT TEMPERATURE REGULATOR - Primary combustion chamber (at. Solid burning)

(at. Sludge burning - PID setting)

- Secondary combustion chamber

- High flue gas

- Ash door

- Primary combustion chamber start signal from secon

combustion chamber temperature

COMPRESSED AIR PRESSURE

COMBUSTION AIR PRESSURE

NEGATIVE PRESSURE PRIMARY COMBUSTION CHAMBER

DIESEL OIL PRESSURE - ST-1 1 ST-2 - B

AIR REGULATOR - PS-3

15 sec. 30 sec. 30 sec. 20 sec. 25 sec.

Max. 9509: Min. 8509:

Max. 9509:

Max. 7509: Min. 6709:

Max. 350% Min. 3309:

Max. 1009:

3.0 - 6.0 bar

18 mbar

0.5 mbar

7-1 6 bar Completely open

3 - 6 bar

STOP OF INCINERATOR When stopping the incinerator, please remember to : 1. Activate the switch for 'incinerator-stop' on the control panel and the incinerators will automatically to

cooling program.

2. When the primary combustion chamber temperature gets below 100°C the cooling program will

automatically stop. 3. When the incinerator has stopped, switch off the main switch on the control panel. 4. NEVER STOP THE INCINERATOR ON THE MAIN SWITCH DURING OPERATION, AS THIS WILL

CAUSE MELT DOWN OF TOP MOUNTED BURNERS.

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd. Page 23

602-15. GAJWA DONG. SEO GU. INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : htip:llwwwhmmco.co.kr

Page 107: IM 8 Incinerator

PREPARATION FOR START-UP OF THE INCINERATOR

Before start-up of the incinerator, the following is to be carried out : 1. Open all inlet and outlet valves for diesel oil. 2. Open all inlet and outlet valves for waste oil and air. 3. Make sure that there are no hindrances for air admission to primary blower as well as

flue gas outlet.

A. Start-up of the lncinerator op program 'SOLID WASTE' 1. Make sure that the switch is turned to 'waste oil oft. 2. Activate the main switch on the control panel. 3. Reset the alarm lamps on the push button 'reset alarm' 4. Make sure that all the lamps are alight by pressing the button 'lamp test' 5. For start of the incinerator, activate the switch for 'incinerator-start' 6. The incinerator will now start automatically by activating the secondary burner in the secondary

combustion chamber. 7. After approx. 25 minutes the secondary combustion chamber will have a temperature of 650C, and

the primary burner in the primary combustion chamber will be activated. The incinerator the operates within set temperatures(850-950 'C).

8. If the flame in the incinerator goes out, the incinerator is to be reset by means of "reset flame failure burner"

9. Add solid waste to the primary combustion chamber using the sluice by activating the pushbutton on panel (CP-3, Sluice switch box)

B. Start-up of the incinerator on program 'waste oil' 1. Make sure that switch is turned to 'waste oil on' 2. Before start-up of the incinerator, follow the incinerator given under point 'A', item 2 to 7.

When the temperature of the secondary combustion chamber is 6509: the primary burner in the primary combustion chamber will be activated. After a preheating period of 25 seconds the waste oil burner starts automatically and operates within the set point. (850-9509:)

When the 'delay primary burner' is switched to 'AUT(Aut0matic)' position, the primary burner operates for 25 seconds to ignite the sludge burner automatically.

When the 'delay primary burner' is switched to manual 'MAN(Manua1)' position, the primary burner operates all the time together with the sludge burner.

C. Adding of solid waste Before adding a new charge of solid waste, control whether the incinerator is ready to receive more waste or not, by looking through the sight glass.

D. Stop of lncinerator 1. Activate the switch 'incinerator stop' 2. When the temperature in the incinerator drops to below 10O0C, the incinerator stops automatically. 3. When the incinerator has stopped, switch off the main switch on control panel after the blower has

been off for 30 minutes.

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd. Page 24

602-15. GAJWA DONG, SEO GU. INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hnp:llwwwhmrnco.co.kr

ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
Page 108: IM 8 Incinerator

@8 I MAXl NGSOllOOllSOSL WS I

E. Abnormal Start-up and Operation of lncinerator 1. By the first start-up of the incinerator, oscillating combustion can occur which must be stopped

immediately. Activating the switch "incinerator-stop". 2. If there should be any problems during start-up and operation, the incinerator is to be stopped

immediately by activating the "incinerator-stop" switch. 3. Try to find the reason for this abnormal start-uploperation of the incinerator. 4. See the instruction manual under "Trouble Shooting".

F. Attendance of the primary combustion chamber 1. Do not put glass, bottles, and other materials than may not be burned into the primary combustion

chamber. 2. Do not fill wet solid waste into the primary combustion chamber more than one hour before starting

the incinerator. 3. When burning oil-containing materials, such as filter cartridges, oily cotton waste, and scrapings from

the centrifuges, do not put more than 5 liters per charge into the primary combustion chamber. 4. When combusting material with high calorific value with explosion-like combustion, e.g plastic,

max. 5Kg per charge is allowed to be fed into the incinerator. 5. Do NOT overload the incinerator with waste. Please see the below charts.

6. When the incinerator is cooled, remove ashes and slags from primary combustion chamber. The ashes and the slags must be carefully removed. Do not knock or hammer on the sides of the primary combustion chamber. The main switch must be turned off to open the door.

Do not overload the incinerator each types according to below charts.

1 MAXI NGIOOSL WS I 500.000 I 250 I

lncinerator Type

MAXI NGSOSL WS

WARNING DO NOT put explosive materials, closed containers or aerosols into the combustion chamber

Max. caloric per charge of solid waste (Kcal)

320.000

I I

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15, GAJWA DONG, SEO GU, INCHEON CIM, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL . h H p . / h hmmco.co.kr

Max. 20% volume of the primary combustion chamber (Liter)

200

MAXI NG150SL WS I 700,000

Page 25

350

ANURAG
Underline
ANURAG
Arrow
ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
Page 109: IM 8 Incinerator

1 MAXl NG50/1001150SL WS I

WARNING THIS INCINERATOR IS AUTOMATICALLY OPERATED

Do not activate the main power for the control panel before the cooling of the incinerator is finished and the incinerator has stopped.

WARNING I Failure to observe the below instructions can result in substantial damages to burners and thermocouples.

Max, load per charge of solid waste -class II :

TY pe With sluice MAXI NG25 40 Kgh MAXI NG50 80 Kgh MAXI NGIOO 100 Kglh MAXI NG150 100 Kglh

Max. load per charge of oil-containing materials, i.e. filter cartridges, oily cotton waste, scrapings from centrifuges, etc.: MAXI NG25 3 liter MAXI NG50 5 liter MAXI NGIOO 5 liter MAXI NG150 5 liter

Max. load per charge of high-calorific materials with explosion-like combustion, ie plastics, fishing net, etc. : MAXI NG25 3 Kg MAXI NG50 5 Kg MAXI NGIOO 5 Kg MAXI NG150 5 Kg Do not burn explosive materials such as closed containers or aerosols. Remove ashes when needed and make sure that the air holes for the combustion air are always unblocked. Do not feed the incinerator without min. 10 mrn vacuum in the combustion chamber, check U-tube (UM). Too much draught can disturb a constant flame and prolong the heating-up time. Adjust damper in exhaust gas uptake and readjust after reaching working conditions. Power loss during operation might cause overheating and consequently damage the incinerator.

I Shipboard inclneration of the following substances shall be prohibited I

A) Annex I, II and Ill cargo residues and related contaminated packing materials. B) Polychlorinated biphenyls . (PCBs) C) Garage, as defined in annex V of MARPOL 73/78, containing more than traces of heavy metals D) Refined petroleum products containing halogen compounds.

(Guarantee claims ( All components mounted on the incinerator, including burner and flame tubes, are designed exclusively for the

operating temperature and max. loaded quantities of energy stated in this instruction book.

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd. Page 26

602-15. GAJWA DONG SEO GU, INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : http:l/wwwhmmco.co.kr

ANURAG
Highlight
ANURAG
Arrow
ANURAG
Arrow
Page 110: IM 8 Incinerator

1 MAXI NGSOll 001 1 SOSL WS I

Therefore, claims for damages caused by overheating will not be accepted.

CALORIFIC VALUE (calories)

IMO defines Solid Waste Class II as follows expressed in percentage:

50% Food waste 50% Rubbish, containing approx. 30% paper, 40% cardboard, 10% rags, 20% plastic

This mixture will have up to 50% moisture and 7 % incombustible solids.

Refuse consisting of an approx. even mixture of rubbish and garbage by weight. This type of waste is common to passenger ships occupancy and has a calorific value of approx. 2,400 kcaUkg. (10,000 kJkg) as fired.

DIFFERENT TYPES OF FUEL

Marine diesel oil:

Low heating value: Density

10.130 kcallkg (42,400 kJlkg) 0,84 (kglL)

INSTRUCTION BOOK FOR INCINERATOR ~ H M M C O Hyundai Marine Machinery Co., Ltd.

602-15, GAJWADONG. SEO GU, INCHEON CITY. KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwww.hmrnco.co.kr

Page 27

ANURAG
Highlight
Page 111: IM 8 Incinerator

TROUBLE SHOOTING CHART The following trouble shooting chart is by no means complete, but covers the more general type of problems, which would most likely occur if a breakdown is experienced.

ADJUSTMENT OF DAMPER 8 AIR NOZZLE The damper of the exhaust gas funnel is to be completely open. This damper is only used, if there is too much 'draught' in the funnel, like for instance if the negative pressure in the combustion chamber drops below 50 mm WG The ideal condition of sludge burning is when the negative pressure is 10 -50 mmWG When the negative pressure is under 10mmWG Combustion air nozzle should be closed to protect back fire. When the negative pressure is over 5OmmWG combustion air nozzle should be open for optimum combustion performance.

The negative pressure has to be controlled by the U-tube with water (UM).

ADJUSTMENT OF BURNER If the temperature in the secondary combustion chamber does not reach 700 OC within 50 minutes, a thing which can occur when the vessel is placed in cold areas, the oil pressure to the burner must either be raised or alternatively a nozzle with a larger capacity must be installed.

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15. GAJWADONG. SEO GU. INCHEON CITY. KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwww.hmmco.co.kr

Page 28 2

ANURAG
Highlight
ANURAG
Typewriter
1 atm= 1.01325 bar i.e. 1 bar is already less then atmospheric pr. but for the ease of calculation 1 bar is considered as atmospheric pressure.
ANURAG
Typewriter
1 bar=750.062 mmHG=10^5 Pascal or 100 KPa
ANURAG
Typewriter
ANURAG
Typewriter
1 atm=760 mmHG
ANURAG
Typewriter
1 bar= 10197.1621298 mmWG
ANURAG
Typewriter
=0.000981 bar or 0.001 bar or 1 mbar
ANURAG
Typewriter
i.e. 1-5 mbar
ANURAG
Typewriter
ANURAG
Arrow
Page 112: IM 8 Incinerator

TROUBLE

1. Flame failure (Red alarm lamp) lncinerator running on cooling program

- .High temperature lncinerator (Red Alarm lamp)

lncinerator running On cooling program

3. Low pressure combustion air. (Red alarm lamp)

lncinerator running on cooling program

POSSIBLE CAUSE

A. No diesel oil to the Primary burner

B. The oil filter in diesel oil pump or pipe line is blocked

C. The flame detector is Shouted up

D. Wrong adjustment of Ignition electrodes

E. Oil nozzle blocked up

A. The Thermocouple TC-1 Has been interrupted

B. Too high oil pressure on diesel oil pump PU-1

C. Burning of solid waste With abnormal heat value

D. Combustion of too Much sludge

(energy wise kcallh)

A. Wrong adjustment of Pressure switch

B. Blocking of air inlet Primary blower

CORRECTIVE ACTION SUGGESTED

A. Check the level in diesel oil tank

B. Clean the filter

C. Clean the flame Detector glass carefully

D. Adjust the electrodes

E. Clean the filter in The oil nozzle or change the nozzle -

A. Replace the thermocouple and check the cable connection

B. Re-adjust the oil pump Pressure

C. Re-set when the temperature Is below the minimum temp. set point

D. Adjust the sludge Admission on PU-3 and MO-2

A. Re-adjust the pressure switch (PS-1) To 18 mbar with a Screw driver on adjustment screw

B. Remove the blocking

INSTRUCTION BOOK FOR INCINERATOR ~ H M M C O Hyundai Marine Machinery Co., Ltd.

602-15, GAJWA DONG SEO GU, INCHEON CITY KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp://w.hrnrnco.co.k~

Page 29

Page 113: IM 8 Incinerator

rROUBLE

I. Overload of motor (Red alarm lamp)

Incinerator running on cooling program

5. Alarm at inside door not closed. (Red alarm lamp)

incinerator running on cooling program

j. Low negative pressurt combustion chamber

(Red alarm lamp)

incinerator running on cooling program

5. High temperature exhaust gas (Red alarm lamp)

lncinerator running on cooling program

POSSIBLE CAUSE

A. The motor thermal Overload protector is Switch off

B. The automatic fuse is Switched off

C. Faults in the control Panel

A. The inside door is blocked by solid waste

B. Air supply failure

A. No vacuum Adjustment failure

B. Burning of solid waste Wkh abnormal heat Value

C. Combustion of too much sludge

(energywise, KcaVh)

A. The thermocouple TC-2 has been Interrupted.

B. Burning of solid waste With abnormal heat Value.

C. Combustion of too Much sludge

(Energy wise , Kcallh)

CORRECTIVE ACTION SUGGESTED

A. Search the reason for the switch off. Reset the automatic Fuse

B. Search the reason for the switch off. Reset the automatic fuse

C. Check cable connection and Contractor in the control panel

- A. Activated the sluice by pressing

the start button several times . until the alarm is off.

B, Check the air supply. Check the air valve.

A. If no vacuum is obtained, adjust the damper in the flue gas mixing chamber, or see the instruction for adjustment of damper

C. Adjust the admission of sludge oil at the sludge pump and the motor PU-3 and MO-2

A. Replace the thermocouple and check the cable connection.

B. Reset when the temperature is below the minimum temp. set point

C. Adjust the admission of sludge at the sludge dosing pump and the motor PU-3 and MO-2

INSTRUCTION BOOK FOR INCINERATOR Hyundai Marine Machinery Co., Ltd. Page 30

602-15, GAJWA DONG SEO GU, INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:lM.hrnmco.co.kr

Page 114: IM 8 Incinerator

WASTE OIL DOSING PUMP (PU-3)

INSTRUCTION BOOK FOR INCINERATOR QHMMCO Hyundai Marine Machinery Co., Ltd. Page 31

602-15, GAJWA DONG, SEO GU, INCHEON CIPI, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : http:llwww.hmrnco.co.kr

Page 115: IM 8 Incinerator

INSTRUCTION OPERATION AND MAINTENANCE OF PARTS

INSTRUCTION FOR REPAIR OF REFRACTORY LINING

The refractory lining should be maintained according to operation and maintenance instructions. In case of damage to the lining, repairs can be carried out according to the following instructions:

Repair type 1: Damages of less than 4 cm3 and cracks wider than approx. 3 mm. Repair type 2: Damages of between 4 cm3 and 100 cm3. Repair type 3: Damages exceeding 100 cm3 and wear exceeding approximately 20 mm.

LINE OF PROCEDURE

Repair type 1

The damaged area is to be cleaned for loose particles and then coated with an air setting mortar or a special, fine grain coating with approximately 42% A1203 and a low iron content temperature limit of approximately 1500 "C.

Repair type 2

The damaged area is to be cleaned for loose particles. A chemically setting plastic mouldable with approximately 45% A1203, a temperature limit of approximately 1500°C, and a grain size 0 - 5 mm can be used. The mouldable is to be formed to balls of approximately 50 mm diameter and rammed into position in the holes. This should be continued until the damage is repaired.

In order to obtain a good result the repair spot should have a finish coating. The incinerator has to air dry for 2 -4 hours before it is operated again.

Repair type 3

Please contact HMMCO for information or contact a company speciallsed in refractory linings.

Broken ceramics are to be replaced by new ones using air setting mortar and castable refractory.

INSTRUCTION BOOK FOR INCINERATOR QHMMCO Hyundai Marine Machinery Co., Ltd.

602-15. GAJWA DONG. SEO GU, INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL: hllp:llwwwhrnrnco.co.kr

Page 32

ANURAG
Highlight
ANURAG
Highlight
ANURAG
Highlight
Page 116: IM 8 Incinerator

DIGITAL TEMPERATURE CONTROLLER (5A216A2) - THERMO COUPLE S TYPE

1.Be~sure.lo operate the ~0nlr0ller installed on a panel lo prevent dedrlc shock 2. ,p me rwt c h i i wiring as far as porslble away from power and grbund

CAUTION orclrjL

3. Do no1 mount front panel facing dowmvard 4. To prevanl elaciric snOCk. be sum lo lum oft and the ~ u r m drcu~l breaker

5. The power &nsump(lonS are 100-240VAC. 50160Hz. 10VAma.x a M operate wlthoul power swllching in advance.

6. No work in wet han&( iI caused eledlic shock ) 7. R~~~r:Lha~e7ey:of:g~ndlno:connec~mWIbo.we~r, . . , . . , ; . . . keep away:for'gw@lng lo

q~as pipe. waier9pti. Ii~merung rod el& 8: No~apelicdislurbatices are-?used,

L . ~

. . . . , , . . 1 Lighis on-ihen Mahual Medfi 6peialesior, LED ..; blhltingduripg .. ... AUTO-TUNING pmcess.

between peramelers or reg~stering parameler

durlng EVENT ocwrs

seuinas I . . ' II - pressing SETlENT Key NOVA

al leas1 3 sec swilchGs ,. between an operaling Used when I I - Used lo change the value ol display and an operaling I parameter selling display-

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Mar ine Machinery Co., Ltd. Page 33

602-15, GAJWADONG, SEO GU. INCHEON CITY KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL: hHp:lh.hmrnco.co.kr

Page 117: IM 8 Incinerator

'mte1:RET. RS. HBA. ALM4 to be ourchased seoaratelv 'note2:lI can't use at ST340.360.380 'not03 : It can't install with AOUT

Specification 1 PVSP Dala Dlspaly : each 4 dgits ) Sampling Time : 250ms lndiit ion Acuracy : f 8.2% of FS 0 Running Mode : AUTO I MAN

0 Control Loops and Mode : iSlg!e:Loop ConW Nwnber of Setpdnt(SP) : i*(i ZonePIP) Retransrnlsslon Oulput : 4 - 20rnADG( PV. SP, MV ) or LMp pwer supply Communication Protoaols : PC-Link,MODQl&(ASCIl, RTU), SYNC Master. Slave Pwer Supply and Consumption : 100 - 246VAC. 50 - 60Hz I Max 6W belw

PV InDut : Unlvewl I n ~ u l f l Point) HBA Type of Input

T1C:K J,E,T.R,B,S.L,N.U. W,Plalinel II RTD : Ptl W, JPtiW DCV : -ID - 2OmV. 0 - IOmV, 00,4 - 2.0VCC, 1 - SVDC. 0 - 1OVDC

(4 - 20mA. 0 - 20mA, Wll'h~.external250P. 500Q)

output 0 Control OutDul : 1 Point 0 0 Time-proportional PID : Reby. SSR(V-Pulse) Continuous PID i SCR(4 - 20mAaC)

(Alarm) A l a n Capacity : STD 2 Points. Max 4 Points 'note4 Alarm Type : 21 types(High/Low Temp Limit. Deviation Limit etc) 'note5

HBA CT spec : uxr CTL-~-s or 8W:l CT

'note4 : ST340. 360. 380 - Max 2 Points 'note5 : In case d HBA Option - 22 Types

Safety & EMC ) Safety. EN61010-1. UL61010C-1, CANICSA.C22 2 No 10101-92, Category II

0 EMC EMI(Emtsslon) - EN61326, ClassA EMS(lmmun~ty) - EN61326

WHMMGU Hyundai Marine Machinery Co., Ltd. Page 34 602-15. GAJWA DONG. SEO GU, INCHEON CIN, KOREA

Tel : 032 583 0671 Fax : 032 583 0674 URL : http: l~ .hmmco.co.kr

Page 118: IM 8 Incinerator

I MAXI NGS011001 I SOSL WS I

WHMMLU Hyundai Marine Machinery Co., Ltd. Page 35 602-15. GAJWADONG SEO GU. INCHEON CITY, KOREA

Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:/lwwwhmmco.co.kr

rViPUy(ru M p I f i n m .

ACwnw Obarbl b b p ~ .nl' Ubdi

Rumho'M$da NU.M~U l l 3 & ~

E~li4mh m ~ m c &.Z% el m- (Imlwbre G~a-1 AiWNmvll. 1 . ~ 0 z&;.FI~~

Ti+$ U ~ i l v r d l l ~ u t l PIMI Vb. ~,i, ~ 1 . h ~ . 9 ; LH. U; W. ~ldkrlll Rm M l O , dm 00

I P - amV. 0 - WOnlV, OV4-Z4VDC.

Page 119: IM 8 Incinerator

O P E R A T I O N FLOW FOR PRIMARY COMBUSTION CHAMBER (5A2)

NO.

TEP 1

TEP 2

Front panell Adiustinq Key I Description I - Press button Press button "SET/ENTn

for 5 Seconds.

change setting value This is the start of setting for S-type thermo couple.

I DIl I I P r e h down orrow key

iEXJ (one time)

I

Procedure of setting method for PJD coritrol (up & Down slop)

I D\I I I Press down I

Press down arrow key (One time) I

Press button "Sn/ENTM for 0.5 Sec..

Press down arrow key

Press down arrow key

Press button "SET/ENTm

I I -Please see the nex t poge

INSTRUCTION BOOK FOR INCINERATOR HMMCO Hyundai Marine Machinery Co., Ltd. Page

602-15, GAJWADONG. SEO GU, INCHEON CITY KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hnp:l/whmmco.co.kr

Page 120: IM 8 Incinerator

I MAXI NGSOll 001 1 SOSL WS (

OPERATION FLOW FOR PRIMARY COMBUSTION CHAMBER (5A2)

NO. Front Panel

El Adjusting Key

ress button "SET/ENTn )r 0.5 Sec..

Setting the SP value

Figure plqce

Down

'ress button "S€T/ENT' or 0.5 Sec.,

Setting the SP value

Figure place

'ress but to^ "SET/ENT or 0.5 Sec..

Press button "SET/ENTn to stop the setting.

Descr ipt ion

Procedure of setting method for PID up-slbp

- Setting Value of MAXI NG 50 : 65

- Setting Value. of MAXI NG 100//1.50 : 33

Set-up SP value

Procedure o f setting method for PID down-slop

Set-up SP value (10)

Press button "SET/ENTn for 5 Seconds., This is the stop of setting for PID control

-Please see the next page

W H M M O Hyundai Marine Machinery Co.. Ltd. Page 37 602-15, GAJWADONG. SEO GU. INCHEON CITY. KOREA

Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwww.hmrnco.co.kr

Page 121: IM 8 Incinerator

0.PERATION FLOW FOR PRIMARY COMBUSTION CHAMBER (5A2) - NO..

TEP 3

'ront Panel Adjusting Key

Press button "SET/ENT" to change setting volue

Press down arrow key, (One time)

Press down arrow key (One time)

Press down drrOw key (One time)

'ress button "SET/ENl or 0.5 Sec..

Press down arrow key

Press down arrow key This is setting for thermo cou le Cd Press down arrow key

Description

Press buttop "SET/ENT" for 5 Seconds. This is the stort of setting for S-type thermo couple.

Procedure of setting method for temp. setting.

Please set-up for TC-S

lease see

INSTRUCTION BOOK FOR INCINERATOR QHMMCO Hyundai Marine Machinery Co., Ltd.

602-15, GAJWA DONG, SEO GU, INCHEON C I R KOREA Tel : 032 583 0671 Fax: 032 583 0674 URL: hnp:llwwwhmmw.cokki

the next

Page 38

Page 122: IM 8 Incinerator

OPERATION FLOW FOR PRIMARY COMBUSTION CHAMBER (5A2)

NO. Front Panel Adjusting Key Description

Press button "S€T/ENT for 0.5 Sec..

Press button "SET/ENT for 0.5 Sec..

--

Press button "s€T/ENT for 0.5 Sec..

Press button "SET/ENT for 0.5 Sec,.

Press button "S€T/.ENT8 for 0.5 Sec..

Press button "SET/ENT' for 0.5 Sec..

Procedure of setting method for high temp. (5K5-Relay 2) TEP E

Setting the SP value (1 050)

figure place 1 UP

Down

Press button "SET/ENTS for 0.5 Sec..

High temp. setting. Setting : 1 0 5 0 ~ ~

Set-up SP value (1050)

ase see the next page

INSTRUCTION BOOK FOR INCINERATOR WHMMCO Hyundai Marine Machinery Co., Ltd. Page 39 602-15. GAJWA DONG, SEO GU, INCHEON CIM, KOREA

Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llmvw.hrnrnco.co.kr

Page 123: IM 8 Incinerator

OPERATION FLOW FOR PRIMARY COMBUSTION CHAMBER (5A2) - NO. -

'EP 5

-

TEP c

. r o d Panel Adjusting Key

jetfina the SP

+ess button "SET/ENl or 0.5 Sec..

+ess button "SET/ENl or 0.5 Sec..

+ess button "SET/ENl 'or 0.5 Sec..

Setting the SP value (145)

Figure place ] Up

Down

Press button "SET/EN' for 0.5 Sec..

Settina the SP volue -(45)

Figure place 1 UP

Do,"

Press button "SET/EN for 0.5 Sec..

Description

High temp. wt t ing. (Res-et) Setting : 50 C

Set-up SP value (50)

Procedure of setting method for cooling down blower RESTART temp. (5K7-Relay 3)

Cooling down blower RESTART temp. Setting : 145'C

Set-up SP value (145)

Cooling down blower STOP Setting : 45OC

Set-up SP volue (45)

A -Please see the next page

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery C o . , Ltd. Page 40

602-15, GAJWADONG, SEO GU, INCHEON CITY KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwww.hmmco.co.kr

Page 124: IM 8 Incinerator

OPERATION FLOW FOR PRIMARY COMBUSTION CHAMBER (5A2)

NO. -

;TEP I

Front Panel

Press button "SET/ENTW for 0.5 Sec..

Adjusting Key D e s c r i ~ t i o n

Press button "S.ET/ENT" to stop setting.

Procedure. of setting method for solid waste burning quto operation (5K9-Reloy 4)

Setting the. SP value (950)

Ih] up flgur? PbCd 'm Down

Press button "SET/ENTm for 0.5 Sec..

'ress button "S€r/ENT" Set up SP value (100) 'or 0.5 Sec.. I -

Auto operating temp. setting (~ igh ) Setting : 950°C

SP (950)

Setting the SP value (100)

IAI UP Figure place

Down

"ress button "SET/ENT" 'or 0.5 Sec..

Auto operating temp. setting. (Low) Setting : 100°C (850 - 95OoC)

Press button "SET/ENT" to stop setting.

I

-Please see t h e n e x t page

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd. Page 41

602-15. GAJWA DONG. SEO GU. INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hllp:/lwww.hmmco.co.kr

Page 125: IM 8 Incinerator

SPARE ,a AUTO SOLID OPERATION WGTE BURNlNG

AI THERMO ELEMENT HIGH TEMP.. COMBUSTION CHAMBER (1 050%)

PID CONTRQL FOP TEMP. POWER SOURCE COMBUSTION CHAMBEB (AC 100V-240V, 50/60HZ. 1 OVA)

(9.5V.C)

DOOR BLOCKING & COOLING DOWN(^ ~ S C - 1 0bC)

(PRIMARY BLOWER STOP)

COMMON

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15. GAJWADONG. SEO GU, INCHEON CTTY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwww.hrnmco.co.k~

Page 42

Page 126: IM 8 Incinerator

O P E R A T I O N FLOW FOR SECONDARY COMBUSTION CHAMBER (6A2) -

NO.

STEP 1

-

;TEP 2

Front Pane Adjusting Key Press button "SET/ENT" to change setting value

Press down arrow key (One time)

Press down arrow key (One t ine)

Press down arrow key (One time)

'ress button "SET/ENT' 'or 0.5 Sec..

Press down arrow key

Press down arrow key This is setting for

Press down arrow key

Description

Press button "SET/ENTm for . 5 Seconds. This is the start of setting for S-type thermo couple.

Procedure of setting method for temp, setting.

Please set-up for TC-S

1NSTRUCTlON BOOK FOR INCINERATOR @HMMCO Hyundai Mar ine Machinery Co., Ltd. Page 43

602-15. GAJWADONG. SEO GU. INCHEON C I N , KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : http:llwhmmco.ca.kr

Page 127: IM 8 Incinerator

OPERATION FLOW FOR SECONDARY COMBUSTION CHAMBER (6A2)

NO. -

TEP 2

TEP 2

.rant Panel Adjusting Key Description I

'ress button "SET/ENTP' or 0.5 Sec..

yes= button " S ~ / E N T " Procedure of setting or 0.5 Sec.. method for auto

o~ero t ina temp.

s e t h g the SP value (750)

IAI UP I 'ress button "S€T/ENT" Set-up SP volue (750) or 0 5 Sec..

Setting the SP Auto operating temp. volue. (80

b u setting. (Low)

n g m PIOSB Setting : 80°C

h w n (670 750°C)

+ess button "SET/ENT" Set-up SP value (80) 'or 0.5 Skc..

Press button "SET/ENTm for 0.5 Sec..

I

Press button "SET/ENTW procedure of setting for 0.5 Sec.. method for hiah temp.

-Please see the next page

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd. Page

602-15. GAJWADONG. SEOGU. INCHEON CITI, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hnp:llwwwhmmco.co.kr

Page 128: IM 8 Incinerator

OPERATION FLOW FOR SECONDARY COMBUSTION CHAMBER (6A2) -

NO. Front Panel Adjusting Key Setting the SP value (1050)

Press hutton "Sn/'EN1 for 0,5 Sec..

Settina the SP

UP '50b Figurn place

OO*.

Press buttan "SET/ENl for 0.5 Sec..

Press button "SET/ENl for 0.5 Sec..

- --

Press button "SET/ENl for 0.5 Sec..

Settina t h e SP value 31 45)

figure ploce [a] UP

IV] own

Press button "SEI/ENl for 0.5 Sec..

Descri,ption

High temp. setting. Setting : 1 0 5 0 ~ ~

Set-up SP value (1050)

High temp. setting. (Reset) Setting : 5 0 C

Set-up SP vaiue (50)

Procedure of setting method for coolina down blower RESTART temp. (6K7-Relay 3)

Cooling down blower RESTART temp. Setting : 145OC

Set-up SP value (145)

ase see the next page

INSTRUCTION BOOK FOR INCINERATOR ~ H M M C O Hyundai Marine Machinery Co., Ltd. Page

602-15, GAJWA DONG, SEO GU, INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwww.hmmco.co.kr

Page 129: IM 8 Incinerator

OPERATION FLOW FOR SECONDARY COMBUSTION CHAMBER (6A2)

NO.

TEP 5

-

TEP E

Fron't Panel Adjusting Key

Setting the SP value! (45)

Fiaum ~ I a c o up

'ress button "SET/ENT 'or 0.5 Sec..

?ess button "SET/ENT 'or 0.5 Sec..

Press button '$ET/ENTn to stop setting.

Setting the SP value (100)

figure ploca 1 Up

Down

'ress button "SET/ENl For 0.5 Sec..

Description :ooling down blower STOP jetting : 45 OC

Set-up SP value (45)

Procedure of setting method for solid waste burning auto operation (6K9-Relay 4)

Signal to prirnary burner start Setting : 650°C

Set-up SP value (650)

Signal to prirnary burner Stop :550°C - 650°C) [Low temp, stop)

Set-up SP value (100)

see the next page

INSTRUCTION BOOK FOR INCINERATOR ~ H M M C O Hyundai Marine Machinery Co., Ltd. Page 46

602-15, GAJWA DONG SEO GU. INCHEON CITY, KOREA Tel : 032 583 0671 Fax: 032 583 0674 URL: htt~:llmvw.hrnrnw.co.kr

Page 130: IM 8 Incinerator

OPERATION FLOW FOR SECONDARY COMBUSTION CHAMBER (6A2)

I Press button I

NO.

"SET/ENT" to stap setting.

WIRING

Front Panel

PID CONTROL FOR TEMP. COMBUSTION CHAMBER

(670'C-750'C)

Al THERMO ELEMENT (5-TYPE) Cg

SPARE

DOOR BLOCKING & COOLING DOWN(14SC-100'C

(PRIMARY BLOWER STOP

Adjusting Key

Press button "SEr/ENTU for 0.5 Sec..

START SIGNAL TO PRIMARY BURNER

Description

HIGH TEMP. COMBUSTION CHAMBER (1050'C)

POWER SOURCE (AC 100V-240V. 50/60HZ.

1 OVA)

-Please see the next page

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd. Page 47

602-15, GAJWA DONG. SEO GU, INCHEON CITY KOREA Tel : 032 563 0671 Fax : 032 583 0674 URL: hiip:llwmvhmmco.co.kr

Page 131: IM 8 Incinerator

FLUE GAS TEMP. CONTROL(TC-2)-THERMO COUPLE : PT 100n

Specification

.". -, Ol .b," a,,, r m rim,

I Input ranee for the sen=

8 How to select the switch tcr each lnwt smsu

INSTRUCTION BOOK FOR INCINERATOR ~ H M M C O Hvundai Marine Machinew Co.. Ltd.

602.1'5, GAJWADONG SEO GU. I N C H E ~ ~ CIN KOREA Tel 032 583 0571 Fax ,032 583 0674 URL nnp l w nmmco co kl

Page 48

Page 132: IM 8 Incinerator

Second flow chart -

R First flow chart

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd. Page 49

602-15, GAJWA DONG. SEO GU, INCHEON CIW, KOREA Tel : 032 563 0671 Fax : 032 583 0674 URL : http:lhvwwhmmco.ur.kr

Page 133: IM 8 Incinerator

' Operation chart for alarm output

I)"..- - !

0 Option oi alarm output

Auto tuning operatlon

I@ Loop break alarrn(LBA)

YLW me 01 LM me ~ s * WWI w m a. .LBI OYWI m be ulrc~w 11 EV-I. ~v.2 a vu u o a a mw m n ~ w t LM LYIW~ u MI YMW at want WWL 11 ran MI aoollW In mr

Q Sensor break alarm(SBA)

.1hue b iesYtar InUIYaI UmO b e t w m ON am OFF In DIIIOFF mnUd, M lotern1 uma u too sort . tho nunundcnartnlna) can Da oavrrsd by

nolrr. Y I I C ~ I ume ssn DO =I in HIS emluon ol nrrt no- sow. saturn la I s war 0.1 to IWOI

.ms maam man n l u c of P mlm m n r s m w mart & V. HIS w not 1nd1mo man value a P mwa, IS Mt v

.mlr ONloFF m l r o l can be ~PDIIM m mc w r p m m ( w l n a -or-) ID b mnllollad mlch mra ran mur 4 hewn! ONIOFF acuan.

.Even 11 ONIOFF mlrol IS S b Q k alalur, me hvlllns can W -red by relunr valw m H1S or ssoaclb or w naawr a mpmao snaractmlruc of me awlvnank a M mnualad or I ~ S ~ I I I W p o w o n a urt mror. PIoIILb eomlder .MY. mlnlr 10 mlnlmllo ma nunllng whon darlwr ma 11110m.

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd. Page 50

602-15. GAJWA DONG SED GU, INCHEON CITY KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwwwhmmco.cokr

Page 134: IM 8 Incinerator

Ramp function I

SV-2 function

CwlIHeat function

w-hmma u to o g r m ~r n m a r mm w me. ma t a m , - m n m o m m e ma rmmammr *hm pv mar. eoa-mm ma haat-hnctlon 10 wu w a r n m r w m m/a

modl W W W l mUDl rn-. but PID msUM 1. dltlorem

(I1 h ~ ~ l - I Y l d o n U h l n p e d IO cool-lumllon m OOanYns heat- muon, II o m - . w.s m m ma. ~suw m ouw m m m r u u mn n u r n p r a m oms)

.*IM ampmg l l - N n r m lo mcMtrcl*n ir m-- to ilut- w o n m w m n s to WIL

.It b ImmrYMe m owam born tumm at - YI rnls UIL X-mOmle a ma hmum M m mrn w m .

.IWI IWIW u n m m a t 7wn mr am.

.Um Vlll m m ~IUI ma.mrIw c w m m -w.d wm U~WI~IUI.

INSTRUCTION BOOK FOR INCINERATOR OHMMCO Hyundai Marine Machinery Co., Ltd. 602-15, GAJWA DONG. SEO GU. INCHEON CITY. KOREA

Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwww.hmmco.co.kr

Page 51

Page 135: IM 8 Incinerator

( MAXI NGSOlIOOllJOSL WS I

I P P U U Y O " . .PW 4 ADS m a 0, w PO rua can m ytatsd II ma vrnvla ~r WII bl rsmw m.

.m(m r- PD utm) ma m e IS ~ P ~ I U . n a maarnrr or ms me aqruno ,a,, m- .I*.* M .110116*. 11m a c,wcI,ODI. .ZIMICDI~O. r m n must b. SPPIU~ p m m m o r y MI m w a it

*P.llll .I"pa"m MIllho ." d a m turn-.. m L

.rnos(sa. .-.a PO a r ~ m l

mr mas. u amma at u* mnmm. rokn o n r w t must not w D ~ ~ ~ ~ . a a u u u* nm can aa a u r r o a bv a m n m a me mwu,. mplaYn' din. m UsYoI 1mMI.WC UUnS .,Slam D DDWD!

u m l r a m m OL w. .R Wn U - n P W r d s Dafao maw# YIVxnmU.

B Manual resst

R D W U ~ ~ -YO( l u s arm bor-uu inmn ams 18 not u m a nn tallmr m e . n m n p wuu! w a r n ~ n r u w -I r m t mmn u u s d at P ~ O W ~ ~ . I mud m e orrr. .mml m e t ulcm 4s wed at proparmnnl omma m d a a*. . ~ . n u l ~ i . ~ t MCM D P O ~ U S ~n a w ol vlUn# rESr .m.n PV mnd 61 U ram*. p r o p m . l D M d 1. WII. Wen W U M

SV. IESW VYW mB WCT YI% n I M VV I. I b rW Ulln SV. <ESl 'urn WU wdm IOI "DIM.

3 Relay output

El Voltage pulse(SSR1 outpul

mm - allm anolonum 0- is m oaea a c ban-s (sen unll). ,I a n pr- m u * MM. m e I. m . %dam *MR. n a- 4 m amr w r a m n l w IS am6 at mmA. 006 at 4mr. a t u d m wmnrdurn .M can urea .I ma mu WPIIU~IO~. .mtr -t o p r a t a mourn lnnar o.p.rm*l . ~ ~ I V Y I ~ WO~MI~~VIL

I h m o r ~ w r a m wrm U MI cnm#.d ern 1 me r&Uw M.d b mn101.d n WWP. m I? r e ~ m r r md 1. loo lbrne mI.llr(-r K O O ) . h. M.", a n b. CD.npd (aw. uu the m a I.U m m m a )

-0 ml urn ( U I M 1 Wtwl In cru G i U n l DNlOfF DDnWol. .omrmns r m u urns im m mlrd at imr u ow p a l u ~ a a v u

01 - t lq M - l o w smut om m uu ot vvns a ~ n n t wmur m w e re4 mme 0.. wr uw h wr mrmr armr -use LM mwo IS mmlmrlns l v o ~ o n o m a m .I lm a 0% cdum all.

.Fmt WXIT llrnp dm3 no1 maralas h u s a of valng mmnt wmuL

INSTRUCTION BOOK FOR INCINERATOR ~ H M M C O Hyundai Marine Machinery Co., Ltd. Page 52

602-15, GAJWA DONG. SEO GU, INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : http:llwww.hmrnco.co.kr

Page 136: IM 8 Incinerator

D How to change the set value

INSTRUCTION BOOK FOR INCINERATOR QHMMCO Hyundai Marine Machinery Co., Ltd. Page

602-15, GAJWA DONG, SEO GU. INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : http:/lwww.hmrnco.co.kr

Page 137: IM 8 Incinerator

INSTRUCTION BOOK FOR INCINERATOR OHMMCO Hyundai Marine Machinery Co.. Ltd. 602-15. GAJWA DONG, SEO GU, INCHEON CITY KOREA

Tel : 032 583 0671 Fax : 032 583 0674 URL : hnp:llwwwhrnmco.co.kr

Page 54

Page 138: IM 8 Incinerator

- Appllcatlon of Relay output type.

g Analcgue Input

Tt SERIES . mCUYIe

m-I e4,:h.l H.S~ m~rn L.IO YI:O

I

Application of SSR ovtput type.

. . . . DlDlDn and Van 55R do% D M ura Wllr WlaW Of

a ~ d m ~ n m p r m a s ~ w U * m . - m r a w h a e 01 SSR.

z w SR I. a. YM m ~ ( m % j . II nun 8a1.u . neat kom SSR as m%. m - m rat mmnng a r a v u a mu a our W n u appw W I0 3M u W d SSR -e

How to take out the Inner body from the case.

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd. Page 55

602-15. GAJWA DONG, SEO GU, INCHEON CITY, KOREA Tel: 032 583 0671 Fax: 032 583 0674 URL: hiip:llw.hmmco.co.kr

Page 139: IM 8 Incinerator
Page 140: IM 8 Incinerator

BURNER CONTROL BOX (lIA2112A2) - LAL 2.25

Appllcstlon range - 2 mntrol Outputs lor the re1e.u of lhs 2nd and. 1 nacss- saw. the 3rd ou l~ut slsse lor the load contmlh

- G=nnactlon Iaclllly lor remote lockout-warning devlss. remote reo.1 and remote smewenw shutdown.

All lime varianls ol the type LAC... have the appllcstlon lealu: rer dessribed below.

Application features 1. WIV) mspeSt to rI.ndo,dr: The deolpn and !he control proglammc of the burner control unm hw UL. are ,n comp.hnu, wlth a11 prossnlly known European stsndsrdr and regulsllons lor alomldnp 011 burners. The unlls can also be eppned In those countries whoa. sstefy regulallons bllw the Eumpmn normn.

- - - - O~tec101 and llame slmulstlon test are relnslsled lmmedla- teh alter the toleraled atler-burn tlme. They end only on sorn~letlon ol the pm-pume ttme ol the next burner start-ua

-The cones1 hlnstlonlnp 01 !he name supawlslon clmult ir aY(OmatI0ally ohecksd dudng eem burner nml-up.

-The control sonlasts wed lor the relaare ol luel are te*tea dudng each post-purge tlms lo make sure no woldlng has occured

2. WIU) m a w d 10 the wntm101 me burner. - The control unlts permil oparellon 01 the burner wlln or

without post-purge. - Fan molorr wilh a power conrumpllon 01 up to 4A (slsdlng

sunent mar. 20A) can be connected dlmct. -Separate wnlrol outputs lor -Long pra-lgnlllon (trom smn

comrnandb and &hon ore-lgnlllon- . - SOPB~BIB control ouwuls lor .OPEN-. -CLOSE- and MIN-

tmve1 a, ma a* damoar motnr

3. Wllh mapan to flame ruwrvlsion - Methods 01 llame ~uwwls lon used:

Wllh U L l ... M e U L 2 .: Phatonslsllve dsl.clor Wee ORB. . (normal ssnanlrlhl or WP. 0 R B . S (hopho. %nsltNltv). Wllh LALZ. .. only:

...

4. Wllh m s m l o mounung and elacbical instsllauon: - Mo~ntlng p ~ s l l l ~ n and orlenlalon optlonel (proleaion stan-

dam IP40) - 24 wldng termlnals - 2 BYXlllaw termlnals pwanlsally sapsraled. having the

dos10natl0n~ -31. a i d 5 2 - - 3 eanh tarmlnals p m l w over In a tongue wllh I ~ Q for the

emhlng 01 the bumsr - 3 n w l m lermlnsb, prewlred to larminsl 2 vhlsh is the mu-

IRI ~ P Y I - 14 knockout6 lor the cable anlw by means of cable

bushings. 8 at the alder and 6 In the I Iw r o l the basaDlale - 6 lhreadad knmkouts at the r l d u lor cable antn glands

Pgll and V." -I6 UNF.

-The deslgn ol connection rocket and plug-in sesllon make I1 im~os~ lb le lo dug In e control unlt whlch ir no1 mrmlned lor the burner. ............... ......

-Checked alr damper operation to ensure lhal pre-purge Is - G a s burner conlrols have a ys!low Woe plate inscriplion. 011 eneclsd wllh nominal omb bust ion arr chrok.rl nnrh~nnr. burner con~rolt have a white inscn~lion.

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15, GAJWA DONG, SEO GU, INCHEON CITY, KOREA Tel: 032 583 0671 Fax : 032 583 0674 URL: hhp:llwww.hmmco.co.kr

Page 57

Page 141: IM 8 Incinerator

16 IntewaL On cornplsllon 01 15 tsrrnlnel20 rocelves wollsoe and. O~~Y~IYI(KIUS~~. conwol OYIDYLS 9 to I1 as well as input 8 rva p8lvanlcal.y aeparatsd lmrn the control sectlon 01 the contmi unll so that the latter is potacted spnlnrl mYl)ne v ~ i i a ~ e a l r m lhe load conlrol drcult. - The slert-up ~ s q ~ a n c e 01 lhe conlrol unit en08 Wdh the rebase 01 the load conlmllor -LR- at tsmlneI20. The sequence gW(tch ewitches kseI1 on aulmetlwllv, whlch takes place elther lmmsdlat~ly or affer some Mnal lad .Idle steps-, 1.e. rlcps without chanplng the c m l a d posl- llDn5

B Opentlng posltlon o l lhe burner

B C Burner oneration lheat eenemilon)

Wlth mnlmlled snutdarn lhe lusl valvos are c o l d Immeals lslr and. Olmultanso~siv. the sequence swllch starts egaln and programmes

16 hsl-pu Um. (posl ourpa vlln Ian G2 st larmmsl 7) Shonly %I the stan 01 the post-purge t h e !he vollsgs a lermlnal 10 is remrtsted. so met the slc dampor travels lo the MIN oasst.on

113 Pemieslbhl attar-bum Uma. Durlng this time the llama supe~iolon cI~cYII m y 91111 ncelve a llame algnal wllhoul lnltiating burner lockoul.

0-A End o l conlml pmgnmms (- stan posllion) When. on complct~on 01 16. me ~fguencz rwdch has reset lhe conlrol contacts to the r slan ponllon. thereby s w l n l n s dsell on. the oeteclor and !tame r~mulatlon lest slenr agaln Vollage on terminal 4 (wilh LAL2 ... types: tennlnal 121 Is the rional lndlcatlns that lhe stsn ~oait ion has been reached.

Control programme under fault condiiions and lockout Indication

In the even1 01 laull m n d lions the sequence switch stops end Olm~ltaneou~ly the lookout lndlcstor. The symbol aPPeannO above the reading msh lndlcater the Mnd o l taun

No stsh oacaure, e.p. lhe CLOSE slpnel ha3 not M e n 4 rupplled to termlnal8 by the llmll aMsh -2- (or the aw l - llaw mi lch 4.). or a mntecl hes not becn closed bct- w o n termmels 12 and 4 or 4 and 5.

A Shut down 01 s3nn-u~ mquence, because the OPEN slg- nal hss not been supplled la temlnal 8 by the llmlt wl lch 4.. Tamlnals 6 and 7 (wilh LALI. .. types also ler- mlnd 15) ramaln under valhgs unlil the fault is coneo- led.

rn Lockout due to a lault in the llame supewlalon clrcult

v Shutdown ol n s w p saquenu, bemuse the po*tlon sans1 lor the low-tlamo poslllon ha, not becn suPP led to temlnal 8 by the auxlllay awllch .MS. Temlnals 6. 7 end 15 remln under vollspe untll the laull lo conecled.

1 Lockoy becsure no lisme algnsl has been ncelved on completion at the safety tlrne.

Lakwt, because the llsme slgnal has been lost durlng ( burner operation or elr pressure fallure has ornured.

Loc*OUt on mmplelion or attar mmpleUDn of mntrol pmgnmme seqmrm due l o extmneous llghl 1e.g. llsme not exllnpulshed. IeaWng fuel valves) or due I0 a faUW name slgnsl (e.9. fault in Hame supewlslon clrcull or slml- larl

a - b SlSrtYP sequencn b - b' i d k SlepS- UP 10 the sell shul- down 01 tho se- guence swltCh h lb l - e

INSTRUCTION BOOK FOR INCINERATOR QHMMCO Hyundai Marine Machinery Co., Ltd. Page 58

602-15. GAJWA DONG. SEO GU. INCHEON C I l Y KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL: hnp:llw.hmmco.co.kr

Page 142: IM 8 Incinerator
Page 143: IM 8 Incinerator

Connection examples

2-stage burner Load contml wllh an ONIOFF- controller. During bummr4l periods. the air damper Is In I 11. CI-d posluon.

Technical data Namlnal voltage

Frequency conswnpllon Fuse lbulll-in1

Exiernal luse span dlslurbence level Perm18slble lnpu cunent at terminal 1 Psrmlaslble loading of conlml lerminnls

220V -15%...240V +lo% types ULZ... on mw!est 10ov-IS%..IIOV+IO%

mar. 16A. Is9 N according to WE0875 5A aceordlng loM)E0660 A C 3

Requbed switching ca~aslty ~~( iw l lch lng devloes between - tannlnalr 4 and 5 1 4 250V.r - tmnlnals 4 and l 2 1A. 250V.r - Iarmlnsle 4 and 14 depending on lhs load 0"

termlnsls 15.16.I8: mln. IA. 250V.r

Mo~nIinB p~s l l lon opllonsl ~rolecl lon standard IP40

Welgh16 - control unillbsseplale aPDlOl. 1000M59 - ORBI ~ i l h soomm cable approx- 25 9 - OR81 with plastic plug

apD,ox, 32g and 500 mm cable - ORB3 ~ l l h o ~ l Cable approx. 35 9 - RAR,.. appror. 858 C 5

Flame ruperrlslon

~ y m e r conlml LALL ORB ... ORB ... S wllh detector:

MI". nqu~rsd detector ounenl wlth 2201240V 951105pA 951105pA -. possible deteclor cunenl 160pA 1WrA

+pale 01 the instrument l o terminal 23

Recommended lllumlnallon at a colwr tem~emlum 01 2858K 40 Lux 5 LUl

Burner control LA=- ORB ... 0RB.S RAR.- wilh detmor:

MI". maulred detector cunent wlth POIZ~OV war/\ v a p q 6.516.5fl

D ~ I B C ~ O ~ wlrlng lewth - I" the care of a mulll- core cable - W I I ~ separately laid cable - wi~h IOW capltsnce screened cable (screen insul~ledll Screen to lermlnal

not admissible 20m 20m mu7: 30m

zoom 200m RARB: 1000m 23 23 24

CBI -7153 E

INSTRUCTION BOOK FOR INCINERATOR QHMMCO Hyundai Marine Machinery Co., Ltd. Page 60

602-15, GAJWA DONG, SEO GU. INCHEON CITY KOREA Tel : 032 583 0671 Fax: 032 583 0674 URL: http:llwwwhrnrnco.co.kr

Page 144: IM 8 Incinerator

lhs control units ere ol plug* deslpn. Housing and connecll~n socket are made Imm heat end knoact reslsllng black plat- tic material. The houalna conlelns:

-the overshed wnchronous motor 01 the Pmgremmlng mechanism wllh gear train and step acllon sequence switch .

-the sequeme awllch wllh 15 non-adjus- lable cams - tho lmkoul lndlcator at the head 01 the sequence switch

-the main relay Omd relay) - the IochuI relay wllh e l e c t M remote renet InclllW hadvlng the funcUons .Iocko~I. - -mm-

- h e alectmnlc flame slgnel empllller with 11s name relay

-the lmkoul reaet bullon wllh bum-ln IockD~l mrnlng lamp and

-the unlt fuse wllh amre luse

The bask clrcult dlsgram 01 iha UL3.25 dlHers lmm that of h a s LALZ ... In that -

the ~ollowlng elements and conespondin9 cunenl paths are deleted: Eontacl In. NTC-reslator. contact Xlla and conlast Xtlla. 1.e. wlth extraneous light durlng bur- ner ofl perlodr and during the pre-puwe lime lockout does not occur but the bur-

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd. Page 61

602-15, GAJWADONG, SEOGU, INCHEON CITY, KOREA

Tel : 032 583 0671 Fax : 032 583 0674 URL: hItp:llwww.hrnrnco.co,kr

Page 145: IM 8 Incinerator

Available types - Switching llmee In seconds In the sequence of the burner stan-up. valld for frequency 01 MI Hz; lor 60 Hz frequency swllchlng times era reduced by Po!&-Tlmeainbaldtqps (mundedup) arethe dlglleof unl l lq~e relerenw.

For name supe~lsbn wllh photoreelallvs Unlv.appl. dateclom me QR E... ULl.26

- For IIsme supeNkl0n wllh photoreelsllve detenorr lype ORE. .. or salenlum cell dsteclors Npe RAR .... wllh the Flesh- Universal Medium and

0 possibllllq 10 SYDBNIOIOII the alr pressure appll~llllon heavy 011 and lhe genemlors burners posslblilty 01 semlautomatlc start-up ULZ.14 LAL2.25 IAu.65

Same as LPIUL25 wllh the exception Ulal SP~CBPPI. 0.9. sxlraneaus light does not cause burner lrmneralorplsnlo lockoul but pwenls sIad4p 01 burner LAU.25

2s 17 S l n r t ~ p lime lor fan motor 0 2 2 2 s

n6 lnlewal lmm start-up to OPEN eommsnd 5 lor sb damper 4 5

I11 Runnlng lime for alr damper to OPEN wsltion opilonal opllonel ODILII~I

110 Wlh L A K ... types only: lnlervai lrom start- up lo beglnnlng ot elr pressure check 6 10 10

n Pre-purge lime wHh ah damber open 10 22.5 67.5

112 Running Ume lor alr damDar lo MIN. poslllon opllonsl optional a~tlonal

13" Pra-lgnlllon tlme I O N G - (transformer fmm l r ~ m hom wnnscled lo termlnal 15) stan command" alsrt command" start commend"

13 Re-lgnlllon lime SHORT- llransfoner wnnected 10 bnnlnel 161 2 2.5 2,5.

12 Safely time 9) 4 5 5

13" post-lgnltlon t he Itrandormer connecled lo terminal 151 10 15 15

14 lntervel beween beginning 01 12 and releese of valve a1 lnrmlnef 19 8 7.5 7.5

15 interval bsween end 01 14 and release of load ~onlroller a1 lenninai 20 4 7.5 7.5

KO Inlewd up 10 the sell-ohuldOWn d the sequence rwilch (-iule step34 32 35 20

16 Post-Durge lime (with G21 10 15 15

113 Pelmi~sible aner-burn tlme 10 15 15

la Duration 01 start-up (wllhoul Ill and IlZI 30 47.5 92.5

.) n.sWn,. lm. n o ! o... omrn. dudw bum.rrun: C I S C7 -. w," .I.o....u,. W~..I.I~~ IU" ..): m m r h OI.SYI#. ~ 3 m . 1 ol lh. rnonlo-U-

7.C* C

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15, GAJWA DONG, SEO GU. INCHEON CITY KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hilp:.//whmmcoccockr

Page 62

Page 146: IM 8 Incinerator

~ ~ s ~ g n of t h e light detectors ORB-. ma detectors. with the exceptton of ORB3, can be SuPDlled in nOmsl or hlgh response senalllvlly varlsnlr. The hlghm sensl- livity ~ d a n t s ere marked In .ad and with en -5. aner the We reference.

when "sing the hlgher ~ens1tlv.t~ ..S-typos. Iha burnar must be rtmnply lllumlnated to check the sarsrmous llghl t a t of tho burner cOn1,Ol. TO mmply Wlh DIN4787. Pa* 1. SCCllOn 5.1b msp. d n n lSOlD.s3544.2. Emctlon 4 22a. the lest must be msda with an lllumlnallon strength 01 20.000 Lux a1 2856K on the sudece ot the burner.

Especially smell dlmenrloned pholo-re~lative detector wlth I n l~sed thermoplastic cable. A gulde gmovs In tho secvdng nangs and a spring l~ l l ded cem on the dal6-2lor clamp ensure not only a vibration p rod mountlng ot the detector, but dso always ensure lhs correct slghtlng of the ~hoto-realsleneo on the llame. Ass-das (see elso the dlmenalon dlsgramr): - Securing flange, wlth cholca bihvean 21 or 36mm hole

centres. - ~etector clamp, normal. - elector clamp for llsxlbls sondulL

gram. - Requlrea accessmiss (clamp and flange). For orderlng rela- rences refer to dlmenslon dlaorems.

All that is necea-ry for the mountlng of this deteclor on the burner is a hole wlth a sfde groove (see dimenelonr dlagramsl. m e aesllng end aecudng ribs a1 h e plug hold the detector tlrmly in the hole; the gulde key guarantees Wrrecl allgnmenl 01 the phot0-res1911Ye element 10 the llame. - Requlred ordering reterencer: - rwe 01 detector (ORB1 with plug or ORBIS with @ugl. - ~01.1 length 01 cable -L. en0 slnppsd length -M- In em, 8.0.:

bRmsl50.7 with olm. SLBnaard l cn~ lha according to

ORBIS with plaatlc plug a n alao b. auppllsd com@ate wtlh ds-r omrim of l l 8 m m lenplh (Drswlng: 118 mm Instead of 31mml. .L-a~0mr270mm. 4- a~pmx40rnm. TYDs

Housing 0 17mm. Dellrered wllhoul connecting cable. Terminel blocu easlly accesalble. Dsllvered somplels wllh mounling flange end detector clamp. 1

INSTRUCTION BOOK FOR INCINERATOR ([IBHMMCO Hyundai Marine Machinery Co., Ltd. Page 63 602-15, GAJWADONG, SEO GU, INCHEON CITY, KOREA

Tel : 032 583 0671 Fax : 032 503 0674 URL : http://www.hrnrnco.co.kr

Page 147: IM 8 Incinerator

PRIMARY & SECONDARY BURNER (ST-IIST-2)

FUEL OIL PUMPS [PUI] [PUq

The pump is factory adjusted at 10 bar.

-.

Fig. 1

Nozzle connections- Left: GI18 BSP Right: hand available to order

PI

S

R

F

Pressure gauge conn. In front GI18 BSP

Pressure regulation

Suction line GI14 ESP

Return line GI14 ESP

Cartridge fllter

a Vacuum meter conn. GI18 BSP v

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Mar ine Machinery Co., Ltd.

602-15, GAJWA DONG, SEO GU. INCHEON CITY. KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL: hnp:llwww.hmmco.co.kr

Page 64

Page 148: IM 8 Incinerator

Adjustment of electrodes and air quantity.

SECONDARY BURNER (ST2)

Adjustment of air quantity (more air: adjustment towards hlgher numbers). He burner is e a ~ i ~ ~ e d with an air adiustment. for adiusting the air to the burner. Fac.. approx.20% open.' '

- . - . - . - . -. -.

PRIMARY BURNER (ST-1)

More air: Adjustment towards hlgher numbnn

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15, GAJWA DONG, SEO GU, INCHEON CITY, KOREA Tel : 032 583 0671 Fax: 032 583 0674 URL : http://w.hrnmco.co.kr

dory setting is

Page 65

Page 149: IM 8 Incinerator

Type pump

Capacity

Head

Output speed

Motor

Motor speed

I MAXl NGSOllOOllSOSL WS I W.0 DOSING PUMP PU-3 TYPE MAXl NG 50 SL WS

INSTRUCTION FOR OPERATION AND MAINTENANCE

: HDRP012-12

: I 7 4 h

: 2 Bar

: 92-475 rpm

: 0.45 Kw

: 1,690 rpm

LANTERN

SUCTION CASING

PRESSURE BRANCH

COUPLING ROD

ROTOR

MECHANICAL SEAL CASING

JOINT SEAL

PLUGIN SHAFT

STATOR

MATERIAL SPECIFICATION

: Steel St 37-2

: 1.4408

: 1.4571

: 1.6582

: 1.4571

: 1.4571

: NBR Perbunan

: 1.4571

: VITON

- INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15, GAJWADONG, SEO GU, INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hiip://w.hwhrnwocok

Page 66

Page 150: IM 8 Incinerator

( MAXl NGS0/100/150SL WS I

W.0 DOSING PUMP PU-3 TYPE MAXl NG 100 SL WS

INSTRUCTION FOR OPERATION AND MAINTENANCE

Self-priming positive displacement pump with geared motor.

TYPe Pump : HDRP 012-12L

Capacity : 174 11h

Head : 2 Bar

Output speed : 92-475 rpm

Motor : 0.45 KW

Motor speed : 1690 rpm

MATERIAL SPECIFICATION

LANTERN

SUCTION CASING

PRESSURE BRANCH

COUPLING ROD

ROTOR

MECHANICAL SEAL CASING

JOINT SEAL

PLUG-IN SHAFT

STATOR

: Steel St 37-2

: 1.4408

: 1.4571

: 1.6582

: 1.4571

: 1.4571

: NBR Perbunan

: 1.4571

: VITON

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15, GAJWA DONG, SEO GU. INCHEON CITY KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : http:/h.hmmco.co.k~

Page 67

Page 151: IM 8 Incinerator

( MAXl NG5011001150SL WS [

W.0 DOSING PUMP PU-3 TYPE MAXl NG 150 SL WS

INSTRUCTION FOR OPERATION AND MAINTENANCE

Self-priming positive displacement pump with geared motor.

Type pump

Capacity

Head

Output speed

Motor

Motor speed

LANTERN

SUCTION CASING

PRESSURE BRANCH

COUPLING ROD

ROTOR

MECHANICAL SEAL CASING

JOINT SEAL

PLUG-IN SHAFT

STATOR

: HDRP025-6L

: 233 11h

: 2 Bar

: 92-475 rpm

: 0.45 Kw

: 1690 rpm

MATERIAL SPECIFICATION

: Steel St 37-2

: 1.4408

: 1.4571

: 1.6582

: 1.4571

: 1.4571

: NBR Perbunan

: 1.4571

: VITON

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602.15. GAJWA DONG SEO GUS INCHEON CITY. KOREA Td : 032 563 0671 Fax : 032 583 0674 URL : hnp:lhvww.hmmco.co.kr

Page 68

Page 152: IM 8 Incinerator

WASTE OIL DOSING PUMP I PU3 CHARACTERISTIC CURVES

bnr bor bur

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15. GAJWA DONG. SEO GU. INCHEON CIW, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:l/w.hmrnco.co.kr

Page 69

Page 153: IM 8 Incinerator

Progressive Cavity Pumps PU3 Waste oil dosing pump

Lubrication

R1 GEAR UNITS GEAR UNIT SIZE MOUNTING POSITION I LUBRICANT QUANTITY TYPE BRAND

RFSOH - RMSOH - R T W I (SRFOW) (SPRFO511) 0.350KG 0.450KG 0.400KG RF6311 - RMWI - R T W I (SRF1011) 0.600KG 0.8WKG IP

RFBOH - RMBOII - RTBWI (SRFZWI) 1.OOOKG 1.3WKG

RFIWH - R M I W I -RT10011 (SRF3015011) 1.600KG 2.1 WKG 1.9WKG RF1 W 1 - RM12.511 - RT12511 (SRF10011) 2.500KG 3.300KG 2.9WKG

GEAR UNIT SIZE 1 MOUNTING POSITION 1 LUBRICANT QUANTITY TYPE

B3-B5 V W S V3-V6 RF4m - RM4012 - RT4012 0.30OKG 0.40OKG 0.353KG ' RFWZ - RM5012 - RT5012 0.550KG 0.700KG O.6WKG ALTINA - IP

RF6312 - RMW2 - RT632 1.OOOKG 1.300KG 1.150KG GREASE 0 RF8012 - RMW2 - RT8012 5.000KG 6.50OKG 5.8WKG,

RFl0012 - RM10012 - RT10012 8.30OKG 10.80OKG 9.5WKG MELLANA IP

RF12Y1- RM12511 -RT12Y1 13.000KG 17.WOKG 15.00OKG>OILS

I RECOMMENDED TYPES OF GREASE: R1 IR2 GEAR UNITS RECOMMENDED TYPES OF GREASE: R2 GEAR UNITS I OMALA OIL SHELL

SlMMlA GREASE 0 SHELL MOBILGEAR 630 M O W FGL BP SPARTAN EP 220 ESSO NEBULA EP 0 ESSO GRXP 220 BP GR MUlEP 0 AGlP BLASIA 220 AGlP

Remark 1. Initial filling q'ty is provided by maker 2. Oil change interval : Every 12 months (Overall change)

INSTRUCTION BOOK FOR INCINERATOR ~ H M M C O Hyundai Marine Machinery Co., Ltd.

602-15. GAJWADONG SEOGU, INCHEON CITY. KOREA Tel : 032 583 0671 Fax : 032 563 0674 URL : http:llwwwhmmco.co.kr

Page 70

Page 154: IM 8 Incinerator

Filling Up of Suction Side t o Avoid Dry Running at Startup

Before switching on the pump, fill the suction-sided pumpcasing with fluid so that the first rotations will lubricate the conveying elements immediately. A small quantity of fluid is sufficient for lubrication; the subsequent operation of the pump is self-priming, even if an air column up to the liquid level remains.

ElectriclHydraulic Connections The risk of exposure to electrical hazards must be ruled out. Always observe the safety regulations

valid at the site of installation.

Checking Direction of Rotation The rotational direction of the pump determines the flow direction of the conveying medium. Prior to commissioning, the rotational direction of the pump must be checked for compliance wlth the data sheet specification and the rotational direction arrow on the type plate of the pump.

COUNTER-CLOCKWISE CLOCK-WISE

INSTRUCTION BOOK FOR INCINERATOR QHMMCO Hyundai Marine Machinery Co., Ltd.

602-15, GAJWA DONG, SEO GU, INCHEON CITY. KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llw,hmmco.co.kr

Page 71

Page 155: IM 8 Incinerator

I MAXI NG5OllOOllSOSL WS I WASTE OIL BURNER (B)

This type of sludge burner is specially designed to handle waste oil with soft particles up to max. 8 diameter. In order to obtain proper combustion the below procedure should be observed strictly. Before start-up check the following:

mm.

1. The combustion air will be regulated by means of an air damper in order to obtain complete combustion. The combustion is controlled visually by means oaf a sight glass on the side of the incinerator. Note: During test of new incinerator's the damper is adjusted and should not be changed.

2. When starting-up the atomizing air regulates the pressure between 0,8 - 2 bar.

SLUDGE OIL INLET

(AIR/SLUDGE DISTRIBUTOR)

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15, GAJWA DONG SEO GU. INCHEON CITY KOREA Tel : 032 583 0671 Fax : 032 583 0874 URL : hnp:/Whmmw.co.kr

Page 72

Page 156: IM 8 Incinerator

SLUDGE NOZZLE

Pos. - 1 2 3 4 5 6 7 8 9

Q'ty Designation

1 Flange for air tube 1 Air tube 1 Flange 1 Socket 1 Flange for sludge pipe 1 Sludge pipe 1 Plate for sludge pipe 1 Joint bushing for sludge pipe 1 Lock nut for joint bushing

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15, GAJWA DONG, SEO GU. INCHEON CITY. KOREA Tel: 032 583 0671 Fax: 032 583 0674 URL : hHp:llwwwhrnrnco.co.kr

Page 73

Page 157: IM 8 Incinerator

SCHEME FOR MAINTENANCE

I Temperature setting in temp regulator to be checked, 1 2000 h

waste oil burner (B) I ;be cleaned and inspected for wear and tear. I 500 h (ST-1 ) I Oil filter on diesel oil pump to be cleaned,

Electrodes to be checked, see also

I Special instruction. I - Flame detector (FD) Photo cell to be cleaned. 2000 h

Thermocouple (TC) Exchanged in case of fracture.

and possible obstruction. Electrical I connections to be tightened up and I

cables to be checked.

I

Mill pump (PU-5) Check of impeller and mechanical seal 1000 h

Gear motor for PU-3

L ~ ~ V ~ ~ ~ O Mill pump (PU-5) be coni l led. Regularly

Lining I if necessary. See special instruction 11 --

Self-cleaning 2000h Deposits to be removed

Strainer for sludge

The bearings for all electrical motors are of the fully closed type without lubricating nipples. Change of bearings after a working shift of 10,000 hours

INSTRUCTION BOOK FOR INCINERATOR BHMMCO Hyundai Marine Machinery Co.. Ltd. Page 74 602-15. GAJWA DONG, SEO GU, INCHEON CITY. KOREA

Tel : 032 583 0671 Fax : 032 583 0674 URL: htte:llwww.hmmco.co.kr

Page 158: IM 8 Incinerator

LIST OF PARTS

COMPONENTS INCINERATOR

--

MS3 I Micro switch 1 1 PSI I Pressure switch

VH TC2 TC 1 TC3

r I ~efraciory lining repair set

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co.. Ltd.

602-15. GAJWA DONG, SEO GU, INCHEON CITY, KOREA Tel : 032 583 067.1 Fax : 032 583 0674 URL : http:llwhrnmco.co.kr

Silencer for MV9 (114") Primary blower Them~ocouple in funnel Thermocouple Thermocouple

c;onracr nr

IG

IL

IL1

Page 75

HM96D4019 Contact HMMCO HM60M400lA HM60T4015 HM60T4015 HM57S4001 HM60P4001

PS2 PS3

BK

C2 C3 C4

EF

r

Sluice door Refractory lining repair set Gasket for IG Feeding door Gasket for IL Ash door Gasket for IL1

Contact HMMCO HM86D4001 - HM86D4001 - HM86D4001

Pressure switch Pressure switch Mixing chamber Gasket for BK Pneumatic cylinder (feeding door lock) Pneumatic cylinder (sluice) Pneumatic cylinder (sluice) Secondary combustion chamber Refractory lining repair set Primarv combustion chamber

HM60P4007 HM60P4005 - HM26P40186 HM58L4001 HM58L4003 HM58L4003

Contact HMMCO

-~ ~ . ~ ~ . . . . dMCO

Page 159: IM 8 Incinerator

Additional Components incinerator

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co.. Ltd.

602-15, GNWA DONG, SEO GU, INCHEON CITY, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwwwhmmco.co.kr

Page 76

HM68A4002 HM86G4012 HM20P4077 62M4010

SG SG SG

Sight glass (SG) Gasket for SG Sight glass cap for SG U-gauge

Page 160: IM 8 Incinerator

BURNER (ST-IIST-2) < DH160 E2 >

Pas. I PO& 2 Pas. 3 POS. 4 Pos5

. Poo. 8 POP.7 Pw. 8 Pus. 9 Pos. 10 Pw. H Pos. 12 Pos. 13

, Pca 14 Pm. 15' P a 18 POD. 17 Pas. 18 Pa. 19 Pas. 20 P a . 21

INSTRUCTION BOOK FOR INCINERATOR QHMMCO Hyundai Marine Machinery Co., Ltd.

602-15, GAJWA DONG, SEO GU, INCHEON CIM, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwwwhmmco.co.kr

Page 77

Page 161: IM 8 Incinerator

W.0 DOSING PUMP (PU-3)

Maker : BONFlGLlOLO Type : HMD 008-12 1012-12L 1025-6L

INSTRUCTION BOOK FOR INCINERATOR OHMMCO Hyundai Marine Machinery Co., Ltd. 602-15. GAJWA DONG SEO GU. INCHEON CITY KOREA

Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwww.hrnmco.co.kr

Note:

Page 78

When ordering spare parts for the sludge dosing pump please state the circulation pump No. 80P3997 together with the part Nos. described.

Page 162: IM 8 Incinerator

&L

I MAXI NGSOllOOllSOSL WS I

g instruction belonging to

INSTRUCTION BOOK FOR INCINERATOR OHMMCO Hyundai Marine Machinery Co., Ltd. 602-15, GAJWA DONG. SEO GU, INCHEON C I N , KOREA

Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp://w,hmmco.co.kr

Page 79

Page 163: IM 8 Incinerator

WASTE OIL BURNER (B)

PART NO. DESCRIPTION 1 Waste oil burner 2 Housing 3 Turbolator 4 Photo cell(RAR7)

SLUDGE OIL INLET

PART NO. 20P2048 20P2050 20P2049 6639045

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15. GAJWA DONG SEO GU. INCHEON CITY KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : hHp:llwww.hmmco.co.kr

Page 80

Page 164: IM 8 Incinerator

INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15, GAJWA DONG, SEO GU, INCHEON CIW, KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL: hUp:/lwwwhmmco.co.kr

\

I MAXI NGSOllOOllSOSL WS I

ADDITIONAL COMPONENTS

MlLL PUMP - PU-5

The mill is a centrifugal pump with the impeller equipped with knives for comminuting the contents of the sludge tank, maximum particle size of comminution 6mm.

BEFORE SETTING TO WORK

Control direction of rotating ( indicate on the pump casing ) should be clockwise when looking at the el-motor.

Clean tank, suction and discharge pipe for metals. If the pump is made with bayonet locking, control that the pump is properly locked in the bayonet locking.

MAINTENANCE

Check the mechanical seal for leakages, and change it if necessary.

The pump will normally work without maintenance.

As regards check-up of the universal cutter please note that the cutter blades are to be armour-plated. When they are worn out, the armour-plating must either be renewed repaired.

TECHNICAL DATA - MlLL PUMP (PUS)

Is a centrifugal pump with the impeller equipped with knives for comminution content of the

sludge tank. Max. particle size after comminution 6mm.

FOR 3 X 440 V - 60 CYCL.

Capacity : 26 m3/hr and 15 m31hr

Head : 0.4 bar

Motor : 4.8 Kw and 2.2 Kw 13580 rpm I RT = 8.5 14.61 amp

MATERIAL SPECIFICATION

Pump cover : Cast iron ( GC 200 )

Impeller : Bronze castings ( BC 6 )

Spiral casting : Cast iron ( GC 200 )

Cutter : Bronze castings ( BC 6 )

Weight pump and motor : Approx. 60 Kg

Page 81

Page 165: IM 8 Incinerator

PART LIST - MILL PUMP(HMP-15M3 126M3)

ITEM or POS.

101 102 103 lo4 105 lo6 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122

COMPLETE PART NO. : 75K4018

COMPONENT

PUMP CASING IMPELLER MOTOR MOTOR BRACKET UNIVERSAL CUTTER DOUBLE MECHANICAL SEAL CASING O-RING SUCTION COVER O-RING IMPELLER KEY IMPELLER BOLT STUD BOLT HEX. NUT SPRING WASHER HEX. BOLT LUBRICATION HEX. BOLT SEAL COVER OIL SEAL HEX. BOLT SPRING WASHER SEAL COVER O-RING OIL GAUGE

MATERIAL

GC 20 BC 6

GC 200 SS 400 SlClSlC VlTON VlTON SM 45C SS 400 SS 400 SS 400 SS 400 SS 400

TURBINE OIL SS 400 GS 200 VlTON 55400 SS400 VlTON

AL

- INSTRUCTION BOOK FOR INCINERATOR @HMMCO Hyundai Marine Machinery Co., Ltd.

602-15. G A M A DONG. SEO GU, INCHEON CIPI. KOREA Tel : 032 583 0671 Fax : 032 583 0674 URL : http:llwwwhmmco.co.kr

Page 82

\.,

'd'

bd

w

, .,

k J

_... 4

" \

.&

,' \, 4

d

4

w

iU/

'LJ

W

bJ

W

.- W

- \

W

.. \

'wd

... ., %rz

# \

'ha

Page 166: IM 8 Incinerator

9 HYUNDAI MARINE MACHINERY CO.,LTD. 3 HEAD OFFICE & FACTORY 602-15, GAJWA-DONG SEO-GU, INCHOEN CITY, KOREA. TEL : +82-32-583-0671 FAX : +82-32-584-0460

3

3

Update : V3-20070207