    Saudi Kayan PolycarbonatePlant

    PHENOLICS WASTE WATER INCINERATOR

     INCINERATOR C

  • 8/20/2019 Incinerator C

    2/12

    2

    Saudi Kayan PolycarbonatePlant.Contents

     Basic of incineration

     About Incinerator C ( I 90901 )

     Start up and Nora! Operation

     S"ut do#n and Eer$enc% Operation

     Inter!oc&s and Contro!

  • 8/20/2019 Incinerator C

    3/12

    3

    Saudi Kayan PolycarbonatePlant

    .

     WHAT IS

    •Incinerator : a furnace to burn waste.

    •A thermal oxidizer: a process unit for air pollution control in manychemical plants that decomposes hazardous gases/liquid at a high

    temperature and releases them into the atmosphere.• In the Incinerator the chemical/Biological waste is burnt at itsdestruction temperatures. The outlet streams are monitored for thesafety of the Environment before releasing to atmosphere.

  • 8/20/2019 Incinerator C

    4/12

    4

    Saudi Kayan PolycarbonatePlant

    'E *AS+ASTE I,I- ( ANISOE )

    ANT AIR

    +ASTE +ATER ( /ENOICS )

    ATOIIN* STEA

    INCINERATOR C O2ER2IE+

    ain burner 

    i!ot burner 

    Incinerator B!o#er 

    13 burners

    4 burners

  • 8/20/2019 Incinerator C

    5/12

    5

      audi Kayan Polycarbonate Plant

    /S

    905

    /S

    906

    /S

    901

    7

    908

    B7

    901

    /S

    908

    7

    905

    B7

    906

    7

    90

    B7

    908

    E/S

    910

    AIN BRNER

    START

    I*NITION

    START

    R*E

    START

    R*IN* AIN BRNER

    STO'AE

    RO2EN

    'AE

    RO2EN+ASTE

    REA-:R*E

    COETE

    'AE RO2EN EER*ENC: S/T-O+N

    ICINERATOR C CONTRO ANE

  • 8/20/2019 Incinerator C

    6/12

    6

    Saudi Kayan PolycarbonatePlant

    Incinerator Operation

     Phenolics waste water in TK-93902 is ed to Phenolics wastewater incinerator and !"rnt# $"el %as is "sed as a "el or the Incinerator# Anisole is also !"rnt in case o Plant "&set conditions#

     The Burner Management ystem !BM" is a safety control systemthat provides for the orderly start up# operation# and shutdown of theincinerator burner. The BM monitors critical interloc$s during burnerfiring and ensures a safe shutdown if a critical interloc$ fault should

    occur. The system is designed for local operation start up. BM controlis e%ecuted within a &'( logic)solver.

  • 8/20/2019 Incinerator C

    7/12

    7

    Saudi Kayan PolycarbonatePlant

    Sr.No. Step Activity

    1 Pre startTo check the healthiness of all safety andoperation parameters

    2 System PurgeTo purge out all hydrocarbons beforeignition of burner ith air bloing.

    ! Pilot "gnition #irst step before $ain burner startup.

    % $ain &urner "gnitionTo start the main burner for asteincineration.

    '$ain &urner lo (re

    release)heck the healthiness of $ain burnerbefore aste li*uid incineration.

    + Normal ,peration To increase the temperature as per S,P.

    -aste li*uidincineration

    To burn the Phenolics aste above itsminimum aste destruction temperatureby introducing the aste li*uid in theincinerator.

    INCINERATOR START OERATON STES

  • 8/20/2019 Incinerator C

    8/12

    8

    Saudi Kayan PolycarbonatePlant

    NORA S/T-O+N OERATION

    Sr.No. Activity

    1 Stop t"e f!o# of #aste(s) to t"e t"era! o;idi ain burnerStop > pus" button ( /S 908 )

    % Stop Incinerator b!o#er I?90901?B?01 as needed.

    EER*ENC: S/T-O+N OERATION

     If a s%ste eer$enc% stop is initiated for an% reason@ it "as t"e sae

    effect as a trip of an% of t"e continuous inter!oc&s or a f!ae fai!ure.

     T"e ain fue! b!oc& a!es (72?901) and t"e #aste b!oc& a!es c!ose

    (72?90 72?904)@ causin$ an iediate burner s"utdo#n.

     

  • 8/20/2019 Incinerator C

    9/12

    9

    Saudi Kayan PolycarbonatePlant

    REEBER -RIN* START AN- S/T-O+N

     'o!!o# t"e start up and s"utdo#n SOs strict!%.

      -urin$ Initia! start up and If t"e unit "as been s"utdo#n

    in e;cess of 8 da%s and t"e refractor% is near abient #it"

    "i$" "uidit% t"e initia! cure?out sc"edu!e s"ou!d be

    fo!!o#ed.

     If t"e teperature is be!o# 154 DC after s"ut do#n@ fo!!o#

    t"e Co!d startup or Initia! care out procedure .

     If t"e teperature is aboe 154 DC after s"utdo#n@ fo!!o#

    t"e /ot startup procedure.

  • 8/20/2019 Incinerator C

    10/12

    10

    Saudi Kayan PolycarbonatePlantTec"nica! data

    T? 98906

    Capacit% F 3504 '3

     ( +or&in$ capacit% 3154 '3

     )a; pup inF 49. '3 ( hra; pup outF 18.6 '3 ( hr

  • 8/20/2019 Incinerator C

    11/12

    11

    Saudi Kayan PolycarbonatePlant

    / //

    PIT-901 Main b!n"! #a$ %&$'!"a( &!"$$!" 0)7 1)1 - -

    PIT-902 Main b!n"! #a$ *+,n$'!"a( &!"$$!" - - 1)6 1)7PIT-905 P"n+.i/ Wa$'" Wa'"! &!"$$!" 1)5 2 9 -

    PIT-906 Ani$+." Lii* Wa$'" &!"$$!" 1)5 2 9 -

    PIT-903 P.an' ai! &!"$$!" 3 4 - -

    PIT-907 A'+(iin# S'"a( &!"$$!" 2 2)76 - -

    TIT-902 T"!(a. Oi*i"! '"(&"!a'!" 760 815 1040 1090

    IT-904 C+(b$'i+n ai! .+, 1600 22900 - -

    I?91 is a coon inter!oc& for t"e Incinerator C.

    'o!!o#in$ are inter!oc& set points of t"e process paraeters.

  • 8/20/2019 Incinerator C

    12/12

    12

      audi Kayan Polycarbonate Plant

    Thank You

    AES/ ATE

    AB- RA'