IMPLEMENT CHANGE MANAGEMENT

IN VALIDATION

Paul L. Pluta, PhDJournal of Validation Technology

Journal of GXP Compliance

University of Illinois at Chicago (UIC)

College of Pharmacy

Chicago, IL, USA

Page 2: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

CHANGE MANAGEMENT FUNCTION

ORGANIZATION STRUCTURE

• Separate department

• Identified part of validation

• Functional part of validation

• Identified part of QA

• Functional part of QA

• Other

Page 3: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

CHANGE MANAGEMENT PROBLEMS

What is the definition of change?

Page 4: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

PROBLEMS WITH CHANGE MANAGEMEMT

• Personnel work load– Insufficient pre-work

– Incomplete post-work

• Personnel attitude– “No change” evaluations

– “Like for like” evaluations

– Avoid validation documentation

• Level of compliance understanding– Change management requirement

– Inputs from multiple departments• Regular and reliable input

• Variable input

• No input

• Emergency changes– No records – “We always do it this way.”

Page 5: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

OBJECTIVE

• Why change management problems?– Multiple reasons

• Approaches to improve change management

• Approaches to correct change deficiencies in validation packages

Page 6: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

OUTLINE

• Lifecycle approach to validation

• Validation change initiation

• Validation Plan

• Infrastructure

• Problem solving approaches

PLEASE PARTICIPATE

Page 7: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

CHANGE MANAGEMENT STRATEGY AND

APPROACH

• Lifecycle approach

• Science and technical basis

• Uniform approach to all validation / qualification

• Documentation consistency

• Infrastructure – Organization structure, approval committee, quality system management, culture

Page 8: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

LIFECYCLE APPROACH

• FDA Guidance

• Application to equipment, facilities, systems, others

– Manufacturing process validation

– Other processes: Cleaning, packaging, analytical

– Equipment “processes:” Purified Water, HVAC

– Equipment

– Quality systems

• Stage expectations

Page 9: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

LIFECYCLE APPROACH TO PROCESS VALIDATION

Process validation stages and stage expectations1. Development

2. Demonstration

3. Monitoring and maintenance

FDA Objective: Manufacturing processes

Applications?

Application to quality systems, e.g., training.

Reference: FDA. Guidance for Industry. Process Validation: General Principles and Practices, January 2011.

9

Page 10: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION PRINCIPLES

• Validation is confirmation.

• Successful performance is assumed

• Scientific and technical basis -- statistical data treatment

• Validated processes, equipment, utilities, computer systems, others

• Three validation stages Process improvements

• Minimize variation and variation control plan

• Appropriate for associated risk

10

Page 11: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

PROCESS VALIDATION AND QUALIFICTION

Process Validation – Process QualificationPV -- PQ -- PPQ

Qualification Qualification

Equipment #1 HVACUtilities

Equipment #2 FacilitiesComputers

Equipment #3

Analytical methods validation

Process is validated

11

Page 12: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

LIFECYCLE APPROACH TO PROCESS VALIDATIONFDA, 2011

Definition: Collection and evaluation of data, from the process design stage throughout commercial production, which establishes scientific evidence that a process is capable of consistently delivering quality products. Process validation involves a series of activities over the lifecycle of the product and process.

Three stages of activities:

• Stage 1 – Process Design – Development and scale-up activities

• Stage 2 – Process Qualification – Reproducible manufacturing

• Stage 3 – Continued Process Verification – Routine manufacturing

STAGE 1 AND STAGE 3 EMPHASIS – NEW PARADIGM

ABOVE CONCEPTS APPLICABLE TO ALL PROCESSES, EFU, ETC.

12

Page 13: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

LIFECYCLE APPROACH RESPONSIBILITIES

Stage 1. R&D, Technical Support, Engineering, other technical functions.

Stage 2. Partnership with Stage 1 contributors

Stage 3. QA with functional and statistical (SPC) support

NEW PARADIGM

INTEGRATED ORGANIZATIONAL APPROACH

13

Page 14: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

STAGE 1: QUALITY BY DESIGN (QbD)

Quality target product profile (QTTP)

Critical quality attributes (CQA)

Critical material attributes (CMA)

Critical process parameters (CPP)

Design space

Scale-up and technology transfer

Identify input variables

Input variable control strategy

Continuous improvement

Other considerations: PAT, risk analysis

DEVELOPMENT PROCESS DEFINED

GLOBAL GUIDANCES

14

Page 15: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

STAGE 2: DEMONSTRATION

Process Performance Qualification (PPQ)

• Confirm the process design and development work

• Demonstrate that the commercial manufacturing process performs as expected.

• Based on sound science and experience.

• Higher level of testing and sampling.

• Process is reproducible and will consistently deliver quality products.

15

Page 16: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

STAGE 3: MONITORING AND MAINTENANCE

• Assuming good development of the process, identification of potential variation, and control of same, the manufacturer must maintain the process under control over the product lifetime.

• Control must accommodate expected changes in materials, equipment, personnel, and other changes throughout the commercial life of the product based on risk analysis.

16

Page 17: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION PHILOSOPHY

• Validation is confirmation.

• Acceptable (passing) results are expected.

• Validation is not

– R&D

– Final stage of development process

– Optimization

– Fine-tuning

– Debugging

17

Page 18: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION HISTORY AND EVOLUTION

1978

GMP includes Validation.

1987

DevelopmentVALIDATION Control

2008-2011

Lifecycle approach

UNDERSTANDING PQ MONITORING

18

Page 19: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION CHANGE INITIATION

• What is being validated or qualified?

• Why necessary?

• Risk / impact analysis

• Validation Plan

• Post validation: What else must be done when validation is completed?

• Assurance of completion

Page 20: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

STAGE 2 DOCUMENTS – PROCESS QUALIFICATIONVALIDATION INITIATION AND VALIDATION PLAN

Initiation: Statement of recommended validation• What?

• Why needed?

• Why acceptable?

• Impact of validation – risk analysis

• Approach to accomplish – Validation Plan

• Approvals

Validation Plan: Details of work to accomplish validation• Description of strategy and approach

• References from Stage 1 work supporting validation

• Approvals

MAY BE SINGLE DOCUMENT OR TWO SEPARATE DOCUMENTS

20

Page 21: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION INITIATION OUTLINE / TEMPLATE

NEW VALIDATION OR CHANGE TO A VALIDATED SYSTEM

• Objective of validation

• Why needed?

• Impact of validation– Risk analysis

• Why acceptable?– Compliance to internal requirements, policies, engineering standards, etc.

– Regulatory impact (Prior approval, CBE, CBE30, etc.)

– Other systems or product impacted

– Procedure changes or other document changes

– Notifications to affected groups (internal, external, labs)

• Validation Plan -- Approach to accomplish validation

Above applicable to equipment and other qualification

HAVE MODEL DOCUMENTS AVAILABLE

21

Page 22: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION INITIATION -- PROBLEMS

• Inconsistent content– Form with standardized information needed – outline sections

• Poorly written– Inadequate information

• Prematurely written– Written to meet business goals

– Written to demonstrate future intent

• Amendments necessary -- changes usually required

Validation initiations should be submitted for approval only after objective and scope of validation is determined and work details (risk/testing/sampling) determined.

Amendments are a planning failure regardless of justification.HAVE MODEL DOCUMENTS AVAILABLE

22

Page 23: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION INITIATION SUMMARY

• Establish template for all validation / qualification

• Minimize writing

• Simple words, simple sentences

• Clear and concise.

• Provide details in Validation Plan

• Checklist for specific types of validation

23

Page 24: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

CHECKLIST EXAMPLE: PRODUCT / PROCESS DESIGN INFORMATION

• Technical reports from R&D

• Pharmaceutics reports

• Formulation and process development reports (CQA, CMA, CPP)

• Technology transfer / Scale-up reports

• Identification of sources of variation

• Variation control plans

• Analytical methods

• Other technical reports

REPORTS SHOULD BE REVIEWED FOR CONSISTENCY BETWEEN GROUPS

REPORTS SHOULD BE REFERENCED IN VALIDATION PLAN

24

Page 25: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

CHECKLIST EXAMPLE: EQUIPMENT

• Operating manuals in engineering library

• Calibration schedule initiated

• Preventive maintenance schedule initiated

• SOP’s written

• Drawing filed

• Other

Page 26: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION PLAN

• Introduction

• Technical information

• Validation strategy and testing

• Validation documentation

• References

Page 27: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION PLANMOST IMPORTANT DOCUMENT

OUTLINE

• Introduction

• Technical information– Validation pre-work references

• Validation strategy and testing

• Validation documentation– List of required protocols, reports, procedures, etc.

– Validation post-work requirements

– Administrative benefit

• References– List of reports and scientific references (including Stage 1 reports)

HAVE MODEL DOCUMENTS AVAILABLE

27

Page 28: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION DOCUMENT CONTINUUM

Validation Plan -- Comprehensive explanation

Validation Protocol -- Execute Validation Plan with

details

Results -- Execute protocol – Pass / Fail / Discussion

Conclusion: Process / equipment is validated

28

Page 29: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION PLAN

INTRODUCTION

• Overview describing validation / product / process / equipment / etc. (consistent with request)

• Requirements to complete validation– Conformance to regulations and internal policy

– Impact of change to maintain the validated state

– Impact on regulatory submission

– Impact of change on procedures, drawings, other documents

– Notifications to other areas internal and external (e.g., environmental agency, internal test labs) impacted by validation

29

Page 30: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION PLAN

TECHNICAL INFORMATION• Basic product / process / equipment description

– Formula

– Process

– Specifications

– Include non-technical description information

• Technical aspects of validation / qualification

• Reference to technical reports from Stage 1

• Total validation approach– Experimental studies

– Past data (retrospective data)

– Validation protocols

– Other work

– New procedures

• Number of lots – related to impact of change and risk

WRITTEN FOR THE READER

30

Page 31: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION PLAN

VALIDATION STRATEGY AND TESTING

• Prospective validation only

• Types of testing -- general

– Regulatory specifications

– Internal controls

– Process tests

• Tests and rationale – general

– Address changes – based on risk analysis

• Sampling and rationale – general

– Exceed routine QA testing – based on impact and risk analysis

• Data treatment – general

– Statistical data treatment and confidence limits

• Acceptance criteria – general

• Post-validation testing (Stage 3)

DETAILS OF ABOVE PROVIDED IN PROTOCOLS

31

Page 32: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

SAMPLING AND RATIONALE

• Sampling templates recommended

• Specified sampling for each unit operation

• Sampling pages approved by Validation Approval Committee

• Consistent sampling for all processes –minimize judgments by document writers.

• Risk-based

• Cleaning validation example.

32

Page 33: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION SAMPLING

What is routine QA sampling?

Impact of change• High impact

• Medium impact

• Low impact

• No impact

Risk analysis – Related to numerical RPN analysis • High risk

• Medium risk

• Low risk

RISK LEVEL MUST BE ACKNOWLEDGED

TEST REQUIREMENTS MUST REFLECT RISK ANALYSIS

33

Page 34: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION POST-WORK

Activities to be done post-validation

• New drawings and drawing updates

• Calibration changes

• Preventive maintenance changes

• Operations manual changes

• SOP changes

• Others

Page 35: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION PLAN

VALIDATION DOCUMENTATIONList all documents required to complete validation

Doc # Title Date complete

01 XXX Validation Initiation

02 XXX Dryer Engineering Study

03 XXX Dryer Qualification

04 XXX Process Scale-up Engineering Study

05 XXX Process Validation

06 Update Validation Master Plan – Product and Equipment sections

07 XXX Project Summary Report

08 XXX Reference document

09 XXX Reference document

35

Page 36: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION PLAN

REFERENCES

• R&D Reports

– R&D reports

– QbD required documents

• Development and analytical reports

• Published literature

Scientific and technical support to validation plan

Report copies should be stored in validation area or readily accessible (within 30 minutes)

36

Page 37: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION DOCUMENT APPROVALVALIDATION APPROVAL COMMITTEE (VAC)

VAC must review documents with perspective of an external regulatory auditor

• Assure acceptability of technical validation and product quality

• Assure compliance with regulations, policies, and industry expectations

• Assure acceptability of documentation.– Spelling and grammar

VAC IMPORTANT PARTNER WITH VALIDATION

37

Page 38: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

INFRASTRUCTURE

• Documentation format

• Document authors – training

• Validation Approval Committee –Responsibilities and training

• Post-validation follow up

• Site culture

up

Page 39: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

PROCESS VALIDATION DOCUMENTS

• Validation policy – Reference PV Guidance approach– Corporate templates

• Validation Master Plan (VMP) – Reference PV Guidance approach

• Stage 1 documents – Process Design

• Stage 2 documents – Process Qualification

– Validation Request / Plan -- Reference PV Guidance

– Validation Protocol(s) – Reference PV Guidance

– Engineering Studies

– Others

– Validation Results / Report – Reference PV Guidance

• Stage 3 documents – Continued Process Verification

– PQ requirements

– Routine monitoring – Reference PV Guidance

• Associated validation and qualification -- Reference PV Guidance

• Other associated documents

39

Page 40: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION DOCUMENT APPROVAL

Technical validation• Scientific and technical principles

• Consistent approach

• Supports objective of validation

• Supports routine manufacturing in type of testing and sampling

• Support routine manufacturing in duration of sampling and testing

• Results and discussion support data

• Correct technical conclusions

• Equipment testing support entire operating range used in manufacturing

40

Page 41: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION APPROVAL COMMITTEE

• Training consistent with area of expertise

• Specialized training on validation function

• Emphasize role of internal auditor– Surrogate regulatory auditor

VALIDATION APPROVAL COMMITTEE

IS NOT

Training for new personnel

Expeditor for engineering documents

41

Page 42: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

OTHER APPLICATIONS

• Other processes

• Equipment “processes”

• Equipment / facilities/utilities/control

systems, etc. qualifications

• Quality systems.

Page 43: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

MANAGEMENT RESPONSIBILITYVALIDATION QUALITY SYSTEM

LIFECYCLE APPROACH

Quality System Design

Is the quality system properly designed to conduct the validation

business process? What about outsourced products, outsourced

processes, outsourced validation/qualification?

Quality System Performance

Does the quality system perform as designed?

Quality System Monitoring and Maintenance

What is done to maintain quality system performance?

RISK AND VARIATION

43

Page 44: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

QUALITY SYSTEM QUESTIONS

Procedures for all validation quality system activities -- Manufacturing processes, cleaning processes,

analytical processes, equipment qualifications, other qualifications, computer systems, and

other categories of validation/qualification?

Model documents for above categories of activities regarding validation initiation, validation plans,

protocols, results, and reports?

Validation documents templates?

Validation training for validation personnel

Validation training for associated functions? R&D, Technical support, others

Validation training for document writers?

Adequate number of validation personnel?

Expertise of validation personnel?

Expertise of Validation Approval Committee (VAC)?

VAC responsibilities consistent with expertise?

Technical writers?

Personnel development and training?

Validation facilities?

Facility security?

Document library?

Electronic systems?

Electronic systems to monitor throughput, open documents, errors, etc.?

Monitoring on validated processes? Feedback, e.g., incidence of recleaning?

Monitoring on qualified EFU? Feedback?

44

Page 45: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

QbD and VALIDATION QUALITY SYSTEM

Objectives

• Validation business process performance excellence

Validation quality system attributes

• Business process performance attributes

Validation quality system parameters

• Business process performance

Variation and control

• Business system procedures and training

Risk management

• Highest risk activities prioritized

Validation quality system improvement

• Improvements based on evaluation activities

45

Page 46: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION QUALITY SYSTEM BUSINESS PROCESS

PROJECT INITIATION, DESIGN, AND DEVELOPMENT BY SITE FUNCTION (STAGE 1)

1. Validation provides information on future needs in support of PQ

2. Validation receives / accesses recommended documents

PROCESS QUALIFICATON (PQ – STAGE 2)

3. Validation initiation – Sources of requests

4. VAC approval

5. Protocol written

6. VAC approval

7. Test results and post-validation recommendations

8. VAC approval

9. Validation administrative closure

10. Document storage

POST VALIDATION (STAGE 3)

11. Post-validation protocol initiation

12. VAC approval

13. Test results

14. VAC approval

15. Validation administrative closure

16. Document storage

17. Monitor validated process, EFU, etc. performance

18. Validation reviews – Deviations, CAPA, etc.

IMPROVEMENT PROJECTS

19. Initiate validation improvement project

20. Complete validation improvement project including implementation

21. Complete validation change project

46

Page 47: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION QUALITY SYSTEM BY DESIGNLIFECYCLE APPROACH

INITIATION, DESIGN, AND DEVELOPMENT

1. Objective

2. Attributes and parameters

3. Variation and control of variation

4. Risk analysis

5. Monitoring

PROCESS QUALIFICATION

1. Objective

2. Attributes and parameters

3. Variation and control of variation

4. Risk analysis

5. Monitoring

POST VALIDATION

1. Objective

2. Attributes and parameters

3. Variation and control of variation

4. Risk analysis

5. Monitoring

IMPROVEMENT PROJECTS

1. Objectives

2. Performance and implementation,

47

Page 48: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

QbD APPROACH TO VALIDATION QUALITY SYSTEM –BUSINESS PROCESS

Objectives

– What are the goals of each process step?

Attributes

– What makes a process step successful?

Parameters

– What factors significantly influence the success of the process step?

Variation and control of variation

– What variation in performance is expected and how is it controlled?

Risk management

– What are highest risk activities?

– Prioritization, evaluation, and review highest level for highest risk

Evaluation

– Review performance of validation quality system and subsystems

– Review performance of validatd processes, EFU, etc.

48

Page 49: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION QUALITY SYSTEM -- PROBLEM EXAMPLES

MANUFACTURING EQUIPMENT AND PROCESSES

• Operators did not perceive changes to be changes – inadequate change control

• Everything was “like-for-like” or not significant.

CLEANING VALIDATION

• No technical basis for cleaning

• Operators did whatever needed “to get the job done.”

CLEANING VALIDATION SAMPLING

• Sampling personnel not adequately trained – false negative data

DOCUMENTATION

• Numerous documentation problems such as data recording, original data, back dating, etc.

DOCUMENTATION COMPLIANCE

• Documentation not compliant with corporate requirements or regulatory expectations

DOCUMENTATION GRAMMATICAL

• Documentation poorly written

SAMPLING PROBLEMS

• Sampling personnel not adequately trained

NON-STERILE “CLEAN” PROCESSES

• Sampling personnel not adequately trained in mmicrobiology

LIKE-FOR-LIKE CHANGES

• No testing of correct installation

49

Page 50: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

VALIDATION QUALITY SYSTEM –

CORRECTIVE ACTION PROJECTS

Validation Training Module

Validation Protocol Writer Training

Cleaning Validation Training

Cleaning Visual Inspection Training

Documentation Practices Training

Validation Approval Committee Training

Validation Approval Committee Procedure and Responsibilities

Validation Model Documents

Like-for-Like Approval (non-protocol) Process

Microbiology Training

Validation Policy Changes

RECORD CORRECTIVE ACTION PROJECTS IN VMP

50

Page 51: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

PROBLEM SOLVING APPROACHES

“No change” evaluations

• Example: Motor “like-for-like changes”

• Multiple problem examples

• Must check installation

Requirement: Email stating installation was

verified by supervisor attached to validation

initiation form. Minimal paperwork.

Page 52: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

PROBLEM SOLVING APPROACHES

Overlooked Requirements

• Template with specific requirements for each

validation / qualificationo Manufacturing process

o Equipment

o Cleaning

o HVAC

o Purified Water

Requirement: Template affixed to validation initiation

document and Validation Plan

Page 53: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

PROBLEM SOLVING APPROACHES

Deficient Validation / Qualification Packages

• Old (>10yrs) packages

• Multiple changes

Requirement: New changes include review of entire package in addition to specific change requirements

• Example: Water system, steam system, room configurations, others

Page 54: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

PROBLEM SOLVING APPROACHES

Deficient Validation / Qualification Packages

• Old (>10yrs) packages, multiple changes

Internal review program

Headcount approach: Intern program,

summer students

Page 55: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

SUMMARY

CHANGE MANAGEMENT PROBLEMS ADDRESSED

– Personnel work load

• Insufficient pre-work

• Incomplete post-work

– Personnel attitude

• “No change” evaluations

• “Like for like” evaluations

• Avoid validation documentation

– Level of compliance understanding

• Inputs from multiple departments– Regular and reliable input

– Variable input

– No input

– Emergency changes

• No records – “We always do it this way.”

Page 56: IMPLEMENT CHANGE MANAGEMENT IN VALIDATION - … Chge Mgmt... · IMPLEMENT CHANGE MANAGEMENT IN VALIDATION ... • Number of lots –related to impact of change and risk ... 07 XXX

Paul L. Pluta, PhD

Editor-in-ChiefJournal of Validation TechnologyJournal of GXP Compliance