Page 1: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

Implementation of Trades and Transfers

National Grid NTS

5th June 2008

Page 2: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

2

Overview

Proposal 187A implemented 1 June 2008 ‘Old’ (i.e. current RMSEC) rules will apply for June RMSEC,

allocating July Capacity First auction to which ‘new’ (187A) rules apply is July

RMTTSEC for August Capacity RMTTSEC process to kick off 20 June* with issue of

Surrender Invitation There will be some overlap of the RMSEC and RMTTSEC

auction processes

*All dates in this presentation are indicative - a definitive timeline will be published at the start of the process

If there is any variance between this presentation and the legal text put in UNC, then the UNC takes precedence

Page 3: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

3

Surrender Invitation

Surrender invitation letter issued [20] June via JO, Surefax and National Grid website

Surrender invitation will specify:

-The calendar month in respect of which the rolling monthly surrender invitation is made

-The date (being within the next two business days) on which the surrender window will be open

-The reserve price for Monthly NTS Entry Capacity at each ASEP for the relevant month

Surrender Invite

Surrender Window RMTTSEC

Invite

RMTTSEC Bid Window

Allocation Process

Aggregate Results

User Results

20 June

2 b. days5 b. days 29 July

Page 4: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

4

Surrender Window

Surrender window open [24] June 08:00 hours to 17:00 hours on Gemini

A User may make up to two offers per ASEP

Offers can be withdrawn or amended within the window

The User will have to accept terms and conditions before being able to submit a surrender offer - this will include a requirement to confirm that the User holds, and continues to hold, an amount of firm capacity equivalent to that offered for surrender in total (i.e. the aggregate of both bids) at each ASEP

Surrender Invite

Surrender Window RMTTSEC

Bid WindowAllocation Process

Aggregate Results

User Results

20 June

2 b. days5 b. days 29 July

When placing a surrender offer, the User must specify:

-The identity of the User

-The relevant month

-The ASEP

-The amount (not less than the minimum eligible amount, 100,000kWh) being offered for surrender

-The minimum price that the User wishes to be paid in respect of the surrendered capacity – NB there is no restriction on this price

Page 5: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

5

RMTTSEC Invitation

RMTTSEC invitation issued [27] June via JO, Surefax and National Grid website

RMTTSEC invitation will specify:

-The date (being one of the 20 business days preceding the last business day of the month, and being not earlier than 5 business days after the invite is issued) on which the RMTTSEC bid window will be open

-For each ASEP:

-the quantity of capacity that has been offered for surrender

a) below reserve, b) at reserve, c) above reserve

-the amount of unsold capacity

-the reserve price

Surrender Invite

Surrender Window RMTTSEC

Invite

RMTTSEC Bid Window

Allocation Process

Aggregate Results

User Results

20 June 5 b. days 29 July

Page 6: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

6

RMTTSEC Bid Window

RMTTSEC bid window open [4] July 08:00 hours to 17:00 hours on Gemini

A User may have up to twenty bids per ASEP

Bids can be withdrawn or amended within the bid window

Users placing a bid must specify:

-The identity of the User

-The relevant month

-The ASEP

-The amount (not less than the minimum eligible amount 100,000kWh) of monthly capacity applied for

-The minimum amount (not less than the minimum eligible amount) that the User is willing to be allocated

-The bid price, which is not less than the reserve price

Surrender Invite

Surrender Window RMTTSEC

Invite

RMTTSEC Bid Window

Allocation Process

Aggregate Results

User Results

Bid window – one of last 20 b. days preceding last b. day of month

20 June 29 July

Page 7: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

7

Allocation Process

The allocation process will take place from [4] July to [28] July

Capacity will be allocated in 2 stages firstly via the ‘initial stage’ (at the ASEP) and secondly via the ‘trade and transfer’ stage (between ASEPs), with the general principles being:

-Capacity will be allocated to the highest priced bid first

-Capacity allocations will utilise the lowest priced available capacity first and in the following order across both the initial allocations stage and the trade & transfer allocations stage:

1) Surrendered Capacity below reserve price

2) Surrendered Capacity at reserve price

3) Unsold Capacity

4) Surrendered Capacity above reserve price

Surrender Invite

Surrender Window RMTTSEC

Invite

RMTTSEC Bid Window

Allocation Process

Aggregate Results

User Results

Bid window – one of last 20 b. days preceding last b. day of month

20 June 29 July

Page 8: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

8

Initial Allocation Stage

All bids ranked in order of price (highest first) at each ASEP Capacity allocated to highest priced bids first Where the amount applied for exceeds the available (surrendered and

unsold) capacity, the User will be allocated the remaining unallocated amount

Where two or more bids specify the same bid price, the allocation will be pro rated

Where the amount to be allocated does not meet the minimum amount criteria, the bid will be disregarded from the initial allocation stage and an allocation made between the other equally priced bids or the next highest priced bid (as relevant)

Surrendered capacity will only be allocated where the bid price is equal to or higher than the minimum surrender price

All unallocated and partially allocated bids remaining unsatisfied at the end of the initial allocation stage will progress through to the trade and transfer allocation stage

ASEPs with unsatisfied bids remaining progress through to the T&T stage as Recipients, ASEPs with unsold or surrendered capacity remaining progress through as Donors

Page 9: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

9

Trade and Transfer Allocation Stage

Unsatisfied bids ranked in price order (highest first) at each ASEP All unsatisfied bids at each ASEP will be grouped such that each unsatisfied

bid group contains 25% of the total unsatisfied bid volume for that ASEP Bids will be kept whole and where a bid falls across two groups, it will be included in

the higher group Where two bids have the same bid price, they shall both be included in the higher

group Where a group contains more than 25% of the unsatisfied bid quantity, the size of the

next group will be reduced accordingly (i.e. Group1 at ASEP A contains 30% unsatisfied bid volume so Group2 will contain 20%)

This could result in less than 4 groups for each ASEP The bid group price (a Weighted Average Price) will be calculated for each

group The bid groups for all ASEPs will be ranked according to bid group price,

with the highest ranking first. Where two or more groups for the same ASEP occur consecutively, they will be amalgamated for the purposes of calculating exchange rates

Bid groups will be allocated against in descending order The bid group price is used purely for the initial ranking, it will not be

recalculated during the process

Page 10: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

10

Applying Exchange Rates

National Grid will consider each unsatisfied bid group in turn (highest first) and identify the most favourable Donor ASEP with reference to the inter-ASEP exchange rate applying between them

Capacity will be allocated from the most favourable Donor first (i.e. closest to 1:1) The exchange rate will be calculated on the basis of the remaining unsatisfied bid volume

within the group, regardless of whether that could be met wholly by that Donor ASEP Where a Donor cannot satisfy all of the bids in the group, the bids will be allocated against in

price order (highest first) Equally priced bids will be sorted according to time stamp Where no more allocations can be made from the Donor and there are unsatisfied bids

remaining within the unsatisfied bid group, the next most favourable Donor will be considered

Where no more allocations can be made from any Donor and there are unsatisfied bids remaining within the bid group, those bids will drop down to the next bid group for that ASEP (unless there are no more, in which case they will be rejected)

Once a bid group has been fully allocated against or all unsatisfied bids have dropped to the next bid group for that ASEP or been rejected, the next highest ranking unsatisfied bid group will be considered and the process repeated

Allocations will not be made where The exchange rate is higher than 10:1 The unit price (bid price/exchange rate) is higher than the minimum surrender price for

surrender offers The amount to be allocated is less than the minimum amount criteria

Page 11: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

11

User Results

Individual Users who placed bids or surrender offers will be informed of their results via Gemini on [28] July

Users who submitted bids will be informed of:

-The bids in respect of which an allocation was made

-The amount of Monthly Entry Capacity held for the relevant month

-The amount of NTS Entry Capacity held for the relevant month

Users who submitted surrender offers will be informed of:

-The amount of capacity that the User offered for surrender

-The aggregate amount of capacity that was accepted as surrendered

-The weighted average unit price in respect of each surrender offer

Surrender Invite

Surrender Window RMTTSEC

Invite

RMTTSEC Bid Window

Allocation Process

Aggregate Results

User Results

1 b. day20 June

Page 12: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

12

Aggregate Results

Surrender Invite

RMTTSEC Invite

RMTTSEC Bid Window

Aggregate Results

User Results

All Users will be informed of the aggregate results via Gemini and the National Grid website on [29] July

-Standard auction related information e.g. highest / lowest accepted bid prices, weighted average bid prices

-The amount of capacity allocated through the initial allocation stage

-The amount of capacity allocated through the trade and transfer stage

-The aggregate amount of capacity offered for surrender and the aggregate amount of capacity accepted as surrendered

-The amount of capacity remaining unsold and therefore available for daily auctions

-The order in which bid groups were ranked

-For each recipient ASEP, the highest and lowest bid price and the weighted average bid price

-The weighted average inter-ASEP exchange rate for each combination of Recipient-Donor ASEP pairs

1 b. day20 June

Page 13: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

13‘Old Rules’ June RMSEC Timetable for July Capacity

16 June RMSEC Invite

23 June RMSEC Bid

Window and User Results

24 June Aggregate

Results

Surrender Invite

Surrender Window RMTTSEC

Invite

RMTTSEC Bid Window

Allocation Process

Aggregate Results

User Results

20 June 29 July

Page 14: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

14

Additional Information

Inter-ASEP exchange rates will be published after each auction

This will allow a picture of indicative exchange rates to be built up

It is envisaged that in time, as experience is gained, the 15 days for allocations will shorten

Process is to be run manually until Gemini solution can be implemented

Receipt of decision to implement Mod 187A not being received until late April means that a Gemini solution will not now be in place until April 09

Page 15: Implementation of Trades and Transfers National Grid NTS 5 th June 2008

15

Contacts

For questions on the Modification: Chris Wright – BGT – 01753 431059 Fergus Healy 01926 655031 Claire Dykta 01926 655915

For questions on the Methodology Statement: Andrew Fox 01926 656217

For questions on the Auction Chris Gumbley 01926 654071 Dave Wagstaff 01926 654045 Kay Haycock 01926 655342 Andy Nixon 01926 654132 [email protected]

A further run through of the RMTTSEC process will be given to the Gas Operational Forum

10th June, 10:30am, Radisson Grafton Hotel Tottenham Court Road

ANY QUESTIONS?