implementing bim for owners - nfmt · building elements, level of development/lod) – additional...

33
Implementing BIM for Owners UNDERSTANDING THE BENEFITS OF BIM AND THE STEPS TO START IMPLEMENTING Jason Kunkel // Senior Applications Specialist © 2016 CAD D Microsystems, Inc.

Upload: others

Post on 03-Jun-2020

46 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

FEBRUARY 26, 2016

Implementing BIM for OwnersUNDERSTANDING THE BENEFITS OF BIM AND THE STEPS TO START IMPLEMENTING

Jason Kunkel // Senior Applications Specialist

© 2016 CADD Microsystems, Inc.

Page 2: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Purpose // Process // Payoff

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 2

WHAT IS THE GOAL OF TODAY’S PRESENTATION?

To educate owners and their consultants on why and what it takes to implement BIM.

WHAT ARE WE GOING TO ACCOMPLISH DURING THIS PRESENTATION?

We will discuss what BIM is, a brief history, why it’s beneficial, the components of a BIM implementation for owners, a recommended roadmap for implementation, and then next steps.

WHAT DO WE HOPE YOU WILL TAKE AWAY FROM THIS PRESENTATION?

You will gain the knowledge you need to understand BIM from an owner’s perspective, be much better equipped to start implementing it, and have your next steps defined.

Page 3: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Agenda

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 3

Introduction

Overview of BIMWhat is i t? // Brief History // Why is it Beneficial?

Components of a BIM ImplementationWhat are they? // What are some recommendations?

Recommended BIM Implementation RoadmapShort Term // Medium Term // Long Term

Wrap UpSummary // Next Steps // Questions

Presentation Ends

Page 4: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Overview of BIMWhat is it? // Brief History // Why is it Beneficial?

© 2016 CADD Microsystems, Inc.

Page 5: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

What is BIM?DEFINITIONS

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 5

BIM

verb

nounBuilding Information Modeling is a processwhereby a building is modeled virtually, with it’s associated information, to be used to help design and maintain a building.

““

Building Information Model is a digital / virtual model of a building used in the BIM process. These are relational databases with graphics and data.

““

Page 6: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Brief History of BIM• BIM was first wrote about in 1975

– Chuck Eastman, Professor at Georgia TechSchool of Architecture

– “The Use of Computers Instead of Drawingsin Building Design”

• “Building Information Model” term coined in 1992– Paper by van Nederveen and Tolman

• Autodesk popularized “BIM”– 2002 white paper titled “Building Information Modeling”

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 6

Page 7: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Maintaining Current DrawingsBIM is uniquely suited for this by having one file with all the building data versus many different CAD files. Plus, Revit can manage who owns what down the individual element.

Why is BIM Beneficial?Better Designs through AnalysisEnergy consumption, heating and cooling loads, computational fluid dynamics (CFD), solar radiation, LEED calculations, and more.

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 7

More Coordinated DesignsAllows the different design disciplines to coordinate their designs virtually, reducing costly design changes and change orders during construction.

Better VisualizationTo help stakeholders better see what they’re getting and to help contractors better understand the design intent (more views in the construction documents, including 3D).

More Data AvailableModels can maintain this data, such as specifications, throughout the design and construction process and then transitioning into building operations.

Accurate EstimatesModels can quickly generate very detailed cost estimates as well as Bills of Material (BOM).

Page 8: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Why is BIM Beneficial?2014 SMARTMARKET REPORT

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 8

• 74% of responders report a positive return-on-investment (ROI) using BIM

• 86% of responders have been using BIM for three or more years

• In the past two years, the percentage of contractors implementing BIM at a high level has grown from 55% to 79%

• 82% of contractors require or encourage their teams to have BIM expertise

Page 9: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Components of a BIM ImplementationWhat are they? // What are some recommendations?

© 2016 CADD Microsystems, Inc.

Page 10: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

BIM StrategyROADMAP FOR NOW AND THE FUTURE

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 10

• Define Your Goals/Strategies for BIM– Short Term = 6-12 months– Medium Term = 1-3 years– Long Term = 3-5 years

• Layout your Tactics– What steps will you take specifically to achieve

those goals?– What can you do in-house and what will

require help from outside experts?

• Develop the Roadmap– We’ll discuss a recommended one later

Page 11: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

BIM RequirementsTHE FOUNDATION OF YOUR STANDARDS

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 11

• Defines specifically what you want out of a BIM model deliverable

• Will probably end up being a contract addendum

• Allows for the creation of consistently formatted models –both graphics and data

• Sooner this is in place, the sooner you can start building your model library

• Sections Typically Include:– General requirements (overview, terminology,

existing conditions, project team roles, templates, ownership)

– Submittal requirements (general, design submittals, construction submittals)

– Modeling requirements (general modeling, building elements, level of development/LOD)

– Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities management/7D)

– Appendix (naming conventions, BIM Project Execution Plan)

Page 12: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Levels of Development (LOD)DEFINING HOW THINGS ARE MODELED

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 12

• Essentially, how detailed are the graphics and how much data is embedded

• Broken down by building elements– USACE and BIMForum use UniFormat to organize

• Top 3 Industry Definitions:– American Institute of Architects (AIA):

G202, Project Building Information Modeling Protocol Form– U.S. Army Corps of Engineers (USACE):

Minimum Modeling Matrix (M3), part of their BIM Requirements– BIMForum:

Level of Development Specification 2014Image courtesy of the BIMForum Level of Development Specif icat ion, version 2014

Page 13: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

BIM Requirements and LODRECOMMENDATIONS

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 13

• Define LOD for both graphics and data separately

– As they do not always run in parallel

• Be very specific about what should and should not be modeled (LOD)

– So as to avoid over-modeling

• Be very specific about the data fields that are necessary and required

– So data connections outside of Revit can be maintained

– For example, ARCHIBUS and Maximo

• Minimize redundant data fields– Identify overlap and deciding upon one

field that serves multiple outside systems– For example, using the COBie Row Name

field to also contain the asset identifier

• If possible, require only Revit– So you can be very specific on how

elements should be modeled– Organize elements based on Revit

categories

Page 14: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Levels of Development (LOD)POTENTIAL ISSUE WITH ORGANIZING ELEMENTS VIA UNIFORMAT

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 14

They all have the same UniFormat Number:

B2070.10 Exterior Louvers

Page 15: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

BIM Project Execution Plan (BEP)KEEPING YOUR PROJECTS BIM COMPLIANT

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 15

• Project-specific BIM data– Project contacts and milestone dates– Which parties are responsible for

modeling which elements and to what LOD, based on the project design phases

– Method and frequency of exchanging models

• Information Typically Includes:– Project Information and Key Contacts– Organizational Roles– Project BIM Goals and Objectives– Information Exchanges and Collaboration

Procedures– Modeling (LOD) Requirements– Model Quality Control Procedures– Model Structure– Project Deliverables

Page 16: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

BIMing Your FacilitiesGETTING MODELS OF YOUR BUILDINGS

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 16

• Turning your existing data into BIM models

– a.k.a. “BIMing” or “Revitizing”

1. Get from your consultants– They’re probably already modeling in Revit– They just give you DWGs because that’s all

you ask for

2. Make them Yourself– In-house teams using drawings, scans, and

field measurements

3. Contract them Out– Some firms specialize in this at an affordable

price

Page 17: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

QA / QCPROVIDING CONTENT TO ASSURING CORRECT MODELS // CHECKING FOR COMPLIANCE

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 17

Quality Assurance (QA)• Tools to provide to model authors

– In-house or outside consultants

• Examples:– BIM Requirements / BEP– Revit Project Templates– Revit Content (Families)– Designer’s Guide

Quality Control (QC)• Tools to help you check the models for

compliance• Examples:

– Manually via a checklist– Automatically via software

Autodesk Model Checker for RevitFREE UTILITY

Page 18: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Classifications3 MAIN CLASSIFICATION SYSTEMS

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 18

Autodesk Classification Manager for Revit

OmniClass Table 21(UniFormat)

§ Organizes by system

§ Ideal for estimates and initial design

§ What the architects and engineers want to know

OmniClass Table 22(MasterFormat)

§ Organizes by material

§ Ideal for organizing the work to be executed

§ What the contractor wants to know

OmniClass Table 23

§ Organizes by products

§ Ideal for understanding specific items

§ What the building engineer wants to know

FREE UTILITY

Page 19: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Building Master Files ProcessTHE DESIGN AND CONSTRUCTION WORKFLOW

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 19

• Maintaining a master set of files for each facility to use for continued design & construction projects

• Issues owners typically face:– Out-of-date or inaccurate information– Files not updated in a timely manner– Simultaneous projects overwrite each

other’s work– Projects sometimes begin with a costly

survey to build the backgrounds

• A single, comprehensive building model (Revit) is uniquely suited to solve this challenge

– No more missing drawings or not knowing which is the latest version

– Allows for simultaneous projects, even if adjacent to each other (via Worksharing)

– Allows for projects to be done in-house or by outside consultants

Page 20: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

COBieCONSTRUCTION OPERATIONS-BUILDING INFORMATION EXCHANGE

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 20

• A standardized format for taking data from BIM models to O&M applications

• COBie becoming the norm for data exchange at construction completion

• COBie format is strict and not specific to any one BIM application

• Many O&M solutions directly import COBie data to quickly get the building engineers up-and-running

Autodesk COBie Extension for RevitFREE UTILITY

Page 21: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

BIM ManagerA NEW ROLE WITH NEW RESPONSIBILITIES

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 21

• Helps manage this new process

• Responsibilities:– Oversees the implementation– Manages models for projects– Assists teams with new project setup– Reviews models for compliance– Provides feedback– Updates processes and content

• Part-time role at first

Page 22: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

SoftwareWHAT YOU WILL NEED…

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 22

§ Ideal for creating / authoring BIM models

§ Has tools for Architects, MEP, and Structural engineers

Revit§ Ideal for aggregating

your models together§ Includes sequencer,

QTO, and clash detection tool (Manage)

Navisworks§ Ideal for working with

point clouds§ Import laser scans,

visualize, publish, and prepare for modeling

ReCap

Page 23: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

EducationINITIAL TRAINING ONGOING EDUCATION

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 23

• Targeted training for:– Software tools– New processes– Utilizing standards created

• Include courses for each group:– BIM Manager– Designers– Space Managers– Construction Administrators– Project Managers– Leadership

• Utilize an on-demand resource– General curriculum– Customized courses that are recorded

Page 24: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

BIM Implementation RoadmapShort Term // Medium Term // Long Term

© 2016 CADD Microsystems, Inc.

Page 25: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Recommended Roadmap: Short Term6-12 MONTHS

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 25

1. Get a BIM Strategy, BIM Requirements document, and BIM Project Execution Plan (BEP) template in place

2. Appoint a BIM Manager (part-time role)

3. “Revitize” at least one facility

4. Ensure you have the correct Software in place

5. Begin to Provide Training to your Teams

6. Implement a Pilot Program– Perform at least 1 design & construction project using BIM

Page 26: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Recommended Roadmap: Medium Term1-3 YEARS

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 26

1. Refine your BIM Documents

2. Continue “Revitizing” facilities = Build your Library– By receiving models from consultants or having them modeled yourself

3. Implement a Master Files Process

4. Pass Data from D&C to O&M– COBie or equivalent

5. Expand the Pilot Program– Multiple construction types (new buildings, major renovations, interiors

projects) and multiple teams (in-house and outside consultants)– Try each combination to test and refine the process

Page 27: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Roadmap: Long Term3-5 YEARS

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 27

• Have all your facilities “Revitized”

• Retire the Pilot Program– All new design and construction projects now done

in BIM

• Direct Integration of D&C and O&M Systems– Revit and Maximo connected

• Other Future Technologies– Data accessed and updated in the field– Augmented reality– Cloud-based data and software

Page 28: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Wrap Up

© 2016 CADD Microsystems, Inc.

Summary // Next Steps // Questions

Page 29: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

SummaryWHAT DID WE LEARN TODAY?

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 29

• History and Benefits of BIM

• The Components of a BIM Implementation– BIM Requirements document– LOD– BIM Project Execution Plan template– “Revitizing” your Facilities– Classifications– Master File Process– COBie– BIM Manager– Software– Education

• A Recommended BIM Implementation Roadmap

– Short Term– Medium Term– Long Term

Page 30: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Free Utilities

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 30

LEED EXTENSION BETA• E-mail me ([email protected])

COBIE EXTENSION V1.0• www.caddmicrosystems.com/

cobieextensionREVIT MODEL CHECKER V4.0• www.caddmicrosystems.com/

modelcheckerCLASSIFICATION MANAGER V1.0• www.caddmicrosystems.com/

classificationmanager

Page 31: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Next StepsWHERE TO GO FROM HERE?

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 31

• There is a lot more to this than can fit in a 60 minute presentation

• Have us come in and discuss our services to help you implement BIM

• In the meantime, download our free utilities

Page 32: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

Questions

© 2015 CADD Microsystems, Inc.MARCH, 2016 // 32

Page 33: Implementing BIM for Owners - NFMT · building elements, level of development/LOD) – Additional BIM tasks (overview, phased construction/4D, estimating/5D, sustainability/6D, facilities

© 2015 CADD Microsystems, Inc.FEBRUARY 26, 2016 // 33