Sr No Location Unit Department Date of Job Improvement Area (Cost Reduction / Reliability / Safety & Environment / Happiness/ Generation Increase) Details of Improvement Job Annual Benefit (Rs per Year) Non-Monetary Benefit Cost incurred for Job (Rs) Payback Name of Team Leader & Team- members for the Job Department from which support is received

Upload: anuragpugaliaa

Post on 19-Jul-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Improvement Jobs Format

Sr No Location Unit Department Date of Job

Improvement Area (Cost

Reduction / Reliability /

Safety & Environment /

Happiness/ Generation

Increase)

Details of Improvement JobAnnual Benefit (Rs per

Year)Non-Monetary Benefit

Cost incurred for

Job (Rs)Payback

Name of Team Leader & Team-

members for the Job

Department

from which

support is

received

Page 2: Improvement Jobs Format

Sr

NoLocation Unit Department Date of Job

Improvement Area (Cost

Reduction / Reliability / Safety &

Environment / Happiness/

Generation Increase)

Details of Improvement Job

Annual

Benefit

(Rs per

Year)

Non-Monetary Benefit

Cost

incurred

for Job

(Rs)

Payback

1220kV

SwitchyardRAS Electrical

16th Sept -

19th Sept

U-09 & 10 Load Centre HT cable

trench opeining (Reliability &

safety)

Application of Firex FM-71 insulation

material at U-09 & 10 Load Centre to seal

the HT cable trench opeining

NA

Benefit in terms of any unwanted

air & water ingressment from

cable trench opening and Heat

absorbing Firestop Barrier

designed to seal cable & pipe

penetrations through walls, floors

& ceilings

31643.55

2220kV

SwitchyardRAS Electrical

21th Aug-

23rd Aug35 MVA Tr-1 & Tr-2 132kV Bay

Application of INSILCOTE RTV silicon

rubber coating at 132kV Bay of 35 MVA

TR-1 & 2 (Transformer Bushings, CT, PT

And circuit breaker)

NA

Hydrophobicity of INSILCOTE

inhibits the formation of

continuous moist conductive

layers on insulator surfaces. This,

in turn, limits the flow of leakage

currents, thus preventing the

creation of dry bands and partial

discharges – critical steps in the

flashover process.

239700

Opportunity based

shut down of

Cement Plant U-X

and

Utilization of

coating material

within the

duration of its

shelf life which

incurred savings of

Rs. 75,000/-

CPP-Ras

CPP-Ras

Page 3: Improvement Jobs Format

Name of Team Leader & Team-

members for the Job

Department

from which

support is

received

Mr. Pankaj Joshi & team NA

Mr. Pankaj Joshi & team NA

CPP-Ras

CPP-Ras

Page 4: Improvement Jobs Format

S.No. Action Plan

1

APC Scheme of RAS & BWR need to be reviewed & updated/modification according to

the connectivity with SMP

2 Tie feeder -2,3,& 4 loading need to be maintained near to Zero MW

3 Close monitoring of cement plant start & stop

4 Auto/ frequency based laod shedding to be reviewed

5

Possibility of Load management for BWR & RAS generation and also daily priority of

cement plant loading

6 Power flow at tie feeders is dependent on the running availability of SMP unit-1&2

7 Relay co-ordination settings of all the tie feeders

8

Segregation of power flow in all the tie feeders in case of any outage of cement plant

load or any shorfall in generation

9 Bus voltage to be monitored and controlled at SMP, SP & RAS end individually

10

Preparation of separate SLD & APC schemes with Iso/ Droop mode for better learning &

understanding while running the whole system with SMP

11 Review of Iso/ droop logics of 2x50MW & GPP-2,3&4 when running in parallel mode

12 Possibility of running any one 50MW TG at iso mode and the other at droop mode

13 Cement Plant U-X & RNCU start & stop staus to be reviewed

14 Load flow analysis & study with different scenarios at E-tap

15

In case of any 132kV Tie feeder tripping , check the feasibility of 10/12.5 MVA

transformer charging for 2x50MW auxiliary

16 Cement Plant under frequency shedding to be reviewed

17

Switching ON/OFF the capacitor banks at cement plant as per requirement of MVAR

demand

18 Changeover of modes of running Generators AVR & governer mode in case of contigency

19

Rate of change of frequency (df/dt) settings at respective buses to be reviewed for all

cement plants (U-03 to 10)

20 Checking of the control wiring of the tripping of cement plant drives

21 Tap changer operation need to be reviewed at all points

22 MW set point to be disabled in case of any islanding condition

23

Allocation of man power in cases of C-shift at RAS PP CCR for better control &

monitoring purpose.

RAS & BWR Power Plant connected with SMP