in the republic of ghana on eastern corridor … · jan. 2013 location map s=1:5,000,000 ghana...

112
Ministry of ROADS and highways (mrh) REPUBLIC OF ghana PREPARATORY SURVEY ON EASTERN CORRIDOR DEVELOPMENT PROJECT IN THE REPUBLIC OF GHANA FINAL REPORT APPENDIX (DRAWINGS) JAPAN INTERNATIONAL COOPERATION AGENCY(JICA) CENTRAL CONSULTANT INC. PADECO CO., LTD. JANUARY 2013 CR(3) 13-002 EI

Upload: others

Post on 18-Oct-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

  • JAN

    UA

    RY

    2013P

    RE

    PA

    RA

    TO

    RY

    SUR

    VE

    Y O

    N E

    AST

    ER

    N C

    OR

    RID

    OR

    DE

    VE

    LO

    PM

    EN

    T P

    RO

    JEC

    TIN

    TH

    E R

    EP

    UB

    LIC

    OF

    GH

    AN

    AF

    INA

    L R

    EP

    OR

    T

    Ministry of ROADS and highways (mrh) REPUBLIC OF ghana

    PREPARATORY SURVEYON

    EASTERN CORRIDOR DEVELOPMENT PROJECTIN

    THE REPUBLIC OF GHANA

    FINAL REPORTAPPENDIX (DRAWINGS)

    JAPAN INTERNATIONAL COOPERATION AGENCY(JICA)

    CENTRAL CONSULTANT INC. PADECO CO., LTD.

    JANUARY 2013

    C R ( 3 )

    1 3 - 0 0 2

    E I

  • JAN

    UA

    RY

    2013P

    RE

    PA

    RA

    TO

    RY

    SUR

    VE

    Y O

    N E

    AST

    ER

    N C

    OR

    RID

    OR

    DE

    VE

    LO

    PM

    EN

    T P

    RO

    JEC

    TIN

    TH

    E R

    EP

    UB

    LIC

    OF

    GH

    AN

    AF

    INA

    L R

    EP

    OR

    T

    Ministry of ROADS and highways (mrh) REPUBLIC OF ghana

    PREPARATORY SURVEYON

    EASTERN CORRIDOR DEVELOPMENT PROJECTIN

    THE REPUBLIC OF GHANA

    FINAL REPORTAPPENDIX (DRAWINGS)

    JAPAN INTERNATIONAL COOPERATION AGENCY(JICA)

    CENTRAL CONSULTANT INC. PADECO CO., LTD.

    JANUARY 2013

  • DRAWING TITLE

    PART I

    NEW ROAD BETWEEN ASUTSUARE JCT. – ASIKUMA JCT.

    1. LOCATION MAP ・・・・・・・・・・・・・・・・・・・ 1

    2. PLANS AND PROFILES ・・・・・・・・・・・・・・・・・・・ 2 - 24

    3. TYPICAL CROSS SENTION ・・・・・・・・・・・・・・・・・・・ 25 - 26

    4. GENERAL PLANS OF BRIDGES ・・・・・・・・・・・・・・・・・・・ 27 - 30

    5. CROSS SECTIONS ・・・・・・・・・・・・・・・・・・・ 31 - 75

    6. INTERSECTION DESIGNS ・・・・・・・・・・・・・・・・・・・ 76 - 78

    7. CULVERTS LOCATION ・・・・・・・・・・・・・・・・・・・ 79

    8. BUS BAY LAYOUT ・・・・・・・・・・・・・・・・・・・ 80

    9. TOLL BOOTH LAYOUT ・・・・・・・・・・・・・・・・・・・ 81

    10. FOOTBRIDGE ・・・・・・・・・・・・・・・・・・・ 82

    PART II

    ASUTSUARE - AVEYIME ROAD

    1. LOCATION MAP ・・・・・・・・・・・・・・・・・・・・ 1

    2. PLANS AND PROFILES ・・・・・・・・・・・・・・・・・・・・ 2 - 9

    3. TYPICAL CROSS SENTION ・・・・・・・・・・・・・・・・・・・・ 10

    4. CROSS SECTIONS ・・・・・・・・・・・・・・・・・・・・ 11 – 23

    5. CULVERTS LOCATION ・・・・・・・・・・・・・・・・・・・・ 24

    6. GENERAL PLAN OF CULVERT ・・・・・・・・・・・・・・・・・・・・ 25

  • PART I

    NEW ROAD BETWEEN ASUTSUARE JCT. – ASIKUMA JCT.

    DRAWINGS

  • Asikuma JCT.

    Asutsuare JCT.

    Asutsuare

    Aveyime

    Kpong

    Atimpoku

    Juapong

    Pedoe-Dufo

    Frankadua

    Osi-Abura

    Kpalukope

    AkuseVolivo

    Volo

    Dufor-Adidome

    N2

    N2

    Volta

    Volta

    Project:

    Scale : As Shown Sheet 1/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    LOCATION MAP

    JAN. 2013

    LOCATION MAP

    S=1:5,000,000

    Project:

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GENERAL MAP DETAIL MAP S=1:300,000

  • Project:

    Scale : As Shown Sheet 2/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in metre.

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(1/23)

    JAN. 2013

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

  • Project:

    Sheet 3/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(2/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 4/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    JAN. 2013

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(3/23)

    Scale : As Shown

    1. All dimensions are in metre.

  • Project:

    Sheet 5/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(4/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 6/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(5/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 7/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(6/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 8/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(7/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 9/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(8/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 10/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(9/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 11/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(10/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 12/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(11/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 13/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(12/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 14/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(13/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 15/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(14/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 16/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(15/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 17/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(16/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 18/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(17/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 19/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(18/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 20/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(19/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 21/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(20/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 22/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(21/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 23/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(22/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 24/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE JCT. - ASIKUMA JCT.

    PLAN & PROFILE(23/23)

    Scale : As Shown

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Scale : 1:100 Sheet 25/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in millimetre.

    ASUTSUARE JCT. - ASIKUMA JCT.

    TYPICAL CROSS-SECTION (1)

    JAN. 2013

    TYPICAL CROSS-SECTION (1)S=1:100

    Project:

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

  • C

    Project:

    Sheet 26/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    TYPICAL CROSS-SECTION (2)S=1:200

    Scale : 1:100

    1. All dimensions are in millimetre.

    ASUTSUARE JCT. - ASIKUMA JCT.

    TYPICAL CROSS-SECTION (2)

    JAN. 2013

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

  • 53000

    19000

    A1

    P1

    A2

    Bridge Length = 520000

    125000 270000 125000

    VCL=160000

    8000

    8000

    BH-2

    Dep=18.00m

    BH-01

    Dep=13.00m

    ELEVATION

    Estimated Support Layer -2.760m

    6500Concrete Pileφ=1400 l=13500 n=10

    6500Concrete Pile

    φ=1400 l=13500 n=10

    53000

    19000P2

    11500 11500

    9.240m

    17100

    Bridge Length = 520000

    125000 270000 125000

    PLAN

    6500

    17100

    6500

    17100

    23000

    11500

    23000

    11500

    GENERAL PLAN OF BRIDGE ACROSS VOLTA RIVER (1) S=1:1000

    Scale : Sheet 27/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in millimetre.

    GENERAL PLAN OF BRIDGE

    ACROSS VOLTA RIVER (1)

    JAN. 2013 1:1000

    Project:

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

  • 17100

    400 16300 400

    2000 6150 6150 2000

    3000

    53000

    23000

    SECTION OF TOWER

    19000

    17100

    400 16300 400

    2000 6150 6150 2000

    3000

    SECTION OF SUPERSTRUCTUER SECTION OF ABUTMENT

    8000

    1400 4x3575=14300 1400

    17100

    17100

    Concrete Pileφ=1400 l=13500 n=10

    φ1400

    S=1:200

    Project:

    Scale : Sheet 28/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in millimetre.

    1:200

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GENERAL PLAN OF BRIDGE ACROSS VOLTA RIVER (2)

    GENERAL PLAN OF BRIDGE

    ACROSS VOLTA RIVER (2)

    JAN. 2013

  • 16000(Irrigation Canal) 4000

    (Service Road)3500

    (Embankment)

    8000(Road) 15000(Irrigation Canal)

    20.000

    30.000

    Gradient

    300.000

    15.000

    23300.000

    18.000

    24.550

    25.850 I=2.000%

    L=357.500m

    NO.23

    250.000

    50.000

    23250.000

    18.000

    24.358

    NO.23

    I=2.000%

    L=247.598m

    VCL=260000 VCR=6500000

    Bridge Length = 50000

    260.000

    10.000

    23260.000

    24.427

    1500

    50 Girder Length = 49900 50

    350 Span Length = 24150 350200

    350 Span Length = 24150 350

    224

    1450

    A1

    285.000

    25.000

    23285.000

    24.533

    P1

    310.000

    10.000

    23310.000

    24.542

    A2

    17.0

    ELEVATION S=1:200

    A1

    No.23+260.000

    A2

    No.23+310.000

    M F F

    8000

    6500 8000

    L=200.000 A=400.000

    L=200.000 A=400.000

    4.0%4.0%

    4.0%4.0%

    KIP Road(W=8m)

    No.23+

    290

    50005000

    5000

    BH-6

    EL=58.0m

    Dep=3.35m

    PlannedHeight

    GroundHeight

    AccumulatedLength

    Length

    Chainage

    Average Curve

    Radius

    Super

    Elevation

    M

    17100

    400 16300 400

    2000 6150 6150 2000

    CROSS SECTION S=1:100

    920 7X2180=15260 920

    70

    154

    1450

    i=2.50% i=2.50%

    Bridge Length = 50000

    50 Girder Length = 49900 50

    350 Span Length = 24150 350200

    350 Span Length = 24150 350

    PLAN S=1:200

    A1 A2

    17100

    5000

    18100

    5000 5000

    17100

    400

    2000

    6150

    6150

    2000

    400

    17100No.23+260.000

    No.23+310.000

    KIP Road(W=8m)

    No.23+290

    GENERAL PLAN OF BRIDGE ACROSS APGIP CANAL S=1:200

    Scale : As Shown Sheet 29/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in millimetre.

    GENERAL PLAN OF BRIDGE

    ACROSS APGIP CANAL

    JAN. 2013

    Project:

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

  • No.61

    15.000

    61000.000

    66.019

    69.800

    950.000

    50.000

    60950.000

    66.789

    69.800

    NO.60

    960.000

    10.000

    60960.000

    69.800

    A1

    985.000

    25.000

    60985.000

    69.800

    P1

    10.000

    10.000

    61010.000

    69.800

    A2

    2.5%

    2.5%

    Alabo river

    No.60+985

    I=0.000%

    L=640.000m

    R=∞

    L=4211.268m

    10000

    10000

    8000

    Bridge Length = 50000

    50 Girder Length = 49900 50

    350 Span Length = 24150 350200350 Span Length = 24150 350

    224

    1450

    ELEVATION S=1:200

    A1

    No.60+960.000

    A2

    No.61+10.000

    M MF F

    Estimated Height of Bearing Layer

    67.155(H.W.L.)

    60.300

    7000 6000 7000

    BH-3

    Dep=7.50m

    Gradient

    PlannedHeight

    GroundHeight

    AccumulatedLength

    Length

    Chainage

    Average Curve

    Radius

    Super

    Elevation

    70.000

    60.000

    17100

    400 16300 400

    2000 6150 6150 2000

    CROSS SECTION S=1:100

    920 7X2180=15260 920

    70

    154

    1450

    i=2.50% i=2.50%

    Alabo river

    No.60+

    985

    Bridge Length = 50000

    50 Girder Length = 49900 50

    350 Span Length = 24150 350200350 Span Length = 24150 350

    PLAN S=1:200

    A1

    No.60+960.000

    A2

    No.61+10.000

    17100

    7000

    18100

    6000 7000

    17100

    400

    2000

    6150

    6150

    2000

    400

    17100

    GENERAL PLAN OF BRIDGE ACROSS ALABO RIVER S=1:200

    Scale : As Shown Sheet 30/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in millimetre.

    GENERAL PLAN OF BRIDGE

    ACROSS ALAVO RIVER

    JAN. 2013

    Project:

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

  • STA =0+000.000

    STA =0+200.000

    STA =0+400.000

    STA =0+600.000

    STA =0+800.000

    STA =0+958.639

    STA =1+000.000

    STA =1+200.000

    Project:

    Scale : 1:200 Sheet 31/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in metre.

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (1/45)

    JAN. 2013

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

  • STA =1+304.160

    STA =1+400.000

    STA =1+600.000

    STA =1+800.000

    STA =2+000.000

    STA =2+200.000

    STA =2+400.000

    STA =2+600.000

    STA =2+800.000

    Project:

    Sheet 32/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (2/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =3+000.000

    STA =3+200.000

    STA =3+400.000

    STA =3+587.200

    STA =3+600.000

    STA =3+800.000

    STA =3+937.200

    STA =4+000.000

    STA =4+200.000

    Project:

    Sheet 33/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (3/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =4+322.902

    STA =4+400.000

    STA =4+600.000

    STA =4+672.902

    STA =4+800.000

    STA =5+000.000

    STA =5+200.000

    STA =5+400.000

    STA =5+600.000

    Project:

    Sheet 34/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (4/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =5+691.244

    STA =5+800.000

    STA =6+000.000

    STA =6+200.000

    STA =6+307.235

    STA =6+400.000

    STA =6+600.000

    STA =6+800.000

    STA =6+985.175

    Project:

    Sheet 35/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (5/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =7+000.000

    STA =7+200.000

    STA =7+285.175

    STA =7+364.636

    STA =7+400.000

    STA =7+600.000

    STA =7+664.636

    STA =7+800.000

    STA =8+000.000

    STA =8+200.000

    Project:

    Sheet 36/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (6/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =8+400.000

    STA =8+600.000

    STA =8+782.888

    STA =8+800.000

    STA =8+982.888

    STA =9+000.000

    STA =9+200.000

    STA =9+400.000

    STA =9+527.852

    STA =9+600.000

    Project:

    Sheet 37/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (7/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =9+727.852

    STA =9+800.000

    STA =10+000.000

    STA =10+200.000

    STA =10+400.000

    STA =10+600.000

    Project:

    Sheet 38/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (8/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =10+800.000

    STA =11+000.000

    STA =11+200.000

    STA =11+400.000

    STA =11+600.000

    STA =11+800.000

    STA =12+000.000

    STA =12+200.000

    Project:

    Sheet 39/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (9/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =12+400.000

    STA =12+600.000

    STA =12+800.000

    STA =13+000.000

    STA =13+200.000

    STA =13+400.000

    STA =13+600.000

    STA =13+800.000

    STA =14+000.000

    Project:

    Sheet 40/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (10/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =14+200.000

    STA =14+400.000

    STA =14+600.000

    STA =14+800.000

    STA =15+000.000

    STA =15+200.000

    STA =15+400.000

    STA =15+600.000

    STA =15+694.715

    Project:

    Sheet 41/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (11/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =15+800.000

    STA =16+000.000

    STA =16+069.715

    STA =16+200.000

    STA =16+400.000

    STA =16+600.000

    STA =16+800.000

    STA =17+000.000

    STA =17+200.000

    Project:

    Sheet 42/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (12/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =17+400.000

    STA =17+600.000

    STA =17+753.585

    STA =17+800.000

    STA =18+000.000

    STA =18+128.585

    STA =18+200.000

    STA =18+400.000

    STA =18+600.000

    Project:

    Sheet 43/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (13/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =18+800.000

    STA =19+000.000

    STA =19+200.000

    STA =19+400.000

    STA =19+600.000

    STA =19+800.000

    STA =20+000.000

    STA =20+018.624

    STA =20+200.000

    Project:

    Sheet 44/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (14/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =20+393.624

    STA =20+400.000

    STA =20+600.000

    STA =20+766.940

    STA =20+800.000

    STA =21+000.000

    STA =21+141.940

    STA =21+200.000

    STA =21+400.000

    Project:

    Sheet 45/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (15/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =21+600.000

    STA =21+800.000

    STA =22+000.000

    STA =22+200.000

    STA =22+400.000

    STA =22+600.000

    STA =22+625.144

    STA =22+800.000

    STA =22+825.144

    Project:

    Sheet 46/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (16/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =23+000.000

    STA =23+079.458

    STA =23+200.000

    STA =23+279.458

    STA =23+281.542

    STA =23+400.000

    STA =23+481.542

    Project:

    Sheet 47/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (17/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =23+600.000

    STA =24+200.000

    STA =24+334.261

    STA =24+400.000

    STA =24+592.846

    STA =24+600.000

    STA =24+800.000

    STA =24+842.846

    Project:

    Sheet 48/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (18/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =25+000.000

    STA =25+100.890

    STA =25+200.000

    STA =25+350.890

    STA =25+400.000

    STA =25+538.687

    STA =25+600.000

    STA =27+000.000

    Project:

    Sheet 49/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (19/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =27+200.000

    STA =27+400.000

    STA =27+498.441

    STA =27+600.000

    STA =27+748.441

    STA =27+800.000

    STA =28+000.000

    STA =28+200.000

    STA =28+400.000

    Project:

    Sheet 50/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (20/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =28+600.000

    STA =28+800.000

    STA =29+000.000

    STA =29+116.113

    STA =29+200.000

    STA =29+400.000

    STA =29+600.000

    Project:

    Sheet 51/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (21/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =29+616.113

    STA =29+800.000

    STA =30+000.000

    STA =30+200.000

    STA =30+400.000

    STA =30+529.587

    STA =30+600.000

    Project:

    Sheet 52/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (22/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =30+800.000

    STA =31+000.000

    STA =31+029.587

    STA =31+053.274

    STA =31+200.000

    STA =31+400.000

    STA =31+600.000

    STA =31+800.000

    STA =32+000.000

    STA =32+200.000

    Project:

    Sheet 53/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (23/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =32+400.000

    STA =32+600.000

    STA =32+800.000

    STA =33+000.000

    STA =33+200.000

    STA =33+400.000

    STA =33+600.000

    STA =33+800.000

    STA =34+000.000

    Project:

    Sheet 54/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (24/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =34+120.550

    STA =34+200.000

    STA =34+400.000

    STA =34+600.000

    STA =34+800.000

    STA =35+000.000

    STA =35+200.000

    STA =35+400.000

    Project:

    Sheet 55/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (25/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =35+600.000

    STA =35+800.000

    STA =36+000.000

    STA =36+200.000

    STA =36+400.000

    STA =36+600.000

    STA =36+800.000

    STA =37+000.000

    Project:

    Sheet 56/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (26/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =37+200.000

    STA =37+400.000

    STA =37+600.000

    STA =37+800.000

    STA =38+000.000

    STA =38+200.000

    STA =38+400.000

    STA =38+600.000

    STA =38+800.000

    STA =39+000.000

    Project:

    Sheet 57/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (27/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =39+200.000

    STA =39+400.000

    STA =39+600.000

    STA =39+800.000

    STA =40+000.000

    STA =40+200.000

    STA =40+400.000

    STA =40+600.000

    Project:

    Sheet 58/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (28/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =40+800.000

    STA =41+000.000

    STA =41+200.000

    STA =41+400.000

    STA =41+600.000

    STA =41+608.702

    STA =41+800.000

    STA =42+000.000

    STA =42+200.000

    Project:

    Sheet 59/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (29/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =42+400.000

    STA =42+600.000

    STA =42+800.000

    STA =43+000.000

    STA =43+200.000

    STA =43+400.000

    STA =43+600.000

    STA =43+800.000

    STA =44+000.000

    Project:

    Sheet 60/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (30/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =44+200.000

    STA =44+400.000

    STA =44+600.000

    STA =44+800.000

    STA =45+000.000

    STA =45+200.000

    STA =45+400.000

    STA =45+600.000

    Project:

    Sheet 61/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (31/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =45+800.000

    STA =46+000.000

    STA =46+016.541

    STA =46+200.000

    STA =46+400.000

    STA =46+600.000

    STA =46+800.000

    STA =47+000.000

    Project:

    Sheet 62/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (32/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =47+200.000

    STA =47+400.000

    STA =47+600.000

    STA =47+800.000

    STA =48+000.000

    STA =48+200.000

    STA =48+400.000

    STA =48+600.000

    STA =48+800.000

    Project:

    Sheet 63/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (33/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =49+000.000

    STA =49+200.000

    STA =49+400.000

    STA =49+600.000

    STA =49+800.000

    STA =50+000.000

    STA =50+200.000

    STA =50+400.000

    STA =50+600.000

    Project:

    Sheet 64/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (34/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =50+800.000

    STA =51+000.000

    STA =51+200.000

    STA =51+400.000

    STA =51+600.000

    STA =51+800.000

    STA =52+000.000

    STA =52+200.000

    Project:

    Sheet 65/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (35/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =52+400.000

    STA =52+600.000

    STA =52+800.000

    STA =53+000.000

    STA =53+200.000

    STA =53+400.000

    STA =53+600.000

    STA =53+800.000

    STA =54+000.000

    Project:

    Sheet 66/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (36/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =54+200.000

    STA =54+400.000

    STA =54+600.000

    STA =54+800.000

    STA =55+000.000

    STA =55+200.000

    STA =55+400.000

    STA =55+600.000

    STA =55+800.000

    Project:

    Sheet 67/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (37/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =56+000.000

    STA =56+200.000

    STA =56+400.000

    STA =56+600.000

    STA =56+800.000

    STA =57+000.000

    STA =57+197.998

    STA =57+200.000

    STA =57+400.000

    Project:

    Scale : 1:200 Sheet 68/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (38/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =57+600.000

    STA =57+697.998

    STA =57+800.000

    STA =58+000.000

    STA =58+095.920

    STA =58+200.000

    STA =58+400.000

    STA =58+595.920

    STA =58+600.000

    STA =58+800.000

    Project:

    Sheet 69/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (39/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =59+000.000

    STA =59+200.000

    STA =59+400.000

    STA =59+600.000

    STA =59+800.000

    STA =60+000.000

    STA =60+200.000

    STA =60+400.000

    STA =60+600.000

    Project:

    Sheet 70/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (40/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =60+800.000

    STA =61+000.000

    STA =61+200.000

    STA =61+400.000

    STA =61+600.000

    STA =61+800.000

    STA =62+000.000

    STA =62+200.000

    STA =62+400.000

    Project:

    Sheet 71/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (41/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =62+600.000

    STA =62+639.760

    STA =62+800.000

    STA =63+000.000

    STA =63+139.760

    STA =63+200.000

    STA =63+400.000

    STA =63+600.000

    Project:

    Sheet 72/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (42/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =63+800.000

    STA =64+000.000

    STA =64+200.000

    STA =64+312.702

    STA =64+400.000

    STA =64+600.000

    STA =64+800.000

    STA =64+812.702

    Project:

    Sheet 73/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (43/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =65+000.000

    STA =65+200.000

    STA =65+400.000

    STA =65+600.000

    STA =65+800.000

    STA =66+000.000

    STA =66+200.000

    STA =66+400.000

    Project:

    Sheet 74/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (44/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =66+600.000

    STA =66+800.000

    STA =67+000.000

    STA =67+027.142

    Project:

    Sheet 75/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE JCT. - ASIKUMA JCT.

    CROSS SECTION (45/45)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Scale: As Shown

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in metre.

    INTERSECTION (1)

    JAN. 2013

    ASUTSUARE JCT.

    Juapong

    Asutsuare

    Afienya

    S=1:2,000

    INTERSECTION (1)

    Sheet 76/82

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    S=1:500

  • Project:

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    INTERSECTION (2)

    Bridge across

    Volta River

    VOLIVO INTERSECTION

    Austsuare Jct.

    Asutsuare

    INTERSECTION (2)

    Sheet 77/82

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    1. All dimensions are in metre.

    JAN. 2013 Scale: As Shown

    S=1:500

    Aveyime

    S=1:2,000

  • S=1:500

    Project:

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    INTERSECTION (3)

    ASIKUMA JCT.

    HaveHo

    Juapong

    Avegame

    S=1:2,000

    INTERSECTION (3)

    Sheet 77/82

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    1. All dimensions are in metre.

    JAN. 2013 Scale: As Shown

  • Project:

    Sheet 79/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in mm.

    ASUTSUARE JCT. - ASIKUMA JCT.

    CULVERTS LOCATION

    JAN. 2013

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale :NTS

    CULVERTS LOCATION

    TYPE A

    H

    B

    TYPE B

    H

    B B B

    Road Between Asutsuare Jct. and Asikuma Jct.

    Station Culvert Size Remarks1 No.00 + 660 Box 1 - B1.0 H1.0 Type A (Box)2 No.01 + 710 Box 1- B1.2 H1.0 Type A (Box)3 No.07 + 100 Box 3 - B2.0 H1.2 Type B (Box)4 No.08 + 000 Box 3 - B1.4 H1.0 Type B (Box)5 No.10 + 410 Box 1 - B2.5 H1.0 Type A (Box)6 No.12 + 780 Box 1 - B1.0 H1.0 Type A (Box)7 No.15 + 340 Box 1 - B1.2 H1.0 Type A (Box)8 No.15 + 700 Box 1 - B1.2 H1.0 Type A (Box)9 No.24 + 320 Box 1 - B4.0 H2.6 Type A (Box)

    10 No.25 + 210 Box 3 - B5.0 H2.0 Type B (Box)11 No.26 + 700 Box 1 - B1.0 H1.0 Type A (Box)12 No.33 + 000 Box 1 - B1.2 H1.0 Type A (Box)13 No.45 + 890 Box 1 - B1.0 H1.0 Type A (Box)14 No.47 + 800 Box 1 - B1.0 H1.0 Type A (Box)15 No.49 + 540 Box 1 - B1.8 H1.3 Type A (Box)16 No.50 + 157 Box 1 - B1.0 H1.0 Type A (Box)17 No.54 + 910 Box 1 - B1.2 H1.2 Type A (Box)18 No.60 + 500 Box 1 - B1.0 H1.0 Type A (Box)19 No.62 + 000 Box 1 - B1.8 H1.3 Type A (Box)20 No.62 + 770 Box 1 - B1.8 H1.3 Type A (Box)21 No.65 + 510 Box 1 - B1.0 H1.0 Type A (Box)

    NoteDimensions of Box Culvert are in meters

  • Project:

    Sheet 80/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in mm.

    ASUTSUARE JCT. - ASIKUMA JCT.

    BUS BAY LAYOUT

    JAN. 2013

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale :NTS

    SHOULDER (2.5m WIDE)

    70000 30000 30000 70000

    BUS BAY LAYOUT

    SHOULDER (2.5m WIDE)

    PEDESTRIAN PLATFORM (1.5m WIDE)

    3500

    500

    120

    3000 9000CARRIAGEWAY (7.3m WIDE)

    120

    BROKEN WHITE CENTRE LINE

    0.12m DOTTED WHITE LINE

    "BUS STOP"SIGN POST

    RAISED BARRIER KERBS PLACEDWITH 1.0m GAPS

    CONTINUOUS WHITE EDGE LINE

    TRAPEZOIDAL SPEED CUSHION

    6000

    1000 4000 1000

    75

    25

    7.5% S

    lope 7.5% Slope

    Finished Road Level

  • Project:

    Sheet 81/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in mm.

    ASUTSUARE JCT. - ASIKUMA JCT.

    TOOL BOOTH LAYOUT

    JAN. 2013

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale :1:1000

    PROPOSED TOLL BOOTH AT DAFOR ADIDOME

    TOLL BOOTH

    TOLL BOOTH

    TOLL BOOTH

    C

    L

    C

    L

    PAVEMENT BLOCKS

    PAVEMENT BLOCKS

    PAVEMENT BLOCKS

    PAVEMENT BLOCKS

    TO ASIKUMA TO ASUTSUARE

    210000

    60000 45000 45000 60000

    23070

    3270

    0

    EXTENT OF CANOPY

    TOLL BOOTHPAVEMENT BLOCKS PAVEMENT BLOCKS

    TOLL BOOTH

    PAVEMENT BLOCKS PAVEMENT BLOCKS

    5050

    4x56

    50=2

    2600

    5050

    3270

    0

    1185

    090

    0011

    850

    3270

    0

    1185

    090

    0011

    850

  • SIDE VIEW

    Carriageway2500 25003650 3650

    Carriageway ShoulderShoulder

    5500

    100 100

    Project:

    Sheet 82/82

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in mm.

    ASUTSUARE JCT. - ASIKUMA JCT.

    FOOTBRIDGE GENERAL VIEW

    JAN. 2013

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale :1:200

    2650

    250 250

    100 1002650

    6150

    150

    19x300=5700 1200 20x300=600010 2400300 12900

    1001600

    100100 3500 100

    1000

    100

    200

    600

    100

    200

    21x1

    50=3

    150

    20x1

    50=3

    000

    150

    6150

    176001200 15200 1200

    200 2000 200 200 2000 200

    2400

    1012

    900

    6000

    1200

    5700

    300 16

    00

    2650

    176001200 15200 1200

    200 2000 200 200 2000 200

    2400

    1012

    900

    6000

    1200

    5700

    30016

    00

    2650

    3500

    250035

    002500

    200

    2000

    200

    2400

    FOOTBRIDGE GENERAL VIEW

    SIDE VIEW A-A

    P L A N

    6300

    A

    A

  • PART II

    ASUTSUARE - AVEYIME ROAD

    DRAWINGS

  • Asikuma JCT.

    Asutsuare JCT.

    Asutsuare

    Aveyime

    Kpong

    Atimpoku

    Juapong

    Pedoe-Dufo

    Frankadua

    Osi-Abura

    Kpalukope

    AkuseVolivo

    Volo

    Dufor-Adidome

    N2

    N2

    Volta

    Volta

    Project:

    Scale : As Shown Sheet 1/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE - AVEYIME

    LOCATION MAP

    JAN. 2013

    LOCATION MAP

    S=1:5,000,000

    Project:

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    GENERAL MAP DETAIL MAP S=1:300,000

  • Project:

    Sheet 2/25

    Description:GHANA HIGHWAY AUTHORITY

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: NotesJICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    ASUTSUARE - AVEYIME

    PLAN & PROFILE (1/8)

    OCT. 2012

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    Scale : As Shown

    1. All dimensions are in metre.

  • Project:

    Sheet 3/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    OCT. 2012

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    ASUTSUARE - AVEYIME

    PLAN & PROFILE (2/8)

    Scale : As Shown

    1. All dimensions are in metre.

  • Project:

    Sheet 4/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    OCT. 2012

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    ASUTSUARE - AVEYIME

    PLAN & PROFILE (3/8)

    Scale : As Shown

    1. All dimensions are in metre.

  • Project:

    Sheet 5/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    OCT. 2012

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    ASUTSUARE - AVEYIME

    PLAN & PROFILE (4/8)

    Scale : As Shown

    1. All dimensions are in metre.

  • Project:

    Sheet 6/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    OCT. 2012

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    ASUTSUARE - AVEYIME

    PLAN & PROFILE (5/8)

    Scale : As Shown

    1. All dimensions are in metre.

  • Project:

    Sheet 7/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    OCT. 2012

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    ASUTSUARE - AVEYIME

    PLAN & PROFILE (6/8)

    Scale : As Shown

    1. All dimensions are in metre.

  • Project:

    Sheet 8/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    OCT. 2012

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    ASUTSUARE - AVEYIME

    PLAN & PROFILE (7/8)

    Scale : As Shown

    1. All dimensions are in metre.

  • Project:

    Sheet 9/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    OCT. 2012

    PLANS=1:10,000

    PROFILEH=1:10,000 V=1: 1,000

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    ASUTSUARE - AVEYIME

    PLAN & PROFILE (8/8)

    Scale : As Shown

    1. All dimensions are in metre.

  • Project:

    Scale : 1:100 Sheet 10/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in millimetre.

    ASUTSUARE - AVEYIME

    TYPICAL CROSS-SECTION

    JAN. 2013

    TYPICAL CROSS-SECTIONS=1:100

    Project:

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

  • STA =0+200.000

    STA =0+400.000

    STA =0+600.000

    STA =0+800.000

    STA =1+000.000

    STA =1+200.000

    STA =1+400.000

    STA =1+600.000

    STA =1+800.000

    STA =2+000.000

    Project:

    Sheet 11/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in metre.

    ASUTSUARE - AVEYIME

    CROSS SECTION (1/13)

    JAN. 2013

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

  • STA =2+200.000

    STA =2+400.000

    STA =2+600.000

    STA =2+800.000

    STA =3+000.000

    STA =3+200.000

    STA =3+400.000

    STA =3+600.000

    STA =3+800.000

    STA =4+000.000

    Project:

    Sheet 12/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE - AVEYIME

    CROSS SECTION (2/13)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =4+200.000

    STA =4+400.000

    STA =4+600.000

    STA =4+800.000

    STA =5+000.000

    STA =5+200.000

    STA =5+400.000

    STA =5+600.000

    STA =5+800.000

    STA =6+000.000

    Project:

    Sheet 13/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE - AVEYIME

    CROSS SECTION (3/13)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =6+200.000

    STA =6+400.000

    STA =6+600.000

    STA =6+800.000

    STA =7+000.000

    STA =7+200.000

    STA =7+400.000

    STA =7+600.000

    STA =7+800.000

    STA =8+000.000

    Project:

    Sheet 14/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE - AVEYIME

    CROSS SECTION (4/13)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =8+200.000

    STA =8+400.000

    STA =8+600.000

    STA =8+800.000

    STA =9+000.000

    STA =9+200.000

    STA =9+400.000

    STA =9+600.000

    STA =9+800.000

    STA =10+000.000

    Project:

    Sheet 15/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE - AVEYIME

    CROSS SECTION (5/13)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =10+200.000

    STA =10+400.000

    STA =10+600.000

    STA =10+800.000

    STA =11+000.000

    STA =11+200.000

    STA =11+400.000

    STA =11+600.000

    STA =11+800.000

    STA =12+000.000

    Project:

    Sheet 16/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE - AVEYIME

    CROSS SECTION (6/13)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =12+200.000

    STA =12+400.000

    STA =12+600.000

    STA =12+800.000

    STA =13+000.000

    STA =13+200.000

    STA =13+400.000

    STA =13+600.000

    STA =13+800.000

    STA =14+000.000

    Project:

    Sheet 17/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE - AVEYIME

    CROSS SECTION (7/13)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =14+200.000

    STA =14+400.000

    STA =14+600.000

    STA =14+800.000

    STA =15+000.000

    STA =15+200.000

    STA =15+400.000

    STA =15+600.000

    STA =15+800.000

    STA =16+000.000

    Project:

    Sheet 18/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE - AVEYIME

    CROSS SECTION (8/13)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =16+200.000

    STA =16+400.000

    STA =16+600.000

    STA =16+800.000

    STA =17+000.000

    STA =17+200.000

    STA =17+400.000

    STA =17+600.000

    STA =17+800.000

    STA =18+000.000

    Project:

    Sheet 19/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE - AVEYIME

    CROSS SECTION (9/13)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =18+200.000

    STA =18+400.000

    STA =18+600.000

    STA =18+800.000

    STA =19+000.000

    STA =19+200.000

    STA =19+400.000

    STA =19+600.000

    STA =19+800.000

    Project:

    Sheet 20/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE - AVEYIME

    CROSS SECTION (10/13)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =20+000.000

    STA =20+200.000

    STA =20+400.000

    STA =20+600.000

    STA =20+800.000

    STA =21+000.000

    STA =21+200.000

    STA =21+400.000

    STA =21+600.000

    Project:

    Sheet 21/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE - AVEYIME

    CROSS SECTION (11/13)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =21+800.000

    STA =22+000.000

    STA =22+200.000

    STA =22+400.000

    STA =22+600.000

    STA =22+800.000

    STA =23+000.000

    STA =23+200.000

    STA =23+400.000

    Project:

    Sheet 22/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE - AVEYIME

    CROSS SECTION (12/13)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • STA =23+600.000

    STA =23+800.000

    STA =24+000.000

    STA =24+200.000

    STA =24+400.000

    Project:

    Sheet 23/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    ASUTSUARE - AVEYIME

    CROSS SECTION (13/13)

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale : 1:200

    1. All dimensions are in metre.

    JAN. 2013

  • Project:

    Sheet 24/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in mm.

    ASUTSUARE-AVEYIME

    CULVERTS LOCATION

    JAN. 2013

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    Scale :NTS

    CULVERTS LOCATION

    TYPE A

    H

    B

    TYPE B

    H

    B B

    TYPE C

    D

    D

    TYPE D

    D

    Asutsuare - Aveyime Road

    Station Culvert Size Remarks1 No.0+520 Box 1 - B3.1 H2.3 Type A (Box)2 No.1+747 Pipe 1 - D900 Type C (Pipe)3 No.2+450 Pipe 1 - D900 Type C (Pipe)4 No.3+540 Pipe 1 - D900 Type C (Pipe)5 No.3+920 Pipe 1 - D900 Type C (Pipe)6 No.6+550 Pipe 1 - D900 Type C (Pipe)7 No.8+310 Pipe 1 - D900 Type C (Pipe)8 No.8+950 Pipe 1 - D900 Type C (Pipe)9 No.9+264 Pipe 1 - D900 Type C (Pipe)10 No.9+350 Pipe 1 - D900 Type C (Pipe)11 No.10+300 Pipe 1 - D900 Type C (Pipe)12 N0.14+850 Box 2 - B2.5 H3.3 Type B (Box)13 No.15+405 Pipe 2 - D900 Type D (Pipe)14 No.17+710 Pipe 2 - D1700 Type D (Pipe)15 No.17+932 Pipe 2 - D900 Type D (Pipe)16 No.18+750 Pipe 1 - D900 Type C (Pipe)17 No.18+990 Box 1 - B1.0 H1.0 Type A (Box)18 No.20+294 Box 1 - B1.0 H1.0 Type A (Box)19 No.20+937 Box 1 - B1.0 H1.0 Type A (Box)20 No.21+350 Box 1 - B1.0 H1.0 Type A (Box)21 No.21+658 Box 1 - B1.0 H1.0 Type A (Box)22 No.22+174 Box 1 - B1.0 H1.0 Type A (Box)23 No.22+281 Box 1 - B1.0 H1.0 Type A (Box)

    NoteDimensions of Box Culvert are in metersDimensions of Pipe Culvert are in millimeters

  • Project:

    Scale : 1:200 Sheet 25/25

    Description:

    Revision

    Rev. by: Date: Sign:Rev. no:

    Signature:

    Signature:

    Signature:Drawn by:

    Checked by:

    Designed by: Notes

    1. All dimensions are in millimetre.

    GENERAL PLAN OF BOX CULVERT

    ACROSS LUPE RIVER

    JAN. 2013

    GENERAL PLAN OF BOX CULVERT ACROSS LUPE RIVER S=1:200

    Project:

    GHANA HIGHWAY AUTHORITY

    JICA PREPARATORY SURVEY ON EASTERN

    CORRIDOR DEVELOPMENT PROJECT IN THE

    REPUBLIC OF GHANA

    REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS

    (B2.50 X H3.30 @2)

    SECTION A-A INLET DETAIL

    PLAN

    CoverDRAWING TITLEPART I NEWROAD BETWEEN ASUTSUARE JCT. – ASIKUMAJCT.DRAWINGS1. LOCATION MAP2. PLANS AND PROFILES3. TYPICAL CROSS SENTION4. GENERAL PLANS OF BRIDGES5. CROSS SECTIONS6. INTERSECTION DESIGNS7. CULVERTS LOCATION8. BUS BAY LAYOUT9. TOLL BOOTH LAYOUT10. FOOTBRIDGE

    PART II ASUTSUARE - AVEYIME ROAD1. LOCATION MAP2. PLANS AND PROFILES3. TYPICAL CROSS SENTION4. CROSS SECTIONS5. CULVERTS LOCATION6. GENERAL PLAN OF CULVERT

    HistoryItem_V1 AddMaskingTape 範囲: 現在のページ マスク座標: 横方向, 縦方向オフセット 1062.01, 9.29 幅 118.66 高さ 128.55 ポイント オリジナル: 左下

    1 0 BL Both 41 CurrentPage 99

    CurrentAVDoc

    1062.0081 9.2912 118.6602 128.5485

    QITE_QuiteImposingPlus2 QI+ 2.1a QI+ 2 1

    0 112 0 1

    1

    HistoryList_V1 qi2base