Page 1: India presentation 2

L&T’s Contribution : Indian Nuclear Industry

Mr. Philippe TOLLINIHead of business Development -

Europe

January 27, 2014

3rd Annual UKTI Civil Nuclear Export Showcase 2014

1 of 38

Page 2: India presentation 2

Power Scenario in India

Total Installed Capacity – 229 GW

2.3% peak supply deficit (~ 3 GW)Source – CEA Report, Oct’13

Thermal Hydro Nuclear Renew.

156.4

39.8

4.8

28.1

Installed capacity in GW

Thermal Hydro Nuclear Total

72.3

10.8 5.3

88.4

25.1

1 0

26.1

New Installations - 12th Five Year Plan (2012 – 2017)

Planned Achieved

2 of 38

Page 3: India presentation 2

Indian Nuclear Power Program – Trend and Plan

Source – DAE site3 of 38

1980 1990 2000 2010 2020 2030 2040 20500

0.02

0.04

0.06

0.08

0.1

0.12

0.14

0.16

0.18

0

50000

100000

150000

200000

250000

300000

0.0180.03

0.06

0.09

0.150.17

600 950 2750 478020000

63000

104000

275000

% of total electricty MW Capacity

Page 4: India presentation 2

1970 1980 1990 2000 2010 2020

STAGE 1

STAGE 2

STAGE 3

The Indian Nuclear Power Road Map

TAPS 1 & 2

RAPS 1 & 2

MAPS 1 & 2

NAPS 1 & 2 RAPS 3 & 4

KGS 1 & 2KAPS 1 & 2

RAPS 5 & 6

KGS 3 & 4

TAPS 3 & 4

KAPS 3 & 4

RAPS 7 & 8

160 MWe

220 MWe

540 MWe

700 MWe

KK 1 & 2

Under Const.

PHWR PWR

1000 MWe

FBTR - 40 MWe

PFBR – 500 MWe

AHWR Critical Facility

4 of 38

Page 5: India presentation 2

5 of 38

Nuclear industry in Indian : Moving forward

Source: Nuclear Power Corporation of India (Ltd)

Present Proposed

On January 2014, Prime minister of India, Manmohan Singh, laid foundation stone of country's largest nuclear power plant

(4 units of 700 MWs each) in Haryana, north of India

Page 6: India presentation 2

BWRTAPS 1 & 2

• Initial 2 reactors (1969)• Imported technology &

equipment

6 of 38

Page 7: India presentation 2

Stage 1 : PHWR – Indigenous Capability Dev.

RAPS 1 to 6

Calandria

End Shield

Steam Generator

Equipment

Construction

Control & Automation

MAPS 1 & 2 NAPS 1 & 2 Valves

EPC

Heat Exchangers

KAPS 1 & 2 KGS 1 & 4 TAPS 3 & 4

Rajasthan7 & 8

Kakrapar3 & 4 Under Const.

7 of 38

Page 8: India presentation 2

Foreign PWRs - Faster Capacity Augmentation

VVER (Rosatom)

2 Final stages of construction4 planned – Tamil Nadu4 planned – West Bengal

EPR (AREVA)

6 planned – Maharashtra

AP1000 (WEC)

6 planned – Gujarat

ESBWR (GEH)

6 planned – Andhra Pradesh

8 of 38

Page 9: India presentation 2

Stage 2 – FBR 500 MW

Reactor Safety Vessel

Steam Generator

Decay Heat Exch.

Reactor Roof Slab

Reactor Main Vessel

Sodium Air Heat Exch.

Dummy Fuel Assembly

Thermal Insul. Panels

9 of 38

Page 10: India presentation 2

10 of 38

Kalpakkam large FBR vessel installation

Page 11: India presentation 2

06-07 07-08 08-09 09-10 10-11 11-12 12-13

5.0

7.48.5

9.811.7

12.814.0

Number of Emp. 54,000+

Founded1938

CAGR – 16%

Gov. & Pvt.

Finan-cial In-stitu-tions 31%

General Public, 25%

FIIs 18%

Em-ployees

12%

Others

14%

Market CapUSD 13.8 Bn

Sales ($ Bn)

AAA Rating with Stable outlook from CRISIL & AAA from ICRA

Share holders

Larsen & Toubro

11 of 38

Major Shareholders

LIC of India (16%)

Employee Welfare Foundation (12%)

Unit Trust of India (8%)

Page 12: India presentation 2

Independent Verticals & SubsidiariesInfrastructure

Buildings & Factories

Heavy Civil Infra

Water & Ren. Energy

Transportation

Hydrocarbon Heavy Engineering Power

Metal & Material Handling

Machinery & Industrial Products

Electrical & Automation

Others Major Subsidiaries

• Shipbuilding

• Infra. Dev. Pvt. Ltd.• Sp. Steels & Heavy

Forgings

• IES

• Shipbuilding

• Realty

• L&T Infotech

• L&T Finance

• Hyd. Metro

Power T&D

12 of 38

Page 14: India presentation 2

Capabilities

Steam Generator 3D Model

Plant ModelStress Analysis

Design & Engg.

Equipment Mfg. Construction Valves Control &

Automation EPCRaw Material

14 of 38

Page 15: India presentation 2

Castings

Piping

CapabilitiesDesign &

Engg.Equipment

Mfg. Construction Valves Control & Automation EPCRaw

Material

Forgings

15 of 38

Page 16: India presentation 2

Critical Eqpt. Supply since late 60s

CapabilitiesDesign &

Engg.Equipment

Mfg. Construction Valves Control & Automation EPCRaw

Material

16 of 38

Page 17: India presentation 2

Steam Generators for

PHWR

Steam Generators for PFBRControl Rod Drive

mechanismSpecial Steels & Heavy

Forgings

CapabilitiesDesign &

Engg.Equipment

Mfg. Construction Valves Control & Automation EPCRaw

Material

17 of 38

Page 18: India presentation 2

TAPP 3 & 4 built in record time of 60 months

CapabilitiesDesign &

Engg.Equipment

Mfg. Construction Valves Control & Automation EPCRaw

Material

18 of 38

Page 19: India presentation 2

Industrial Valves – For Nuclear Application & BOP

CapabilitiesDesign &

Engg.Equipment

Mfg. Construction Valves Control & Automation EPCRaw

Material

19 of 38

Page 20: India presentation 2

Teaming with Rolls-Royce

LV switchgear sophistication and range to meet global benchmarks

CapabilitiesDesign &

Engg.Equipment

Mfg. Construction Valves Control & Automation EPCRaw

Material

20 of 38

Page 21: India presentation 2

Engineering

Procurement

Quality Systems

Project Management

CapabilitiesDesign &

Engg.Equipment

Mfg. Construction Valves Control & Automation EPCRaw

Material

21 of 38

Page 22: India presentation 2

Global Participation – a New Frontier

CanistersCasks

Overpack Casks

Casks

To Switzerland

To USA

22 of 38

To USA

Page 23: India presentation 2

Participation in ITER fusion reactor - France

29 m

Ø 29.4 m

Top Lid

Upper Cyl.

Lower Cyl.

Base Section

Installation at site Cadarache in France

Cryostat

23 of 38

Page 24: India presentation 2

ITER Cryostat - Site Workshop

60 % work completed; Expected readiness by Aug’14

24 of 38

As of January 12, 2014

Page 25: India presentation 2

L& T Facilities

Heavy Engineering Heavy Steel Forgings Ship Building E&C - Hydrocarbon Turbine JV Boiler JV HP Piping Casting ESP Howden

Integrated Manufacturing Complex at Hazira

25 of 38

Page 26: India presentation 2

India’s largest integrated facility for heavy forgings – 300 MT ingot, 120 MT forgings

L&T Special Steels & Heavy Forgings

Latest investment for nuclear power industry

26 of 38

Page 27: India presentation 2

L&T Special Steels & Heavy Forgings

Steel Melting with 100 T EAF

27 of 38

India’s Biggest Open Die Hydraulic Press (9.000 T) and 150MT Manipulator

Page 28: India presentation 2

Summary

is partner to India’s Nuclear Power Growth Story

has proven Capabilities covering entire Value Chain

is a global supplier of Critical Equipment & Services

28 of 38

Will continue to develop in-house PHWR & FBR Rx

is moving forward on its large nuclear program

Page 29: India presentation 2

L&T looks forward to participate in a bigger way in this truly international effort for the betterment of Mankind